Amendment_2_LD8_Concrete.pdf

PDF 83 KB Posted

Attached to
Concrete and placement Federal contract opportunity
Solicitation number
W912ES-13-T-0135
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

Amendment 2 Restructure line items / SOW extend closing date to 27 Sept 2013 1pm.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete and placement, newest first.
File Type Posted
Restructured_Clins.pdf PDF
Amendment_Concrete_Placement.pdf PDF
Lock_and_Dam_No._8_Brochure.pdf PDF
Solicitation_concrete.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6732039231

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the closing date (1pm Central, 27 Sep 2013) and restructure the line items and statement of w ork w ithin the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-13-T-0135

X 9B. DATED (SEE ITEM 11)

27-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Sep-2013

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Kevin.P.Henricks@usace.army.milEMAIL:651-290-5414TEL:

KEVIN P HENRICKS / CHIEF, CONTRACTING DIVISION

W912ES-13-T-0135

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 23-Sep-2013 05:00 PM to 27-Sep-2013 05:00 PM.

CLIN 0001

The cost constraint EST has been added.

CLIN 0002

The CLIN description has changed from Admixtures (per CY of concrete) to Pumping.

The pricing detail quantity has decreased by 74.00 from 130.00 to 56.00.

The unit of issue has changed from Each to Hours.

The cost constraint EST has been added.

CLIN 0003

The CLIN type priced has been deleted.

The CLIN description has changed from Winter Service to Deleted.

The pricing detail quantity 1.00 has been deleted.

The unit of issue Lump Sum has been deleted.

CLIN 0004

The CLIN description has changed from Fuel Surcharge to Deleted.

The unit of issue Lump Sum has been deleted.

CLIN 0005

The CLIN description has changed from Pumping (per hour) to Deleted.

The unit of issue Hours has been deleted.

CLIN 0006

The CLIN description has changed from Mileage (per mile) to Deleted.

The unit of issue Miles has been deleted.

b6ct9jhr Typewritten Text b6ct9jhr Typewritten Text b6ct9jhr Typewritten Text b6ct9jhr Typewritten Text b6ct9jhr Typewritten Text

1:00 PM

b6ct9jhr Typewritten Text

CLIN 0007

The CLIN description has changed from Drop Chute to Deleted.

The pricing detail quantity 1.00 has been deleted.

The unit of issue Lump Sum has been deleted.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

31-MAR-2014 130 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625 FOB: Destination

B6R0LL2

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

31-MAR-2014 56 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

The following Delivery Schedule item for CLIN 0004 has been changed from:

31-MAR-2014 1 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

31-MAR-2014 0 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

The following Delivery Schedule item for CLIN 0005 has been changed from:

31-MAR-2014 1 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

31-MAR-2014 0 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

The following Delivery Schedule item for CLIN 0006 has been changed from:

31-MAR-2014 1 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

31-MAR-2014 0 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

The following Delivery Schedule item for CLIN 0007 has been changed from:

31-MAR-2014 1 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

31-MAR-2014 0 LOCK & DAM #8

JIM RAND

USACE - LOCK & DAM 8

BOX 10

GENOA WI 54632-0265

608-689-2625

The following have been modified:

NOTES TO OFFEROR

NOTES TO OFFEROR

The Contractor’s quote shall contain sufficient information so that the U.S. Army Corps of Engineers can determine whether the proposed elements are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the proposed methods of performance and materials to be supplied.

The Contractor should be prepared to defend any discrepancies between the quote and a fair and reasonable estimate prepared by the Government. It should include sufficient information to demonstrate that the work effort is reasonable pertaining to the site and scope. Any unusual conditions or factors affecting the work duration/productivity should be identified.

It is preferred that the quote be provided electronically to:

Justin Rose, Contract Specialist, Justin.H.Rose@USACE.Army.mil

The offeror may also submit the quote by mail / courier to the following:

CONTRACTING DIVISION

USACE – ST PAUL

ATTN: JUSTIN ROSE

180 5TH STREET EAST

SUITE 700

ST. PAUL, MN 55101-1678

PLEASE E-MAIL ALL QUESTIONS to Justin Rose, Contract Specialist, at Justin.H.Rose@USACE.Army.mil

OFFEROR SHALL BE REGISTERED IN SAM (System for Award Management) https://www.sam.gov/portal/public/SAM/ to include the FAR and DFARS Reps and Certs sections with the proper NAICS code applicable to the solicitation. For assistance with SAM, contact information is below:

SAM by GSA Hours of Operation: Monday – Friday 8am to 8pm ET, U.S. Calls 866-606-8220, Service desk website: http://www.fsd.gov/

Minnesota PTAC (Procurement Technical Assistance Center), www.mnptac.org

Sherri Komrosky, Program Director, 612-259-6565 (office), skomrosky@mnptac.org

STATEMENT OF WORK

LOCK 8 WINTER MAINTENANCE – DEWATERING

CONCRETE SUPPLY AND DELIVERY

SCOPE OF WORK

1. General. The work shall consist of the concrete being supplied for Lock 8 Winter Maintenance. A total of approximately 130 cy3 shall be delivered and placed by methods of pumping to Lock and Dam No.8.

This amount could vary as the final inspections cannot be completed until the lock chamber is emptied in early December. The placement areas include the upstream bulk head supporting blocks, the downstream bulk head sill beam, and the vertical concrete repair located on the Land and Intermediate wall inside the lock chamber. The quote shall provide for all labor, equipment, materials, and supplies necessary for this work.

2. Construction Schedule. The concrete supplier shall coordinate with the Government Representative for exact placement times, dates and quantities. However, tentative delivery dates are set for mid January 2014 through early March 2014.

3. Site Location.

U.S. Army Corps of Engineers St. Paul District Lock and Dam No. 8 4405 Highway 35 (Box 10) Genoa, WI 54632-0265

4. Submittals. The following shall be submitted to the Government for approval no later than 10 days after the award of contract.

1. Concrete Mixture Design A mix design shall be submitted for each concrete mix to be used on the project. Each mix design shall list the proportions by weight of cement, weight or volume of water, weights of aggregates in a saturated surface-dry condition, and type, quantity, and name of admixtures per cubic yard of concrete. All materials included in the mixture shall be of the same type and from the same source as will be used on the project. Each mix shall be accompanied by evidence that demonstrates the mix will produce concrete having the characteristics and quality as specified:

a. Mix Design Study Submit a mix design study complying with ACI 211.1 conducted in the past 12 months. The mix design shall be completed by a testing laboratory complying with ASTM C 1077. For SCC (Self-Consolidating Concrete) submit evidence of the design mix for this project. The evidence shall include test data from the Slump Flow Test including the Visual Stability Index (VSI) per ASTM C 1611 and its appendix. A registered professional engineer knowledgeable and familiar with self-consolidating

b. Project Data Project data or mix design studies shall be obtained for the exact mix as submitted. Minor mix alterations or substitutions may be accepted if approved by the Contracting Officer in writing. Any alternations or substitutions shall be clearly identified, and shall be accompanied by recommendations from the admixture supplier or a registered professional engineer indicating the expected effects on the concrete.

2. General Concrete Requirements The concrete shall be a Self-consolidating concrete (SCC), that is able to flow under its own weight and completely fill the form work, even in the presence of dense reinforcement without the need of any vibration while maintaining homogeneity. The concrete shall be composed of a cementitious material, water, fine and coarse aggregates, and admixtures. The admixtures shall include High Range water reducers (HRWR), which are an essential component of SCC to provide the necessary work ability; viscosity modifying agents (VMA) for stability and air entraining admixtures (AEA) to improve the freeze-thaw resistance. The design compressive strength as determined by ASTM C 39 shall not be less than 4,500 pounds per square inch in 28 days. Water-cement ratio shall not exceed 0.40. The maximum water-cement ratio will be determined by the weight equivalency method as described in ACI 211.1 (cement plus pozzolan, silica fume, and ground granulated blast furnace slag). This W/C ratio may cause higher strengths than required. The cementitious material content shall be a minimum of 500 and a maximum of 620 pounds per cubic yard. Materials shall meet the requirements of the respective publications and other data specified below:

a. Slump Flow: For SCC (self-consolidating concrete) the slump flow of concrete is identified as the flow of concrete as measured by the Slump Flow Test. The slump flow should be between 22 and 28 inches, with a visual rating of static stability equal to zero or one as determined by the Visual Stability Index (VSI) as described in ASTM C 1611 and its appendix.

b. Admixtures: Admixtures to be used on the project shall be included in the mix design submittals. Accelerating admixtures shall be used only when approved in writing.

c. Air Entrainment: All concrete shall be air entrained to contain between 4-1/2 and 7- 1/2 percent total air.

d. Aggregates:

i. Size of Coarse Aggregate: Nominal maximum size coarse aggregate shall be 3/4-inch.

ii. Composition: Fine aggregate shall consist of natural sand, manufactured sand, or a combination of natural and manufactured sands. Coarse aggregate shall consist of gravel, crushed gravel, crushed stone, or a combination thereof.

iii. Quality: The aggregate particles shall be clean, hard, unweathered, and uncoated. The shape of the particles shall be generally cubical or spherical.

Where required, fines shall be removed from the aggregates by adequate washing. The aggregates as delivered to the mixer shall meet the quality requirements of ASTM C 33, table 3 for the appropriate type or location of concrete construction for use in a severe climate.

e. Cementitious Materials: Cementitious materials shall be portland cement, or portland cement in combination with pozzolan or ground granulated blast furnace slag. Optional pozzolan replacement of cement shall be limited to 20 percent of the total cementitious material of a mix by weight. Cementitious materials shall conform to appropriate specifications listed below. Use of cementitious materials in concrete which will have surfaces exposed in the completed structure shall be restricted so there is no change in color, source, or type of cementitious material.

i. Portland Cement: ASTM C 150, Type I with a maximum 15 percent amount of tricalcium aluminate, or Type II.

ii. Pozzolan (Fly Ash): ASTM C 618, Class C or F with the optional requirements for multiple factor, drying shrinkage, and uniformity from Table 3 of ASTM C 618.

iii. Ground Granulated Blast – Furnace (GGBF) Slag: ASTM C 989, Grade 120.

5. Method of Placement. The concrete pump shall conform to the following specifications: The pipeline shall be rigid steel pipe or heavy-duty flexible hose. The inside diameter of the pipe shall be at least 4 inches. The distance to be pumped shall not exceed limits recommended by the pump manufacturer. The concrete shall be supplied to the concrete pump continuously. When pumping is completed, concrete remaining in the pipeline shall be ejected without contamination of concrete in place. After each operation, equipment shall be thoroughly cleaned, and flushing water shall be wasted outside of the forms and in compliance with the approved environment protection plan.

6. Safety. All work shall be in conformance with the Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 (15 September 2008 edition).

7. Site Restoration and Cleanup. The contractor shall clean up and dispose of all job related debris in accordance with all state and local laws and ordinances. All surface areas damaged by the Contractor’s operations shall be restored.

8. Measurement and Payment. Payment shall constitute full compensation for furnishing all labor, materials, equipment, and incidentals required and performing all work in a satisfactory manner and in accordance with the requirements described herein.

a. All invoices shall be sent to:

USACE Finance Center St Paul District (B6) 5722 Integrity Drive Millington TN 38054-5005

b. A copy of all invoices shall be sent to:

Fountain City Service Base Attn: Tammy Kime PO Box 397 431 North Shore Drive Fountain City, WI. 54629-0397

(End of Summary of Changes)