Text version

W81G6762002852

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to (1) make changes to the Scope of Work; (2) Change the completion date in FAR Clause 52.211-10 Alt I;

(3) Extend the due date for offers to Tuesday, 13 September at 10 am (Central) and (4) incorporate the updated w age determination.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-16-T-0113

X 9B. DATED (SEE ITEM 11)

11-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2016

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-16-T-0113

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

PRICING SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Herbicide Application

FFP, FOB: Destination 1 Job

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Plant bare root seedlings

760 Each

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Plant RPM trees

56 Each

The following have been modified:

STATEMENT OF WORK

1. Background and Scope:

This contract includes control of woody and herbaceous invasives, supplying and applying herbicide for site prep in open prairie pockets, root dipping, supplying and planting 760 bare root tree seedlings, supplying and planting 56 Root Production Method (RPM) trees, supplying and installing 816 Plantra tree tubes, and supplying and applying deer repellant tablets. This statement of work provides a description of forest restoration work to be conducted by contract on Willow Island in Pool 10 of the Upper Mississippi River adjacent to Guttenberg, IA. The purpose of this contract is to control pockets of black locust and to do some supplemental planting to restore Willow Island to an Oak Savanna like condition. Willow Island is an island created from material dredge out of Bussey Lake as part of the Bussey Lake EMP project. The island consists of an out ring on high ground that served as a containment dike and planted with prairie species during the EMP project. It was later planted in groups of Root Production Method (RPM) trees on a 30x30 foot spacing. Willow Island is roughly 0.06 miles east of Guttenberg, IA and is on the Iowa side of the main navigation channel. The total acreage to be restored on Willow Island is 1.12 acres.

The current management prescription is to plant bare root seedlings on an 8x8 foot spacing and to plant RPM trees on a 30x30 foot spacing.

Species and quantities include:

Bare root seedlings (18-24”): (190) Bur Oak, (190) Black Oak, (190) Northern Pin Oak, and

(190) Swamp White Oak

RPM Trees: (28) Swamp White Oak, and (28) Bur Oak

2. Project Site Access:

Access to the planting area is by boat. The Contractor is responsible for providing their own boat(s) and transporting all Contractor personnel, equipment and supplies to and from the planting area for the duration of the contract. A public boat ramp, Bussey Lake Landing, is located off of Highway X56 on Marina Rd on the north side of Guttenberg, IA and is 0.65 miles from the planting site (see map below for directions).

3. Work Schedule:

Black locust trees (2-6” dbh) will be basal bark treated, then after 1 ½ months will be cut down and crown vetch will be controlled with a foliar herbicide. Herbicide work shall occur between June 1st and July 31st. In the spring, bare root seedlings and RPM (Root Production Method) tree planting can start April 14th and be finished by June 8th.

4. Contractor Furnished Materials:

The Contractor will provide all the herbicide and herbicide equipment needed to control crown vetch and black locust and the equipment needed to cut, buck and fell the black locust. The Contractor will provide all bare root seedlings (760) and RPM trees (56). The Contractor will provide mycorrhizal fungi root dip to inoculate the roots of each bare root seedling before planting. The root dip must contain low host specificity endo- and ectomycorrizae fungi. The Contractor will provide the Repellex Deer Repellant tablets for each bare root seedling and RPM tree. The Contractor will provide a Plantra tree tube for every bare root seedling and RPM tree.

5. Herbicide Application:

All black locust stems in the project area (see attached map) shall be treated between June 1st and July 31st with a basal bark application of the appropriate herbicide (e.g. triclopyr) according to label instructions. 1 ½ months after herbicide application all dead stems shall be cut within 6” of ground level. Any live stems at this point shall be re-applied with basal bark treatment. In addition, foliar applications of clopyralid or another broadleaf specific herbicide labeled for control of crown vetch shall be applied to all crown vetch plants in the project area. Distribution of crown vetch is spotty and total control is desired in this contract. The total acreage to be treated for black locust is approximately 0.25 acre while crown vetch may occur throughout the entire

1.12 acre project area. The contractor shall avoid applications in locations or using chemicals or formulations that may damage established hardwood seedlings and saplings.

To prep the site for tree planting, the Contractor will spray glyphosate at a rate not to exceed 5% solution in a 3 ft diameter circle at each bare root and RPM planting location, roughly at an 8x8 foot spacing for bare roots and 30x30 foot for RPMs. Herbicide applications for site prep should be implemented between two weeks and one month in advance of the tree planting.

6. Planting Procedures:

Bare seedling procedure:

The Contractor shall dip the entire root system of each bare root plant in a solution containing mycorrhizal fungal inoculants upon removing the plant from the nursery bag or box. The quantity of seedlings placed in a planting bag or planting machine holder shall be limited to that which allows the removal of individual seedlings without damage to tops or roots. The Contractor shall remove only one seedling at a time from a planting bag or planting machine holder only after the planting hole has been prepared.

The Contractor shall prepare a planting hole that is wide enough to fully suspend the roots of the plant material. The Contractor shall suspend the root system near the center of the planting hole, with roots in a near-natural arrangement, at a depth at which the top of the root system is covered by approximately one inch of top soil after filling, packing and leveling. A “near-natural arrangement” means that roots approximate the position they would have when growing in nature, and are not twisted, tangled, compacted, curled, or bent relative to a position that is perpendicular to the ground surface. Each plant shall be set firmly in the ground, with moist soil filled in and placed firmly around the roots. The Contractor shall level the soil near the plant after planting and firming so there are no depressions or mounds near the stem. The Contractor may prune seedling roots prior to planting, but must leave minimum of 12” of root length measured from the root collar.

RPM procedure:

The Contractor shall prepare a planting hole that is large enough to hold the potted tree. The Contractor shall place the RPM tree so that it is level and the tree is standing straight, then filled with top soil 1” above the root collar after filling, packing and leveling. The contractor shall also pull apart roots in the root ball to reduce the likelihood of continued root spiraling and eventual girdling of the trees.

The Government Inspector may also specify where certain plant species or associations of plant species are to be planted within the project area. Plant material planted in inappropriate places will be subject to rejection by the Government Inspector during inspections.

Inappropriate places include in rock, standing water or other media that prevent planting tools from making an acceptable planting hole. When an inappropriate place is encountered, the Contractor shall plant the plant material in the nearest appropriate location.

The Contracting Officer may suspend planting work if weather conditions could damage plant material, even if the material is handled in accordance with this agreement. The Contracting Officer may also suspend planting work at any time if the Contracting Officer determines that the Contractor is not handling plants or planting in accordance with this agreement.

Excess and waste material shall be removed and properly disposed of off-site. Areas that have been damaged by planting operations shall be restored to original condition at the Contractor’s expense.

7. Applying Deer Repellant Tablets:

The Contractor must apply 1 Repellex deer repellant tablet for every foot of stem of the bare root seedling and RPM tree. EXAMPLE: a 4ft bare root seedling or RPM tree would require 4 Repellex deer repellant tablets. After the Contractor makes the planting hole, the tablets will be placed before the seedling is put into the ground.

8. Storage and Handling of Bare Root Seedlings and RPM Trees:

The Contractor must ensure that plant materials are properly stored and handled up until the time of actual planting. Temporary refrigerated storage must be provided by the Contractor. The Contractor must ensure bare root seedlings are stored at temperatures from 36 to 45 degrees F, or properly healed-in at the planting location up until the day of actual planting.

Contractor shall be responsible for transporting plant material to the project site under covers to protect plant materials from freezing or drying. Plant material shall not be transported in heated crew vehicles.

At the planting locations, the Contractor shall keep plants covered at all times using light colored tarps or insulating blankets and shall protect all plants from loss, destruction or damage of any kind, including physical injury, freezing, heating or drying. Contractor shall be responsible for all loss, destruction or damage to plant material that occurs from the time contractor takes possession of the plants until plants are planted.

9. Quality Control:

This contract requires a Quality Control Inspector provided by the Contractor. It is the duty of the Quality Control Inspector to closely monitor the planting quality of the Contractor crew and notify the foreman and planters of any issues regarding planting quality, so that deficient trends may be remedied before becoming a detriment to the overall unit quality. The Quality Control Inspector shall keep written records of the crew’s planting quality and provide the record to the Contracting Officer as each planting unit (island) is completed.

Quality control is understood to mean taking those measures necessary to ensure that the planting is completed in full accordance with all specifications set forth in this contract. The Contractor will be ultimately responsible for quality control. Quality control will be reviewed during the pre-work meeting. In addition, Government representatives will be available during the first day of planting and will occasionally visit the site during planting. They will also be available for consultation, but they will not serve as daily inspectors. It is the responsibility of the Contractor to provide day-to-day oversight of the planting crews. The Government will conduct an inspection at the completion of the planting to determine the acceptability of the planting.

The Government will inspect the planting to determine compliance with specifications. Inspection of planting will include visual inspection of 100% of the area and random sampling of planting procedures above and below ground and seedling spacing. Inspection plots will be located throughout the planting area(s) so as to obtain a representative sample of the work. Inspections will consist of observations of seedling handling, planting and inspection procedures, and examination of a sample of individual seedlings.

Planting shall be suspended, if in a planting day, three inspection plots fall below 90 percent and the overall stand percentage is lower than 90 percent. The Contractor, after consultation with the Government Inspector, shall determine the cause for the error and shall convey to the crew methods to prevent future mistakes before continuing work. If after resuming work, two more plots indicate the planting quality of at least 90 percent will be considered non-compliance with the terms of this contract and may be grounds for termination.

Planting procedures will be observed and planted seedlings from a representative sample will be dug and examined to assure compliance with specifications.

Above Ground Inspection:

(a) Spacing

(b) Planting spot selection

(c) Tree location on spot

(d) Planting depth and exposed roots

(e) Firmness

Below Ground Inspection:

(a) Planting hole orientation

(b) Root configuration and orientation

(c) Altered root length and damage

(d) “Foreign” material in planting hole

(e) Loose soil or air pockets (f) A minimum of twelve 1/250th acre square plots will be randomly chosen (13.2 ft. per side).

Inspect and record the number of planted trees meeting above-ground contract specification.

After determining the number of satisfactory above-ground trees on the plot, a minimum of three planted trees within the plot are dug for below-ground compliance. Trees will be dug starting with the one closest to the plot center and progressing outwards. The number of trees meeting below-ground specifications will be recorded. Planting quality will be computed by the following formula:

Planting = # of sat. trees above-ground # of sat. dug trees Quality _______________________ X _______________ X 100

# of plantable spots # of dug trees

10. Safety Manual:

The Contractor must comply with all safety and health requirements as outlined in the U.S. Army Corps of Engineers Safety and Health Requirements Manuel, EM 385-1-1 dated September 2008, to insure safe working conditions for contractor employees and government visitors to the site. If the Contractor does not have a copy of this manual, one will be provided or can be downloaded from http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385‐1‐1.pdf

11. Pre-Work Meeting:

After a notice to proceed has been issued by the Contracting Officer, the Contractor will contact the Government Inspector and arrange a pre-work meeting before actual work begins.

12. Government point of Contact(s) and Government Inspector(s):

Eric Hanson, Ecologist/Biologist, ofc 651-290-5386 cell 320-248-8776 Dan Reburn, Natural Resource Specialist, ofc 651-290-5900 cell 651-262-8649

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 18-Aug-2016 02:00 PM to 13-Sep-2016 10:00 AM.

The description of performance has changed from 52.211-10 to 52.211-10Alt I.

CLIN 0002

The pricing detail quantity has increased by 759.00 from 1.00 to 760.00.

The unit of issue has changed from Job to Each.

CLIN 0003

The CLIN description has changed from Plant trees to Plant RPM trees.

The pricing detail quantity has increased by 55.00 from 1.00 to 56.00.

The unit of issue has changed from Job to Each.

SECTION 00700 - CONTRACT CLAUSES

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -

ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the award of the contract, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 15 September 2017. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the award by 30 September 2016. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

WAGE RATES

General Decision Number: IA160003 08/26/2016 IA3

Superseded General Decision Number: IA20150003

State: Iowa

Construction Type: Heavy River Work

Counties: Iowa Statewide.

HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES, RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY CONSTRUCTION.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 05/13/2016 3 05/27/2016 4 07/08/2016 5 08/26/2016

CARP0004-007 01/01/2016

SCOTT COUNTY

Rates Fringes

CARPENTER........................$ 28.69 22.01

ENGI0150-008 06/01/2016

CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT COUNTIES

Rates Fringes Power equipment operators:

GROUP 1.....................$ 33.50 29.95

GROUP 2.....................$ 32.50 29.95

GROUP 3.....................$ 29.85 29.95

GROUP 4.....................$ 28.80 29.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat

GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt Paver Screed; Asphalt Plant; Automatic Curbing Machine; Backfiller (throw bucket); Blastholer Self-Propelled Rotary Drill or Similar Machines; Boom Tractor or Side Boom; Boring Machine (Directional, Vertical or Horizontal); Building Hoist (1,2 or 3 drums); Caisson Auguring Machines; Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming Machine;

Combination Backhoe Front End Loader; Combination Concrete Finishing Machine and Float; Concrete Breaker or Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;

Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.); Curing-Tinning Machine; Dipper Dredge Crane man; Dipper Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.); Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);

Grader, Motor Grader, Motor Patrol, Auto Grader, Form Grader, Pull Grader, Sub Grader, Elevating Grader; Group Equipment Greaser; Guard Rail Post Driver; Hoists; Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck Mounted or Pull Type, and Similar Equipment; Laser Screed; Loader (Track, Rubber Tire or Articulated); Locomotive Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad Foot Compactor; Shovel; Slip Form Paver; Steel Track- Type Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy; Trenching Machine (40 H.P. & over); Work Boat.

GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster; Boiler (Engineer or Fireman); Conveyor Over 20 H.P.; Distributor; Driver on Truck Crane or Similar Machines; Elevator; Farm-Type Tractor (Without Power Attachment); Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant; Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine (Under 40 H.P.).

GROUP 4: Air Compressor (400 C.F.M. or over); Compact Loader (Rubber Tire, Track & Utility); Engine Driven Welding Machine; Mechanical Heater (other than steam boiler);

Small Outboard Motor Boat (Safety Boat & Life Boat); Water Pump (More than one well point pump).

ENGI0234-002 12/01/2012

REMAINING COUNTIES

Rates Fringes Power equipment operators:

GROUP A.....................$ 32.24 12.90

GROUP B.....................$ 31.57 12.90

GROUP C.....................$ 29.31 12.90

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol (finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics - welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self-propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.

GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self-propelled sheepsfoot roller, self-propelled roller, dristributor, screening and washing plant, self-propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self-propelled elevator grader, water wagon on compaction

GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver-oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3", farm type tractor (pulling disc, harrow or roller).

* IRON0111-005 07/01/2016

(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE, HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON, LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)

Rates Fringes Ironworker.......................$ 30.75 28.69

LABO0309-005 01/01/2016

SCOTT COUNTY

Rates Fringes

LABORERS

GROUP 1.....................$ 26.59 18.21

GROUP 2.....................$ 27.09 18.21

GROUP 3.....................$ 27.72 18.21

LABORER CLASSIFICATIONS

GROUP 1 - Flagman; Dumpman; Spotter; Broom Man; Landscaper; Planting & Removal of Trees; Fencing Laborers; Cleaning of Forms or Lumber (in Bone Yard); Laying of Sod;

Moving and/or Maintenance of Flares & Barricades; Operation of all Hand, Electric, Air, Hydraulic or Mechanically Powered Tools under the the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator; Mortar Mixer; Power & Hand Saw (When Clearing Timber); General Laborer; Material Handler; Form Handler; Concrete Dumper; Puddler; Explosives Handler;

Center Strip Handler & Installer; Prime Mover or any Mechanical Device Taking the Place of Concrete Buggy or Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting Hammer Driver; Laying & Jointing of Telephone Conduit; Gas Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin; Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker; Bankman on Floating Plant; Jointman With Pipelayer; Back-up Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water Main; Batterboard Man or Laser Operator on Sewer & Water Main; Laborer in Ditch or Tunnel, on Sewer or Water Main & Telephone Conduit, Cutters; Burners;

Torchman; Gravel Box Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of Steel & Rebar; & Wrecking Laborers

GROUP 2 - Asphalt Raker or Luteman; Pipe Setter on Sewer or Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb Machine Operator; Concrete Burning Machine Operator; & Coring Machine Operator; Hazardous Waste Worker; Asbestos Abatement Worker

GROUP 3 - Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)

PLAS0544-001 03/01/2016

SCOTT COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 26.24 20.12

TEAM0371-001 05/01/2012

SCOTT COUNTY

Rates Fringes Truck drivers:

GROUP 1.....................$ 31.34 10.05+a GROUP 2.....................$ 31.78 10.05+a GROUP 3.....................$ 32.02 10.05+a GROUP 4.....................$ 32.28 10.05+a GROUP 5.....................$ 33.13 10.05+a

Footnote:

a. PENSION: $40.10 per day

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons, air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick- up-trucks when hauling material, tools or men to and from and on the job site, and forklifts up to 6,000 lb capacity

GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A-frame winch trucks, or similar equipment when used for transportation purposes.

Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or simiolar equipment when used for transportation purposes.

GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks

GROUP 4: Oil distributors, lowboys

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

SUIA2002-002 12/01/2014

Rates Fringes

CARPENTER

Mississippi River (Iowa Side).......................$ 27.00 14.24 Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay previalis in the adjoining states, then those rates shall apply)................$ 31.64 18.08 Missouri River..............$ 30.27 10.81

CEMENT MASON/CONCRETE FINISHER...$ 33.00 7.60

Ironworkers: (setting of all structural steel and reinforcing steel installation:)

Des Moines and Lee Counties....................$ 29.42 16.68 Dubuque, Clayton & Allamakee Counties..........$ 26.67 16.68 Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.89 16.68 Jackson, Clinton, Louisa & Muscatine Counties........$ 36.20 16.68 Woodbury & Monona Counties..$ 19.46 16.68

Laborers:

Class A Mississippi River..........$ 29.30 8.15 Missouri River.............$ 27.30 8.15 Class AA Mississippi River..........$ 30.33 8.15 Missouri River.............$ 28.33 8.15 Class B Mississippi River..........$ 27.60 8.15 Missouri River.............$ 25.60 8.15 Class C Mississippi River..........$ 24.43 8.15 Missouri River.............$ 22.43 8.15

TRUCK DRIVER

Mississippi River...........$ 23.58 10.35 Missouri River..............$ 23.58 10.35

LABORERS CLASSIFICATIONS

GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.

GROUP AA: Pipelayer, concrete specialist; tunnelman

GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper), timber and chair-sawman, mechanical stresser or strechman on post-tension or pre-stressed concrete on or off job, form tamper, air-gas and electric tool opertors-vibrators-Barcohammer-Pavec-tampers-electric drills-hammers and jackhammers, tree groundman, chair tenders-tool room men and checkers, concrete processing material and monitors, stringman on paving work, broom operator (not self propelled), fence erectors, handling and placing of metal mesh, dowel bars, reinforcing baars and chairs, dumpmen and spotters, carring reinforcing rods, corrugated culvert pipe, stake chaser, seeding or mulching and planting of trees shrubs and flowers, water pumps (under 3"), compressors (under 400 CFM), general laborer, rodman, hot asphalt labor, carpenter tender, concrete finisher tender.

GROUP C: Waterboy, flagman, flagger/traffic control, watchman.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey.

Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198.

The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana.

2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.

08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis- Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).

Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION