Attachment_D_-_Supplemental_Price_Breakdown_and_Cost_Breakdown_Sheet.xls

XLS spreadsheet 38 KB Posted

Attached to
UD2. 4, Package #3 - Dormitory, Jordan Federal contract opportunity
Solicitation number
W912ER18R0007
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Attachment D - Supplemental Price Breakdown and Cost Breakdown Sheet

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Breakdown Sheet

COST BREAKDOWN
RFP: W912ER18R0007P2#463243
PROJECT:MSAB DormitoryPROPOSER:
LOCATION:JordanDATE:
ITEMDESCRIPTIONLABOR MAN-HOURSDIRECT LABOR COSTDIRECT EQUIPMENT COSTDIRECT MATERIALS COSTSUB CONTRACTOR COSTTOTAL DIRECT COSTJOOHHOOHBONDOVERHEAD/ INDIRECT COSTPROFITTOTAL PROPOSED COST
0001Mobilization and Demobilization in accordance with the contract documents
0002Site Design & Survey in accordance with the contract documents
0003Construct Dormitory in accordance with the contract documents
0004Construct Dormitory Supporting Facilities in accordance with the contract documents
0004AAConstruct Site Electrical Distribution System
0004ABConstruct Water Distribution Piping System
0004ACConstruct Site Fire Water Piping System
0004ADConstruct Site Sanitary Sewer Collection Piping System
0004AEConstruct Site Communication Distribution System
0004AFConstruct Site Storm Water Collection System
0004AGSite Improvements
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
0005Option #1 Provide Furniture, Fixtures and Equipment (FF&E)
0005AAProvide Furniture, Fixtures and Equipment (FF&E) in accordance with the contract documents
Total Option Bid Price (Item 0005AA)
0006Option #2 Provide Electronic Security Systems (ESS)
0006AAProvide Provide Electronic Security Systems (ESS) in accordance with the contract documents
Total Option Bid Price (Item 0006AA)
0007Option #3 Construct R-11 Cooling Barn
0007AAConstruct R-11 Cooling Barn in accordance with the contract documents
Total Option Bid Price (Item 0007AA)
0005Option #1 Contractor Provide (FFE) Furniture, Fixtures, and Equipment in accordance with the contract documents
TOTAL OPTION PRICE (ITEM 0005)
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0005)
\0005Option #1 Contractor Provided Construction Escorts in accordance with the contract documents

&C&"Arial,Bold"&12EXHIBIT 1&RPage &P of &N

Unit Prices

UNIT COST BREAKDOWN
RFP:W912ER-12-R-0062 / Rev #P2#1234
PROJECT:Interstellar Space Station
LOCATION:Far Far, AwayBase Hourly Labor RateDirect Labor RateBurdened Labor Rate
ITEMDESCRIPTIONUS EmployeeNON US EmployeeUS EmployeeNON US EmployeeUS EmployeeNON US EmployeeTotal Burdened RateFringe BenefitsTotal Hourly Rate
LABOR
Site Superintendent
Foreman
Skilled Labor
Semi Skilled Labor
Unskilled Labor
Technician Labor
Specialty Trades Labor
Operator
Driver
MATERIALS1EA1 TON1 M21 M31 LM
3000 psi Structural Concrete (M3)$138.00
Reinforcing Steel (Ton)$1,900.00
Concrete Masonry Unit (EA)$0.50
Paint (M2)$13.45
Sub-base Gravel (M3)$27.00
Asphalt 3" (M2)$55.00
Concrete Piles 600mm (LM)$235
Concrete Piles 800mm (LM)$285

&C&"Arial,Bold"&12EXHIBIT 1&RPage &P of &N