SOLIC_LD-9_ROOF_REPLACEMENT_CONTRACT_DWG_SECURED.pdf

PDF 2 MB Posted

Attached to
Replace Roof Lock and Dam 9 Federal contract opportunity
Solicitation number
W912ES-17-T-0035
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof Lock and Dam 9, newest first.
File Type Posted
Amendment_1_Photo.jpg JPG image
17-P-0035_Amendment.pdf PDF
SOLIC_LD-9_W912ES-17-T-0035_SPECIFICATION.pdf PDF
SOLIC_LD-8_W912ES_17-T-0033_Construction_DWGs_11x17_SECURED.pdf PDF
SOLIC_LD-9_W912ES-17-T-0035_SPECIFICATION.pdf PDF
SOLIC_LD-9_W912ES_17-T-0035_Construction_DWGs_11x17_SECURED..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL CONTROL STATION

AND COMFORT STATION ROOFS REPLACEMENT

FOR

LOCK AND DAM 9 – CRAWFORD COUNTY, WISCONSIN

W912ES-17-T-0035

CONTRACT DRAWINGS

FOR

TABLE OF CONTENTS

DESCRIPTION PAGE

LD 9 - SITE ACCESS 3

LD 9 - STAGING AREAS 5

LD 9 - SITE PHOTOS 7

LD 9 - CONSTRUCTION DRAWINGS 23

FOR

LOCK AND DAM NO. 9

SITE ACCESS

B6ECDSAT

Callout

SITE ACCESS

B6ECDSAT

Callout

RAILROAD CROSSING

B6ECDSAT

Callout

SECURITY GATE

REQUIRES APPROVED

ACCESS

B6ECDSAT

Callout

SECURITY GATE

REQUIRES APPROVED

ACCESS

B6ECDSAT

Callout

COMFORT STATION

B6ECDSAT

Callout

PUBLIC LOT

B6ECDSAT

Text Box CONTRACTOR PARKING IN PUBLIC LOT OR IN SECURE LOT ON NORTH SIDE OF BUILDING AS INDICATED

FOR

STAGING AREAS

Callout

APPROX. LOCATION OF

BALLAST AND PAVER STOCKPILE

B6ECDSAT

Callout

MATERIAL STAGING AND

CONTRACTOR PARKING

B6ECDSAT

Callout

TEMPORARY DUMPSTER LOCATION

B6ECDSAT

Callout

ROOF ACCESS

B6ECDSAT

Callout

PUBLIC RESTROOM

FACILITIES

B6ECDSAT

Callout

12 FT GATE OPENING

B6ECDSAT

Polygonal Line

B6ECDSAT

Callout

STOCKPILE ACCESS ROUTE

B6ECDSAT

Polygon

B6ECDSAT

Callout

MATERIAL STAGING AND CONTRACTOR PARKING

Polygon

FOR

SITE PHOTOS

FOR

Figure 1: Exterior staircase provides access to 2nd floor of CCS.

Figure 2: Ballast and Concrete Pavers to be removed and stockpiled.

FOR

Figure 3: Roof Access. Government to remove and replace conduits and outlets.

Figure 4: Roof access door sill of 2nd Floor of Central Control Station entrance.

FOR

Figure 5: Standing just off of the stairs looking toward the Northeast corner.

Figure 6: Standing on the stairs looking toward the east corner.

FOR

Figure 7: Standing in the North corner looking toward the East.

Figure 8: Standing in the North corner looking at the roof access.

FOR

Figure 9: Standing in East corner looking to the South.

Figure 10: Standing in East corner looking to the North.

FOR

Figure 11: Standing in South corner looking to the West.

Figure 12: Standing in South corner looking to the East.

FOR

Figure 13: Standing in SW corner of the 2nd Floor CCS looking to the SE.

Figure 14: Standing in SW corner of the 2nd Floor CCS looking to the South. Weather station on handrail to be removed by lock staff prior to Contractor work. Lock staff will re-install after roofing work is completed.

FOR

Figure 15: Weather station on handrail to be removed by lock staff prior to Contractor work. Lock staff will re-install after roofing work is completed.

Figure 16: Comfort station roofline in foreground, with stockpile access road in the background.

FOR

Figure 17: 12 foot gate opening for access to the ballast and concrete paver stockpile locations.

Figure 18: Typical detail of handrail bracing. Government to remove and replace conduits and outlets.

FOR

Figure 19: Penetration test measured 11” away from the scupper openings.

Figure 20: Measured depth from top of EPDM to top of metal decking web.

FOR

Figure 21: Option No. 3, gutter replacement on north side of building.

Figure 22: Option No. 3, gutter replacement on south side of building.

FOR

Figure 23: Option No. 3, gutter replacement on south side of building.

Figure 24: Option No. 3, gutter replacement on south side of building.

FOR

Figure 25: Option No. 3, missing ice guard/snow bar on south side of building.

of Figure 26: Approved dumpster location.

FOR

Figure 27: Roof penetrations.

Figure 28: Option No. 3, Ice Guard/Snow Bar to be installed on standing metal roof to match existing.

FOR

Figure 29: Option No. 3, Existing Ice Guard/Snow Bar and damaged gutter on south side of roof.

FOR

CONSTRUCTION DRAWINGS

CONTRACT DRAWINGS
TABLE OF CONTENTS
SITE ACCESS
STAGING AREAS
SITE PHOTOS
Figure 1:
Figure 2:
Figure 3:
Figure 4:
Figure 5:
Figure 6:
Figure 7:
Figure 8:
Figure 9:
Figure 10:
Figure 11:
Figure 12:
Figure 13:
Figure 14:
Figure 15:
Figure 16:
Figure 17:
Figure 18:
Figure 19:
Figure 20:
Figure 21:
Figure 22:
Figure 23:
Figure 24:
Figure 25:
Figure 26:
Figure 27:
Figure 28:
Figure 29:

CONSTRUCTION DRAWINGS

File details come from the government source that posted it. Updated .