REGISTER.pdf

PDF 82 KB Posted

Attached to
Paving Repair at 6 Lock & Dam Sites (WI, MN and IA)
Solicitation number
W912ES18B0015
Issued by

About this file

Updated Submittal Register

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

Lock and Dam 6 Pavement Rehabilitation

01 14 00.00 13 SD-01 Preconstruction Submittals 3.2Contractor Disposal Areas

01 22 00.00 10 SD-03 Product Data 1.4Delivery Ticket

01 32 01.00 13 SD-01 Preconstruction Submittals

3.4.1 G CORInitial Project Schedule

3.4.2 G CORPeriodic Updates

01 35 26 SD-01 Preconstruction Submittals

1.6 G SOAccident Prevention Plan (APP)

1.7 G SOActivity Hazard Analysis (AHA)

1.6.1.2 G SOCritical Lift Plan

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates 1.5.1.3Crane Operators

1.6.1.1 GStandard Lift Plan

1.6.1.2 GCritical Lift Plan

1.7 GActivity Hazard Analysis (AHA)

1.11.4Certificate of Compliance

01 45 04.00 13 SD-01 Preconstruction Submittals

3.2.1 GQuality Control Plan (CQC)

01 50 02.00 13 SD-01 Preconstruction Submittals 1.5.1Traffic Control Plan

01 57 20.00 13 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

01 57 20.00 13 1.7 G ENVEnvironmental Protection Plan 02 41 00 SD-01 Preconstruction Submittals

1.3 GDEMOLITION PLAN

03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant

SD-04 Samples 2.3.2Field-Molded Type

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant

03 30 00.00 10 SD-03 Product Data Vapor Retarder

2.4Chemical Admixtures SD-05 Design Data

2.1.1 G MTLMixture Proportions

SD-06 Test Reports

3.8.1.1Air Content 3.8.1.2Slump 3.8.1.4Compressive Strength

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-08 Manufacturer’s Instructions 2.1Curing Compound

32 01 16.01 SD-01 Preconstruction Submittals

1.3 GEquipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

32 01 17.01 SD-01 Preconstruction Submittals

1.3 GEquipment

SD-03 Product Data

2.1 GCRACK SEALANT

SD-07 Certificates

2.1 GPlant Certification

32 01 19 SD-03 Product Data GManufacturer's

Recommendations 3.1Equipment

SD-04 Samples GMaterials

32 01 29.62 SD-03 Product Data 2.2Grout Mixture

SD-06 Test Reports 3.9Production Sampling and Testing 2.9Tests, Inspections, and

Verifications SD-07 Certificates

2.2Grout Mixture 2.1Equipment

32 11 23 SD-03 Product Data Delivery Tickets

SD-06 Test Reports

2.3.1 GInitial Tests

3.12.1 GIn-Place Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

32 12 13.01 SD-01 Preconstruction Submittals 1.3Equipment

FIO

2.1 GBituminous Material

SD-07 Certificates

2.1 GDelivered Material Certification

32 12 16.01 SD-01 Preconstruction Submittals GBituminous Mixture Design

1.3Equipment

FIO

SD-06 Test Reports

3.6 GTesting

SD-07 Certificates

3.5 GPlant Certification

3.5 GDelivered Material Certification

32 12 36.13 SD-01 Preconstruction Submittals 1.3Equipment

FIO

2.1 GBituminous Material

SD-07 Certificates

2.1 GDelivered Material Certification

32 12 36.23 SD-01 Preconstruction Submittals

2.1 GContractor Mix Design

1.3Equipment

FIO

2.3 GAggregate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

32 12 36.23 2.2 GBituminous Material SD-06 Test Reports

3.6 GTesting

SD-07 Certificates

3.5 GDelivered Material Certification

32 17 24.00 10 SD-03 Product Data

2.1 GPaint

35 31 19.00 13 SD-01 Preconstruction Submittals

G GTMaterial Sources SD-03 Product Data Geotextile Data

SD-06 Test Reports Gradation Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR