W81G6740035467

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment incorporates changes to the Specifications. (See Continuation Page for details.)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-14-B-0004

X 9B. DATED (SEE ITEM 11)

07-Mar-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Mar-2014

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-14-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

SPECIFICATION CHANGES

1. Replace existing Section 01 22 00.00 13 Paragraph 1.6.1 with the following:

“1.6.1 Payment Dredging - St. Paul District includes, but is not limited to, dredging between Upper Mississippi River miles 614.0 and 857.6, dredging between Minnesota River miles 0.0 and 14.7, dredging between St. Croix River miles 0.0 and

24.5 and dredging between Black River miles 0.0 and 1.4. Payment will be made for the dredging, transportation of dredged material up to 4 river miles, unloading of dredged material, and placement of dredged material in a placement site as identified in each Task Order. Payment for portions of dredge sites not dredged to the project depth but within the specified tolerance will be reduced by the quantity not dredged as computed by the Government. Work shall include, but not be limited to, dredging; satisfactory placement of material in the placement area; satisfactory placement of material at beach nourishment sites; relocation of navigation markers; transportation of material up to four river miles between the center of the entire dredge site and the center of the channel at the placement/beach nourishment site; and movement of material up to 900 feet overland from the barge unloading site with the exception of placement sites with special consideration where the 900 foot distance is measured from the location designated by the Government within the placement site (see paragraphs 1.11.1 and 1.12.1 of this section).

All work items not specified to be measured under the remaining payment items of the task order will be considered incidental to this payment item.”

2. Replace existing Section 01 22 00.00 13 Paragraph 1.13.2 with the following:

"1.13.2 Measurement Dredging/excavation shall be measured and paid for by the cubic yard (CY) of material in the original position dredged/excavated to the project depth within the limits of the dredge/excavation site as identified in the Task Order. All work items not specified to be measured under the remaining payment items of the task order will be considered incidental to this payment item."

3. Replace existing Section 01 22 00.00 13 Paragraph 1.14.1 with the following:

“1.14.1 Payment Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for small boat harbor dredging in the St. Paul District. Small Boat Harbor Dredging shall include, but not be limited to, authorized harbor; lock chamber; auxiliary lock chamber; and gate area dredging between Upper Mississippi River Miles 614.0 and 857.6 and between Minnesota River Miles 0.0 and 14.7. Dredging of lock approaches shall be measured and paid as Dredging and not under the Small Boat Harbor Dredging - St. Paul District line item. Work shall include, but not be limited to, dredging; satisfactory placement of material in the placement area; satisfactory placement of material at beach nourishment sites; relocation of navigation markers; transportation of material up to four river miles between the center of the entire dredge site and the center of the channel at the placement/beach nourishment site; and movement of material up to 900 feet overland from the barge unloading site with the exception of placement sites with special consideration where the 900 foot distance is measured from the location within the placement site designated by the Government (see paragraphs 1.11.1 and 1.12.1 of this section). All work items not specified to be measured under the remaining payment items of the task order will be considered incidental to this payment item."

4. Replace existing Section 01 22 00.00 13 Paragraph 1.15.1 with the following:

W912ES-14-B-0004

“1.15.1 Payment Dredging - Rock Island District includes, but is not limited to, dredging between Upper Mississippi River miles

300.0 to 614.0. Payment will be made for the dredging, transportation of dredged material up to 4 river miles, unloading of dredged material, and placement of dredged material in a placement site as identified in the Task Order. Payment for portions of dredge sites not dredged to the project depth but within the specified tolerance will be reduced by the quantity not dredged as computed by the Government. Work shall include, but not be limited to, dredging; satisfactory placement of material in the placement area; satisfactory placement of material at beach nourishment sites; relocation of navigation markers; transportation of material up to four river miles between the center of the entire dredge site and the center of the placement/beach nourishment site; and movement of material up to 900 feet overland from the barge unloading site with the exception of placement sites with special consideration where the 900 foot distance is measured from the location within the placement site designated by the Government under paragraph 1.11.1 or paragraph 1.12.1 of this section. All work items not specified to be measured under the remaining payment items of the task order will be considered incidental to this payment item. Rock Island District dredging may include bank (similar to St. Paul District beach nourishment placement), or thalweg placement of dredged material.”

5. Replace existing Section 01 22 00.00 13 Paragraph 1.16.1 with the following:

“1.16.1 Payment Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for small boat harbor dredging in the Rock Island District. Small Boat Harbor Dredging shall include, but not be limited to, authorized harbor; lock chamber; auxiliary lock chamber; and gate area dredging between Upper Mississippi River Miles 300.0 to 614.0. Dredging of lock approaches shall be measured and paid as Dredging and not under the Small Boat Harbor Dredging - Rock Island District line item. Work shall include, but not be limited to, dredging;

satisfactory placement of material in the placement area; satisfactory placement of material at beach nourishment sites; relocation of navigation markers; transportation of material up to four river miles between the center of the entire dredge site and the center of the channel at the placement/beach nourishment site; and movement of material up to 900 feet overland from the barge unloading site with the exception of placement sites with special consideration where the 900 foot distance is measured from the location within the placement site as designated by the Government (see paragraphs 1.11.1 and 1.12.1 of this section). All work items not specified to be measured under the remaining payment items of the task order will be considered incidental to this payment item.”

6. Add the following paragraphs to Section 35 20 23:

"3.6.2.1 Placement Quantity Computational Method

The Government utilizes Topographic data collected from land based survey processes using Survey Grade GPS or Conventional Surveying (Total Station) and Coastal Oceanographics' HYPACK program and uses the "Philadelphia Method" option for volume computations. Using the Philadelphia method the Government can compute the pre-dredge volume of material above the design elevation separately from the allowable overdepth volume and compute any post-dredge infill volume."

3.6.2.2 Contractor Placement Quantity Measurements and Disputes

If the Contractor disputes the Government's pre-placement or post-placement surveys or chooses to perform interim surveys either for progress payments or for verification, the surveys must be performed with an electronic system that collects data in a XYZ format. The Contractor shall provide XYZ and descriptor ASCII file output that is compatible with the Government's HYPACK system. The Contractor shall utilize survey equipment that has elevation/depth accuracy of +/- 0.5 ft and horizontal position accuracy of 6 ft. All surveys must comply with specification in EM 1110-2-1003 01 APR 2004 Hydrographic Survey Manual."