A.02 Market Research Documentation Capabilities Statement W912ER25R0010 Prcourment E.docx
DOCX document 34 KB Posted
- Solicitation number
- W912ER25R0010
About this file
This is a capabilities statement template for contractors to respond to a sources sought notice for the construction of Kuwait Air Force F-18 Super Hornet Program support facilities at Al Jaber Air Base, Kuwait (W912ER25R0010). The template requires contractors to provide basic business information, bonding capabilities, and relevant experience constructing facilities like engine shops, airframes shops, squadron operations facilities, and critical base infrastructure.
The template asks contractors to indicate their ability to perform as prime contractor or joint venture, demonstrate financial capability, confirm Kuwait business licensing, verify Defense Base Act insurance coverage, and document experience in Kuwait/CENTCOM region. Contractors must specify their ability to handle multiple construction contracts simultaneously and indicate the percentage of work they would self-perform. The form includes a project experience template limited to five previous similar projects, requiring details on contract values, dates of performance, and work descriptions specifically related to the F-18 support facilities construction project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 1. GENERAL
1. Business Name: (Insert Business Name)
2. Business Address: (Insert Business Address)
3. Cage Code: (Insert Cage Code)
4. DUNS Number: (Insert DUNS number)
5. Responsible Point of Contact:
| Name: | (Insert Name) | |
| Telephone: | (Insert Telephone Number) | |
| Email: | (Insert Email Address) |
SECTION 2. CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a:
|_| Prime Contractor |_| Joint Venture with (Insert business name, business size, and cage code).
(See FAR subpart 9.6 for Government policy on teaming arrangements)
SECTION 3. CAPABILITY
1. If awarded a contract, our firm can supply performance and payment bonds in accordance with FAR 52.228-15 and acquire Defense Base Act (DBA) Insurance in accordance with FAR 52.228-3.
| Performance Bonds | |_| Yes | |_| No | ||
| Payment Bonds | |_| Yes | |_| No | ||
| DBA Insurance | |_| Yes | |_| No |
2. If awarded a contract, the maximum bonding capacity in U.S. Dollars (USD) our firm can obtain in accordance with FAR 52.228-14 or 52.228-15 is:
| Performance Bond | $_______________________ | |
| Payment Bond | $_______________________ |
3. Our firm has the necessary Kuwait business license and ability to obtain the necessary badging/access to perform work on Al Jaber Air Base, Kuwait.
|_| Yes |_| No
4. Our firm is capable of handling numerous Construction contracts simultaneously at |_|1, |_|2-5, |_|6-10, |_|11-15, |_|16-20, geographically diverse locations.
5. Our firm has performed work in the following locations within the last 5 years:
|_| Al Jaber Air Base |_| Kuwait |_| CENTCOM AOR
6. Our firm has constructed the following facility types/projects:
Check All That Apply
Construction Projects
| |_| |
| Engine Shop |
Airframes shop
| |_| |
| Squadron Operations Facilities |
| |_| |
| Installation of critical base infrastructure |
| |_| |
| Utilities, site development, and other infrastructure development. |
7. Our firm |_| does/ |_| does not have the above capabilities, qualifications, AND EXPERIENCE to perform design-bid-build (D-B-B) projects in an overseas environment, to include CONSTRUCTION MANAGEMENT, LOGISTICAL SUPPORT for personnel, materials and equipment, in areas, including subcontractors and suppliers.
8. If awarded a contract, our firm |_| is/ |_| is not financially capable to perform the cost of the construction and related services.
9. Based on your previous experience as a prime contractor or joint venture, identify the percent of work effort you would expect to self-perform. (Insert the percentage)
10. If your firm has successfully performed construction of facilities and associated services for U.S. or Foreign military commands / facilities / projects in Kuwait or the CENTCOM AOR, please list this experience in the below Construction of Similar Size Scope Projects template.
CAPABILITY STATEMENT
W912ER25R0010
Project Title: _____________________________________
CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS
PROJECT EXPERIENCE TEMPLATE
(Make additional copies as needed but not more than five pages)
Project Title:
Location:
Address of work site:
Contract number:
Task order number:
| Dates of performance: |
| From |
To
| Total Contract Value: |
| $ |
| Total Value to date: |
| $ |
Procuring activity:
Procurement point of contact:
Phone:
| Type of agency: |
| Fed Govt |
State Govt
Municipality
Private
Other (describe)
| Performed as: |
| Prime Contractor |
Subcontractor
Other (describe)
General description of work:
Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:
MINIMUM ONE OR MAXIMUM FIVE PROJECT EXPERIENCE FORMS ARE AUTHORIZED FOR SUBMISSION
File details come from the government source that posted it. Updated .