Amendment 0001

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6791567727

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

This amendment is to: 1. Change language in Section 00 10 50; 2. Change language in Section 00 11 50, Paragraph 6.1.4; 3. Change language in Section 00 11 50, Paragraph 6.3; 4. Change language in Section 00 12 50, Paragraph 4.1.1; 5. Change language in Section 01 57

20.00 13; 6. Change language in SECTION 01 11 02.00 13; 7. Change language in SECTION 01 14 00.00 13; 8. Change language in Section 01 35 29.00 13; and 9. Change the SF 1442 solicitation issue date from September 8, 2009, to September 4, 2009. (See SF30 Continuation Page for details.)

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-09-R-0025

X 9B. DATED (SEE ITEM 11)

04-Sep-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Sep-2009

CODE

CONTRACTING DIVISION

USACE - ST. PAUL�

190 5TH STREET E

ST. PAUL MN 55101

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-09-R-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

1. Section 00 10 50, Paragraph 1.13.2 Written Submission, p. 7

- Remove the last sentence in the first paragraph of Paragraph 1.13.2 (Remove: “In addition to the PDF files, the CD shall include the Microsoft project files and the MII files.”)

- Insert the following text as the last sentence in the first paragraph of Paragraph 1.13.2:

“In addition to the PDF files, the CD shall include the Microsoft Project or Primavera P6 files, and the Microsoft Excel construction cost estimate files.”

2. Section 00 11 50, Paragraph 6.1.4 Construction Cost Estimate, p. 5 and 6

- Remove all text in Paragraph 6.1.4 (Remove: “Submit a construction estimate to support…major material, fabrication and installation unit prices.”)

- Insert the following text in Paragraph 6.1.4:

“Submit a detailed construction cost estimate to support proposed construction prices using Microsoft Excel. Organize the estimate in a work breakdown structure with layers of items and sub items that define the proposed work. Include columns for quantities, units, unit price, and amount for each item and sub item. Reflect all materials and items of work in increasing detail in the work breakdown structure.

Rollup the costs from the sub items to the items. Submit all information on a CD.

The construction estimate shall be organized according to the Proposal Schedule (Section 00 01 50), and the total estimated cost for each bid item must match the price proposal for each bid item.

The construction cost estimate should not include any items included in the design price bid item.

Estimate information for design costs should not be submitted.

Provide contractor quotes for major materials and subcontracted work from at least three (3) sources if possible. Quotes may be considered by the Government to support Offeror pricing in the event that there is a discrepancy between the Offeror’s price and the Government’s estimate, so it is to the advantage of the Offeror to provide quotes when available.

Major incidental items such as mobilization/demobilization, cofferdams, special access, traffic control, and dewatering shall be priced separately.”

3. Section 00 11 50, Paragraph 6.3 Schedule Management Plan, p. 9

- Insert the following sentence between the second and third sentence in the first paragraph of Paragraph 6.3,: “A schedule in Primavera P6 may be submitted on a CD in lieu of a schedule in Microsoft Project.”

- When amended, the first paragraph of Paragraph 6.3 shall read:

“Provide a Critical Path Method (CPM) schedule, showing how the work will be performed and completed by September 30, 2011. Also include a CD with the schedule in a version of Microsoft Project that is compatible with Microsoft Project 2007. A schedule in Primavera P6 may be submitted on a CD in lieu of a schedule in Microsoft Project. This CD shall be separate from the CD with the Factor 1 price information.”

4. Section 00 12 50, Paragraph 4.1.1, Evaluation Criteria, Construction Cost Estimate, p. 5:

- Remove all text in Paragraph 4.1.1, Construction Cost Estimate (Remove: “Construction cost estimates will be evaluated…effects upon cost and schedule.”)

- Insert the following text in Paragraph 4.1.1, Construction Cost Estimate:

“Construction cost estimates will be evaluated to determine if they are complete, fair, reasonable, realistic and balanced. Complete construction cost estimates include the following features:

a. Prices for each estimate item match the bid items in the Proposal Schedule.

b. Estimate is compatible with the technical proposal.

c. Complete and accurate cost and pricing presentation.

d. Detail level unit costs and quantities.”

5. Section 01 57 20.00 13, page 10, paragraph 3.1.1 Permit Conditions: delete paragraph in its entirety.

6. SECTION 01 11 02.00 13, Paragraph 1.2 REFERENCES, U.S. Army Corps of Engineers (USACE), add the following reference: "EM 1110-2-2106 (2008) Design of Precast and Prestressed Concrete Hydraulic Structures"

7. SECTION 01 14 00.00 13, page 9: add the following paragraph:

"3.5 Site Security Requirements.

All contractor personnel accessing the fenced facility, including the guidewall extension, are required to have a Transportation Worker Identity Card (TWIC) to access the site unescorted. Contractor personnel without a TWIC must be escorted at all times by someone with a TWIC. The Contractor shall submit a plan as to how they will meet this requirement. The plan must be approved by the Contracting Officer and the District Security Manager."

8. Section 01 35 29.00 13, page 5, paragraph 1.5.1.1, line 5: delete sentence "The Contractor Quality Control (QC) person can be the SSHO on this project."

9. To change the SF 1442 solicitation issue date from September 8, 2009, to September 4, 2009.

SECTION 00010 - SOLICITATION CONTRACT FORM

The solicitation issue date has changed from 08-Sep-2009 to 04-Sep-2009.

(End of Summary of Changes)