SOLIC_LD-9_ROOF_REPLACEMENT_CONTRACT_DWG_SECURED.pdf
PDF 2 MB Posted
- Attached to
- Replace Roof Lock and Dam 9 Federal contract opportunity
- Solicitation number
- W912ES-17-T-0035
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_Photo.jpg | JPG image | |
| 17-P-0035_Amendment.pdf | ||
| SOLIC_LD-9_W912ES-17-T-0035_SPECIFICATION.pdf | ||
| SOLIC_LD-8_W912ES_17-T-0033_Construction_DWGs_11x17_SECURED.pdf | ||
| SOLIC_LD-9_W912ES-17-T-0035_SPECIFICATION.pdf | ||
| SOLIC_LD-9_W912ES_17-T-0035_Construction_DWGs_11x17_SECURED..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL CONTROL STATION
AND COMFORT STATION ROOFS REPLACEMENT
FOR
LOCK AND DAM 9 – CRAWFORD COUNTY, WISCONSIN
W912ES-17-T-0035
CONTRACT DRAWINGS
FOR
TABLE OF CONTENTS
DESCRIPTION PAGE
LD 9 - SITE ACCESS 3
LD 9 - STAGING AREAS 5
LD 9 - SITE PHOTOS 7
LD 9 - CONSTRUCTION DRAWINGS 23
FOR
LOCK AND DAM NO. 9
SITE ACCESS
B6ECDSAT
Callout
SITE ACCESS
B6ECDSAT
Callout
RAILROAD CROSSING
B6ECDSAT
Callout
SECURITY GATE
REQUIRES APPROVED
ACCESS
B6ECDSAT
Callout
SECURITY GATE
REQUIRES APPROVED
ACCESS
B6ECDSAT
Callout
COMFORT STATION
B6ECDSAT
Callout
PUBLIC LOT
B6ECDSAT
Text Box CONTRACTOR PARKING IN PUBLIC LOT OR IN SECURE LOT ON NORTH SIDE OF BUILDING AS INDICATED
FOR
STAGING AREAS
Callout
APPROX. LOCATION OF
BALLAST AND PAVER STOCKPILE
B6ECDSAT
Callout
MATERIAL STAGING AND
CONTRACTOR PARKING
B6ECDSAT
Callout
TEMPORARY DUMPSTER LOCATION
B6ECDSAT
Callout
ROOF ACCESS
B6ECDSAT
Callout
PUBLIC RESTROOM
FACILITIES
B6ECDSAT
Callout
12 FT GATE OPENING
B6ECDSAT
Polygonal Line
B6ECDSAT
Callout
STOCKPILE ACCESS ROUTE
B6ECDSAT
Polygon
B6ECDSAT
Callout
MATERIAL STAGING AND CONTRACTOR PARKING
Polygon
FOR
SITE PHOTOS
FOR
Figure 1: Exterior staircase provides access to 2nd floor of CCS.
Figure 2: Ballast and Concrete Pavers to be removed and stockpiled.
FOR
Figure 3: Roof Access. Government to remove and replace conduits and outlets.
Figure 4: Roof access door sill of 2nd Floor of Central Control Station entrance.
FOR
Figure 5: Standing just off of the stairs looking toward the Northeast corner.
Figure 6: Standing on the stairs looking toward the east corner.
FOR
Figure 7: Standing in the North corner looking toward the East.
Figure 8: Standing in the North corner looking at the roof access.
FOR
Figure 9: Standing in East corner looking to the South.
Figure 10: Standing in East corner looking to the North.
FOR
Figure 11: Standing in South corner looking to the West.
Figure 12: Standing in South corner looking to the East.
FOR
Figure 13: Standing in SW corner of the 2nd Floor CCS looking to the SE.
Figure 14: Standing in SW corner of the 2nd Floor CCS looking to the South. Weather station on handrail to be removed by lock staff prior to Contractor work. Lock staff will re-install after roofing work is completed.
FOR
Figure 15: Weather station on handrail to be removed by lock staff prior to Contractor work. Lock staff will re-install after roofing work is completed.
Figure 16: Comfort station roofline in foreground, with stockpile access road in the background.
FOR
Figure 17: 12 foot gate opening for access to the ballast and concrete paver stockpile locations.
Figure 18: Typical detail of handrail bracing. Government to remove and replace conduits and outlets.
FOR
Figure 19: Penetration test measured 11” away from the scupper openings.
Figure 20: Measured depth from top of EPDM to top of metal decking web.
FOR
Figure 21: Option No. 3, gutter replacement on north side of building.
Figure 22: Option No. 3, gutter replacement on south side of building.
FOR
Figure 23: Option No. 3, gutter replacement on south side of building.
Figure 24: Option No. 3, gutter replacement on south side of building.
FOR
Figure 25: Option No. 3, missing ice guard/snow bar on south side of building.
of Figure 26: Approved dumpster location.
FOR
Figure 27: Roof penetrations.
Figure 28: Option No. 3, Ice Guard/Snow Bar to be installed on standing metal roof to match existing.
FOR
Figure 29: Option No. 3, Existing Ice Guard/Snow Bar and damaged gutter on south side of roof.
FOR
CONSTRUCTION DRAWINGS
| CONTRACT DRAWINGS |
| TABLE OF CONTENTS |
| SITE ACCESS |
| STAGING AREAS |
| SITE PHOTOS |
| Figure 1: |
| Figure 2: |
| Figure 3: |
| Figure 4: |
| Figure 5: |
| Figure 6: |
| Figure 7: |
| Figure 8: |
| Figure 9: |
| Figure 10: |
| Figure 11: |
| Figure 12: |
| Figure 13: |
| Figure 14: |
| Figure 15: |
| Figure 16: |
| Figure 17: |
| Figure 18: |
| Figure 19: |
| Figure 20: |
| Figure 21: |
| Figure 22: |
| Figure 23: |
| Figure 24: |
| Figure 25: |
| Figure 26: |
| Figure 27: |
| Figure 28: |
| Figure 29: |
CONSTRUCTION DRAWINGS
File details come from the government source that posted it. Updated .