W912ES-17-T-0080-0001_Amendment_1.pdf

PDF 229 KB Posted

Attached to
Spuds for USACE Dredge Federal contract opportunity
Solicitation number
W912ES-17-T-0080
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

PDF File containing Amendment 0001

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6771304229

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to change the delivery date to 7 w eeks ADC, and add a Q&A section w ith responses to questions received from multiple vendors.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-17-T-0080

X 9B. DATED (SEE ITEM 11)

18-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-May-2017

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-17-T-0080

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

15-JUL-2017 2 DREDGE - GOETZ

KEITH GRAHAM

DREDGE GOETZ 431 NORTH SHORE

DRIVE

FOUNTAIN CITY WI 54629

608-687-8526 X7 FOB: Destination

B6R0TP2

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

7 wks. ADC 2 DREDGE - GOETZ

KEITH GRAHAM

DREDGE GOETZ 431 NORTH SHORE

DRIVE

FOUNTAIN CITY WI 54629

608-687-8526 X7 FOB: Destination

B6R0TP2

The following have been added by full text:

QUESTIONS & ANSWERS

Q & A Section Q: Is the delivery date really 7/17/2017?

A: The delivery date has been changed with Amendment 0001. Delivery is now due on or before 7 weeks after date of contract (7 wks ADC).

Q: The drawings are labeled “1 of 3” and “2 of 3.” There is no third page.

A: Page 3 of the drawings contains specifications for another item (spud pins) being fabricated separately from this contract. It is not relevant to this solicitation.

Q: The Welding Notes section of the fabrication drawings indicate the welding is to be SMAW (Shielded Metal Arc Welding – aka Stick welding), by specifying the electrode type to be used.

Is it permissible to use SAW (Submerged Arc Welding) and/or FCAW (Flux Core Arc Welding) instead?

A: The drawing did not require the use of SMAW welds. The weld electrodes as shown were provided for guidance for weld metal tensile strength requirements. Any welding process can be used as long as: (1) weld metal tensile strength agrees with electrode as defined on the contract drawings;(2) welding process does not compromise base metal strength.

Q: We will have prequalified ASME Sec IX weld procedures and welder qualifications. The drawing states AWS D1.1 code. I assume ASME would be more than sufficient.

A: Use of ASME Section IX for welder's qualifications and welding procedures is not acceptable since ASME does not address the structural materials, as used in this contract.

Q: The drawings show four different shell [spud body] sections, ranging from 10’ 3” to 12’ in length. Our normal suppliers are only able to furnish the plate in 8’ wide sheets at the thickness required. In addition, our standard shop equipment can handle plates up to 8’ wide. We’d like to build the shell in four sections, each 8’ or shorter in length. This would require additional weld seams. Is this acceptable?

A: Use of 8-foot wide section to construct spud body above tip assembly is not acceptable. The structural design includes transverse plates in way of the weld seams to provide adequate strength and assist with plate rolling/forming tolerances. If 8-foot wide plate sections are used, additional transverse plates would be required. The additional transverse plates will increase spud weight above current spud design weight, which is not acceptable as spud weight is limited by lifting capabilities of existing spud winch. ASTM A514 Gr. B plate widths up to 120 inches and plate lengths up to 480 inches, are available. Further, it should be noted that since the contract drawing permits only one longitudinal seam in the spud assembly, the required circumference of each rolled plate segment requires a minimum plate dimension of 113" prior to rolling, for each spud segment. Therefore, plate dimensions that are greater than 8'-0" are required for both plate width and length, for each spud rolled plate segment.

Q: Our shop only has the capability of rolling 10’ wide plates of the thickness required. May we deviate from the drawings?

A: No. See previous answer for an explanation.

Q: My shop regularly does hard surface welding for similar sized pieces. Would you like us to provide an estimate for that additional work?

A: No. As stated in the solicitation, Government labor will be used to complete the hard surface welding.

Q: Will there be NDT (non-destructive testing) required on the welds?

A: No testing is required.

Q: In the fabrication drawings, Section 11-E, can welds be made on the outside only?

A: Welding shall be completed on the inside as required.

Q: In detail drawing 14-C, they are asking to back the weld on the inside. This cannot be done with the baffles welded in the ends. How would they like this weld made?

A: The back welding would have to be completed prior to the baffle plates being installed.

Q: According to my plate rolling company [subcontractor], [to form the main spud tube] the plate would have to be rolled in two halves, as A514 will spring back; or the plate may be hot rolled. Would it be possible to roll in halves?

A: No. The additional seam could weaken the spud.

Q: In the Statement of Work, the solicitation states that “Unloading assistance will be provided by the Government.” However, on page 5, Item No. 0001, it states that “Contractor shall be responsible for unloading at destination.” Which is correct?

A: Government labor and equipment will be used to off-load the spuds when delivered.

Q: The fabrication drawings are calling for Item 9, two pieces of 4" pipe, each 14-3/4" long, welded at the center, and the weld splinted with an 8" piece of 5" pipe. It would make more sense to use a solid piece of 4" pipe, 29 1/2" long.

A: A solid piece of 4” pipe 29 ½” cannot be used. The two 14 ¾” lengths of pipe are not butt welded in the center, the 8” long 5” diameter pipe welded over the 4”pipe allows for slight flexing when lifting the spuds.

Q: In the fabrication drawings, Item 8 calls for 3" thick plate. As we were reading the drawings (Section A-A and Section C-C), the 3 inch plate is being welded with an inch sticking out beyond the OD of the pipe, then machined off. That seems like a lot of grinding without an obvious purpose. Could we use a thinner piece of plate, and have it recessed to the outside diameter of the main pipe?

A: The 3” thick plate is required. Refer to Detail 15-E on page two. The 3” plate can be machined prior to inserting in to Spud.

The following have been modified:

STATEMENT OF WORK

Statement of Work The U.S. Army Corps of Engineers requires the manufacture and purchase of two (2) new Dredge spuds for the USACE Dredge Goetz. These spuds are used to anchor the Dredge Goetz in position while dredging.

The spuds shall be 35.75 +‐ 0.125” in diameter and 48’ in length with lifting eye located at the top of the spud. Spuds shall be delivered to the Government ready for installation with the exception of hard surface welding on the spud tips. Government labor will be utilized to complete the hard surface welding of the spud tips.

The spuds shall be built to the specifications in the attached engineered drawing, DWG#659‐E550‐01, using the welding procedures identified in the attached drawing. Prior to delivery, the spuds shall be sand blasted to remove all rust, mill scale, and welding slag. Then painted black in accordance with specifications identified in the engineered drawing 816‐B406‐01, MDC Floating Plant Paint Schedule, hull exterior below water line. The lower 4’6” shall not be painted because of the required hard surface welding.

The vendor is responsible for delivery FOB the address below. Please do not quote delivery separately.

Unloading assistance will be provided by the Government.

No changes to SOW specifications or contract terms shall be made without prior written approval of the contracting officer.

Delivery shall be no later than 7 weeks from Date of Contract (7 wks ADC).

Delivery address:

U.S. Army Corps of Engineers Fountain City Service Base 431 North Shore Dr Fountain City, WI 54629

Hours of operation:

0700‐1530 Monday – Friday Closed Federal Holidays and weekends

Technical Point of Contact:

Jake Bernhardt, Physical Support Branch Chief Office #651‐290‐5981 Cell #651‐249‐6068

Alternate contact:

Keith Graham, Plant and Facility Manager Office #651‐290‐5141 Cell #612‐770‐6455