AMENDMENT_0001.pdf
PDF 152 KB Posted
- Attached to
- Emergency Mechanical Dredging IDIQ Federal contract opportunity
- Solicitation number
- W912ES-14-B-0014
About this file
AMENDMENT 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BIDDING_ABSTRACT_14-B-0014.xls.pdf | ||
| AMENDMENT_0002.pdf | ||
| W912ES-14-B-0014_SOLICITATION_SPEC_29July2014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6742053944
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Incorporate the current WI15 Davis-Bacon Act Wage Determination (General Decision Number: WI140015 08/01/2014 WI15, Superseded General Decision Number: WI20130015).
(Continued. See SF30 Block 14 Continuation Pages.)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 74
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Aug-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-14-B-0014
X 9B. DATED (SEE ITEM 11)
29-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Aug-2014
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-14-B-0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
BLOCK 14 CONTINUATION
2. Revise Note 2, Responsibility Determination (“Notes To Bidders”, Section 00 01 00) to read as follows:
“2. RESPONSIBILITY DETERMINATION. In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent low bidder shall submit the attached “Preaward Questionnaire” immediately following the bid opening upon request by the Contracting Officer.
This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.”
3. Incorporate the attached “Preaward Questionnaire” to the solicitation.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
PREAWARD QUESTIONNAIRE
PREAWARD QUESTIONNAIRE
U. S. Army Corps of Engineers – St. Paul District Solicitation W912ES-14-B-0014
In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent low bidder shall submit the attached “Preaward Questionnaire” immediately following the bid opening upon request from the Contracting Officer.
Name of Firm: _____________________________________________________________________
Address: _________________________________________________________________________
CAGE Code: ___________________________ DUNS Number: ____________________________
Prepared By (Print Name, Title): _____________________________________________________
Phone Number: _________________________ Email: ____________________________________
Please provide the following information:
Balance sheets that identify major categories of assets, liabilities, and owner’s equity; and profit and loss statements for the past three (3) years
Bank certification of financial capability (line of credit) Information concerning problems encountered during the just-completed fiscal year and plans for the future
(if applicable) Copy of joint venture agreement (if applicable)
This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
1. How long has your firm been in present business? _____________
Describe other previous business experience relative to this project (attach additional pages as needed).
2.
3. What percentage of work under this project will be performed by your firm? ______%
4. Provide a list of dredging equipment to be used in the act of excavation, not including “auxiliary equipment” involved in other functions, such as the transportation of excavation sediment from the dredge site to the disposal site.
For each piece of equipment listed, identify the manufacturer, model number, and business owner to demonstrate your firm is capable of complying with 52.000-4008, “Small Business Set-aside Requirements for Dredging”. (Attach additional pages as needed.)
5. Describe other equipment and crew available for performance of this project. (Attach additional pages as needed.)
6. Previous government contracts (attach additional pages as needed).
a. Contract Information:
Contract Number: ________________________________________________________ Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ Contact Name /Title: ________________________________________________________ Phone Number: ________________________________________________________ Email Address: ________________________________________________________
b. Contract Information:
Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ Contact Name /Title: ________________________________________________________
c. Contract Information:
Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ POC Name /Title: ________________________________________________________
7. Work currently in progress (attach additional pages as needed).
a. Contract Information:
Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ Contact Name /Title: ________________________________________________________ Phone Number: ________________________________________________________ Email Address: ________________________________________________________
b. Contract Information:
Contract Number: ________________________________________________________ Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ Contact Name /Title: ________________________________________________________
c. Contract Information:
Contract Title: ________________________________________________________ Contract Location: ________________________________________________________
Work Performed as: __ Prime contractor __Subcontractor __Other(_________________)
Award Date: _____________________________________________ Completion Date or % Complete: ____________________________ Contract Price (Award Amount):______________________________
Project Description (Specify similar equipment, requirements, conditions, etc. as applicable)
Client Information:
Client/Agency Name: ________________________________________________________ POC Name /Title: ________________________________________________________
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
NOTES TO BIDDEERS
NOTES TO BIDDERS
1. To comply with the Small Business requirement set forth at note (1) of Small Business Size Standard 237990, Other Heavy and Civil Engineering Construction (Dredging and Surface Cleanup Activities), the small business prime contractor must perform at least 40 percent of the volume dredged with its own dredging equipment or dredging equipment owned by another small dredging concern. The SBA has interpreted the 40 percent rule to apply only to equipment involved in the act of excavation and not to
“auxiliary equipment” involved in other functions, such as the transportation of excavated sediment from the dredge site to the disposal site (see Size Appeal of American Construction Co., Inc. , SBA No. SIZ-5420 (2012)).
2. RESPONSIBILITY DETERMINATION. In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent low bidder shall submit the attached “Preaward Questionnaire” immediately following the bid opening upon request from the Contracting Officer.
This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
3. BIDDER INQUIRIES. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org
Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet system. Bidders may register online at https://www.projnet.org (click on “Register”).
The following information will be needed to submit or view bidder inquiries:
Managing Agency: USACE
Solicitation Number: W912ES-14-B-0014
Bidder Inquiry Key: P7T87C-3ZFNIN
Bidders shall submit inquiries not later noon on August 4, 2014 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Those who submit an inquiry will receive a system-generated email acknowledgement. All answers to inquiries will be posted in ProjNet after they have been reviewed by the USACE technical team. Bidders are advised to review the solicitation in its entirety and to review all previously submitted questions and responses prior to submitting a new inquiry.
4. QUANTITIES. All Quantities are estimated except where unit is given as Each or Job. This solicitation will result in an Indefinite Delivery Indefinite Quantity contract which precludes the need for the clause at FAR 52.111-18, “Variation in Estimated Quantity”. Contract and task order minimums and maximums are addressed in the following clauses at 52.000-4001, “Contract Minimum/Maximum” (Section 00 80 00) and 52.216-19, “Order Limitations” (Section 00 70 00).
Bids will be evaluated in accordance with the provision at FAR 52.214-19, Contract Award – Sealed Bidding – Construction (Section 00 01 00). The line item quantities listed in the Bid Schedule are for evaluation purposes only and are not intended to convey either a minimum or maximum quantity that will be ordered by the Government. The unit price that will be paid for any line item will not be changed based on the quantity actually ordered by the Government. The ultimate contract price will be the sum of the task orders issued.
5. SAM REGISTRATION. All bidders must register and complete online representations and certifications in the System for Award Management (SAM) at www.sam.gov prior to the bid opening. Bidders that have not registered or completed their online representations and certifications may be rejected. Bidders are advised that the initial registration process in SAM may take several weeks. The Government will review completed Representations and Certifications in SAM following the bid opening. Submission of paper copies of completed representations and certifications is NOT required with bid submissions.
6. ISSUANCE OF TASK ORDERS. Work will be ordered through the issuance of individual task orders as the requirements of the Corps of Engineers are defined. Each task order will include the specific requirements related to the work covered by the task order, and delivery or performance requirements. Task Order prices will be in accordance with the fixed rates established in the Bid Schedule (Section 00 01 00).
7. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern. For further information reference clause 52.214-5000 entitled “Apparent Clerical Mistakes” in Section 00 80 00.
8. For contract line items that are related to transportation of dredge material over 8 river miles, reference the historical data provided in Section 01 00 00.00 13 GENERAL.
9. BID BONDS
a. This solicitation requires each offeror to submit an acceptable bid guarantee in the amount of $150,000.00 along with its offer (see clause 52.228-1). The Contracting Officer has the authority and responsibility to determine whether the bid bond and its accompanying documentation clearly show that the person(s) executing the bid bond on behalf of the surety have the authority to unequivocally bind the bonding company.
b. One acceptable form of bid guarantee is a bid bond. If a bid bond is used, it must be accompanied by a signed and dated power-of-attorney. If a signed and dated power-of-attorney does not accompany the bid bond, the bid must be rejected as non-responsive. Please note that a non-responsive bid may not be corrected after bid opening to make it responsive – the bid must be rejected. The power-of-attorney must be issued by the surety (the Treasury Department-approved bonding company, not the insurance agency writing the bond).
c. Original powers-of-attorney and photocopies or facsimiles of original, otherwise valid, powers-of-attorney provide sufficient evidence of authority to bind the surety. Questions concerning the authenticity or enforceability of a power-of-attorney may be resolved by the Contracting Officer, often in consultation with the surety, after the bid opening.
d. This bid note does not provide bidders with an all-inclusive checklist for submitting an acceptable bid bond – rather, it provides some information regarding recent changes to the Federal Acquisition Regulation regarding the validity of powers-of-attorney. The revised regulation may be found at FAR 28.101-3.
e. The revised regulations described in this bid note are effective for solicitations issued after September
30, 2005.
10. PERFORMANCE AND PAYMENT BONDS. In accordance with the clause at FAR 52.228-15, “Performance and Payment Bonds – Construction” (Section 00 70 00), prior to commencing any work under the contract, the contractor shall provide: (1) a performance bond (Standard Form 25) in the penal amount of $500,000.00; and (2) a payment bond (Standard Form 25-A) in the penal amount of $500,000.00.
11. UNBALANCED BIDS. The government may reject as non-responsive any bid that is materially unbalanced between contract line item numbers or sub-items on the bidding schedule. A bid is materially unbalanced when it is based on prices that are significantly less than cost for some work and significantly more than cost for other work. A materially unbalanced bid may be rejected if the Contracting Officer has a reasonable doubt as to whether the bid will result in the lowest overall cost to the government even though it may be the low evaluated bid. Additionally, a bid that is unbalanced so as to be tantamount to an advance payment will be rejected as non-responsive even if acceptance of the bid would result in the lowest overall cost to the government. Reference is made to paragraph (d) of clause 52.214-19, “Contract Award – Sealed Bidding
– Construction.”
12. MOBILIZATION AND DEMOBILIZATION. Offerors are advised that the Government will closely examine the bid prices for mobilization and demobilization to ensure the proposed prices bear a reasonable relation to the actual cost of the work. Offerors are reminded that unbalanced bids may be rejected in their entirety. In addition, the contractor may be required to furnish cost data to justify bid prices in accordance with clause 252.236-7004, Payment for Mobilization and Demobilization.
13. The addresses, phone numbers, and Internet address (if available) for references cited in these specifications are listed in the Unified Facilities Guide Specification (UFGS) 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS. UFGS 01 42 00 is available under Publications on the TECHINFO page of the Corps of Engineers Huntsville District Internet site at: www.hnd.usace.army.mil/techinfo.
14. Any forthcoming amendments will only be available on this website: www.fbo.gov. It is recommended that each registered firm check this website periodically for updates.
15. FACSIMILE BIDS AND MODIFICATIONS WILL NOT BE ACCEPTED.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DECISIONS
General Decision Number: IL140019 01/24/2014 IL19
Superseded General Decision Number: IL20130019
State: Illinois
Construction Type: Heavy Dredging
Counties: Illinois Statewide.
Dredging Construction Projects: Dredging the following rivers and their tributaries, the Kasakaski River from the mouth to Fayetteville, Illinois; Illinois River;
Minnesota River; Mississippi River and the Ohio River.
Modification Number Publication Date 0 01/03/2014 1 01/24/2014
* SUIL2003-002 01/01/2014
Rates Fringes
Dredging: (Engineer and Mechanic)
AREA I:
Within the geographical jurisdiction of the St.
Louis District, Corps of Engineers...................$ 34.27 22.86
AREA II:
Within the geographical jurisdiction of the
Louisville District, Corps of Engineers................$ 34.16 22.86
AREA III:
Within the geographical jurisdiction of the Huntington District, Corps of Engineers................$ 34.16 22.86
AREA IV:
Within the geographical jurisdiction of the St.
Paul, Rock Island and Chicago Districts, Corps of Engineers................$ 25.10 28.60
Dredging: (Levermen and Boatman)
AREA 1:
Within the geographical jurisdiction of the St.
Louis District, Corps of Engineers...................$ 39.52 22.86
AREA 2:
Within the geographical jurisdiction of the Louisville District, Corps of Engineers................$ 39.41 22.86
AREA 3:
Within the geographical jurisdiction of the Huntington District, Corps of Engineers:...............$ 39.41 22.86
AREA 4:
Within the geographical jurisdiction of the St.
Paul, Rock Island and Chicago Districts, Corps of Engineers:...............$ 25.10 28.60
AREA 4:
Leverman. Operators on Backhoes over 130,000 lbs., Operators on Cranes over 165 Tons, and Operators that are required to have a license or certification to do the work assigned them shall receive 5% more than the highest rate of pay per hour listed on this agreement...................$ 26.355 28.60
Dredging: (Oiler) AREA 1: Within the geographical jurisdiction of the St. Louis District, Corps of Engineers..........$ 27.81 22.86 AREA 2: Within the geographical jurisdiction of the Louisville District, Corps of Engineers...................$ 26.22 22.86 AREA 3: Within the geographical jurisdiction of the Huntington District, Corps of Engineers...................$ 26.22 22.86 AREA 4: Within the geographical jurisdiction of the St. Paul, Rock Island and Chicago Districts, Corps of Engineers...................$ 20.25 28.60
FOOTNOTE: Licensed boat operators/pilot shall receive 10% above the current established Group 1 rate (AREA 4 ONLY)
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).
Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: IA140003 07/11/2014 IA3
Superseded General Decision Number: IA20130003
State: Iowa
Construction Type: Heavy River Work
Counties: Iowa Statewide.
HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES, RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY
CONSTRUCTION.
1 01/24/2014 2 03/28/2014 3 07/11/2014
CARP0004-007 01/01/2014
SCOTT COUNTY
Rates Fringes
CARPENTER........................$ 27.44 19.62
ENGI0150-008 06/01/2013
CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 30.90 26.35
GROUP 2.....................$ 29.90 26.35
GROUP 3.....................$ 27.25 26.35
GROUP 4.....................$ 26.20 26.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat
GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt Paver Screed; Asphalt Plant; Automatic Curbing Machine; Backfiller (throw bucket); Blastholer Self-Propelled Rotary Drill or Similar Machines; Boom Tractor or Side Boom; Boring Machine
(Directional, Vertical or Horizontal); Building Hoist (1,2 or 3 drums); Caisson Auguring Machines; Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming Machine;
Combination Backhoe Front End Loader; Combination Concrete Finishing Machine and Float; Concrete Breaker or Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;
Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.); Curing-Tinning Machine; Dipper Dredge Crane man; Dipper Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.); Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);
Grader, Motor Grader, Motor Patrol, Auto Grader, Form Grader, Pull Grader, Sub Grader, Elevating Grader; Group Equipment Greaser; Guard Rail Post Driver; Hoists; Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck Mounted or Pull Type, and Similar Equipment; Laser Screed; Loader (Track, Rubber Tire or Articulated); Locomotive Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad Foot Compactor; Shovel; Slip Form Paver; Steel Track- Type Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy; Trenching Machine (40 H.P. & over); Work Boat.
GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster; Boiler (Engineer or Fireman); Conveyor Over 20 H.P.; Distributor; Driver on Truck Crane or Similar Machines; Elevator; Farm-Type Tractor (Without Power Attachment); Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant; Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine (Under 40 H.P.).
GROUP 4: Air Compressor (400 C.F.M. or over); Compact Loader (Rubber Tire, Track & Utility); Engine Driven Welding Machine; Mechanical Heater (other than steam boiler);
Small Outboard Motor Boat (Safety Boat & Life Boat); Water Pump (More than one well point pump).
ENGI0234-002 12/01/2012
REMAINING COUNTIES
Rates Fringes
Power equipment operators:
GROUP A.....................$ 32.24 12.90
GROUP B.....................$ 31.57 12.90
GROUP C.....................$ 29.31 12.90
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol (finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics - welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self-propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.
GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self-propelled sheepsfoot roller, self-propelled roller, distributor, screening and washing plant, self-propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self-propelled elevator grader, water wagon on compaction
GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver-oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3", farm type tractor (pulling disc, harrow or roller).
IRON0111-005 07/01/2013
(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE, HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON, LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)
Ironworker.......................$ 29.00 21.01
LABO0309-005 01/01/2014
SCOTT COUNTY
Rates Fringes
LABORERS
GROUP 1.....................$ 25.71 16.45
GROUP 2.....................$ 26.21 16.45
GROUP 3.....................$ 26.84 16.45
LABORER CLASSIFICATIONS
GROUP 1 - Flagman; Dumpman; Spotter; Broom Man; Landscaper; Planting & Removal of Trees; Fencing Laborers; Cleaning of Forms or Lumber (in Bone Yard); Laying of Sod;
Moving and/or Maintenance of Flares & Barricades; Operation of all Hand, Electric, Air, Hydraulic or Mechanically Powered Tools under the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator;
Mortar Mixer; Power & Hand Saw (When Clearing Timber); General Laborer; Material Handler; Form Handler; Concrete Dumper; Puddler; Explosives Handler; Center Strip Handler & Installer; Prime Mover or any Mechanical Device Taking the Place of Concrete Buggy or Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting Hammer Driver;
Laying & Jointing of Telephone Conduit; Gas Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin; Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker; Bankman on Floating Plant; Jointman With Pipelayer; Back-up Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water Main;
Batterboard Man or Laser Operator on Sewer & Water Main; Laborer in Ditch or Tunnel, on Sewer or Water Main & Telephone Conduit, Cutters; Burners; Torchman; Gravel Box Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of Steel & Rebar; & Wrecking Laborers
GROUP 2 - Asphalt Raker or Luteman; Pipe Setter on Sewer or Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb Machine Operator; Concrete Burning Machine Operator; & Coring Machine Operator; Hazardous Waste Worker; Asbestos Abatement Worker
GROUP 3 - Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)
PLAS0544-001 07/01/2010
SCOTT COUNTY
CEMENT MASON/CONCRETE FINISHER...$ 24.69 13.75
TEAM0371-001 05/01/2012
SCOTT COUNTY
Rates Fringes
Truck drivers:
GROUP 1.....................$ 31.34 10.05+a GROUP 2.....................$ 31.78 10.05+a GROUP 3.....................$ 32.02 10.05+a GROUP 4.....................$ 32.28 10.05+a GROUP 5.....................$ 33.13 10.05+a
Footnote:
a. PENSION: $40.10 per day
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons, air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick- up-trucks when hauling material, tools or men to and from and on the job site, and forklifts up to 6,000 lb capacity
GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A-frame winch trucks, or similar equipment when used for transportation purposes.
Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or similar equipment when used for transportation purposes..
GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks
GROUP 4: Oil distributors, lowboys
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
* SUIA2002-002 12/01/2011
Rates Fringes
CARPENTER
Mississippi River (Iowa Side).......................$ 26.47 13.16 Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay prevails in the adjoining states, then those rates shall apply)................$ 31.64 18.08 Missouri River..............$ 28.68 10.20
CEMENT MASON/CONCRETE FINISHER...$ 32.40 7.70
Ironworkers: (setting of all structural steel and reinforcing steel installation:)
Des Moines and Lee Counties....................$ 28.58 16.37 Dubuque, Clayton & Allamakee Counties..........$ 26.67 16.37 Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.15 16.37 Jackson, Clinton, Louisa & Muscatine Counties........$ 35.04 16.37 Woodbury & Monona Counties..$ 18.57 16.37
Laborers:
Class A Mississippi River..........$ 28.30 7.85 Missouri River.............$ 26.80 7.85 Class AA Mississippi River..........$ 29.83 7.85 Missouri River.............$ 27.93 7.85 Class B Mississippi River..........$ 27.10 7.85 Missouri River.............$ 25.10 7.85 Class C Mississippi River..........$ 23.93 7.85 Missouri River.............$ 21.93 7.85
TRUCK DRIVER
Mississippi River...........$ 23.58 10.05 Missouri River..............$ 22.93 10.05
LABORERS CLASSIFICATIONS
GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a boson chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.
GROUP AA: Pipelayer, concrete specialist; tunnelman
GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper), timber and chair-sawman, mechanical stresser or strechman on post-tension or pre-stressed concrete on or off job, form tamper, air-gas and electric tool operators-vibrators-Barcohammer-Pavec-tampers-electric drills-hammers and jackhammers, tree groundman, chair tenders-tool room men and checkers, concrete processing material and monitors, stringman on paving work, broom operator (not self propelled), fence erectors, handling and placing of metal mesh, dowel bars, reinforcing bars and chairs, dumpmen and spotters, carring reinforcing rods, corrugated culvert pipe, stake chaser, seeding or mulching and planting of trees shrubs and flowers, water pumps (under 3"), compressors (under 400 CFM), general laborer, rodman, hot asphalt labor, carpenter tender, concrete finisher tender.
GROUP C: Waterboy, flagman, flagger/traffic control, watchman.
WELDERS - Receive rate prescribed for craft performing operation to which welding is
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).
Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
General Decision Number: MN140096 07/04/2014 MN96
Superseded General Decision Number: MN20130096
State: Minnesota
Construction Type: Heavy Heavy including Water and Sewer Lines
County: Hennepin County in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
1 06/20/2014 2 06/27/2014 3 07/04/2014
CARP0548-002 07/01/2012
Rates Fringes
CARPENTER (Including Form Work)............................$ 33.34 16.73
ELEC0292-024 05/01/2014
Rates Fringes
ELECTRICIAN......................$ 36.53 26.08
ENGI0049-064 05/05/2014
Rates Fringes
OPERATOR: Power Equipment Group 2.....................$ 32.92 17.20 Group 3.....................$ 32.37 17.20 Group 4.....................$ 32.07 17.20 Group 5.....................$ 29.03 17.20 Group 6.....................$ 27.82 17.20
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Dragline & Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous.
GROUP 3: Dragline & Hydraulic Backhoe with shovel-type controls up to 3 cubic yards;
Loader 5 cu yd and over; Mechanic; Tandem Scraper; Truck Crane; Crawler Crane
GROUP 4: Bituminous Roller 8 tons & over; Crusher/Crushing Plant; Drill Rig; Elevating Grader; Loader over 1 cu yd; Grader; Pump; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Loader up to 1 cu yd; Bulldozer 50 hp or less.
GROUP 6: Oiler; Self-Propelled Vibrating Packer 35 hp and over.
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
IRON0512-041 06/09/2013
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 34.15 22.05
* LABO0563-026 05/01/2014
Rates Fringes
LABORERS
(1) Common or General Laborer; Top Person.........$ 27.77 16.52
(2) Mason Tender Cement/Concrete.............$ 27.97 16.52
(6) Pipe Layer..............$ 30.27 16.52
LABO0563-047 05/01/2012
Rates Fringes
LABORER (LANDSCAPE)..............$ 17.49 12.10
PLAS0633-004 05/09/2012
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.80 17.00
PLUM0015-023 05/01/2014
Rates Fringes
PLUMBER..........................$ 31.11 20.17
FOOTNOTE:
Paid Holiday: Labor Day
PLUM0539-017 05/01/2012
Rates Fringes
PIPEFITTER.......................$ 36.52 25.21
TEAM0160-016 05/01/2014
TRUCK DRIVER (DUMP)
(1) Articulated Dump Truck..$ 28.10 14.80
(2) 3 Axles/4 Axles; 5 Axles receive $0.30 additional per hour.........$ 27.55 14.80
(3) Tandem Axles; & Single Axles.......................$ 27.45 14.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .