Attachment B - Experience Overview Sheet (1).pdf
PDF 246 KB Posted
- Attached to
- KNB Marine Construction and Repair
- Solicitation number
- W912ER20R0016
About this file
This pre-solicitation notice provides details for a design-build contract for upgrades and repairs to the ship lift and rail transfer yard at Kuwait Naval Base. The scope of work includes replacement and repairs to the wooden deck and structural elements of the ship lift, replacement and expansion of rails and infrastructure in the dry dock and transfer yard areas, and certification of transfer carriages and rails. The period of performance is anticipated to be 640 calendar days with a contract value between $10-25 million. The request for proposal will be issued on SAM.gov and evaluated using best value tradeoff. No set asides apply given the work is outside the US. Responses to this pre-solicitation notice are not required. The solicitation is anticipated for mid-May 2020 with responses due mid-July 2020 and will be issued by the US Army Corps of Engineers Middle East District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
EXPERIENCE OVERVIEW SHEET
List work which best illustrates current qualifications relevant to this award. Each contract listed on this sheet shall have a completed Construction Experience Form (Attachment C) and Relevancy Matrix (Attachment D). Mark Prime, Sub, or Joint Venture (ONLY ONE).
Explain all projects provided on this sheet with a completed Construction Experience Form (Attachment C) and Relevancy Matrix (Attachment D).
Contract Name/Client, Location of Services
Prime Sub JV Total Contract $ Amount
Offeror's Share of Responsibility for Total Construction Contract
SAMPLE: Ellis Island Seawall Renovation/
X $30,000,000 $30,000,000
1.
3.
4.
5.
6.
7.
8.
9.
10.
OFFEROR’S NAME DATE
File details come from the government source that posted it. Updated .