Fisher Island Amendment 1 09-B-0002.doc

DOC document 101 KB Posted

Attached to
Fisher Island Unloading, Dredging, Mississippi River Federal contract opportunity
Solicitation number
W912ES-09-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

View the file

Other files for this federal contract opportunity

Other files attached to Fisher Island Unloading, Dredging, Mississippi River, newest first.
File Type Posted
Fisher Bid Abstract.pdf PDF
09-B-0002 Amendment 0002.pdf PDF
09B0002_Fisher Island Site Unloading_Half Size.pdf PDF
09B0002_Fisher Island Site Unloading.pdf PDF
09B0002_Fisher Island Site Unloading.pdf PDF
W912ES-09-B-0002 Solicitation Spec.pdf PDF
09B0002_Fisher Island Site Unloading_Half Size.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 1

The following has been changed in Section 00 83 00, Attachment A,WAGE RATES:

General Decision Number: IL080019 07/24/2009 IL19

Superseded General Decision Number: IL20070019

State: Illinois

Construction Type: Heavy Dredging

Counties: Illinois Statewide.

Dredging Construction Projects: Dredging the following rivers and their tributaries, the Kasakaski River from the mouth to

Fayetteville, Illinois; Illinois River; Minnesota River;

Mississippi River and the Ohio River.

Modification Number Publication Date

0 02/08/2008

1 12/26/2008

2 02/20/2009

3 03/13/2009

4 07/24/2009

* SUIL2003-002 01/01/2004

Rates Fringes

Dredging: (Engineer and

Mechanic)

AREA I:

Within the geographical jurisdiction of the St.

Louis District, Corps of

Engineers...................$ 27.65 16.73

AREA II:

Within the geographical jurisdiction of the

Louisville District, Corps of Engineers................$ 27.54 16.73

AREA III:

Within the geographical jurisdiction of the

Huntington District, Corps of Engineers................$ 27.54 16.73

AREA IV:

Within the geographical jurisdiction of the St.

Paul, Rock Island and

Chicago Districts, Corps of Engineers................$ 26.54 22.85

Dredging: (Levermen and

Boatman)

AREA 1:

Within the geographical jurisdiction of the St.

Louis District, Corps of

Engineers...................$ 28.15 16.73

AREA 2:

Within the geographical jurisdiction of the

Louisville District, Corps of Engineers................$ 28.04 16.73

AREA 3:

Within the geographical jurisdiction of the

Huntington District, Corps of Engineers:...............$ 28.04 16.73

AREA 4:

Within the geographical jurisdiction of the St.

Paul, Rock Island and

Chicago Districts, Corps of Engineers:...............$ 26.54 22.85

AREA 4:

Leverman. Operators on

Backhoes over 130,000 lbs., Operators on Cranes over 165 Tons, and

Operators that are required to have a license or certification to do the work assigned them shall receive 5% more than the highest rate of pay per hour listed on this agreement...................$ 27.87 22.85

Dredging: (Oiler)

AREA 1: Within the geographical jurisdiction of the St. Louis District, Corps of Engineers..........$ 23.94 16.73

AREA 2: Within the geographical jurisdiction of the Louisville

District, Corps of

Engineers...................$ 22.35 16.73

AREA 3: Within the geographical jurisdiction of the Huntington

District, Corps of

Engineers...................$ 22.35 16.73

AREA 4: Within the geographical jurisdiction of the St. Paul, Rock

Island and Chicago

Districts, Corps of

Engineers...................$ 22.60 22.85

FOOTNOTE: Licensed boat operators/pilot shall receive 10% above the current established Group 1 rate (AREA 4 ONLY)

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: MN080059 07/24/2009 MN59

Superseded General Decision Number: MN20070059

State: Minnesota

Construction Type: Heavy

Counties: Aitkin, Becker, Beltrami, Big Stone, Blue Earth, Brown, Carlton, Cass, Chippewa, Clearwater, Cook, Cottonwood, Crow Wing, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Hubbard, Itasca, Jackson, Kanabec, Kandiyohi, Kittson, Koochiching, Lac Qui Parle, Lake, Lake of the Woods, Le Sueur, Lincoln, Lyon, Mahnomen, Marshall, Martin, McLeod, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Norman, Otter Tail, Pennington, Pine, Pipestone, Pope, Red

Lake, Redwood, Renville, Rice, Rock, Roseau, Sibley, Steele, Stevens, Swift, Todd, Traverse, Wabasha, Wadena, Waseca, Watonwan, Wilkin, Winona and Yellow Medicine Counties in

Minnesota.

HEAVY CONSTRUCTION PROJECTS (Does not include Water & Sewer

Lines or Treatment Plants)

Modification Number Publication Date

0 02/08/2008

1 05/02/2008

2 06/13/2008

3 07/11/2008

4 07/25/2008

5 08/08/2008

6 10/03/2008

7 12/19/2008

8 02/13/2009

9 05/01/2009

10 06/05/2009

11 06/26/2009

12 07/17/2009

13 07/24/2009

ELEC0110-009 05/01/2007

GOODHUE (West of Belle Creek, Minneola, Roscoe & Vasa

Townships), KANABEC (South of Hillman, Peace & Pomroy

Townships), LE SUEUR (East of Cleveland, Sharon, Tyrone &

Washington Townships), MILLE LACS (South of Bradbury, Lewis &

Onamia Townships), PINE (South of Arione, Barry, Clover, Hinckley & Ogema Townships) & RICE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 33.60 3%+17.01

ELEC0242-006 05/31/2009

AITKIN, CARLTON, CASS (Bounded on the north by the south line of Leech Lake, Minnesota Island, Could, Bay River & Salem

Townships), COOK, CROW WING, HUBBARD (Except Rockwood, Helga, Farden, Lake Hattie, Schoolcraft, Guthrie, Hart Lake, Lake

Alice, Lake George, Hendrickson & Lakeport), ITASCA (Southerly

12 Townships, including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), KANABEC (Northern part, including

Brook, Ford, Krosche, Hillman, Peace & Pomroy Townships), LAKE, MILLE LACS (Including Northerly Townships of Kathio, South

Harbor, Isle, East Side, Onamia & Harbor), MORRISON, PINE

(Excluding southerly Townships of Brook Park, Mission Creek, Munch, Crosby, Pokegama, Cross Lake, Chengwatana, Royalton, Rock Creek & Pine City), TODD & WADENA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 31.24 63.5%

ELEC0292-005 09/01/2006

BIG STONE, CHIPPEWA, KANDIYOHI, LAC QUI PARLE, MCLEOD, MEEKER,

POPE, STEVENS & SWIFT COUNTIES

Rates Fringes

Electricians:

ELECTRICAL CONTRACTS

$300,000 AND OVER:

Cable Splicer..............$ 28.24 61.21%

Electrician................$ 27.24 61.21%

ELECTRICAL CONTRACTS UNDER

$300,000

Cable Splicer..............$ 27.05 63.67%

Electrician................$ 26.05 63.67%

ELEC0294-007 05/31/2009

KOOCHICHING (East of a line extending North and South from the easternmost point of the City limits of Grand Rapids) COUNTY

Rates Fringes

ELECTRICIAN......................$ 32.28 58.75%

CABLE SPLICER: $0.55 additional per hour

ELEC0294-009 05/31/2009

BELTRAMI, CASS (Northern part, bounded on the south by a line extending east & west of the south line of Boy River & Salem

Townships), CLEARWATER, HUBBARD (Northern part bounded on the south by a line extending east and west of the south line of

Lake Alice and Lake George Twp), ITASCA (Excluding the section south of a line extending east & west of the south line of

Grand Rapids & Trout Lake Townships), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids)

ITASCA (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) & LAKE OF THE WOODS (Excluding the northwest angle) COUNTIES

Rates Fringes

CABLE SPLICER....................$ 32.83 58.75%

Electricians:

Electrical Installations

$3,244,800 and over.........$ 32.28 58.75%

Electrical Installations

Under $3,244,800............$ 23.44 37.5%+5.70

ELEC0343-006 06/27/2008

BLUE EARTH, BROWN, COTTONWOOD, DODGE, FARIBAULT, FILLMORE,

FREEBORN, GOODHUE (Except that portion west of Belle Creek, Minneola, Roscoe & Vasa Townships), JACKSON, LE SUEUR

(Cleveland, Le Sueur, Ottawa, Sharon, Tyrone, Washington &

Kasota Townships), LINCOLN, LYON, MARTIN, MOWER, NICOLLET, REDWOOD, RENVILLE, SIBLEY, STEELE, WABASHA, WASECA, WATONWAN, WINONA & YELLOW MEDICINE COUNTIES

Rates Fringes

ELECTRICIAN

Brown, Cottonwood, Lincoln

& Lyon Counties.............$ 27.15 11.23

Remaining Area..............$ 30.12 14.27

ELEC0426-003 06/01/1999

MURRAY, NOBLES, PIPESTONE & ROCK COUNTIES

Rates Fringes

Electricians:

AREA 1:

CABLE SPLICER..............$ 20.90 6.34

ELECTRICIAN................$ 19.00 6.105

AREA 2:

CABLE SPLICER..............$ 23.54 6.67

ELECTRICIAN................$ 21.40 6.405

AREA 1: 0 to 10 miles from Worthington, Minnesota, and 0 to

70 miles from Sioux Falls, South Daktoa

AREA 2: Outside the above area.

ELEC1426-006 06/01/2006

BECKER, DOUGLAS, GRANT, KITTSON, MAHNOMEN, MARSHALL, NORMAN,

OTTER TAIL, PENNINGTON, RED LAKE, ROSEAU, TRAVERSE & WILKIN

COUNTIES

Rates Fringes

CABLE SPLICER....................$ 23.02 12%+7.18

ELECTRICIAN......................$ 21.92 12%+7.18

* ENGI0049-021 05/01/2009

AREA 1 (METRO): COOK & LAKE COUNTIES

AREA 2 (EASTERN): AITKIN, BLUE EARTH, CARLTON, CASS (South of the northern right-of-way of U.S. Hwy #2 & east of the Western right-of-way of U.S. Hwy #371), CROW WING (East of the western right-of-way of U.S. Hwy #371), DODGE, FARIBAULT, FILLMORE, FREEBORN, GOODHUE, ITASCA (East of the western right-of-way of

MN Hwy #6), KANABEC, KOOCHICHING (East of a north-south line from the Canadian border to Pelland, the western right-of-way of U.S. Hwy #71 from Pelland to Big Falls & MN Hwy #6), LE

SUEUR, MEEKER, MILLE LACS, MORRISON (East of the western right-of-way of U.S. Hwy #371 & U.S. Hwy #10 from Little Falls to the Morrison-Benton County line), MOWER, PINE, RICE, STEELE, WABASHA, WASECA & WINONA COUNTIES; & BROWN, MCLEOD, MARTIN, NICOLLET, SIBLEY & WATONWAN COUNTIES (East of the Western right-of-way of MN Hwy #15)

AREA 3 (WESTERN): BECKER, BELTRAMI, BIG STONE, CASS

(Remainder), CHIPPEWA, CLEARWATER, COTTONWOOD, CROW WING

(Remainder), DOUGLAS, GRANT, HUBBARD, ITASCA (Remainder), JACKSON, KANDIYOHI, KITTSON, KOOCHICHING (Remainder), LAC QUI

PARLE, LAKE OF THE WOODS, LINCOLN, LYON, MAHNOMEN, MARSHALL,

MORRISON (Remainder), MURRAY, NOBLES, NORMAN, OTTER TAIL, PENNINGTON, PIPESTONE, POPE, RED LAKE, REDWOOD, RENVILLE, ROCK, ROSEAU, STEVENS, SWIFT, TODD, TRAVERSE, WADENA, WILKIN & YELLOW

MEDICINE COUNTIES; & BROWN, MCLEOD, MARTIN, MEEKER, NICOLLET,

SIBLEY & WATONWAN (Remainder) COUNTIES

Rates Fringes

Power Equipment Operator

AREA 1:

GROUP 1....................$ 31.57 15.25

GROUP 2....................$ 30.57 15.25

GROUP 3....................$ 30.02 15.25

GROUP 4....................$ 29.72 15.25

GROUP 5....................$ 26.68 15.25

GROUP 6....................$ 25.47 15.25

AREA 2:

GROUP 1....................$ 29.11 15.25

GROUP 2....................$ 28.11 15.25

GROUP 3....................$ 27.66 15.25

GROUP 4....................$ 27.36 15.25

GROUP 5....................$ 24.79 15.25

GROUP 6....................$ 23.92 15.25

AREA 3:

GROUP 1....................$ 24.45 15.25

GROUP 2....................$ 23.45 15.25

GROUP 3....................$ 22.52 15.25

GROUP 4....................$ 22.21 15.25

GROUP 5....................$ 20.50 15.25

GROUP 6....................$ 19.90 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1 - *Crane with over 135' Boom, excluding Jib; &

Hydraulic Backhoe and/or other similar equipment with

Shovel-type Controls 3 cu. yds. & over

GROUP 2 - Hydraulic Backhoe and/or similar equipment with

Shovel- type Controls, up to 3 cu. yds.; Front End Loader, 5 cu. yds. & over; Locomotive Crane; Master Mechanic;

Tandem Scraper; Tractor, boom type; Truck Crane, Crawler

Crane

GROUP 3 - Dual Tractor; & Scraper - Struck Cap. 32 cu. yds. & over

GROUP 4 - Bituminous Roller (8 Tons & over); Cat Tractor with

Rock Wagon or similar type; Front End Loader, over 1 cu.

yd.; Mechanic; Rubber-tired Farm Tractor, Backhoe Attach.;

Scraper, up to 32 cu. yds.; Skid Steer Loader, over 1 cu.

yd. with Backhoe Attachment; Tractor, Bulldozer; Tractor

Operator, over 50 HP with Power Take-off; & Dismantling or

Repair Mechanic

GROUP 5 - Bituminous Roller (Under 8 tons); Bituminous

Rubber- tired Roller; Front End Loader, up to & incl. 1 cu.

yd.; Loader (Barber Greene or similar type); & Tractor

Operator, Bulldozer, 50 HP or less

GROUP 6 - Mechanic Tender; Mechanic, Space Heater (Temporary

Heat); Roller on Gravel Compaction; Sheep Foot Roller;

Tractor, Wheel type (over 50 HP); & Truck Crane Oiler

CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;

CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM

UNDERGROUND WORK:

TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM

UNDER AIR PRESSURE - $ .50 PREMIUM

HAZARDOUS WASTE PROJECTS (PPE Required):

LEVEL A - $1.25 PREMIUM

LEVEL B - $ .90 PREMIUM

LEVEL C - $ .60 PREMIUM

IRON0512-012 05/01/2009

BIG STONE, BLUE EARTH, BROWN, CHIPPEWA, COTTONWOOD, DODGE,

DOUGLAS, FARIBAULT, FILLMORE, FREEBORN, GOODHUE, GRANT,

JACKSON, KANABEC, KANDIYOHI, LAC QUI PARLE, LE SUEUR, LINCOLN,

LYON, MARTIN, MCLEOD, MEEKER, MILLE LACS, MORRISON, MOWER,

MURRAY, NICOLLET, NOBLES, OTTER TAIL, PIPESTONE, POPE,

REDWOOD, RENVILLE, RICE, ROCK, SIBLEY, STEELE, STEVENS, SWIFT,

TODD, TRAVERSE, WABASHA, WADENA, WASECA, WATONWAN, WINONA &

YELLOW MEDICINE COUNTIES

Rates Fringes

IRONWORKER.......................$ 33.80 20.44

IRON0512-027 05/01/2009

AITKIN, BECKER, BELTRAMI, CARLTON, CASS, CLEARWATER, COOK,

CROW- WING, HUBBARD, ITASCA, KITSON, KOOCHICHING, LAKE, LAKE OF

THE WOODS, MAHNOMEN, MARSHALL, NORMAN, PENNINGTON, PINE, RED

LAKE ROSEAU & WILKIN COUNTIES

Rates Fringes

IRONWORKER.......................$ 29.76 19.50

LABO0563-008 05/01/2008

Rates Fringes

Laborers:

AREA 1:

(1) Flagger................$ 27.32 10.83

(5) Tunnel.................$ 28.02 10.83

(6) Pipelayer..............$ 29.32 10.83

AREA 2:

(1) Flagger................$ 26.82 10.26

(5) Tunnel.................$ 27.52 10.26

(6) Pipelayer..............$ 28.82 10.26

AREA 3:

(1) Flagger................$ 25.83 11.25

(5) Tunnel.................$ 26.53 11.25

(6) Pipelayer..............$ 27.83 11.25

AREA 4:

(1) Flagger................$ 22.64 10.31

(5) Tunnel.................$ 23.34 10.31

(6) Pipelayer..............$ 24.64 10.31

AREA 5:

(1) Flagger................$ 23.34 10.31

(5) Tunnel.................$ 24.04 10.31

(6) Pipelayer..............$ 25.34 10.31

AREA 6:

(1) Flagger................$ 18.99 9.11

(5) Tunnel.................$ 19.69 9.11

(6) Pipelayer..............$ 20.99 9.11

AREA DESCRIPTIONS

AREA 1: (District 1): PINE COUNTY

AREA 2: (District 2A): CARLTON, COOK & LAKE COUNTIES

AREA 3 : (District 2B): ITASCA COUNTY

AREA 4: (District 3A): KANABEC & MILLE LACS COUNTIES

AREA 5 : (District 3B): BLUE EARTH, BROWN, DODGE, FARIBAULT, FILLMORE, FREEBORN, GOODHUE, LE SUEUR, MOWER, NICOLLET, RICE, STEELE, WABASHA, WASECA AND WINONA COUNTIES

AREA 6: (District 4): AITKIN, BECKER, BELTRAMI, BIG STONE, CASS, CHIPPEWA, CLEARWATER, COTTONWOOD, CROW WING, DOUGLAS, GRANT, HUBBARD, JACKSON, KANDIYOHI, KITTSON, KOOCHICHING, LAC QUI PARLE, LAKE OF THE WOODS, LINCOLN, LYON, MAHNOMEN, MARSHALL, MARTIN, MCLEOD, MEEKER, MORRISON, MURRAY, NOBLES, NORMAN, OTTER TAIL, PENNINGTON, PIPESTONE, POPE, RED LAKE, REDWOOD, RENVILLE, ROCK, ROSEAU, SIBLEY, STEVENS, SWIFT, TODD, TRAVERSE, WADENA, WATONWAN, WILKIN AND YELLOW

MEDICINE COUNTIES

PLUM0006-004 08/01/2008

DODGE, FARIBAULT, FILLMORE, FREEBORN, GOODHUE (Southern half), MOWER, RICE, STEELE, WABASHA, WASECA & WINONA COUNTIES

Rates Fringes

PIPEFITTER.......................$ 35.51 13.35

PLUM0011-006 05/01/2008

CARLTON, COOK (A strip 20 miles inland along the shores of Lake

Superior), KANABEC, LAKE (A strip 20 miles inland along the shores of Lake Superior) & PINE COUNTIES

Rates Fringes

PIPEFITTER.......................$ 33.70 14.35

PLUM0011-013 05/01/2008

AITKIN, BECKER, BELTRAMI, CASS (Southern half), CLEARWATER, CROW WING, DOUGLAS, GRANT, HUBBARD, KITTSON, LAKE OF THE WOODS, MAHNOMEN, MARSHALL, NORMAN, OTTER TAIL, PENNINGTON, RED LAKE, ROSEAU, TRAVERSE, WADENA & WILKIN COUNTIES

Rates Fringes

PIPEFITTER.......................$ 29.39 11.83

PLUM0455-005 05/01/2008

GOODHUE COUNTY (Northern half)

Rates Fringes

PIPEFITTER.......................$ 36.41 19.57

PLUM0455-011 05/01/2008

BLUE EARTH, BROWN, COTTONWOOD, JACKSON, LE SUEUR, LINCOLN,

LYON, MARTIN, MURRAY, NICOLLET, NOBLES, PIPESTONE, REDWOOD,

RENVILLE, ROCK, SIBLEY & WATONWAN COUNTIES

Rates Fringes

PIPEFITTER.......................$ 28.21 17.23

PLUM0539-005 05/01/2008

MCLEOD & MILLE LACS COUNTIES

Rates Fringes

PIPEFITTER.......................$ 37.58 18.00

PLUM0539-009 05/01/2008

BIG STONE, CHIPPEWA, KANDIYOHI, LAC QUI PARLE, MEEKER,

MORRISON, POPE, STEVENS, SWIFT, TODD & YELLOW MEDICINE COUNTIES

Rates Fringes

PIPEFITTER.......................$ 31.53 18.00

PLUM0589-004 05/01/2008

CASS (North of a parallel line drawn from the northern boundary of Crow Wing County, west to the east boundary of Wadena

County), COOK (Except a strip 20 miles inland along the shores of Lake Superior), ITASCA KOOCHICHING,& LAKE (Except a strip 20 miles inland along the shores of Lake Superior) COUNTIES

Rates Fringes

PIPEFITTER.......................$ 33.09 15.22

* SUMN1994-003 07/08/1994

Rates Fringes

CARPENTER........................$ 13.73 2.55

Laborers:

Landscape...................$ 7.25

Unskilled...................$ 12.33 3.18

PAINTER: Steel Only.............$ 19.42 4.72

Power Equipment Operator

Dragline....................$ 13.41 3.95

Grader......................$ 12.03 2.84

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .