AMENDMENT 0001 - DRAWING DOCUMENT -- SA-468097-2_AM0001.pdf
PDF 6 MB Posted
- Attached to
- Amendment 0002 - MMSC Dredging - RSNF, Saudi Arabia Federal contract opportunity
- Solicitation number
- W912ER22R0009
About this file
This solicitation requests dredging services for a harbor in Saudi Arabia. The contractor will be required to dredge four areas of the harbor to depths between -6.62m and -13m. The dredged material will be placed in a designated 19.2 hectare disposal area and used to construct a revetment. The contractor must provide all documentation for Defense Base Act insurance after award and prior to notice to proceed. Performance and payment bonds of 20% are required. The magnitude of construction is estimated between $25-100 million. The U.S. Army Corps of Engineers Middle East District will administer the design-bid-build contract.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET ID
READY TO ADVERTISE
JUNE 3, 2021
AMENDMENT 0001
NOVEMBER 1, 2021
SA-468097-2
W912ER-22-R-0009
US Army Corps of Engineers
MIDDLE EAST DISTRICT
G-001
KING ABDULAZIZ NAVAL BASE
KINGDOM OF SAUDI ARABIA
ROYAL SAUDI NAVAL FORCES, TUWAIQ SHIPS
HARBOR DREDGING
CLIN 0001
NOT FOR CONSTRUCTION
THE STAMPS AFFIXED TO THIS COVER SHEET ARE CERTIFYING THE DRAWINGS
CONTAINED WITHIN HAVE BEEN REVIEWED OR PREPARED BY EACH APPLICABLE
ENGINEERING DISCIPLINE.
CIVIL GEOTECHNICAL
REVETMENTS HARBOR DREDGING
PROFESSIONAL SEALS
INDEX OF DRAWINGS
SHEET REF.
NUMBER
FILE NUMBER
REVISIONS
TITLE
SHEET REF.
NUMBER
FILE NUMBER
REVISIONS
TITLE
REV. NO. AM/COP NO. REV. NO. AM/COP NO.
GENERAL DRAWINGS
SITE DESIGN (CONTINUED)
G-001 SA-468097-2-G-001GN COVER SHEET DREDGING
G-011 SA-468097-2-G-011GN-01 1 AM 0001 INDEX OF DRAWINGS - SHEET 1 OF 2
G-012 SA-468097-2-G-012GN INDEX OF DRAWINGS - SHEET 2 OF 2 CN-101 SA-468097-2--CN101PN-01 1 AM 0001 OVERALL DREDGING PLAN
G-051 SA-468097-2-G-051GN GENERAL NOTES CN-102 SA-468097-2--CN102PN DREDGING PLAN 102
G-052 SA-468097-2-G-052GN LEGEND AND ABBREVIATIONS CN-103 SA-468097-2--CN103PN DREDGING PLAN 103
G-101 SA-468097-2-G-101PN-01 1 AM 0001 SITE LOCUS PLAN CN-104 SA-468097-2--CN104PN DREDGING PLAN 104
G-102 SA-468097-2-G-102PN CONSTRUCTION OVERVIEW PLAN - SHEET 1 OF 2 CN-105 SA-468097-2--CN105PN DREDGING PLAN 105
G-103 SA-468097-2-G-103PN-01 1 AM 0001 CONSTRUCTION OVERVIEW PLAN - SHEET 2 OF 2 CN-106 SA-468097-2--CN106PN DREDGED MATERIAL PLACEMENT OVERALL PLAN
CN-108 SA-468097-2--CN108PN DREDGED MATERIAL PLACEMENT PLAN
CN-301 SA-468097-2--CN301SE DREDGING SECTIONS
SITE DESIGN CN-302 SA-468097-2--CN302SE DREDGED MATERIAL PLACEMENT SECTIONS
CN-303 SA-468097-2--CN303SE DREDGED MATERIAL TRANSMISSION PIPE PROFILE
EXISTING CONDITIONS
VH-101 SA-468097-2--VH101PN OVERALL EXISTING CONDITIONS PLAN SHORE PROTECTION
VH-102 SA-468097-2--VH102PN DEBRIS AND OBSTRUCTIONS PLAN 102
VH-103 SA-468097-2--VH103PN DEBRIS AND OBSTRUCTIONS PLAN 103 CH-108 SA-468097-2--CH108PN DREDGE MATERIAL PLACEMENT AREA - LAYOUT AND GRADING
VH-104 SA-468097-2--VH104PN DEBRIS AND OBSTRUCTIONS PLAN 104 CH-201 SA-468097-2--CH201EL DREDGE MATERIAL PLACEMENT AREA - REVETMENT CREST PROFILE
VH-105 SA-468097-2--VH105PN DEBRIS AND OBSTRUCTIONS PLAN 105 CH-301 SA-468097-2--CH301SE-01 1 AM0001 REVETMENT SECTIONS - SHEET 1 OF 3
CH-302 SA-468097-2--CH302SE REVETMENT SECTIONS - SHEET 2 OF 3
CH-303 SA-468097-2--CH303SE REVETMENT SECTIONS - SHEET 3 OF 3
GEOTECHNICAL
REVETMENT LAYOUT
B-101 SA-468097-2--B-101PN BORING LOCATIONS
B-301 SA-468097-2--B-301SE BORE SAMPLES - SHEET 1 OF 3 CL-108 SA-468097-2--CL108PN DREDGE MATERIAL PLACEMENT AREA - LAYOUT AND BORINGS
B-302 SA-468097-2--B-302SE BORE SAMPLES - SHEET 2 OF 3
B-303 SA-468097-2--B-303SE BORE SAMPLES - SHEET 3 OF 3
B-601 SA-468097-2--B-601SC BORING LOGS - SHEET 1 OF 9 FILL INSTRUMENTATION
B-602 SA-468097-2--B-602SC BORING LOGS - SHEET 2 OF 9
B-603 SA-468097-2--B-603SC BORING LOGS - SHEET 3 OF 9 CI-101 SA-468097-2--CI101PN FILL INSTRUMENTATION OVERALL PLAN
B-604 SA-468097-2--B-604SC BORING LOGS - SHEET 4 OF 9 CI-102 SA-468097-2--CI102PN FILL INSTRUMENTATION SQUADRON OPERATIONS FACILITY
B-605 SA-468097-2--B-605SC BORING LOGS - SHEET 5 OF 9 CI-103 SA-468097-2--CI103PN FILL INSTRUMENTATION HAZMAT FACILITY
B-606 SA-468097-2--B-606SC BORING LOGS - SHEET 6 OF 9 CI-104 SA-468097-2--CI104PN FILL INSTRUMENTATION MAINTENANCE FACILITY
B-607 SA-468097-2--B-607SC BORING LOGS - SHEET 7 OF 9 CI-105 SA-468097-2--CI105PN FILL INSTRUMENTATION MMSC WAREHOUSE - SHEET 1 OF 2
B-608 SA-468097-2--B-608SC BORING LOGS - SHEET 8 OF 9 CI-106 SA-468097-2--CI106PN FILL INSTRUMENTATION MMSC WAREHOUSE - SHEET 2 OF 2
B-609 SA-468097-2--B-609SC BORING LOGS - SHEET 9 OF 9 CI-107 SA-468097-2--CI107PN FILL INSTRUMENTATION GATE HOUSE FACILITY
CI-501 SA-468097-2--CI501DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 1 OF 6
CI-502 SA-468097-2--CI502DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 2 OF 6
EXISTING CONDITIONS AND DEMOLITION CI-503 SA-468097-2--CI503DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 3 OF 6
CI-504 SA-468097-2--CI504DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 4 OF 6
CD-101 SA-468097-2--CD101PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - OVERALL PLAN CI-505 SA-468097-2--CI505DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 5 OF 6
CD-102 SA-468097-2--CD102PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - SQUADRON OPERATIONS FACILITY CI-506 SA-468097-2--CI506DT VIBRATING PIEZOMETER INSTALLATION DETAILS - SHEET 6 OF 6
CD-103 SA-468097-2--CD103PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - HAZMAT STORAGE CI-507 SA-468097-2--CI507DT SETTLEMENT PLATE DETAILS
CD-104 SA-468097-2--CD104PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - MAINTENANCE FACILITY
CD-104a SA-468097-2--CD104aPN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - FACILITY RELOCATION AREA
CD-105 SA-468097-2--CD105PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - MMSC WAREHOUSE - SHEET 1 OF 2 CIVIL GRADING
CD-106 SA-468097-2--CD106PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - MMSC WAREHOUSE - SHEET 2 OF 2
CD-107 SA-468097-2--CD107PN EXISTING CONDITIONS/PRE-CONSOLIDATION DEMOLITION - GATE HOUSE FACILITY CG-101 SA-468097-2--CG101PN PRE-CONSOLIDATION OVERALL PLAN
CD-108 SA-468097-2--CD108PN DISPOSAL AREA - MATERIAL RELOCATION/DEMOLITION PLAN CG-102 SA-468097-2--CG102PN PRE-CONSOLIDATION SQUADRON OPERATIONS FACILITY
CD-501 SA-468097-2--CD501DT STABILIZED CONSTRUCTION ENTRANCE DETAIL CG-103 SA-468097-2--CG103PN PRE-CONSOLIDATION HAZMAT FACILITY
CG-104 SA-468097-2--CG104PN PRE-CONSOLIDATION MAINTENANCE FACILITY
CG-105 SA-468097-2--CG105PN PRE-CONSOLIDATION MMSC WAREHOUSE - SHEET 1 OF 2
CG-106 SA-468097-2--CG106PN PRE-CONSOLIDATION MMSC WAREHOUSE - SHEET 2 OF 2
CG-107 SA-468097-2--CG107PN PRE-CONSOLIDATION GATE HOUSE FACILITY
CG-201 SA-468097-2--CG201PN PRE-CONSOLIDATION PROFILES - SHEET 1 OF 3
CG-202 SA-468097-2--CG202PN PRE-CONSOLIDATION PROFILES - SHEET 2 OF 3
CG-203 SA-468097-2--CG203PN PRE-CONSOLIDATION PROFILES - SHEET 3 OF 3
CG-501 SA-468097-2--CG501DT PRE-CONSOLIDATION TYPICAL DETAILS
J
H
A N
L O
N
S
J E
F F
E R
S
S
J E
F F
E R
S
O c t
S A
G
G
N D
W G
G-011
G E
N E
R A
L
I N
D E
X
O
F
D
R A
W I N
G S
S H
E E
T
O
F
G
H
A M
I L T
O N
T E
T R
A
T
E C
H
N
I C
K E
R S
O N
R
A
D
M A
R L
B O
R O
U G
H
M
A
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
X
W I N
C H
E S
T E
R
V
A
J U
E
P L
T
D
T
E
F I L
E N
A M
E
A N
S I
D
W
E R
R
K I N
G
A
B D
U L
A Z
I Z
V
L
B
S
E
K
I N
G D
F
S
A U
D I
A
R A
B I A
R O
Y A
L
S
A U
D I
N
A V
R
C E
S
T
U W
A
Q
S
H I P
S
H A
R B
E
D G
I N
G
C L
S A
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
E
N G
I N
E E
R S
P:\23308\127-23308-19004\CAD\PUBLISH\CAD SUBMITTAL\CAD FILES\127-23308-19004\CAD\SHEETFILES\MED_DRAWINGS\_SA-468097-2\GENERAL\SA-468097-2-G-011GN-01.DWG 2021-10-29 SCOTT.JEFFERS
NOT FOR CONSTRUCTION
R
E V
I S
W
A
M E
N D
M E
N
V
DREDGE AREAS
(SEE CN SHEETS)
HAUL ROAD
(SEE GC SHEETS)
DISPOSAL AREA
(SEE CH SHEETS)
PRECONSOLIDATION
(SEE CG & CI SHEETS)
LAYDOWN AREA
(SEE GC SHEETS)
LAYDOWN AREAS
(SEE GC SHEETS)
LAYDOWN
AREA (SEE
SHEET
CD-108)
LAYDOWN AREA
(SEE SHEET
CD-108)
SCALE =
REGIONAL LOCUS PLAN
NONE
SCALE =
KANB SITE LOCUS PLAN
1:15000
B
C
L A
R K
J
H
A N
L O
N
S
J E
F F
E R
S
O c t
S A
G
P
N D
W G
G-101
G E
N E
R A
L
S I T
E
L O
C U
S
P
L A
N G
H
A M
I L T
O N
N N
KANB
T E
T R
A
T
E C
H
N
I C
K E
R S
A
D
M A
R L
B O
R O
U G
H
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
V
A
P L
T
E
F I L
E N
A M
E
A N
S I
D
W
E R
R
K I N
G
A
B D
U L
A Z
V
S
E
K
I N
G D
S
A U
D I
A
R A
B I A
R O
Y A
L
S
A U
D I
N
A V
R
C E
S
T
U W
A
I P
S
H A
R B
E
D G
I N
G
C L
S A
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P:\23308\127-23308-19004\CAD\PUBLISH\CAD SUBMITTAL\CAD FILES\127-23308-19004\CAD\SHEETFILES\MED_DRAWINGS\_SA-468097-2\GENERAL\SA-468097-2-G-101PN-01.DWG 2021-10-26 SCOTT.JEFFERS
NOT FOR CONSTRUCTION
R
E V
I S
W
A
M E
N D
M E
N
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CONTRACTOR
LAYDOWN AREA
CONTRACTOR
LAYDOWN AREA
CONTRACTOR HAUL ROAD
AMMUNITION PIER/BASE
ACCESS GATE
BASE ACCESS
GATE
J W
H
B C
C
R M
B
O c t
S A
G
P
N D
W G
G-103
S I T
E
D
E S
I G
N
C O
N S
T R
U C
T I O
N
O
V E
R V
I E
W
P
L A
N
S H
E E
T
O
F
G
H
A M
I L T
O N
N
T E
T R
A
T
E C
H
N
I C
K E
R S
A
D
M A
R L
B O
R O
U G
H
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
V
A
P L
T
E
F I L
E N
A M
E
A N
S I
D
W
E R
R
K I N
G
A
B D
U L
A Z
V
S
E
K
I N
G D
S
A U
D I
A
R A
B I A
R O
Y A
L
S
A U
D I
N
A V
R
C E
S
T
U W
A
I P
S
H A
R B
E
D G
I N
G
C L
S A
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P:\23308\127-23308-19004\CAD\PUBLISH\CAD SUBMITTAL\CAD FILES\127-23308-19004\CAD\SHEETFILES\MED_DRAWINGS\_SA-468097-2\GENERAL\SA-468097-2-G-103PN-01.DWG 2021-10-26 SCOTT.JEFFERS
ALL DIMENSIONS AND/OR DIMENSIONS
SHOWN IN CALLOUTS/NOTES ARE IN
METERS UNLESS OTHERWISE NOTED
NOT FOR CONSTRUCTION
ORTHOIMAGERY COPYRIGHT 2020 GOOGLE, MAXAR TECHNOLOGIES, CNES/AIRBUS
CONSTRUCTION OVERVIEW PLAN 2 OF 2
1:7500
HAUL ROAD CENTERLINE
DREDGE MATERIAL
TRANSMISSION PIPELINE
EXISTING FENCE
PROPOSED FENCE
PROJECT LIMITS
DREDGING LIMITS
CONTRACTOR LAYDOWN
AREA
DREDGE AREAS
DREDGE MATERIAL
PLACEMENT
SURCHARGE PLACEMENT
X
X
LEGEND
OO
MATCHLINE SEE SHEET MATCHLINEG-102
LEGEND
G-102
G-103
R
E V
I S
W
A
M E
N D
M E
N
PL1
PL2
PL3
PL4
PL5
PL6
PL7
PL8
PL9
PL10
PL11
PL12
PL13
PL14
PL15
PL16
PL17
PL18
PL19
PL20
PL21
PL22
PL23
PL24
PL25
PL26
PL27
PL28
PL29
PL30
PL31
PL32
PL33
PL34
PL35
PL36
PL37
PL38
PL39
PL40
PL41
PL42
PL43
PL44
PL45
PL46
PL47
PL48
PL49
PL50
PL51
PL52
PL53
PL54
PL55
PL56
PL57
PL58
PL59
PL60
PL61
PL62
PL63
PL64
PROJECT LIMITS
POINT
PL1
PL9
PL2
PL3
PL4
PL5
PL6
PL7
PL8
PL10
PL11
PL12
PL13
PL14
PL15
PL16
PL17
PL18
PL19
PL20
PL21
PL22
PL23
PL24
PL25
PL26
PL27
PL28
PL29
PL30
PL31
PL32
NORTHING
2985311.22
2982624.27
2985399.93
2985227.11
2984866.30
2983905.30
2983536.97
2983532.56
2983146.58
2982631.12
2982694.01
2983142.90
2983375.05
2983398.05
2983445.57
2983354.57
2983648.78
2984072.55
2984140.86
2984298.30
2984224.33
2984411.77
2984370.40
2984327.51
2984174.55
2984660.04
2984813.00
2984693.88
2984870.19
2985096.90
2985175.87
2985163.38
EASTING
369867.56
370817.04
370523.56
370521.80
371296.05
371769.40
371555.36
371467.10
371524.47
370659.45
370575.25
370118.86
370011.75
369953.55
369884.23
369687.70
369536.24
369402.48
369409.75
369523.60
369671.18
369816.35
369879.27
369849.65
370071.10
370406.42
370184.97
370102.69
369841.40
369994.38
370095.74
370009.25
PROJECT LIMITS
POINT
PL33
PL34
PL35
PL36
PL37
PL38
PL39
PL40
PL41
PL42
PL43
PL44
PL45
PL46
PL47
PL48
PL49
PL50
PL51
PL52
PL53
PL54
PL55
PL56
PL57
PL58
PL59
PL60
PL61
PL62
PL63
PL64
NORTHING
2985157.12
2985151.30
2985138.60
2985111.70
2985117.97
2985064.09
2985044.59
2984918.71
2984851.87
2984750.94
2984816.12
2984801.15
2984749.90
2984661.68
2984592.00
2984654.40
2984595.70
2984613.23
2984551.50
2984574.02
2984591.84
2984611.23
2984622.50
2984665.81
2984676.24
2984666.85
2984743.24
2984772.66
2985193.04
2985340.78
2985385.24
2985373.33
EASTING
370014.36
370015.84
369981.67
369959.96
369950.46
369822.99
369823.28
369716.58
369641.70
369573.29
369470.32
369437.53
369376.22
369505.81
369456.91
369367.98
369320.43
369298.78
369248.79
369235.75
369249.19
369224.85
369182.13
369152.09
369213.97
369219.13
369331.91
369303.38
369289.35
369437.87
369701.66
369781.60
PROJECT BOUNDARY, TYP.
DREDGE AREA "A"
EL: (-)13.0m (MINIMUM)
DREDGING LIMITS
N
DREDGE AREA
"D", SEE NOTE
DREDGE AREA "B"
EL: (-)11.62m
DREDGE AREA "C"
EL: (-)6.62m
DREDGE AREA "A"
DREDGE AREA "B"
DREDGE AREA "C"
DREDGE AREA "D"
DREDGED MATERIAL PLACEMENT AREA
DREDGED MATERIAL
PLACEMENT AREA
AREA: 19.2
ha
NOTE
1. FOR DREDGE AREA "D" ONLY DREDGE SHOALING AREAS
IDENTIFIED TO ELEVATION -6.62m RCD. CONTRACTOR TO
VERIFY.
T E
T R
A
T
E C
H
N
I C
K E
R S
A
D
M A
R L
B O
R O
U G
H
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
V
A
P L
T
E
F I L
E N
A M
E
A N
S I
D
W
E R
R
K I N
G
A
B D
U L
A Z
V
S
E
K
I N
G D
S
A U
D I
A
R A
B I A
R O
Y A
L
S
A U
D I
N
A V
R
C E
S
T
U W
A
I P
S
H A
R B
E
D G
I N
G
C L
S A
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P:\23308\127-23308-19004\CAD\PUBLISH\CAD SUBMITTAL\CAD FILES\127-23308-19004\CAD\SHEETFILES\MED_DRAWINGS\_SA-468097-2\SITE DESIGN\085_CN_HARBOR DREDGING\SA-468097-2--CN101PN-01.DWG 2021-10-28 SCOTT.JEFFERS
ALL DIMENSIONS AND/OR DIMENSIONS
SHOWN IN CALLOUTS/NOTES ARE IN
METERS UNLESS OTHERWISE NOTED
NOT FOR CONSTRUCTION
M
F
E R
R A
R O
J
B
A L L
B
A
L L E
N
O c t
S A
C
N P
N D
W G
CN-101
S I T
E
D
E S
I G
N
O V
E R
A L L
D
R E
D G
I N
G
P
L A
N G
H
A M
I L T
O N
OVERALL DREDGING PLAN
1:7500
LEGEND
DREDGE QUANTITIES
REVETMENT
R
E V
I S
W
A
M E
N D
M E
N
AREA DESIGN OVERDREDGE TOTAL DREDGE
AREA
(sq.m) (cu.m) (cu.m) VOLUME (cu.m)
A 66,850 482,430 22,000 504,430
B 145,650 1,128,890 43,300 1,172,190
C 131,100 396,990 39,300 436,290
D
(see note)
TOTAL DREDGE VOLUME
2,112,910
NOTE:
FOR DREDGE AREA "D" ONLY DREDGE SHOALING AREAS
IDENTIFIED TO ELEVATION -6.62m RCD. CONTRACTOR TO VERIFY.
MIN. 2.0
+0.70m MLW
+1.27m MSL
+1.84m MHW
0.00m RCD
SEASIDE
CREST ALIGNMENT
BASELINE
N
2.3 MIN
N
N
DREDGED
MATERIAL
SAND FILL
(REUSABLE GRANULAR
DREDGED MATERIAL)
GEOTEXTILE FILTER
TUBES (TYP)
EL. + 5.00 m
PRIMARY ARMOR LAYER
UNDERLAYER STONE,
0.20 TONNES
GEOTEXTILE
ABRASION LAYER
MARINE MATTRESS (SEE
SECTION 35 31 19)
SEABED ELEVATION
VARIES
TOE PROTECTION
0.43 TONNES
GEOTEXTILE
LAYER
PERMANENT
SURFACE, EL + 4.00 m
ORDERLY PLACED SINGLE
INTERLOCKING AND OVERLAPPING
LAYER OF DOLOS UNITS OF 1.62 TONNES
EL. +2.70 m ± 75 mm
TEMPORARY MATERIAL STOCKPILE TO
BE USED FOR IOC DEVELOPMENT
EL. + 7.97 m
+0.70m MLW
+1.27m MSL
+1.84m MHW
0.00m RCD
MIN. 2.0
SAND FILL
(REUSABLE GRANULAR
DREDGED MATERIAL)
GEOTEXTILE FILTER
TUBES (TYP)
SEASIDE
CREST ALIGNMENT
BASELINE
DREDGED
MATERIAL
TEMPORARY MATERIAL STOCKPILE TO
BE USED FOR IOC DEVELOPMENT
GEOTEXTILE
LAYER
UNDERLAYER STONE,
0.22 TONNES
GEOTEXTILE
ABRASION LAYER
MARINE MATTRESS (SEE
SECTION 35 31 19)
EL. + 5.00 m
SEABED ELEVATION VARIES
PRIMARY ARMOR LAYER
EL. + 7.97 m
PERMANENT
SURFACE, EL + 4.00 m
1.6 m MIN
VARIES BETWEEN 0.7 - 0.9 m
VARIES BETWEEN
2.3 - 3.0 m
1.1 m MIN
ORDERLY PLACED SINGLE LAYER OF
INTERLOCKING AND OVERLAPPING DOLOS UNITS
1.60 TONNES MINIMUM
TOE PROTECTION
VARIES BETWEEN
0.43 - 0.76 TONNES
EL. VARIES FROM +2.70 m TO +2.20 m ± 75 mm
R
C
Z L A
P I N
S K
I
S
S
A I E
D I
K
S
A N
A B
R I A
O c t
S A
C
H S
E D
W G
CH-301
S I T
E
D
E S
I G
N
R E
V E
T M
E N
T
S
E C
T I O
N S
S H
E E
T
O
F
G
H
A M
I L T
O N
T E
T R
A
T
E C
H
N
I C
K E
R S
A
D
M A
R L
B O
R O
U G
H
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
V
A
P L
T
E
F I L
E N
A M
E
A N
S I
D
W
E R
R
K I N
G
A
B D
U L
A Z
V
S
E
K
I N
G D
S
A U
D I
A
R A
B I A
R O
Y A
L
S
A U
D I
N
A V
R
C E
S
T
U W
A
I P
S
H A
R B
E
D G
I N
G
C L
S A
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P:\23308\127-23308-19004\CAD\PUBLISH\CAD SUBMITTAL\CAD FILES\127-23308-19004\CAD\SHEETFILES\MED_DRAWINGS\_SA-468097-2\SITE DESIGN\086_CH_SHORE PROTECTION\SA-468097-2--CH301SE-01.DWG 2021-10-29 SCOTT.JEFFERS
ALL DIMENSIONS AND/OR DIMENSIONS
SHOWN IN CALLOUTS/NOTES ARE IN
METERS UNLESS OTHERWISE NOTED
NOT FOR CONSTRUCTION
SCALE:
CH-108
4D
PRECAST CONCRETE REVETMENT SECTION
WESTERN SEGMENT
1:100
SCALE:
CH-108
4A
PRECAST CONCRETE REVETMENT SECTION
TRANSITION SEGMENT
1:100
GENERAL NOTES
1. ACCURATE SURVEY OF THE SEAWARD SLOPE OF THE EXISTING
PROTECTED SHORELINE IS UNAVAILABLE. CONTOURS SHOWN ON THE
PLANS ARE BASED ON SHOTS AT THE TOP AND BOTTOM OF THE
REVETMENT. AS-BUILT DETAILS OF THE EXISTING PROTECTED
SHORELINE ARE NOT AVAILABLE. THE SHORELINE CONTOURS SHOULD
BE CONSIDERED APPROXIMATE AND SHALL BE VERIFIED DURING THE
CONSTRUCTION.
2. CONTRACTOR SHALL REMOVE AND RELOCATE EXISTING DOLOS UNITS
AND STONE WITHIN THE LIMITS OF THE DREDGE MATERIAL DISPOSAL
AREA TO THE FACE OF THE PROPOSED REVETMENT. IT IS ASSUMED
THAT THE DOLOS LAYER IS ONE UNIT THICK CONSISTENT WITH THE
ORIGINAL DESIGN PLANS. THICKNESS OF THE DOLOS LAYER IN THE
EXISTING REVETMENT SHALL BE VERIFIED DURING THE
CONSTRUCTION.
3. RELOCATE EXISTING STONE LANDSIDE OF THE DOLOSES.
4. THE 5 TONNE EXISTING DOLOS SHALL BE USED ON THE EASTERN
SEGMENT OF THE REVETMENT STARTING AT STA 1+168 AND MOVING
NORTH AND WEST UNTIL THE SUPPLY OF THE DOLOS IS EXHAUSTED.
NEW 2.85 TONNE DOLOS SHALL BE USED TO COMPLETE THE EASTERN
SEGMENT UP TO THE TRANSITION SEGMENT.
5. THE CONTRACTOR SHALL CONSTRUCT DEMONSTRATIONS SECTIONS
AS DEFINED IN SPECIFICATION SECTION 35 31 19, PART 3.1.
DEMONSTRATION SECTIONS SHALL BE PROVIDED FOR THE
RELOCATED DOLOSES, THE EASTERN AND WESTERN REVETMENT
SEGMENTS. REFER TO SHEETS CH-301, CH-302, AND CH-303.
6. TRANSITION SECTION OF THE REVETMENT SHALL BE CONSTRUCTED
USING 1.62 TO 2.85 TONNE DOLOS ARMOR UNITS.
7. CONSTRUCTION OF WESTERN REVETMENT SEGMENT WILL CONSIST
OF 1.62 TONNE DOLOS ARMOR UNITS. BROKEN FRAGMENTS OF THE
EXISTING DOLOS AND SALVAGED ROCK MAY BE USED TO CONSTRUCT
THE WESTERN END OF THE REVETMENT FROM STATION 0+00 TO 0+50
PROVIDED THE WEIGHT OF THE UNIT IS NOT LESS THAN 1 TONNE.
8. THE NEW REVETMENT WILL START ON THE ROCK UNDERLAYER
EXPOSED AFTER THE REMOVAL OF THE DOLOS LAYER. THE SLOPE OF
THE ROCK UNDERLAYER IS UNKNOWN. IT IS ASSUMED THAT THE ROCK
UNDERLAYER IS AT A SLOPE OF 2:1 (H:V) CONSISTENT WITH THE
ORIGINAL DESIGN PLANS. THE UNDERLAYER ROCK SLOPE SHALL BE
VERIFIED DURING THE CONSTRUCTION OF THE DEMONSTRATION
SECTIONS.
9. THE ROCK UNDERLAYER OF THE EXISTING SHORELINE THAT IS
EXPOSED BY THE REMOVAL OF THE DOLOS SHALL BE SMOOTHLY
BLENDED WITH THE ROCK UNDERLAYER OF THE NEW EASTERN
REVETMENT SEGMENT.
10. ON THE EASTERN SEGMENT JUNCTION, THE DOLOS ARMOR LAYER ON
THE SEAWARD FACE OF THE REVETMENT SHALL BE SMOOTHLY
BLENDED WITH THE EXISTING DOLOS REVETMENT.
11. ON THE WESTERN SEGMENT JUNCTION, THE SEAWARD FACE OF THE
REVETMENT CONSISTING OF A COMBINATION OF 1.6 TONNE DOLOS,
BROKEN EXISTING DOLOS FRAGMENTS AND/OR SALVAGED ROCK
SHALL BE SMOOTHLY BLENDED WITH THE EXISTING DOLOS ARMOR.
12. BROKEN DOLOSES, NOT USED IN REVETMENT RECONSTRUCTION MAY
BE PLACED ON THE TOE PROTECTION FOR ADDITIONAL
REINFORCEMENT PROVIDED THEIR WEIGHTS ARE NOT LESS THAN
THAT REQUIRED IN THE DESIGN OF THE TOE PROTECTION BERM.
13. PROPOSED REVETMENT STRUCTURE CONSISTS OF PRECAST
CONCRETE ARMOR UNITS (DOLOS), ROCK UNDERLAYER, AND CORE
MADE OF GEOTEXTILE FILTER TUBES.
14. GEOTEXTILE FILTER TUBES ARE TO BE DETAILED DESIGNED BY THE
SELECTED CONTRACTOR.
R
E V
I S
W
A
M E
N D
M E
N
| SA-468097-2_AM0001 |
| SA-468097-2-G-001GN-01 - G-001 |
| SA-468097-2-G-011GN-01 - G-011 |
| SA-468097-2-G-101PN-01 - G-101 |
| SA-468097-2-G-103PN-01 - G-103 |
| SA-468097-2--CN101PN-01 - CN-101 |
| SA-468097-2--CH301SE-01 - CH-301 |
File details come from the government source that posted it. Updated .