A.02 Market Research Documentation Capabilities Statement W912ER25R0010 Prcourment E.pdf
PDF 448 KB Posted
- Solicitation number
- W912ER25R0010
About this file
This is a Capability Statement template for solicitation W912ER25R0010, designed to gather information from contractors interested in constructing support facilities for the Kuwait Air Force F/A F-18 Super Hornet Program at Al Jaber Air Base, Kuwait. The three-page template requests detailed company information including business name, CAGE code, DUNS number, and point of contact details.
The template requires contractors to indicate their proposal status (prime contractor or joint venture), bonding capabilities for performance and payment bonds, Defense Base Act insurance status, and Kuwait business license status. It also asks contractors to demonstrate their capacity to handle multiple construction contracts simultaneously, past performance in the CENTCOM AOR, and specific experience with facility types including engine shops, airframes shops, squadron operations facilities, and base infrastructure projects. Contractors must specify their self-performance percentage and document up to five relevant past performance projects using the included project experience template, which captures details such as contract values, dates, agency types, and scope descriptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.02 Market Research Documentation Capabilities Statement W912ER25R0010 Prcourment E.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAPABILITY STATEMENT
W912ER25R0010
Project Title: _____________________________________
SECTION 1. GENERAL
1. Business Name: (Insert Business Name)
2. Business Address: (Insert Business Address)
3. Cage Code: (Insert Cage Code)
4. DUNS Number: (Insert DUNS number)
5. Responsible Point of Contact:
Name: (Insert Name) Telephone: (Insert Telephone Number) Email: (Insert Email Address)
SECTION 2. CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a:
Prime Contractor Joint Venture with (Insert business name, business size, and cage code).
(See FAR subpart 9.6 for Government policy on teaming arrangements)
SECTION 3. CAPABILITY
1. If awarded a contract, our firm can supply performance and payment bonds in accordance with FAR 52.228-15 and acquire Defense Base Act (DBA) Insurance in accordance with FAR 52.228-3.
Performance Bonds Yes No Payment Bonds Yes No DBA Insurance Yes No
2. If awarded a contract, the maximum bonding capacity in U.S. Dollars (USD) our firm can obtain in accordance with FAR 52.228-14 or 52.228-15 is:
Performance Bond $_______________________ Payment Bond $_______________________
3. Our firm has the necessary Kuwait business license and ability to obtain the necessary badging/access to perform work on Al Jaber Air Base, Kuwait.
Yes No
CAPABILITY STATEMENT
W912ER25R0010
Project Title: _____________________________________
4. Our firm is capable of handling numerous Construction contracts simultaneously at 1, 2-5, 6-10, 11-15, 16-20, geographically diverse locations.
5. Our firm has performed work in the following locations within the last 5 years:
Al Jaber Air Base Kuwait CENTCOM AOR
6. Our firm has constructed the following facility types/projects:
Check All That Apply
Construction Projects
Engine Shop Airframes shop
Squadron Operations Facilities Installation of critical base infrastructure Utilities, site development, and other infrastructure development.
7. Our firm does/ does not have the above capabilities, qualifications, AND EXPERIENCE to perform design-bid-build (D-B-B) projects in an overseas environment, to include CONSTRUCTION MANAGEMENT, LOGISTICAL SUPPORT for personnel, materials and equipment, in areas, including subcontractors and suppliers.
8. If awarded a contract, our firm is/ is not financially capable to perform the cost of the construction and related services.
9. Based on your previous experience as a prime contractor or joint venture, identify the percent of work effort you would expect to self-perform. (Insert the percentage)
10. If your firm has successfully performed construction of facilities and associated services for U.S. or Foreign military commands / facilities / projects in Kuwait or the CENTCOM AOR, please list this experience in the below Construction of Similar Size Scope Projects template.
CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS
PROJECT EXPERIENCE TEMPLATE
(Make additional copies as needed but not more than five pages)
Project Title:
Location:
Address of work
Contract number: Task order number:
Dates of From To Total Contract $ Total Value to $
Procuring activity:
Procurement point of contact: Phone:
Type of agency: Fed Govt
State Govt
Municipality Private Other (describe)
Performed as: Prime Contractor
Subcontractor Other (describe)
General description of work:
Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:
MINIMUM ONE OR MAXIMUM FIVE PROJECT EXPERIENCE FORMS ARE AUTHORIZED FOR SUBMISSION