24 W912ES-17-T-0035

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Polygonal Line

B6ECDSAT

Callout

SCUPPER,

SEE NOTE 7

B6ECDSAT

Callout

REPLACE CONCRETE ROOF PAVERS WITH EDPM WALKWAY PADS

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

EQUIPMENT PADS, SEE NOTE 10

B6ECDSAT

Line

B6ECDSAT

Callout

DOOR SILL,

SEE DETAIL ON PAGE 7

B6ECDSAT

Callout

DOWNSPOUT, SEE NOTE 4

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout DENOTES CHANGE IN ROOF SYSTEM ELEVATION (TYP.) IN RELATION TO THE SCUPPERS AT +0, SEE NOTE 7

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE

NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY

STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT

DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY

TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS

NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM

MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING,

CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK

AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS

REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF)

THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT

DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM

MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH

EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO

PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING

SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH

AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

B6ECDSAT

Oval

B6ECDSAT

Oval

B6ECDSAT

Callout

TWO ADDITIONAL PIPE PENENTRATIONS

FIELD VERIFY

B6ECDSAT

Oval

B6ECDSAT

Oval

B6ECDSAT

Callout

TWO ADDITIONAL PIPE PENENTRATIONS

FIELD VERIFY

B6ECDSAT

Text Box

Text Box

25 W912ES-17-T-0035

Text Box

EXISTING ICE GUARD/SNOW BAR

B6ECDSAT

Callout

OPTION NO.3

FURNISH AND INSTALL

ICE GUARD/SNOW BAR 16" FROM ROOF EDGE, SEE NOTE 13

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Text Box

B6ECDSAT

Callout

REMOVE BALLAST STONE, SEE NOTE 2

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK, SEE NOTES 5 AND 6

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK, SEE NOTES 5 AND 6

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK, SEE NOTES 5 AND 6

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK, SEE NOTES 5 AND 6

B6ECDSAT

Callout

HANDRAIL,

SEE NOTE 4

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

EPDM TO EXTEND UP AND OVER PEAK NEAR EXTERIOR OF PARAPET WALL

B6ECDSAT

Callout

EPDM TO EXTEND UP AND OVER PEAK NEAR EXTERIOR OF PARAPET WALL

B6ECDSAT

Callout

OPTION NO. 2

VERTICAL PLYWOOD,

SEE NOTE 12

B6ECDSAT

Callout

OPTION NO. 2

VERTICAL PLYWOOD,

SEE NOTE 12

B6ECDSAT

Text Box

B6ECDSAT

Callout

HANDRAIL,

SEE NOTE 4

B6ECDSAT

Line

B6ECDSAT

Callout

A. HANDRAILS TO BE REMOVED PRIOR TO EPDM DEMO

AND RESET AFTER NEW EPDM IS INSTALLED.

B. EXISTING BOLTS ANCHORED IN WALL TO REMAIN IN PLACE.

C. BOLT PENETRATIONS/HANDRAIL BRACKET FLANGE ADJACENT

TO THE ROOF MEMBRANE TO BE SEALED IN ACCORDANCE WITH

THE EPDM MANUFACTURER'S RECOMMENDATIONS.

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS

EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE PARAPET WALL

PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF) THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

B6ECDSAT

Line

B6ECDSAT

Line

B6ECDSAT

Callout

SEAMLESS GUTTER

REPLACEMENT,

SEE NOTES 13 AND 16

B6ECDSAT

Callout

SEAMLESS GUTTER

REPLACEMENT,

SEE NOTES 13 AND 16

B6ECDSAT

Line

Line

26 W912ES-17-T-0035

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

CONTINUOUS HANDRAIL,

SEE NOTE 4

B6ECDSAT

Callout

CONTINUOUS HANDRAIL,

SEE NOTE 4

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE

NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY

STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT

DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY

TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS

NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM

MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING,

CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK

AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS

REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF)

THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT

DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM

MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH

EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO

PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING

SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH

AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

B6ECDSAT

Oval

B6ECDSAT

Callout

OPTION NO.3

FURNISH AND INSTALL

ICE GUARD/SNOW BAR 16" FROM ROOF EDGE,

SEE NOTE 13

B6ECDSAT

Line

B6ECDSAT

Line

B6ECDSAT

Callout

SEAMLESS GUTTER

REPLACEMENT,

SEE NOTES 13 AND 16

B6ECDSAT

Oval

Oval

27 W912ES-17-T-0035

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

HANDRAIL,

SEE NOTE 4

B6ECDSAT

Callout

HANDRAIL,

SEE NOTE 4

B6ECDSAT

Line

B6ECDSAT

Callout

OPTION NO.3

FURNISH AND INSTALL

ICE GUARD/SNOW BAR 16" FROM ROOF EDGE, SEE NOTE 13

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE

NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY

STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT

DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY

TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS

NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM

MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING,

CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK

AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS

REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF)

THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT

DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM

MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH

EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO

PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING

SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH AND

PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

B6ECDSAT

Callout

OPTION NO.3

FURNISH AND INSTALL

ICE GUARD/SNOW BAR 16" FROM ROOF EDGE, SEE NOTE 13

B6ECDSAT

Oval

B6ECDSAT

Line

B6ECDSAT

Oval

B6ECDSAT

Oval

B6ECDSAT

Oval

B6ECDSAT

Oval

B6ECDSAT

Line

B6ECDSAT

Callout

SEAMLESS GUTTER

REPLACEMENT,

SEE NOTES 13 AND 16

28 W912ES-17-T-0035

Text Box

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Callout

METAL COPING REMOVE AND RESET, SEE NOTE 4 OR

REMOVE AND REPLACE-OPTION NO. 1, SEE NOTE 11

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

SCUPPER, SEE NOTE 7

B6ECDSAT

Callout

FLASHING AROUND EXHAUST FAN PER EPDM MANUFACTURERS REQUIREMENTS

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE

NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY

STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT

DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY

TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS

NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM

MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING,

CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK

AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS

REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF)

THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT

DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM

MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH

EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO

PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING

SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH

AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

B6ECDSAT

Callout

FLASHING AROUND PIPE PENETRATION PER EPDM MANUFACTURERS REQUIREMENTS

29 W912ES-17-T-0035

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Callout

REMOVE BALLAST STONE,

SEE NOTE 2

B6ECDSAT

Text Box

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK,

SEE NOTES 5 AND 6

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK,

SEE NOTES 5 AND 6

B6ECDSAT

Callout

REMOVE AND REPLACE ROOF ASSEMBLY TO METAL ROOF DECK,

SEE NOTES 5 AND 6

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Text Box

B6ECDSAT

Callout

EPDM TO EXTEND UP AND OVER PEAK NEAR EXTERIOR OF PARAPET WALL

B6ECDSAT

Callout

EPDM TO EXTEND UP AND OVER PEAK NEAR EXTERIOR OF PARAPET WALL

B6ECDSAT

Text Box

LOCK AND DAM NO. 9 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE

NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS, AND PAVER PADS. NEATLY

STOCKPILE IN THE LOCATION SHOWN ON THE "STAGING AREA" PLAN, PAGE 6 OF THE CONTRACT

DRAWINGS, AND AS APPROVED BY THE CONTRACTING OFFICER.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY

TO BUILDING EQUIPMENT AND REGULARLY SERVICED POINTS.

4. REMOVE AND RESET GROUNDING WIRES, A/C UNITS, PARAPET HANDRAILS, DOWNSPOUTS (AS

NECESSARY) AND PARAPET METAL COPING, UNLESS OPTION 1 IS EXERCISED SEE NOTE 11.

5. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM

MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING,

CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK

AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

7. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS

REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF (2" ON COMFORT STATION ROOF)

THICKNESS INCLUDING COVER BOARD AND INSULATION. SEE FIGURES 19-20 OF THE CONTRACT

DRAWINGS.

8. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM

MANUFACTURER'S REQUIREMENTS.

9. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

10. FURNISH AND INSTALL NEW 3'X3' EQUIPMENT PADS BELOW A/C UNITS.

11. OPTION NO. 1 - FURNISH AND INSTALL NEW PARAPET WALL METAL COPING, COLOR TO MATCH

EXISTING.

12. OPTION NO. 2 - FURNISH AND INSTALL NEW VERTICAL TREATED PLYWOOD AND INSULATION TO

PARAPET WALLS.

13. OPTION NO. 3 - FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 16" FROM ROOF EDGE OF THE STANDING

SEAM METAL ROOF, AND REPLACE APPROXIMATELY 130 LF OF GUTTER.

14. GOVERNMENT TO REMOVE AND REPLACE CONDUITS AND OUTLETS.

15. CLOSE OFF PUBLIC ACCESS TO COMFORT STATION WHILE WORK IN THIS AREA IS PERFORMED.

16. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH

AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.