Updated Front End of Solicitation- sections 1000 6000 7000 8000 and Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pokegema Bid Abstract 14 Oct 09.xls | XLS spreadsheet | |
| pokdwgs.pdf | ||
| pokspecreduced.pdf | ||
| Amendment 0004 6 Oct 09.doc | DOC document | |
| pokeg amend 00003.pdf | ||
| m45-l-50_10_half sheet.pdf | ||
| m45-l-50_11_half sheet.pdf | ||
| m45-l-50_9_half sheet.pdf | ||
| Amend 0002 Pokegema 9 Sep.doc | DOC document | |
| Amend 0002 Pokegema 9 Sep.doc | DOC document | |
| 09B0009POKEGAMASolicitation.pdf | ||
| 09B0009PokegamaGatePlan1.pdf | ||
| AccidentPreventionChecklist.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS SECTION 00 10 00 THROUGH 00 80 00
3TABLE OF CONTENTS SECTION 00 10 00 THROUGH 00 80 00
8SECTION 00 10 00 - Solicitation Contract Form
1252.209-4001
BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105-1
1352.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
1352.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
1352.214-5 SUBMISSION OF BIDS (MAR 1997)
1452.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
1452.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
1552.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
1552.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
1652.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
1652.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
1652.214-4001
INQUIRIES - BID INFORMATION
1752.214-4002
ALL OR NONE QUALIFICATIONS (APR 1984) FAR 14.404-5
1752.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)
1752.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
1952.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (MAR 2009)
2152.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (MAR 2009)
2252.228-1 BID GUARANTEE (SEP 1996)
2352.233-2 SERVICE OF PROTEST (SEP 2006)
2352.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
2452.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
25 Bidding Schedule/Instructions to Bidders
2552.211-5000
EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
26SECTION 00 60 00 - Representations & Certifications
2652.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)
29252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST COUNTRY (JAN 2009)
31SECTION 00 70 00 - Contract Clauses
3152.202-1 DEFINITIONS (JUL 2004)
3152.202-4001 DEFINITIONS (MAY 1995) EFARS Part 2.101
3252.203-3 GRATUITIES (APR 1984)
3352.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
3352.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
3452.203-7 Anti-Kickback Procedures. (JUL 1995)
3552.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
3652.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
3752.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007)
4052.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (MAR 2009)
4152.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)
4252.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)
4452.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT-REPORTING REQUIREMENTS (MAR 2009)
4752.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (SEP 2006)
4852.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) - ALTERNATE I (APR 1984)
4852.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
4952.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
4952.214-26 Audit and Records--Sealed Bidding. (MAR 2009) ALTERNATE I (MAR 2009)
5052.214-27 Price Reduction for Defective Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 1997)
5252.214-28 Subcontractor Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 1997)
5352.216-1 TYPE OF CONTRACT (APR 1984)
5352.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE (JAN 1999)
5452.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)
5552.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)
5652.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)
5752.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
5852.222-3 Convict Labor (JUN 2003)
5852.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005)
5952.222-6 DAVIS-BACON ACT (JUL 2005)
6152.222-7 WITHHOLDING OF FUNDS (FEB 1988)
6252.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988) (DEVIATION 2009-O0001)
6352.222-9 APPRENTICES AND TRAINEES (JUL 2005)
6552.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
6552.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)
6652.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)
6752.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)
6752.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
6752.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)
6852.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
6852.222-26 EQUAL OPPORTUNITY (MAR 2007)
7052.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)
7452.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
7752.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)
7852.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)
7952.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES OR FEES (DEC 2004)
8152.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
8352.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (AUG 2003)
8452.223-6 DRUG-FREE WORKPLACE (MAY 2001)
8652.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)
8752.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
8852.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (MAR 2009)
9052.227-1 Authorization and Consent (DEC 2007)
9152.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)
9252.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)
9252.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
9252.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
9352.228-11 PLEDGES OF ASSETS (FEB 1992)
9452.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)
9452.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)
9852.228-15 Performance and Payment Bonds--Construction (NOV 2006)
9952.229-3 FEDERAL, STATE, AND LOCAL TAXES (APR 2003)
10052.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)
10252.232-17 INTEREST (OCT 2008)
10352.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)
10452.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008)
11052.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—CENTRAL CONTRACTOR REGISTRATION (OCT 2003)
11252.233-1 Disputes. (JUL 2002)
11352.233-3 PROTEST AFTER AWARD (AUG. 1996)
11452.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
11452.236-2 DIFFERING SITE CONDITIONS (APR 1984)
11552.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
11652.236-4 PHYSICAL DATA (APR 1984)
11652.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
11752.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
11752.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
11752.236-8 OTHER CONTRACTS (APR 1984)
11852.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
11852.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
11952.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
11952.236-12 CLEANING UP (APR 1984)
12052.236-13 ACCIDENT PREVENTION (NOV 1991) – ALTERNATE I (NOV 1991)
12152.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
12152.236-16 QUANTITY SURVEYS (APR 1984) - ALTERNATE I (APR 1984)
12252.236-17 LAYOUT OF WORK (APR 1984)
12252.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
12352.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
12452.242-13 Bankruptcy (JUL 1995)
12452.242-14 SUSPENSION OF WORK (APR 1984)
12552.243-4 CHANGES (JUN 2007)
12652.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAR 2009)
12752.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
12852.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
12952.248-3 VALUE ENGINEERING--CONSTRUCTION (SEP 2006)
13252.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (MAY 2004) - ALTERNATE I (SEP 1996)
13552.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
13652.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
13652.253-1 COMPUTER GENERATED FORMS (JAN 1991)
137252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
137252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (JAN 2009)
138252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
139252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JAN 2009)
140252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
140252.204-7004 CENTRAL CONTRACTOR REGISTRATION (52.204-7) ALTERNATE A (SEP 2007)
142252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)
143252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)
143252.223-7004 DRUG-FREE WORK FORCE (SEP 1988)
144252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS
145252.225-7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (JUL 2009)
146252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2008)
148252.225-7030 RESTRICTION ON ACQUISITION OF CARBON, ALLOY, AND ARMOR STEEL
149252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
149252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008)
150252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
151252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)
151252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
152252.236-7002 OBSTRUCTION OF NAVIGABLE WATERWAYS. (DEC 1991)
153252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)
153252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
153252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (MAR 1998)
154252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS (DOD CONTRACTS) (JAN 2009)
155252.247-7023 Transportation of Supplies by Sea (MAY 2002)
157252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000)
15852.000-4004
PARTNERING
159SECTION 00 80 00 - Special Contract Requirements
15952.211-5001
VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS
15952.214-5000 Apparent Clearical Errors – EFARS
16052.228-4002
INSURANCE
16052.228-4022
REQUIREMENT FOR BID GUARANTEE (FAR 28.101-2)
16152.231-5000
EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
16152.232-4004
INVOICE PROCEDURES
16252.236-4005
UNAVAILABILITY OF UTILITY SERVICES
16252.236-4006
SAFETY AND HEALTH REQUIREMENTS MANUAL INTERIM CHANGES, EM 385-1-1 (JAN 2009)
16352.236-4012
MATERIAL SOURCES
16352.236-4014
PURCHASE ORDERS
16452.236-4025
FLOATING PLANT EQUIPMENT (MAY 1999)
16452.236-4061
OBSTRUCTION OF CHANNEL
16552.236-4062
SIGNAL LIGHTS (JAN 1965)
16552.236-4063
RADIO
16552.246-4001
LABORATORY AND TESTING FACILITIES
16652.249-5000
BASIS FOR SETTLEMENT OF PROPOSALS
166 WAGE RATES
SECTION 00 10 00 - Solicitation Contract Form
BID NOTES
BID SCHEDULE NOTESPRIVATE
1.
EFFECTIVE MAY 31, 1998, ALL CONTRACTORS MUST REGISTER WITH THE DEFENSE CENTRAL CONTRACTOR REGISTRATION (CCR) IN ORDER TO RECEIVE ANY CONTRACT AWARD. (Other than those made via the Government credit card program). Contractors may register on line at http://www.ccr.gov 2.
FACSIMILE OF BIDS/PROPOSALS AND FACSIMILE OF MODIFICATIONS THERETO, WILL NOT BE ACCEPTED.
3.
All Quantities are estimated except where unit is given as "EA" (EACH) or "LS" (LUMP SUM).
4.
The apparent low bidder will be requested to provide the following information as soon as possible after bid opening:
a. A Financial Statement, to include a balance sheet and income statement, and
b. A Bank Certification of Financial Capability (line of credit).
This information will be treated as confidential. The financial statements should be not over 60 days old. If over 60 days old, a certification should be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
5.
All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern. For further information reference clause 52.214-5000 entitled “Arithmetic Discrepancies – EFARS” in SECTION 00 80 00.
6.
The original bid/proposal and any modifications must be complete as to all the items on the schedule. Award will be made to that bidder whose bid is most advantageous to the Government, based on price and the price related factors included in the solicitation.
7.
Unbalanced Bids. The government may reject as non-responsive any bid that is materially unbalanced between contract line item numbers or sub‑items on the bidding schedule. A bid is materially unbalanced when it is based on prices that are significantly less than cost for some work and significantly more than cost for other work. A materially unbalanced bid may be rejected if the Contracting Officer has a reasonable doubt as to whether the bid will result in the lowest overall cost to the government even though it may be the low evaluated bid. Additionally, a bid that is unbalanced so as to be tantamount to an advance payment will be rejected as non-responsive even if acceptance of the bid would result in the lowest overall cost to the government. Reference is made to paragraph (d) of clause 52.214-19, “Contract Award – Sealed Bidding – Construction.”
8.
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing in accordance with SECTION 00 10 00, Contract Clause 52.214-6 entitled "Explanation To Prospective Bidders,” not later than 10 days prior to bid opening. Questions can be faxed to (651) 290‑5706, attention to James Roloff. Questions received after the deadline may or may not be answered prior to bid submittal.
9. The addresses, phone numbers, and Internet address (if available) for references cited in these specifications are listed in the Unified Facilities Guide Specification (UFGS) 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS. UFGS 01 42 00 is available under Publications on the TECHINFO page of the Corps of Engineers Huntsville District Internet site at: www.hnd.usace.army.mil/techinfo.
10. Any forthcoming amendments will only be available on this website: www.fbo.gov. Given that e-mail message notifications may not be reliable, it is recommended that each registered firm check this web site periodically for updates. A paper hard copy of each amendment will not be mailed unless specifically requested in writing.
11. Bid Bonds
a. This solicitation requires each offeror to submit an acceptable bid guarantee along with its offer (see clause 52.228-1). The Contracting Officer has the authority and responsibility to determine whether the bid bond and its accompanying documentation clearly show that the person(s) executing the bid bond on behalf of the surety have the authority to unequivocally bind the bonding company.
b. One acceptable form of bid guarantee is a bid bond. If a bid bond is used, it must be accompanied by a signed and dated power-of-attorney. If a signed and dated power-of-attorney does not accompany the bid bond, the bid must be rejected as non-responsive. Please note that a non-responsive bid may not be corrected after bid opening to make it responsive – the bid must be rejected. The power-of-attorney must be issued by the surety (the Treasury Department-approved bonding company, not the insurance agency writing the bond).
c. Original powers-of-attorney and photocopies or facsimiles of original, otherwise valid, powers-of-attorney provide sufficient evidence of authority to bind the surety. Questions concerning the authenticity or enforceability of a power-of-attorney may be resolved by the Contracting Officer, often in consultation with the surety, after the bid opening.
d. This bid note does not provide bidders with an all-inclusive checklist for submitting an acceptable bid bond – rather, it provides some information regarding recent changes to the Federal Acquisition Regulation regarding the validity of powers-of-attorney. The revised regulation may be found at FAR 28.101-3.
e. The revised regulations described in this bid note are effective for solicitations issued after September 30, 2005.
BIDDING SCHEDULE
ITEM
NO.
DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT
PRICE
TOTAL
AMOUNT
| 1 |
| Bonds (Performance and Payment) |
| 1 |
| LS |
| $ |
| $ |
| 2 |
| Demolition of Hoist Car and Rails |
| 1 |
| LS |
| $ |
| $ |
| 3 |
| Install Deck Grates |
| 1 |
| LS |
| $ |
| $ |
| 4 |
| Slide Gate Weld Inspection |
| 1 |
| LS |
| $ |
| $ |
| 5 |
| Spare Parts for Rehabbed Slide Gates |
| 1 |
| LS |
| $ |
| $ |
| 6 |
| Spare Parts for Stoplog Bays and Log Sluice Bay Slide Gates |
| 1 |
| LS |
| $ |
| $ |
| 7 |
| Z-Channel Emergency Stoplog Slot |
| 1 |
| LS |
| $ |
| $ |
| 8 |
| Steel Sill Extensions |
| 1 |
| LS |
| $ |
| $ |
| 9 |
| Log Sluice Bay Stoplogs |
| 1 |
| LS |
| $ |
| $ |
| 10 |
| Mobile Platform Ladder |
| 1 |
| LS |
| $ |
| $ |
| 11 |
| Demolition of Stoplog Handling System |
| 1 |
| LS |
| $ |
| $ |
| 12 |
| Removal of Chain Link Fencing |
| 1 |
| LS |
| $ |
| $ |
| 13 |
| Installation of Chain Link Fencing |
| 1 |
| LS |
| $ |
| $ |
| 14 |
| Walkway Handrailing |
| 1 |
| LS |
| $ |
| $ |
| 15 |
| Recovery and Disposal of Paint Derived Waste |
| 1 |
| LS |
| $ |
| $ |
| 16 |
| Pedestrian Bridge |
| 1 |
| LS |
| $ |
| $ |
| 17 |
| Electrical Service |
| 1 |
| LS |
| $ |
| $ |
| 18 |
| Electrical Service Connection Fee |
| 1 |
| LS |
| $ |
| $ |
| 19 |
| Cable Raceway |
| 1 |
| LS |
| $ |
| $ |
| 20 |
| Pre-engineered Electrical Utility Building |
| 1 |
| LS |
| $ |
| $ |
| 21 |
| Concrete Retaining Wall |
| 1 |
| LS |
| $ |
| $ |
| 22 |
| Sidewalk |
| 1 |
| LS |
| $ |
| $ |
| 23 |
| Superstructure and Structural Walkway Supports Painting Preparatory Work: Unfailed Painted Surfaces |
| 1 |
| LS |
| $ |
| $ |
| 24 |
| Superstructure and Structural Walkway Supports Painting: Finish Coats for Failed and Unfailed Painted Surfaces |
| 1 |
| LS |
| $ |
| $ |
| 25 |
| New Structural Walkway Supports Painting |
| 1 |
| LS |
| $ |
| $ |
| 26 |
| Superstructure and Structural Walkway Supports Painting Preparatory Work: Failed Painted Surfaces |
| 26AA |
| First 400 SF |
| 400 |
| SF |
| $ |
| $ |
| 26AB |
| Over 400 SF |
| 500 |
| SF |
| $ |
| $ |
| 27 |
| Superstructure and Structural Walkway Supports Painting: Primer Coat for Failed Painted Surfaces |
| 27AA |
| First 400 SF |
| 400 |
| SF |
| $ |
| $ |
| 27AB |
| Over 400 SF |
| 500 |
| SF |
| $ |
| $ |
| 28 |
| Superstructure Hand Railing Weld Repair |
| 28AA |
| First 10 LF |
| 10 |
| LF |
| $ |
| $ |
| 28AB |
| Over 10 LF |
| 10 |
| LF |
| $ |
| $ |
| 29 |
| Dewater Slide Gate Bays |
| 6 |
| EA |
| $ |
| $ |
| 30 |
| Slide Gate Removal and Reinstallation |
| 6 |
| EA |
| $ |
| $ |
| 31 |
| Slide Gate Painting |
| 6 |
| EA |
| $ |
| $ |
| 32 |
| Replace Slide Gate Seals |
| 6 |
| EA |
| $ |
| $ |
| 33 |
| Replace Slide Gate Actuators and Stems |
| 6 |
| EA |
| $ |
| $ |
| 34 |
| Slide Gate Weld Repairs |
| 34AA |
| First 5 LF |
| 5 |
| LF |
| $ |
| $ |
| 34AB |
| Over 5 LF |
| 20 |
| LF |
| $ |
| $ |
| 35 |
| Slide Gate Frame Rehabilitation |
| 6 |
| EA |
| $ |
| $ |
| 36 |
| Dewater Stoplog Bays |
| 7 |
| EA |
| $ |
| $ |
| 37 |
| Dewater Log Sluice Bay |
| 1 |
| EA |
| $ |
| $ |
| 38 |
| Stoplog Removal |
| 8 |
| EA |
| $ |
| $ |
| 39 |
| Stoplog Bay Stoplog Slot Rehab |
| 6 |
| EA |
| $ |
| $ |
| 40 |
| Fishway Bay Stoplog Slot Rehab |
| 1 |
| EA |
| $ |
| $ |
| 41 |
| Log Sluice Bay Stoplog Slot Rehab |
| 1 |
| EA |
| $ |
| $ |
| 42 |
| Stoplog Bay Slide Gates |
| 7 |
| EA |
| $ |
| $ |
| 43 |
| Log Sluice Bay Slide Gate |
| 1 |
| EA |
| $ |
| $ |
| 44 |
| Stoplog Bay Slide Gate Installation |
| 7 |
| EA |
| $ |
| $ |
| 45 |
| Log Sluice Bay Slide Gate Installation |
| 1 |
| EA |
| $ |
| $ |
| 46 |
| Stoplog Bay Walkway Modification |
| 7 |
| EA |
| $ |
| $ |
| 47 |
| Log Sluice Bay Walkway Modification |
| 1 |
| EA |
| $ |
| $ |
| 48 |
| Gate Deicing Heater System |
| 8 |
| EA |
| $ |
| $ |
| 49 |
| Apron Floor Repair |
| 49AA |
| First 5 EA |
| 5 |
| EA |
| $ |
| $ |
| 49AB |
| Over 5 EA |
| 5 |
| EA |
| $ |
| $ |
| 50 |
| Riprap |
| 5 |
| TN |
| $ |
| $ |
TOTAL PRICE FOR ITEMS 0001 THROUGH 0050
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 - 0050 |
| POP 02-NOV-2009 TO |
15-DEC-2010
| N/A |
| POKEGAMA/WINNIBIGOSHISH |
JEFF KLEINERT
USACE - POKEGAMA LAKE
34385 W. HWY 2
GRAND RAPIDS MN 55744-9663
218-326-6128
FOB: Destination
B6R0NH1
CLAUSES INCORPORATED BY FULL TEXT
52.209-4001
BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105-1
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
(End of provision)
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
(End of provision)
52.214-5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
(End of provision)
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
(End of provision)
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
(End of provision)
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
(End of provision)
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
(End of provison)
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
(End of provision)
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S. dollars shall be rejected.
(End of provision)
52.214-4001
INQUIRIES - BID INFORMATION
(a) Inquiries:
Any questions regarding this solicitation should be directed to _Maj Preston Hayward, Contract Specialist, at telephone number (651) 290-__5709 (collect calls not accepted). It is requested that all technical questions on the plans and specifications be submitted to the Contract Specialist by facsimile transmission to (651) 290-5706.
The Planholder’s List and bid results can be found on Federal Business Opportunities web site at http://www.fbo.gov for that solicitation..
(b) Bid Depository/Bid Opening Information:
Bids must be deposited prior to the date and time set for opening of bids. The bid depository is located in the Contracting Division, 6th Floor, of the U.S. Army Corps of Engineers - St. Paul District, 190 Fifth Street East, St. Paul, Minnesota 55101-1638. A public bid opening will be held at the same location.
52.214-4002
ALL OR NONE QUALIFICATIONS (APR 1984) FAR 14.404-5
A bidder/offeror must quote on all items in this solicitation to be eligible for award. The Government will award on a “All or None” basis. Evaluation of bids/offers will be based, among other factors, upon the total price quoted for all items.
52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 1.2 |
| 6.9 |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is MN, Itasca Cty, USA, City of Grand Rapids
(End of provision) 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (MAR 2009)
(a) Definitions. As used in this clause—
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Domestic construction material means—
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
Foreign construction material means a construction material other than a domestic construction material.
Manufactured construction material means any construction material that is not unmanufactured construction material.
Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
Unmanufactured construction material means raw material brought to the construction site for incorporation into the building or work that has not been—
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference.
(1) This clause implements—
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
(Contracting Officer to list applicable excepted materials or indicate “none”)
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction Material
Unit of Quantity Cost (Dollars)*
Description
Measure
Item 1:
Foreign construction material _______
Domestic construction material_______
Item 2:
Foreign construction material _______
Domestic construction material_______
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.])
(End of clause)
52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (MAR 2009)
(a) Definitions. “Construction material,” “domestic construction material,” “foreign construction material,” “manufactured construction material,” “steel,” and “unmanufactured construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Required Use of Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of 1605 of the Recovery Act or the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract—
(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.
(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ___20_____ percent of the bid price or $___3 million_, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Jim Roloff, Chief Contracting Division, 190 5th St E, Suite 401, St Paul, MN 55101-1638
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Jeff Kleinert (Lock and Dam Manager)
Address: 34385 WEST HWY 2, Grand Rapids, MN 55744
Telephone: 218-326-6128
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.farsite.hill.af.mil (End of provision
SECTION 00 10 00 - Bidding Schedule/Instructions to Bidders
CLAUSES INCORPORATED BY FULL TEXT
52.211-5000
EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos.__26, 27, 28, 34, 49_________are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of provision)
SECTION 00 60 00 - Representations & Certifications
CLAUSES INCORPORATED BY FULL TEXT
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.
(2) The small business size standard is ---$33.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
(__) Paragraph (d) applies.
(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition…