13-R-0005.pdf

PDF 1 MB Posted

Attached to
Soil Boring/Drilling services IDIQ Federal contract opportunity
Solicitation number
W912ES-15-R-0003
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

SF-1442

View the file

Other files for this federal contract opportunity

Other files attached to Soil Boring/Drilling services IDIQ, newest first.
File Type Posted
15-R-0003-0002.pdf PDF
15-R-0003-0001.pdf PDF
15-R-0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

651-290-5706

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

W912ES-13-R-0005 23-May-2013

b. TELEPHONE NUMBER

651-290-5723

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 10 Jul 2013

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

W912ES

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE W2R906 16. ADMINISTERED BY

GEOTECHNICAL & GEOLOGY

GRANT RIDDICK

USACE - ST PAUL

180 5TH STREET E

ST PAUL MN 55101-1678

TEL: 651-290-5599 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

GWENDOLYN K DAVIS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

213111

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81G6723249975

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

0 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

http://www.wdol.gov/wdol/scafiles/std/05-2203.txt?v=15 6/25/2013

W912ES-13-R-0005

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF DRILL RIG A

FFP

FOB: Destination

MILSTRIP: W81G6723249975

PURCHASE REQUEST NUMBER: W81G6723249975

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 200 Hours

DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined by OSHA. See details in Section C-2a.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 25 Hours

DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined by OSHA. See details in Section C-2a.

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 5 Each

MOB 7 DEMOB PER CALL

FFP

Mobilization and Demobilization Fees per Call

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF DRILL RIG B

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AA 100 Hours

DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA.

See details in Section C-2b

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AB 25 Hours

DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level C as defined by OSHA.

See details in Section C-2b.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AC 5 Each

MOB & DEMOD PER CALL

FFP

Mobilization and Demobilization Fees per Call

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF DRILL RIG C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AA 100 Hours

DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section C-2c.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AB 25 Hours

DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level C as defined by OSHA. See details in Section C-2c.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003AC 2 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobolization Per Call

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF DRILL RIG D

FFP

SKID-FRAME RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AA 80 Hours

DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section C-2d.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AB 20 Hours

DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level C as Defined by OSHA. See Details in section C-2d.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004AC 2 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobilization per call

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF DRILL RIG E

FFP

PIPE-DRIVING RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AA 80 Hours

DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section C-2e.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AB 20 Hours

DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level C as defined by OSHA. See details in Section C-2e.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AC 2 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobilization per call

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA RENTAL OF PIEZOCONE SYSTEM

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AA 200 Hours Rental of Piezocone (CPTu) system

FFP

Rental of Piezocone (CPTu) system With operator, Level D as defined by OSHA. See details in section C-3

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AB 10 Hours RENTAL OF PIEZOCONE (CPTu) SYSTEM

FFP

Rental of Piezocone (CPTu) system With operator, Level C as Defined by OSHA. See Details in section C-2d.

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AC 10 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobilization per call

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 60 Hours

EAST EXTRA DRILL HELPER

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA SAMPLES

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AA 30 Each

WALL SAMPLES

FFP

3-inch Thin-Wall Samples

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AB 50 Each

WALL SAMPLES

FFP

5-inch Thin-Wall Samples

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AC 10 Each

PISTON SAMPLES

FFP

3-inch Horslev Type Piston Samples

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AD 50 Each

PISTON SAMPLES

FFP

5-inch Horslev Type Piston Samples

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AE 75 Foot NQ-3 or EQUIVALENT

FFP

NQ-3 or Equivalent Core Drilling in Rock or Concrete

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AF 100 Foot HQ-3 or EQUIVALENT

FFP

HQ-3 or Equivalent, Core Drilling in Rock or Concrete

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AG 150 Foot

HQ WIRELINE CORE DRILLING

FFP

HQ Wireline Core Drilling in Rock or Concrete

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AH 100 Foot PQ-3 or EQUIVALENT

FFP

PQ-3 or Equivalent Core Drilling in Rock or Concrete

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AJ 50 Foot 6" x 7 3/4" or Equivalent

FFP

6" x 7 3/4" or Equivalent Core Drilling in Rock or Concrete

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 160 Days

EAST PER DIEM

FFP

For each individual when over 50 miles from Home Office (per day)

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 10 Days

EAST AREA RENTAL

FFP

Portable Steam Cleaner Rental

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 10 Each

EAST AREA DOT-APPROVED CONTAINERS

FFP

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA BACKFILL MATERIAL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AA 100 Each

PORTLAND CEMENT

FFP

Portland Cement – 94-Pound Bags

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AB 100 Each

HIGH SOLIDS BENTONITE GROUT

FFP

High Solids Bentonite Grout – 50-Pound Bags

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AC 100 Each

BENTONITE CHIPS

FFP

Bentonite Chips – 50-Pound Bags

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AD 20 Each

FILTER PACK SAND

FFP

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags

UNIT UNIT PRICE ESTIMATED AMOUNT

0012AE 10 Each

BARITE DRILLING ADDITIVE

FFP

Barite Drilling Additive – 50-Pound Bags

UNIT UNIT PRICE ESTIMATED AMOUNT

EAST AREA MONITORING

FFP

Monitoring Well, Piezometer and Instrumentation Casing

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AA 140 Each

RISER PIPE

FFP

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AB 30 Each

WELL SCREEN

FFP

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AC 40 Each

RISER PIPE

FFP

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AD 10 Each

WELL SCREEN

FFP

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, UNIT UNIT PRICE ESTIMATED AMOUNT

0013AE 12 Each

GUARD POSTS

FFP

4-Inch Protective Guard Posts

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AF 70 Foot

PROTECTIVE CASING

FFP

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover:

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AG 140 Foot

PROTECTIVE CASING

FFP

6-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

0013AH 35 Foot

PROTECTIVE CASING

FFP

8-Inch Diameter Monitoring Well Protective Casing with Locking Cove

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF DRILL RIG A

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0014AA 200 Hours

DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined by OSHA. See details in Section C-2a.

UNIT UNIT PRICE ESTIMATED AMOUNT

0014AB 25 Hours

DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

0014AC 5 Each

MOB 7 DEMOB PER CALL

FFP

Mobilization and Demobilization Fees per Call

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF DRILL RIG B

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AA 100 Hours

DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section C-2b

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AB 25 Hours

DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level C as Defined by OSHA. See Details in Section C-2b.

UNIT UNIT PRICE ESTIMATED AMOUNT

0015AC 5 Each

MOB & DEMOD PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF DRILL RIG C

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AA 100 Hours

DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section C-2c.

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AB 25 Hours

DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level C as defined by OSHA. See details in Section C-2c.

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AC 2 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobolization Per Call

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF DRILL RIG D

FFP

SKID-FRAME RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

0017AA 80 Hours

DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section C-2d.

UNIT UNIT PRICE ESTIMATED AMOUNT

0017AB 20 Hours

DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

0017AC 2 Each

MOB & DEMOB PER CALL

FFP

Mobilization and Demobilization per call

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF DRILL RIG E

FFP

PIPE DRIVING RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AA 80 Hours

DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section C-2e.

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AB 20 Hours

DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level C as defined by OSHA. See details in section C-2e.

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AC 2 Each

MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA RENTAL OF PIEZOCONE SYSTEM

UNIT UNIT PRICE ESTIMATED AMOUNT

0019AA 200 Hours Rental of Piezocone (CPTu) system

FFP

Rental of Piezocone (CPTu) system With operator, Level D as defined by OSHA. See details in section C-3

UNIT UNIT PRICE ESTIMATED AMOUNT

0019AB 10 Hours RENTAL OF PIEZOCONE (CPTu) SYSTEM

FFP

Rental of Piezocone (CPTu) system With operator, Level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

0019AC 10 Each

MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0020 60 Hours

WEST EXTRA DRILL HELPER

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA SAMPLES

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AA 30 Each

WALL SAMPLES

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AB 50 Each

WALL SAMPLES

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AC 10 Each

PISTON SAMPLES

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AD 50 Each

PISTON SAMPLES

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AE 75 Foot NQ-3 or EQUIVALENT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AF 100 Foot HQ-3 or EQUIVALENT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AG 150 Foot

HQ WIRELINE CORE DRILLING

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AH 100 Foot PQ-3 or EQUIVALENT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0021AJ 50 Foot 6" x 7 3/4" or Equivalent

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0022 160 Days

WEST PER DIEM

FFP

For each individual when over 50 miles from Home Office (per day)

UNIT UNIT PRICE ESTIMATED AMOUNT

0023 10 Days

WEST AREA RENTAL

FFP

Portable Steam Cleaner Rental

UNIT UNIT PRICE ESTIMATED AMOUNT

0024 10 Each

WEST AREA DOT-APPROVED CONTAINERS

FFP

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA BACKFILL MATERIAL

UNIT UNIT PRICE ESTIMATED AMOUNT

0025AA 100 Each

PORTLAND CEMENT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0025AB 100 Each

HIGH SOLIDS BENTONITE GROUT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0025AC 100 Each

BENTONITE CHIPS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0025AD 20 Each

FILTER PACK SAND

FFP

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot

UNIT UNIT PRICE ESTIMATED AMOUNT

0025AE 10 Each

BARITE DRILLING ADDITIVE

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

WEST AREA MONITORING

FFP

Monitoring Well, Piezometer and Instrumentation Casing

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AA 140 Each

RISER PIPE

FFP

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AB 30 Each

WELL SCREEN

FFP

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AC 40 Each

RISER PIPE

FFP

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AD 10 Each

WELL SCREEN

FFP

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, UNIT UNIT PRICE ESTIMATED AMOUNT

0026AE 12 Each

GUARD POSTS

FFP

4-Inch Protective Guard Posts

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AF 70 Foot

PROTECTIVE CASING

FFP

4-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AG 140 Foot

PROTECTIVE CASING

FFP

6-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

0026AH 35 Foot

PROTECTIVE CASING

FFP

8-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG A

FFP

OPTION YEAR 1

UNIT UNIT PRICE ESTIMATED AMOUNT

1000AA 200 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1000AB 25 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined by OSHA. See details in Section C-2a.

UNIT UNIT PRICE ESTIMATED AMOUNT

1000AC 5 Each

OPTION MOB 7 DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG B

FFP

OPTION YEAR 1

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AA 100 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, UNIT UNIT PRICE ESTIMATED AMOUNT

1001AB 25 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level C as defined by OSHA. See details in Section C-2b.

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AC 5 Each

OPTION MOB & DEMOD PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AA 100 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AB 25 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG D

FFP

OPTION YEAR 1 SKID-

FRAME RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AA 80 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AB 20 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level C as Defined by OSHA. See Details in section C-2d.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG E

FFP

OPTION YEAR 1 PIPE-

DRIVING RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AA 80 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AB 20 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1004AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF PIEZOCONE SYSTEM

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AA 200 Hours OPTION Rental of Piezocone (CPTu) system

FFP

Rental of Piezocone (CPTu) system With operator, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AB 10 Hours OPTION RENTAL OF PIEZOCONE (CPTu) SYSTEM

FFP

Rental of Piezocone (CPTu) system With operator, Level C as Defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AC 10 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1006 60 Hours

OPTION EAST EXTRA DRILL HELPER

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

OPTION EAST AREA SAMPLES

FFP

1007AA 30 Each

OPTION WALL SAMPLES

FFP

1007AB 50 Each

OPTION WALL SAMPLES

FFP

1007AC 10 Each

OPTION PISTON SAMPLES

FFP

1007AD 50 Each

OPTION PISTON SAMPLES

FFP

1007AE 75 Foot OPTION NQ-3 or EQUIVALENT

FFP

1007AF 100 Foot OPTION HQ-3 or EQUIVALENT

FFP

1007AG 150 Foot

OPTION HQ WIRELINE CORE DRILLING

FFP

1007AH 100 Foot OPTION PQ-3 or EQUIVALENT

FFP

1007AJ 50 Foot OPTION 6" x 7 3/4" or Equivalent

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1008 160 Days

OPTION EAST PER DIEM

FFP

OPTION YEAR 1 For each individual when over 50 miles from Home Office (per day)

UNIT UNIT PRICE ESTIMATED AMOUNT

1009 10 Days

OPTION EAST AREA RENTAL

FFP

OPTION YEAR 1 Portable Steam Cleaner Rental

UNIT UNIT PRICE ESTIMATED AMOUNT

1010 10 Each

OPTION EAST AREA DOT-APPROVED CONTAINERS

FFP

OPTION YEAR 1 DOT-

Approved Containers (Drums) for Contaminated Soils, Drilling

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA BACKFILL MATERIAL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AA 100 Each

OPTION PORTLAND CEMENT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AB 100 Each

OPTION HIGH SOLIDS BENTONITE GROUT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AC 100 Each

OPTION BENTONITE CHIPS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AD 20 Each

OPTION FILTER PACK SAND

FFP

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot

UNIT UNIT PRICE ESTIMATED AMOUNT

1011AE 10 Each

OPTION BARITE DRILLING ADDITIVE

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA MONITORING

FFP

OPTION YEAR 1

Monitoring Well, Piezometer and Instrumentation Casing

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AA 140 Each

OPTION RISER PIPE

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AB 30 Each

OPTION WELL SCREEN

FFP

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, UNIT UNIT PRICE ESTIMATED AMOUNT

1012AC 40 Each

OPTION RISER PIPE

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AD 10 Each

OPTION WELL SCREEN

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AE 12 Each

OPTION GUARD POSTS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AF 70 Foot

OPTION PROTECTIVE CASING

FFP

4-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AG 140 Foot

OPTION PROTECTIVE CASING

FFP

6-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

1012AH 35 Foot

OPTION PROTECTIVE CASING

FFP

8-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG A

FFP

OPTION YEAR 1

UNIT UNIT PRICE ESTIMATED AMOUNT

1013AA 200 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1013AB 25 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1013AC 5 Each

OPTION MOB 7 DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG B

FFP

1014AA 100 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, UNIT UNIT PRICE ESTIMATED AMOUNT

1014AB 25 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, UNIT UNIT PRICE ESTIMATED AMOUNT

1014AC 5 Each

OPTION MOB & DEMOD PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AA 100 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AB 25 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

1015AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG D

FFP

OPTION YEAR 1

UNIT UNIT PRICE ESTIMATED AMOUNT

1016AA 80 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1016AB 20 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level C as defined

1016AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG E

FFP

OPTION YEAR 1

PIPE DRIVING RIG

UNIT UNIT PRICE ESTIMATED AMOUNT

1017AA 80 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1017AB 20 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level C as defined by OSHA. See details in section C-2e.

UNIT UNIT PRICE ESTIMATED AMOUNT

1017AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF PIEZOCONE SYSTEM

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1018AA 200 Hours OPTION Rental of Piezocone (CPTu) system

FFP

Rental of Piezocone (CPTu) system With operator, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1018AB 10 Hours OPTION RENTAL OF PIEZOCONE (CPTu) SYSTEM

FFP

Rental of Piezocone (CPTu) system With operator, Level C as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

1018AC 10 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1019 60 Hours

OPTION WEST EXTRA DRILL HELPER

FFP

OPTION WEST AREA SAMPLES

FFP

1020AA 30 Each

OPTION WALL SAMPLES

FFP

1020AB 50 Each

OPTION WALL SAMPLES

FFP

1020AC 10 Each

OPTION PISTON SAMPLES

FFP

1020AD 50 Each

OPTION PISTON SAMPLES

FFP

1020AE 75 Foot OPTION NQ-3 or EQUIVALENT

FFP

1020AF 100 Foot OPTION HQ-3 or EQUIVALENT

FFP

1020AG 150 Foot

OPTION HQ WIRELINE CORE DRILLING

FFP

1020AH 100 Foot OPTION PQ-3 or EQUIVALENT

FFP

1020AJ 50 Foot OPTION 6" x 7 3/4" or Equivalent

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1021 160 Days

OPTION WEST PER DIEM

FFP

OPTION YEAR 1 For each individual when over 50 miles from Home Office (per day)

UNIT UNIT PRICE ESTIMATED AMOUNT

1022 10 Days

OPTION WEST AREA RENTAL

FFP

OPTION YEAR 1

Portable Steam Cleaner Rental

UNIT UNIT PRICE ESTIMATED AMOUNT

1023 10 Each

OPTION WEST AREA DOT-APPROVED CONTAINERS

FFP

OPTION YEAR 1 DOT-

Approved Containers (Drums) for Contaminated Soils, Drilling

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA BACKFILL MATERIAL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1024AA 100 Each

OPTION PORTLAND CEMENT

FFP

Page 100 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1024AB 100 Each

OPTION HIGH SOLIDS BENTONITE GROUT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1024AC 100 Each

OPTION BENTONITE CHIPS

FFP

Page 101 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1024AD 20 Each

OPTION FILTER PACK SAND

FFP

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot

UNIT UNIT PRICE ESTIMATED AMOUNT

1024AE 10 Each

OPTION BARITE DRILLING ADDITIVE

FFP

Page 102 of

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA MONITORING

FFP

OPTION YEAR 1

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AA 140 Each

OPTION RISER PIPE

FFP

Page 103 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AB 30 Each

OPTION WELL SCREEN

FFP

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, UNIT UNIT PRICE ESTIMATED AMOUNT

1025AC 40 Each

OPTION RISER PIPE

FFP

Page 104 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AD 10 Each

OPTION WELL SCREEN

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AE 12 Each

OPTION GUARD POSTS

FFP

Page 105 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AF 70 Foot

OPTION PROTECTIVE CASING

FFP

4-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AG 140 Foot

OPTION PROTECTIVE CASING

FFP

6-Inch Diameter Monitoring Well Protective Casing with Locking

Page 106 of

UNIT UNIT PRICE ESTIMATED AMOUNT

1025AH 35 Foot

OPTION PROTECTIVE CASING

FFP

8-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG A

FFP

OPTION YEAR 2

Page 107 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2000AA 200 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined by OSHA. See details in Section C-2a.

UNIT UNIT PRICE ESTIMATED AMOUNT

2000AB 25 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined by OSHA. See details in Section C-2a.

Page 108 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2000AC 5 Each

OPTION MOB 7 DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG B

FFP

OPTION YEAR 2

Page 109 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AA 100 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, UNIT UNIT PRICE ESTIMATED AMOUNT

2001AB 25 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level C as defined by OSHA. See details in Section C-2b.

Page 110 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AC 5 Each

OPTION MOB & DEMOD PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG C

FFP

Page 111 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AA 100 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AB 25 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

Page 112 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG D

FFP

OPTION YEAR 2

Page 113 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AA 80 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AB 20 Hours

OPTION DRILL RIG D

FFP

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level C as Defined

Page 114 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2003AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF DRILL RIG E

FFP

OPTION YEAR 2

PIPE-DRIVING RIG

Page 115 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2004AA 80 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

2004AB 20 Hours

OPTION DRILL RIG E

FFP

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level C as defined

Page 116 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2004AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA RENTAL OF PIEZOCONE SYSTEM

FFP

Page 117 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AA 200 Hours OPTION Rental of Piezocone (CPTu) system

FFP

Rental of Piezocone (CPTu) system With operator, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AB 10 Hours OPTION RENTAL OF PIEZOCONE (CPTu) SYSTEM

FFP

Rental of Piezocone (CPTu) system With operator, Level C as Defined

Page 118 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AC 10 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2006 60 Hours

OPTION EAST EXTRA DRILL HELPER

FFP

Page 119 of

OPTION EAST AREA SAMPLES

FFP

2007AA 30 Each

OPTION WALL SAMPLES

FFP

2007AB 50 Each

OPTION WALL SAMPLES

FFP

Page 120 of

2007AC 10 Each

OPTION PISTON SAMPLES

FFP

2007AD 50 Each

OPTION PISTON SAMPLES

FFP

2007AE 75 Foot OPTION NQ-3 or EQUIVALENT

FFP

Page 121 of

2007AF 100 Foot OPTION HQ-3 or EQUIVALENT

FFP

2007AG 150 Foot

OPTION HQ WIRELINE CORE DRILLING

FFP

Page 122 of

2007AH 100 Foot OPTION PQ-3 or EQUIVALENT

FFP

2007AJ 50 Foot OPTION 6" x 7 3/4" or Equivalent

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2008 160 Days

OPTION EAST PER DIEM

FFP

OPTION YEAR 2

For each individual when over 50 miles from Home Office (per day)

Page 123 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2009 10 Days

OPTION EAST AREA RENTAL

FFP

OPTION YEAR 2 Portable Steam Cleaner Rental

UNIT UNIT PRICE ESTIMATED AMOUNT

2010 10 Each

OPTION EAST AREA DOT-APPROVED CONTAINERS

FFP

OPTION YEAR 2

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling

Page 124 of

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA BACKFILL MATERIAL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AA 100 Each

OPTION PORTLAND CEMENT

FFP

Page 125 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AB 100 Each

OPTION HIGH SOLIDS BENTONITE GROUT

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AC 100 Each

OPTION BENTONITE CHIPS

FFP

Page 126 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AD 20 Each

OPTION FILTER PACK SAND

FFP

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot

UNIT UNIT PRICE ESTIMATED AMOUNT

2011AE 10 Each

OPTION BARITE DRILLING ADDITIVE

FFP

Page 127 of

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION EAST AREA MONITORING

FFP

OPTION YEAR 2

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AA 140 Each

OPTION RISER PIPE

FFP

Page 128 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AB 30 Each

OPTION WELL SCREEN

FFP

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, UNIT UNIT PRICE ESTIMATED AMOUNT

2012AC 40 Each

OPTION RISER PIPE

FFP

Page 129 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AD 10 Each

OPTION WELL SCREEN

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AE 12 Each

OPTION GUARD POSTS

FFP

Page 130 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AF 70 Foot

OPTION PROTECTIVE CASING

FFP

4-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AG 140 Foot

OPTION PROTECTIVE CASING

FFP

6-Inch Diameter Monitoring Well Protective Casing with Locking

Page 131 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2012AH 35 Foot

OPTION PROTECTIVE CASING

FFP

8-Inch Diameter Monitoring Well Protective Casing with Locking

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG A

FFP

OPTION YEAR 2

Page 132 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2013AA 200 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig ATV, Track-Mounted, Level D as defined

UNIT UNIT PRICE ESTIMATED AMOUNT

2013AB 25 Hours

OPTION DRILL RIG A

FFP

Drill Rig A, Geotechnical Drilling Rig, ATV, Track-Mounted, level C as defined

Page 133 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2013AC 5 Each

OPTION MOB 7 DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG B

FFP

Page 134 of

2014AA 100 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, UNIT UNIT PRICE ESTIMATED AMOUNT

2014AB 25 Hours

OPTION DRILL RIG B

FFP

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, Page 135 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2014AC 5 Each

OPTION MOB & DEMOD PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG C

FFP

Page 136 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AA 100 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AB 25 Hours

OPTION DRILL RIG C

FFP

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel

Page 137 of

UNIT UNIT PRICE ESTIMATED AMOUNT

2015AC 2 Each

OPTION MOB & DEMOB PER CALL

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION WEST AREA RENTAL OF DRILL RIG D

FFP

OPTION YEAR 2

Page 138 of http://www.wdol.gov/wdol/scafiles/std/05-