Amended Drawing AC 113
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid abstract and Cert.pdf | ||
| Pool 8 Bid Abstract.xls | XLS spreadsheet | |
| Pool 8 Amendment 3.pdf | ||
| Pool 8 Amendment 2.pdf | ||
| Pool 8 Amendment 1.doc | DOC document | |
| AC302_M-P8P3S3_SECT_C-330230.pdf | ||
| AC111_M-P8P3S3_STPLN_C-111126.pdf | ||
| AC301_M-P8P3S3_SECT_C-330129.pdf | ||
| 08B0004_Full_Size_Part3.pdf | ||
| 08B0004_Full_Size_Part2.pdf | ||
| 08B0004_Full_Size_Part1.pdf | ||
| 08B0004.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10’
120’ +/-ACCESS
655 655
635635
640640
64564
645645
D w n b y
D e s ig n e d b y
D a t e
R e v
C k d b y
US Army Corps of Engineers
St. Paul District
Sheet reference number:
A
B
C
D
2 3 4 5
A u t h o r it y
F il e
N a m e
P lo t
D a t e
P lo t
S c a le
D r a w in g u m b e r
S o li c it a t io n o
S y m b o l
D e s c r ip t io n A p p r
D a t e
H o r iz o n t a l C o o r d in a t e
S y s t e m
V e r t ic a l C o o r d in a t e
S y s t e m
Sheet of
D E
P A
R T
M E
T
O F
H
E
A R
M Y
S T
P A
U L
M
IN
N E
S O
T A
C O
R P
S
G
IN
E E
R S
S T
P A
U L
D
IS
T R
IC
T X
X
U
M
Z
N E
N A
D
R V
Y
C O
N S
T R
U C
T
IO
A W
IN
G
M
IS
S
IS
S
IP
P I R
IV
E R
P
O O
L
H O
U S
T
C
U N
T Y
M N
E N
V
M G
M T
P R
O G
P O
O L
IS
L A
N
A S
A G
E
A
W
E S
B
D
C
M S
L
A
D J
E L
E V
A T I
O N
0 50 100 150 200 250 280-50-100-150-200
E L
E V
A T I
O N
N
FLOW
EXISTING ROCK
GROINS
EXISTING ROCK
GROIN
EXISTING ROCK
GROIN
APRROX. LOCATION
OF EXISTING WING DAM
NOTES:
EL. 610.6
EXISTING GROUND LINE
VARIES
PROVIDE 10’ TOP
WHEN TOP OF
EXCAVATION
IS AT EL. 645.0
OR BELOW
TYPICAL SECTION
PLAN
0 100’ 200’
01-86M
01-88M
01-87M
J B
M
APRROX. LOCATION
OF EXISTING WING DAM
EXCAVATION AREA
EXISTING DROP
STRUCTURE
G C
W J J F J S
H
G C
W
A B
O V
B
O W
N S
V
IL
L
P R
O V
B
R R
W
X
C A
V A
T
IO
N
P L
C T
IO
N
ABOVE BROWNSVILLE APPROVED SAND BORROW AREA
EXCAVATION
ABOVE BROWNSVILE APPROVED SAND BORROW AREA
EXCAVATION
LOWEST CONTROLED POOL SURFACE
EL. 630.6
C
IV
IL
S
IT
E
C-113
A C
M P
P
S
S T
P L
N
C .D
G N
D R
A W
IN
G
IS
S U
W
IT
M
E N
D M
E
G C
W
1. TOPOGRAPHY SHOWN ON THIS SHEET WAS DEVELOPED FROM
FIELD SURVEYS OBTAINED IN NOVEMBER 2008.
2. WORK LIMITS SHALL BE CONFINED TO AREAS CONTAINING
DREDGED MATERIAL.
3. VEGETATION ALONG THE PERMIMETER OF THE ISLAND
SHALL NOT BE DISTURBED.
4. EXCAVATION AREA DEPICTED IS THE AREA AVAILABLE.
5. DURING EXCAVATION, THE CONTRACTOR SHALL LEAVE THE
PERIMETER BERM AT A MINIMUM ELEVATION 645.0,
MINIMUM 10’ TOP WIDTH, 1V:3H SIDE SLOPES ABOVE
AVERAGE WATER SURFACE ELEVATION, AND 1V:2H SIDE
SLOPES BELOW AVERAGE WATER SURFACE ELEVATION.
HOWEVER, AT THE ACCESS, THE CONTRACTOR SHALL
MAINTAIN A BERM WITH MINIMUM 10’ TOP WIDTH AND
1V:3H SIDE SLOPES.
6. THE CONTRACTOR SHALL REMOVE MATERIAL FROM THE
NORTHERN HALF OF THE PLACEMENT SITE PRIOR TO
REMOVING MATERIAL FROM THE SOUTHERN HALF. MATERIAL
REMOVAL FROM THE SOUTHERN HALF MAY REQUIRE CONTRACTOR
REMOVAL OF THE GOVERNMENTS DROP STRUCTURE.
7. THE CONTRACTOR SHALL REMAIN AT LEAST 30’ FROM THE
EXISTING DROP STRUCTURE.