Questions and Answers for W91ES-09-R-0026 Lock and Dam 3 Lower Embankment Improvments

View the file

Other files

File Type Posted
0026 RFP Amendment 0004.pdf PDF
M-L3-52_12.pdf PDF
M-P3-61_2 —
M-L3-40_1 —
M-P3-52_003.pdf PDF
M-P3-61_1.1 —
M-P3-61_3.1 —
Anticipated Conditions - LD3 WDNR Permit and Water Quality Certification.doc DOC document
M-L3-40_3 —
M-P3-52_002.pdf PDF
M-P3-52_001.pdf PDF
Attachment 7 LE Cover.pdf PDF
0026 RFP Amendment 0003.pdf PDF
0026 RFP Amendment 0002.pdf PDF
LD3 Lower Emb 0026 RFP Amend 0001.pdf PDF
Attachment 2.4_LE GRR appendices.pdf PDF
Attachment 1 LE conceptual drawings.pdf PDF
LD3 Lower Embankment RFP FINAL 9.11.09.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Data Sheet and Evaluation Questionnaires 9-R-26.docx DOCX document
Amendment 0001.pdf PDF
Attachment 2.1_Part 1_06Nov16Final GRR EIS.pdf PDF
09-R-0026 Lock 3 Final RFQ Lower Embank.pdf PDF
Attachment 2.2 LE Hist Nav Season Info.pdf PDF
Attachment 1 Conceptual Drawings Lower Embankments.pdf PDF
Attachment 2.1_Part 2_ LE GRR Real Estate drawings.pdf PDF
Attachment 2.1_Part 3_ LE GRR drawings.pdf PDF
Attachment 2.3 LE Hydrographs cover.pdf PDF
Attachment 3 draft RFP Lower Embankments.pdf PDF
Attachment 4 LE draft Wage Rates.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following questions were asked and answered from 22 July 2009 to 04 August 2009 for Request for Quotation W912ES-09-R-0026 (Lock and Dam 3 Lower Embankment Improvements):

Question 1:

Patricia, could we get the following forms in Word Format?

Attachment 1 - Phase One Proposal Data Sheet (Tab A)

Attachment 2 - Past Performance Evaluation Questionnaire:

Design (Tab C)

Attachment 3 - Past Performance Evaluation Questionnaire:

Construction (Tab C)

I thought that we could take the .pdf of the RFQ and import these forms in Word but have been told that does not work very well.

William, I would like to make the same request as below for your Lock and Dam #3 Lower Embankments Project. Thanks.

Answer to Question 1:

The Government posted these Word documents on 22 July 2009.

Question 2:

W912ES-09-R-0026 We are having some problems finding the 2006/2007 investigations including borings in documents.

Please provide direction on finding these ASAP.

Answer to Question 2:

Just want to let you know that we just put on Amendment 0002 for W912ES-09-R-0026 on www.fbo.gov.

Question 3:

Would it be permissible to place a cover letter on the RFQ?

Answer to Question 3:

In response to your question, a cover letter is not authorized in the Request for Qualifications submittal requirements or with our evaluation methodology.

Therefore, any cover letter would not be considered in the evaluation process.

Question 4:

Will the shortlist firms for the subject solicitation be given the native CADD files for the drawings that are shown as PDF’s on the website? If yes, this would greatly help in preparing competitive bids.

Answer to Question 4:

Yes. We will be providing CADD files with the RFPs.

(End of Questions and Answers)