SOLICITATION W912ES-14-B-0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BIDDING_ABSTRACT_14-B-0014.xls.pdf | ||
| AMENDMENT_0002.pdf | ||
| AMENDMENT_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W912ES-14-B-0014
OPERATIONS AND MAINTENANCE
MISSISSIPPI AND MINNESOTA RIVERS
SPECIFICATIONS
FOR
EMERGENCY MECHANICAL DREDGING
JULY 2014
US Army Corps of Engineers St. Paul District
W81G6742053944
Emergency Mechanical Dredging, Mississippi and Minnesota Rivers, Minnesota, Wisconsin, and Iow a
Work consists of, but is not limited to, furnishing all plant, labor, material, and equipment necessary for dredging w ith a backhoe, dragline, or other mechanical equipment on marine plant, and transporting dredged material to designated placement sites.
This solicitation is issued as an Invitation for Bids (IFB) and is 100% set-aside for small business concerns. The solicitation w ill result in an Indefinite Delivery Indefinite Quantity (IDIQ) type contract for an approximate period of performance of three months. The estimated price range is betw een $500,000 and $1,000,000. The appropriate NAICS code for this procurement is 237990 (dredging) w ith a small business size standard of $27,500,000.
X
KEVIN P HENRICKS 651-290-5414
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jul-2014
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.216-22
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________06 Aug 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
651-290-5706FAX:TEL: TEL: FAX:
W912ES-14-B-0014 213
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912ES-14-B-0014
TABLE OF CONTENTS
SECTION 00 01 00 ‐ SOLICITATION CONTRACT FORM
NOTES TO BIDDERS
BID SCHEDULE
SECTION 00 10 00 ‐ BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.209‐4001 BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105‐1
52.214‐3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
52.214‐4 FALSE STATEMENTS IN BIDS (APR 1984)
52.214‐5 SUBMISSION OF BIDS (MAR 1997)
52.214‐6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
52.214‐7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
52.214‐18 PREPARATION OF BIDS‐‐CONSTRUCTION (APR 1984)
52.214‐19 CONTRACT AWARD‐‐SEALED BIDDING‐‐CONSTRUCTION (AUG 1996)
52.214‐26 AUDIT AND RECORDS‐‐SEALED BIDDING (OCT 2010)
52.214‐34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
52.214‐35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
52.214‐4001 INQUIRIES ‐ BID INFORMATION
52.214‐4002 ALL OR NONE QUALIFICATIONS (FEB 2011) FAR 14.404‐5
52.216‐1 TYPE OF CONTRACT (APR 1984)
52.222‐5 CONSTRUCTION WAGE RATE REQUIREMENTS‐‐SECONDARY SITE OF THE WORK (MAY 2014) 52.222‐23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
52.222‐38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS (SEP 2010)
52.225‐10 NOTICE OF BUY AMERICAN REQUIREMENT‐‐CONSTRUCTION MATERIALS (MAY 2014)
52.233‐2 SERVICE OF PROTEST (SEP 2006)
52.252‐1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
SECTION 00 60 00 ‐ REPRESENTATIONS & CERTIFICATIONS
52.204‐8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2014)
52.209‐7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
252.203‐7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011)
SECTION 00 70 00 ‐ CONTRACT CLAUSES
52.202‐1 DEFINITIONS (NOV 2013)
52.202‐4001 DEFINITIONS (JULY 2014) UAI PART 2.101‐100
52.203‐3 GRATUITIES (APR 1984)
52.203‐5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203‐6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.203‐7 ANTI‐KICKBACK PROCEDURES. (MAY 2014)
52.203‐8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
52.203‐17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
52.204‐4 PRINTED OR COPIED DOUBLE‐SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204‐7 SYSTEM FOR AWARD MANAGEMENT (JULY 2013)
52.204‐10 REPORTING EXECUTIVE COMPENSATION AND FIRST‐TIER SUBCONTRACT AWARDS (JULY 2013)
52.204‐13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)
52.209‐6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
52.209‐9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013) 43
52.211‐10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
52.216‐18 ORDERING. (OCT 1995)
52.216‐19 ORDER LIMITATIONS. (OCT 1995)
52.216‐22 INDEFINITE QUANTITY. (OCT 1995)
52.219‐6 NOTICE OF TOTAL SMALL BUSINESS SET‐ASIDE (NOV 2011)
52.219‐8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2014)
52.219‐14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
52.219‐28 POST‐AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)
52.222‐3 CONVICT LABOR (JUN 2003)
52.222‐6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)
52.222‐7 WITHHOLDING OF FUNDS (MAY 2014)
52.222‐8 PAYROLLS AND BASIC RECORDS (MAY 2014)
52.222‐9 APPRENTICES AND TRAINEES (JUL 2005)
52.222‐10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222‐11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222‐12 CONTRACT TERMINATION‐‐DEBARMENT (MAY 2014)
52.222‐13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014)
52.222‐14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222‐15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222‐21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
52.222‐26 EQUAL OPPORTUNITY (MAR 2007)
52.222‐27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)
52.222‐35 EQUAL OPPORTUNITY FOR VETERANS (SEP 2010)
52.222‐36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)
52.222‐37 EMPLOYMENT REPORTS ON VETERANS (SEP 2010)
52.222‐40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
52.222‐50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
52.222‐54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)
52.222‐99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014‐O0017) (JUNE 2014) 52.223‐2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION
CONTRACTS (SEP 2013)
52.214‐26 AUDIT AND RECORDS‐‐SEALED BIDDING (OCT 2010)
52.223‐9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA‐DESIGNATED ITEMS (MAY 2008)
52.223‐11 OZONE‐DEPLETING SUBSTANCES (MAY 2001)
52.223‐17 AFFIRMATIVE PROCUREMENT OF EPA‐DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
52.223‐18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
52.225‐9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
52.225‐13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227‐1 AUTHORIZATION AND CONSENT (DEC 2007)
52.227‐2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)
52.227‐4 PATENT INDEMNITY‐‐CONSTRUCTION CONTRACTS (DEC 2007)
52.228‐1 BID GUARANTEE (SEP 1996)
52.228‐2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228‐11 PLEDGES OF ASSETS (JAN 2012)
52.228‐12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228‐14 IRREVOCABLE LETTER OF CREDIT (MAY 2014)
52.228‐15 PERFORMANCE AND PAYMENT BONDS‐‐CONSTRUCTION (OCT 2010)
52.229‐3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232‐5 PAYMENTS UNDER FIXED‐PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232‐17 INTEREST (MAY 2014)
52.232‐23 ASSIGNMENT OF CLAIMS (MAY 2‐14) ‐ ALTERNATE I (APR 1984)
52.232‐27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)
52.232‐33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (JULY 2013) 102
52.232‐39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232‐40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
52.233‐1 DISPUTES. (MAY 2014)
52.233‐3 PROTEST AFTER AWARD (AUG. 1996)
52.233‐4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236‐2 DIFFERING SITE CONDITIONS (APR 1984)
52.236‐3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236‐5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236‐6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236‐7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236‐8 OTHER CONTRACTS (APR 1984)
52.236‐9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
(APR 1984)
52.236‐10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236‐11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236‐12 CLEANING UP (APR 1984)
52.236‐13 ACCIDENT PREVENTION (NOV 1991)
52.236‐16 QUANTITY SURVEYS (APR 1984)
52.236‐17 LAYOUT OF WORK (APR 1984)
52.236‐21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
52.236‐26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242‐13 BANKRUPTCY (JUL 1995)
52.242‐14 SUSPENSION OF WORK (APR 1984)
52.243‐4 CHANGES (JUN 2007)
52.244‐6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAY 2014)
52.246‐12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.248‐3 VALUE ENGINEERING‐‐CONSTRUCTION (OCT 2010)
52.249‐2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED‐PRICE) (APR 2012)
52.249‐10 DEFAULT (FIXED‐PRICE CONSTRUCTION) (APR 1984)
52.252‐2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252‐6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
52.253‐1 COMPUTER GENERATED FORMS (JAN 1991)
252.201‐7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.203‐7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) 252.203‐7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE‐CONTRACT‐RELATED
FELONIES (DEC 2008)
252.203‐7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.204‐7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204‐7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
252.204‐7006 BILLING INSTRUCTIONS (OCT 2005)
252.204‐7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV 2013)
252.209‐7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
TERRORIST COUNTRY (MAR 2014)
252.225‐7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2012)
252.225‐7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)
252.225‐7048 EXPORT‐CONTROLLED ITEMS (JUNE 2013)
252.232‐7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUNE 2012)
252.232‐7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.236‐7000 MODIFICATION PROPOSALS ‐ PRICE BREAKDOWN. (DEC 1991)
252.236‐7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
252.236‐7002 OBSTRUCTION OF NAVIGABLE WATERWAYS. (DEC 1991)
252.236‐7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)
252.243‐7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
252.243‐7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.244‐7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)
252.247‐7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)
252.247‐7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
SECTION 00 80 00 ‐ SPECIAL CONTRACT REQUIREMENTS
52.000‐4000 GENERAL
52.000‐4001 CONTRACT MINIMUM/CONTRACT MAXIMUM
52.000‐4004 PARTNERING
52.000‐4008 SMALL BUSINESS SET ASIDE REQUIREMENTS FOR DREDGING (OCT 2000)
52.229‐4001 IOWA SALES AND USE TAX
52.232‐4004 INVOICE PROCEDURES
52.236‐4006 SAFETY AND HEALTH REQUIREMENTS MANUAL INTERIM CHANGES, EM 385‐1‐1 (JAN 2009) .. 150
52.236‐4014 PURCHASE ORDERS
52.236‐4025 FLOATING PLANT EQUIPMENT (MAY 1999)
52.236‐4061 OBSTRUCTION OF CHANNEL
52.236‐4062 SIGNAL LIGHTS (JAN 1965)
52.236‐4063 RADIO
52.249‐5000 BASIS FOR SETTLEMENT OF PROPOSALS
AT/OPSEC 15: PRE‐SCREEN CANDIDATES USING E‐VERIFY PROGRAM
MVP‐0002 APPARENT CLERICAL MISTAKES
MVP‐0003 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(S‐102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS‐BACON ACT
CERTIFIED LABOR PAYROLLS (APRIL 2011)
WAGE DECISIONS
Section 00 01 00 ‐ Solicitation Contract Form
NOTES TO BIDDERS
1. To comply with the Small Business requirement set forth at note (1) of Small Business Size Standard 237990, Other Heavy and Civil Engineering Construction (Dredging and Surface Cleanup Activities), the small business prime contractor must perform at least 40 percent of the volume dredged with its own dredging equipment or dredging equipment owned by another small dredging concern. The SBA has interpreted the 40 percent rule to apply only to equipment involved in the act of excavation and not to “auxiliary equipment” involved in other functions, such as the transportation of excavated sediment from the dredge site to the disposal site (see Size Appeal of American Construction Co., Inc. , SBA No. SIZ- 5420 (2012)).
2. RESPONSIBILITY DETERMINATION. In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent low bidder will be requested to provide the following information:
a) A detailed description of the work to be self-performed and resources available to demonstrate the firm is capable of complying with: (1) 52.000-4008, Small Business Set-aside Requirements for Dredging and (2) 52.219-14, Limitations on Subcontracting.
b) Financial Statements, including balance sheets that identify major categories of assets, liabilities, and owner’s equity; and profit and loss statements for the past three (3) years.
c) A Bank Certification of Financial Capability (line of credit).
Bidder qualification information, as referenced in the provision at 52.209-4001, must be received by the Contracting Officer within two (2) business days after the bid opening. This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
3. BIDDER INQUIRIES. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org
Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet system.
Bidders may register online at https://www.projnet.org (click on “Register”).
The following information will be needed to submit or view bidder inquiries:
Managing Agency: USACE
Solicitation Number: W912ES-14-B-0014
Bidder Inquiry Key: P7T87C-3ZFNIN
Bidders shall submit inquiries not later noon on August 4, 2014 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Those who submit an inquiry will receive a system-generated email acknowledgement. All answers to inquiries will be posted in ProjNet after they have been reviewed by the USACE technical team. Bidders are advised to review the solicitation in its entirety and to review all previously submitted questions and responses prior to submitting a new inquiry.
4. QUANTITIES. All Quantities are estimated except where unit is given as Job or Each. This solicitation will result in an Indefinite Delivery Indefinite Quantity contract which precludes the need for the clause at FAR 52.111-18, “Variation in Estimated Quantity”. Contract and task order minimums and maximums are addressed in the following clauses at 52.000-4001, “Contract Minimum/Maximum” (Section 00 80 00) and 52.216-19, “Order Limitations” (Section 00 70 00).
Bids will be evaluated in accordance with the provision at FAR 52.214-19, Contract Award – Sealed Bidding – Construction (Section 00 01 00). The line item quantities listed in the Bid Schedule are for evaluation purposes only and are not intended to convey either a minimum or maximum quantity that will be ordered by the Government. The unit price that will be paid for any line item will not be changed based on the quantity actually ordered by the Government. The ultimate contract price will be the sum of the task orders issued.
5. SAM REGISTRATION. All bidders must register and complete online representations and certifications in the System for Award Management (SAM) at www.sam.gov prior to the bid opening. Bidders that have not registered or completed their online representations and certifications may be rejected. Bidders are advised that the initial registration process in SAM may take several weeks. The Government will review completed Representations and Certifications in SAM following the bid opening. Submission of paper copies of completed representations and certifications is NOT required with bid submissions.
6. ISSUANCE OF TASK ORDERS. Work will be ordered through the issuance of individual task orders as the requirements of the Corps of Engineers are defined. Each task order will include the specific requirements related to the work covered by the task order, and delivery or performance requirements. Task Order prices will be in accordance with the fixed rates established in the Bid Schedule (Section 00 01 00).
7. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern. For further information reference clause 52.214-5000 entitled “Apparent Clerical Mistakes” in Section 00 80 00.
8. For contract line items that are related to transportation of dredge material over 8 river miles, reference the historical data provided in Section 01 00 00.00 13 GENERAL.
9. BID BONDS
a. This solicitation requires each offeror to submit an acceptable bid guarantee in the amount of $150,000.00 along with its offer (see clause 52.228-1). The Contracting Officer has the authority and responsibility to determine whether the bid bond and its accompanying documentation clearly show that the person(s) executing the bid bond on behalf of the surety have the authority to unequivocally bind the bonding company.
b. One acceptable form of bid guarantee is a bid bond. If a bid bond is used, it must be accompanied by a signed and dated power-of-attorney. If a signed and dated power-of-attorney does not accompany the bid bond, the bid must be rejected as non-responsive. Please note that a non-responsive bid may not be corrected after bid opening to make it responsive – the bid must be rejected. The power-of-attorney must be issued by the surety (the Treasury Department-approved bonding company, not the insurance agency writing the bond).
c. Original powers-of-attorney and photocopies or facsimiles of original, otherwise valid, powers-of-attorney provide sufficient evidence of authority to bind the surety. Questions concerning the authenticity or enforceability of a power-of-attorney may be resolved by the Contracting Officer, often in consultation with the surety, after the bid opening.
d. This bid note does not provide bidders with an all-inclusive checklist for submitting an acceptable bid bond – rather, it provides some information regarding recent changes to the Federal Acquisition Regulation regarding the validity of powers-of-attorney. The revised regulation may be found at FAR 28.101-3.
e. The revised regulations described in this bid note are effective for solicitations issued after September
30, 2005.
10. PERFORMANCE AND PAYMENT BONDS. In accordance with the clause at FAR 52.228-15, “Performance and Payment Bonds – Construction” (Section 00 70 00), prior to commencing any work under the contract, the contractor shall provide: (1) a performance bond (Standard Form 25) in the penal amount of $500,000.00; and (2) a payment bond (Standard Form 25-A) in the penal amount of $500,000.00.
11. UNBALANCED BIDS. The government may reject as non-responsive any bid that is materially unbalanced between contract line item numbers or sub-items on the bidding schedule. A bid is materially unbalanced when it is based on prices that are significantly less than cost for some work and significantly more than cost for other work. A materially unbalanced bid may be rejected if the Contracting Officer has a reasonable doubt as to whether the bid will result in the lowest overall cost to the government even though it may be the low evaluated bid. Additionally, a bid that is unbalanced so as to be tantamount to an advance payment will be rejected as non-responsive even if acceptance of the bid would result in the lowest overall cost to the government. Reference is made to paragraph (d) of clause 52.214-19, “Contract Award – Sealed Bidding
– Construction.”
12. MOBILIZATION AND DEMOBILIZATION. Offerors are advised that the Government will closely examine the bid prices for mobilization and demobilization to ensure the proposed prices bear a reasonable relation to the actual cost of the work. Offerors are reminded that unbalanced bids may be rejected in their entirety. In addition, the contractor may be required to furnish cost data to justify bid prices in accordance with clause 252.236-7004, Payment for Mobilization and Demobilization.
13. The addresses, phone numbers, and Internet address (if available) for references cited in these specifications are listed in the Unified Facilities Guide Specification (UFGS) 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS. UFGS 01 42 00 is available under Publications on the TECHINFO page of the Corps of Engineers Huntsville District Internet site at: www.hnd.usace.army.mil/techinfo.
14. Any forthcoming amendments will only be available on this website: www.fbo.gov. It is recommended that each registered firm check this website periodically for updates.
15. FACSIMILE BIDS AND MODIFICATIONS WILL NOT BE ACCEPTED.
BID SCHEDULE
ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 Mobilization/Demobilization 1 Job _____________ ______________
0002 Dredging – St. Paul District 50,000 Cubic Yard _____________ ______________
0003 Transportation of Dredge 16,000 Cubic Yard Mile _____________ ______________ Material 4-8 River Miles
0004 Transportation of Dredge Material Over 8 River Miles 9,000 Cubic Yard Mile _____________ ______________
0005 Transportation of Plant Between Dredging Sites 200 Miles _____________ ______________
0006 Overland Transportation of 10,000 Cubic Yard _____________ ______________ Dredged Material up to and Including 0.5 Miles at Placement Sites with Special Consideration
0007 Overland Transportation of 5,000 Cubic Yard _____________ ______________ Material Over 0.5 Miles up to, and including, 1.5 Miles at Placement Sites with Special Consideration
0008 Standby 5 Day _____________ ______________
TOTAL ______________
Section 00 10 00 ‐ Bidding Schedule/Instructions to Bidders
52.209‐4001 BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105‐1
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding its previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
52.214‐3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation.
The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
(End of provision)
52.214‐4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.
The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
52.214‐5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
52.214‐6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
| 52.214‐7 | LATE | SUBMISSIONS, | MODIFICATIONS, | AND | WITHDRAWALS | OF | ||
| BIDS | (NOV | 1999) |
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
52.214‐18 PREPARATION OF BIDS‐‐CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
52.214‐19 CONTRACT AWARD‐‐SEALED BIDDING‐‐CONSTRUCTION (AUG
1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
(End of provison)
52.214‐26 Audit and Records‐‐Sealed Bidding (OCT 2010)
(a) As used in this clause, records includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Certified cost or pricing data. If the Contractor has been required to submit certified cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the certified cost or pricing data, shall have the right to examine and audit all of the Contractor's records, including computations and projections, related to--
(1) The proposal for the modification;
(2) The discussions conducted on the proposal(s), including those related to negotiating;
(3) Pricing of the modification; or
(4) Performance of the modification.
(c) Comptroller General. In the case of pricing any modification, the Comptroller General of the United States, or an authorized representative, shall have the same rights as specified in paragraph (b) of this clause and also the right to interview any current employee regarding such transactions.
(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in reproduction, until 3 years after final payment under this contract, or for any other period specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on the data of this contract, is incorporated by reference in its entirety and made a part of this contract.
(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.
(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.
(e) The Contractor shall insert a clause containing all the provisions of this clause, including this paragraph (e), in all subcontracts expected to exceed the threshold in FAR 15.403-4(a)(1) for submission of certified cost or pricing data.
(End of clause)
52.214‐34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR
1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
52.214‐35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
52.214‐4001 INQUIRIES ‐ BID INFORMATION
(a) Inquiries:
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org
Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet system. Bidders may register online at https://www.projnet.org (click on “Register”).
The following information will be needed to submit or view bidder inquiries:
Managing Agency: USACE
Solicitation Number: W912ES-14-B-0014
Bidder Inquiry Key: P7T87C-3ZFNIN
Bidders shall submit inquiries not later than noon on August 4, 2014 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Those who submit an inquiry will receive a system-generated email acknowledgement. All answers to inquiries will be posted in ProjNet after they have been reviewed by the USACE technical team. Bidders are advised to review the solicitation in its entirety and to review all previously submitted questions and responses prior to submitting a new inquiry.
(b) Bid Depository/Bid Opening Information:
Bids must be deposited prior to the date and time set for opening of bids. The bid depository is located in the Contracting Division, 7th Floor, of the U.S. Army Corps of Engineers - St. Paul District, 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678. A public bid opening will be held at the same location.
52.214‐4002 ALL OR NONE QUALIFICATIONS (FEB 2011) FAR 14.404‐5
A vendor must provide a price on all items in this solicitation to be eligible for award. The Government will award on an “All or None” basis. Evaluation of bids/offers will be based upon only the total price included on the pricing schedule for all items. If options are included in the pricing schedule the evaluation will be conducted in accordance with the applicable option clause in the solicitation.
52.216‐1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of an Indefinite Delivery Indefinite Quantity (IDIQ) contract resulting from this solicitation.
| 52.222‐5 | CONSTRUCTION | WAGE | RATE | REQUIREMENTS‐‐SECONDARY | SITE | |
| OF | THE | WORK | (MAY | 2014) |
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
| 52.222‐23 | NOTICE | OF | REQUIREMENT | FOR | AFFIRMATIVE | ACTION | TO | ||||
| ENSURE | EQUAL | EMPLOYMENT | OPPORTUNITY | FOR | CONSTRUCTION | (FEB |
1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
0.7% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is City of St. Paul, MN, Ramsey County and covered areas specified in individual task orders.
| 52.222‐38 | COMPLIANCE | WITH | VETERANS' | EMPLOYMENT | REPORTING |
| REQUIREMENTS | (SEP | 2010) |
By submission of its offer, the offeror represents that, if it is subject to the reporting requirements of 38 U.S.C.
4212(d) (i.e., if it has any contract containing Federal Acquisition Regulation clause 52.222-37, Employment Reports on Veterans), it has submitted the most recent VETS-100A Report required by that clause.
| 52.225‐10 | NOTICE | OF | BUY | AMERICAN | REQUIREMENT‐‐CONSTRUCTION | ||
| MATERIALS | (MAY | 2014) |
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233‐2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer Contracting Division U.S. Army Corps of Engineers 180 5th Street East, Suite 700 St. Paul, MN 55101-1678
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
| 52.252‐1 | SOLICITATION | PROVISIONS | INCORPORATED | BY | REFERENCE | |
| (FEB | 1998) |
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation Supplement (DFARS), Army Federal Acquisition Regulation Supplement (AFARS): http://farsite.hill.af.mil/
The Engineer Federal Acquisition Regulation Supplement (EFARS) has been rescinded by the USACE Acquisition Instruction (UAI). EFARS references can be accessed in the USACE Acquisition Instruction (UAI):
http://www.usace.army.mil/BusinessWithUs/Contracting/Resources.aspx
Section 00 60 00 ‐ Representations & Certifications
CLAUSES INCORPORATED BY FULL TEXT
52.204‐8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.
(2) The small business size standard is $27,500,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated: