RECOVERY-- Pokegema Bid Abstract

View the file

Other files

File Type Posted
pokdwgs.pdf PDF
pokspecreduced.pdf PDF
Amendment 0004 6 Oct 09.doc DOC document
pokeg amend 00003.pdf PDF
m45-l-50_10_half sheet.pdf PDF
m45-l-50_11_half sheet.pdf PDF
m45-l-50_9_half sheet.pdf PDF
Amend 0002 Pokegema 9 Sep.doc DOC document
Amend 0002 Pokegema 9 Sep.doc DOC document
Pokegema Soliciation 11 Sep 09.doc DOC document
09B0009POKEGAMASolicitation.pdf PDF
09B0009PokegamaGatePlan1.pdf PDF
AccidentPreventionChecklist.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pokegema Dam Rehab. Grand Rapids, MN
US Army Corps of Engineers. 190 East 5th Street, Suite 401. Saint Paul, Minnesota 55101-1638 BID OPENING: Date and Time CST
Contracting Officer:_____Lee Wright__________ Contract Specialist: Name____MAJ Preston Hayward_______
Government EstimateWiebolt Electric IncRed Lake BuildersGowan Construction IncFuel Tank Maintenance
UnitUnitUnitUnitUnit
CLINDescriptionQuantityUnitPriceAmountPriceAmount%+-IGEPriceAmount%+-IGEPriceAmount%+- IGEPriceAmount%+-IGE
ITEMS (CLINS 0001 - 0051)
1Bonds (Performance and Payment)1LS$33,000.00$33,000.00$68,046.00$68,046.00206.20%$56,000.00$56,000.00169.70%$60,000.00$60,000.00181.82%$102,564.10$102,564.10310.80%
2Demolition of Hoist Car and Rails1LS$1,769.72$1,769.72$3,472.00$3,472.00196.19%$6,000.00$6,000.00339.04%$15,000.00$15,000.00847.59%$38,461.54$38,461.542173.31%
3Install Deck Grates1LS$6,379.32$6,379.32$6,456.00$6,456.00101.20%$6,000.00$6,000.0094.05%$10,000.00$10,000.00156.76%$64,102.56$64,102.561004.85%
4Slide Gate Weld Inspection1LS$8,638.19$8,638.19$6,942.00$6,942.0080.36%$12,000.00$12,000.00138.92%$20,000.00$20,000.00231.53%$64,102.56$64,102.56742.08%
5Spare Parts for Rehabbed Slide Gates1LS$1,369.00$1,369.00$9,257.00$9,257.00676.19%$6,500.00$6,500.00474.80%$10,000.00$10,000.00730.46%$128,205.13$128,205.139364.87%
6Spare Parts for Stoplog Bays and Log Sluice Bay Slide Gages1LS$2,738.00$2,738.00$6,942.00$6,942.00253.54%$11,000.00$11,000.00401.75%$10,000.00$10,000.00365.23%$128,205.13$128,205.134682.44%
7Z-Channel Emergency Stoplog Slot1LS$5,114.70$5,114.70$1,917.00$1,917.0037.48%$17,600.00$17,600.00344.11%$14,000.00$14,000.00273.72%$25,641.03$25,641.03501.32%
8Steel Sill Extensions1LS$74,470.49$74,470.49$203,038.00$203,038.00272.64%$88,000.00$88,000.00118.17%$100,000.00$100,000.00134.28%$96,153.85$96,153.85129.12%
9Log Sluice Bay Stoplogs1LS$19,728.47$19,728.47$20,249.00$20,249.00102.64%$52,000.00$52,000.00263.58%$40,000.00$40,000.00202.75%$96,153.85$96,153.85487.39%
10Mobile Platform Ladder1LS$3,251.23$3,251.23$3,472.00$3,472.00106.79%$4,000.00$4,000.00123.03%$5,000.00$5,000.00153.79%$64,102.56$64,102.561971.64%
11Demolition of Stoplog Handling System1LS$3,122.82$3,122.82$4,050.00$4,050.00129.69%$20,000.00$20,000.00640.45%$10,000.00$10,000.00320.22%$64,102.56$64,102.562052.71%
12Removal of Chain Link Fencing1LS$3,506.12$3,506.12$3,332.00$3,332.0095.03%$12,000.00$12,000.00342.26%$4,000.00$4,000.00114.09%$19,230.77$19,230.77548.49%
13Installation of Chain Link Fencing1LS$5,429.99$5,429.99$7,232.00$7,232.00133.19%$5,350.00$5,350.0098.53%$2,000.00$2,000.0036.83%$32,051.28$32,051.28590.26%
14Walkway Handrailing1LS$14,382.33$14,382.33$50,722.00$50,722.00352.67%$60,000.00$60,000.00417.18%$40,000.00$40,000.00278.12%$64,102.56$64,102.56445.70%
15Recovery and Disposal of Paint Derived Waste1LS$35,012.66$35,012.66$17,025.00$17,025.0048.63%$20,000.00$20,000.0057.12%$20,000.00$20,000.0057.12%$64,102.56$64,102.56183.08%
16Pedestrian Bridge1LS$218,237.01$218,237.01$196,194.00$196,194.0089.90%$180,000.00$180,000.0082.48%$260,000.00$260,000.00119.14%$240,384.62$240,384.62110.15%
17Pokegama Dam Electrical1LS$525,313.78$525,313.78$239,000.00$239,000.0045.50%$150,000.00$150,000.0028.55%$270,000.00$270,000.0051.40%$293,589.74$293,589.7455.89%
18Pokegama Dam Electrical Service1LS$1,612.64$1,612.64$5,290.00$5,290.00328.03%$25,000.00$25,000.001550.25%$6,000.00$6,000.00372.06%$9,615.38$9,615.38596.25%
19Pokegama Dam Electrical Service Connection Fee1LS$33,113.92$33,113.92$34,770.00$34,770.00105.00%$33,115.00$33,115.00100.00%$40,000.00$40,000.00120.80%$43,589.74$43,589.74131.64%
20Cable Raceway1LS$82,645.60$82,645.60$80,336.00$80,336.0097.21%$66,000.00$66,000.0079.86%$250,000.00$250,000.00302.50%$12,820.51$12,820.5115.51%
21Pre-engineered Electrical Utility Building1LS$26,603.79$26,603.79$63,347.00$63,347.00238.11%$40,000.00$40,000.00150.35%$40,000.00$40,000.00150.35%$19,230.77$19,230.7772.29%
22Concrete Retaining Wall1LS$14,433.86$14,433.86$44,709.00$44,709.00309.75%$40,000.00$40,000.00277.13%$70,000.00$70,000.00484.97%$64,102.56$64,102.56444.11%
23Sidewalk1LS$6,231.01$6,231.01$6,636.00$6,636.00106.50%$6,000.00$6,000.0096.29%$15,000.00$15,000.00240.73%$19,230.77$19,230.77308.63%
24Superstructure and Structural Walkway Supports Painting Preparatory Work: Unfailed Painted Surfaces1LS$10,018.57$10,018.57$38,524.00$38,524.00384.53%$20,000.00$20,000.00199.63%$20,000.00$20,000.00199.63%$25,641.03$25,641.03255.94%
25Superstructure and Structural Walkway Supports Painting: Finish Coats for Failed and Unfailed Painted Surfaces1LS$49,902.53$49,902.53$51,529.00$51,529.00103.26%$33,600.00$33,600.0067.33%$30,000.00$30,000.0060.12%$107,692.31$107,692.31215.81%
26New Structural Walkway Supports Painting1LS$9,705.30$9,705.30$31,858.00$31,858.00328.25%$11,000.00$11,000.00113.34%$10,000.00$10,000.00103.04%$44,871.79$44,871.79462.34%
27Superstructure and Structural Walkway Supports Painting Preparatory Work: Failed Painted Surfaces
27AAFirst 400 SF400SF$9.86$3,944.00$21.00$8,400.00212.98%$25.00$10,000.00253.55%$19.00$7,600.00192.70%$19.23$7,692.31195.04%
27ABOver 400 SF500SF$3.07$1,535.00$21.00$10,500.00684.04%$25.00$12,500.00814.33%$19.00$9,500.00618.89%$19.23$9,615.00626.38%
28Superstructure and Structural Walkway Supports Painting: Primer Coat for Failed Painted Surfaces
28AAFirst 400 SF400SF$2.54$1,016.00$8.00$3,200.00314.96%$10.00$4,000.00393.70%$8.00$3,200.00314.96%$19.23$7,692.00757.09%
28ABOver 400 SF500SF$2.54$1,270.00$8.00$4,000.00314.96%$10.00$5,000.00393.70%$8.00$4,000.00314.96%$19.23$9,615.00757.09%
29Superstructure Hand Railing Weld Repair
29AAFirst 10 LF10LF$54.82$548.20$232.00$2,320.00423.20%$400.00$4,000.00729.66%$120.00$1,200.00218.90%$2,564.10$25,641.004677.31%
29ABOver 10 LF10LF$54.82$548.20$232.00$2,320.00423.20%$200.00$2,000.00364.83%$120.00$1,200.00218.90%$2,564.10$25,641.004677.31%
30Dewater Slide Gate Bays6EA$18,352.50$110,115.00$11,299.00$67,794.0061.57%$32,600.00$195,600.00177.63%$98,700.00$592,200.00537.80%$38,461.54$230,769.24209.57%
31Slide Gate Removal and Reinstallation6EA$16,355.02$98,130.12$14,982.00$89,892.0091.60%$15,300.00$91,800.0093.55%$16,000.00$96,000.0097.83%$10,897.44$65,384.6466.63%
32Slide Gate Painting6EA$17,448.79$104,692.74$5,403.00$32,418.0030.96%$4,800.00$28,800.0027.51%$4,500.00$27,000.0025.79%$44,871.79$269,230.74257.16%
33Replace Slide Gate Seals6EA$499.93$2,999.58$4,883.00$29,298.00976.74%$3,100.00$18,600.00620.09%$10,000.00$60,000.002000.28%$10,897.44$65,384.642179.79%
34Replace Slide Gate Actuators and Stems6EA$22,643.98$135,863.88$30,036.00$180,216.00132.64%$228,000.00$1,368,000.001006.89%$32,000.00$192,000.00141.32%$19,230.77$115,384.6284.93%
35Slide Gate Weld Repairs
35AAFirst 5 LF5LF$24.00$120.00$232.00$1,160.00966.67%$590.00$2,950.002458.33%$230.00$1,150.00958.33%$2,564.10$12,820.5010683.75%
35ABOver 5 LF20LF$24.00$480.00$232.00$4,640.00966.67%$590.00$11,800.002458.33%$230.00$4,600.00958.33%$2,564.10$51,282.0010683.75%
36Slide Gate Frame Rehabilitation6EA$4,345.64$26,073.84$21,095.00$126,570.00485.43%$18,000.00$108,000.00414.21%$35,000.00$210,000.00805.40%$32,051.28$192,307.68737.55%
37Dewater Stoplog Bays7EA$18,330.30$128,312.10$9,933.00$69,531.0054.19%$30,400.00$212,800.00165.85%$98,700.00$690,900.00538.45%$38,461.54$269,230.78209.82%
38Dewater Log Sluice Bay1EA$30,810.52$30,810.52$23,993.00$23,993.0077.87%$50,000.00$50,000.00162.28%$106,000.00$106,000.00344.04%$38,461.54$38,461.54124.83%
39Stoplog Removal8EA$529.30$4,234.40$1,736.00$13,888.00327.98%$3,000.00$24,000.00566.79%$2,500.00$20,000.00472.32%$25,641.03$205,128.244844.33%
40Stoplog Bay Stoplog Slot Rehab6EA$7,352.71$44,116.26$25,392.00$152,352.00345.34%$25,000.00$150,000.00340.01%$70,000.00$420,000.00952.03%$29,487.18$176,923.08401.04%
41Fishway Bay Stoplog Slot Rehab1EA$16,440.94$16,440.94$74,771.00$74,771.00454.79%$25,000.00$25,000.00152.06%$75,000.00$75,000.00456.18%$32,051.28$32,051.28194.95%
42Log Sluice Bay Stoplog Slot Rehab1EA$7,200.32$7,200.32$72,272.00$72,272.001003.73%$25,000.00$25,000.00347.21%$60,000.00$60,000.00833.30%$32,051.28$32,051.28445.14%
43Stoplog Bay Slide Gates7EA$84,467.22$591,270.54$70,100.00$490,700.0082.99%$218,400.00$1,528,800.00258.56%$75,000.00$525,000.0088.79%$44,871.79$314,102.5353.12%
44Log Sluice Bay Slide Gate1EA$123,894.38$123,894.38$153,416.00$153,416.00123.83%$218,400.00$218,400.00176.28%$130,000.00$130,000.00104.93%$44,871.79$44,871.7936.22%
45Stoplog Bay Slide Gate Installation7EA$39,831.08$278,817.56$33,416.00$233,912.0083.89%$38,500.00$269,500.0096.66%$30,000.00$210,000.0075.32%$25,641.03$179,487.2164.37%
46Log Sluice Bay Slide Gate Installation1EA$48,229.88$48,229.88$55,803.00$55,803.00115.70%$49,000.00$49,000.00101.60%$35,000.00$35,000.0072.57%$25,641.03$25,641.0353.16%
47Stoplog Bay Walkway Modification7EA$3,759.59$26,317.13$7,810.00$54,670.00207.74%$4,400.00$30,800.00117.03%$12,000.00$84,000.00319.18%$25,641.03$179,487.21682.02%
48Log Sluice Bay Walkway Modification1EA$4,264.86$4,264.86$16,915.00$16,915.00396.61%$4,400.00$4,400.00103.17%$20,000.00$20,000.00468.95%$25,641.03$25,641.03601.22%
49Gate Deicing Heater System8EA$7,940.19$63,521.52$4,050.00$32,400.0051.01%$10,000.00$80,000.00125.94%$10,000.00$80,000.00125.94%$25,641.03$205,128.24322.93%
50Apron Floor Repair
50AAFirst 5 EA5EA$763.36$3,816.80$511.00$2,555.0066.94%$5,000.00$25,000.00655.00%$2,400.00$12,000.00314.40%$12,820.51$64,102.551679.48%
50ABOver 5 EA5EA$763.36$3,816.80$511.00$2,555.0066.94%$5,000.00$25,000.00655.00%$2,400.00$12,000.00314.40%$12,820.51$64,102.551679.48%
51Riprap5TN$182.25$911.25$567.00$2,835.00311.11%$500.00$2,500.00274.35%$600.00$3,000.00329.22%$1,369.86$6,849.30751.64%
TOTAL$3,059,042.87$3,219,641.00105.25%$5,564,415.00181.90%$5,063,550.00165.53%$4,883,771.27159.65%