Attachment D - Supplemental Price Breakdown and Cost Breakdown Sheet
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakdown Sheet
| COST BREAKDOWN | ||||||||||||||
| RFP: W912ER18R0007 | P2# | 463243 | ||||||||||||
| PROJECT: | MSAB Dormitory | PROPOSER: | ||||||||||||
| LOCATION: | Jordan | DATE: | ||||||||||||
| ITEM | DESCRIPTION | LABOR MAN-HOURS | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | JOOH | HOOH | BOND | OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST | |
| 0001 | Mobilization and Demobilization in accordance with the contract documents | |||||||||||||
| 0002 | Site Design & Survey in accordance with the contract documents | |||||||||||||
| 0003 | Construct Dormitory in accordance with the contract documents | |||||||||||||
| 0004 | Construct Dormitory Supporting Facilities in accordance with the contract documents | |||||||||||||
| 0004AA | Construct Site Electrical Distribution System | |||||||||||||
| 0004AB | Construct Water Distribution Piping System | |||||||||||||
| 0004AC | Construct Site Fire Water Piping System | |||||||||||||
| 0004AD | Construct Site Sanitary Sewer Collection Piping System | |||||||||||||
| 0004AE | Construct Site Communication Distribution System | |||||||||||||
| 0004AF | Construct Site Storm Water Collection System | |||||||||||||
| 0004AG | Site Improvements | |||||||||||||
| TOTAL BASE BID PRICE (ITEMS 0001 - 0004) | ||||||||||||||
| 0005 | Option #1 Provide Furniture, Fixtures and Equipment (FF&E) | |||||||||||||
| 0005AA | Provide Furniture, Fixtures and Equipment (FF&E) in accordance with the contract documents | |||||||||||||
| Total Option Bid Price (Item 0005AA) | ||||||||||||||
| 0006 | Option #2 Provide Electronic Security Systems (ESS) | |||||||||||||
| 0006AA | Provide Provide Electronic Security Systems (ESS) in accordance with the contract documents | |||||||||||||
| Total Option Bid Price (Item 0006AA) | ||||||||||||||
| 0007 | Option #3 Construct R-11 Cooling Barn | |||||||||||||
| 0007AA | Construct R-11 Cooling Barn in accordance with the contract documents | |||||||||||||
| Total Option Bid Price (Item 0007AA) | ||||||||||||||
| 0005 | Option #1 Contractor Provide (FFE) Furniture, Fixtures, and Equipment in accordance with the contract documents | |||||||||||||
| TOTAL OPTION PRICE (ITEM 0005) | ||||||||||||||
| TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0005) | ||||||||||||||
| \ | 0005 | Option #1 Contractor Provided Construction Escorts in accordance with the contract documents |
&C&"Arial,Bold"&12EXHIBIT 1&RPage &P of &N
Unit Prices
| UNIT COST BREAKDOWN | ||||||||||
| RFP: | W912ER-12-R-0062 / Rev # | P2# | 1234 | |||||||
| PROJECT: | Interstellar Space Station | |||||||||
| LOCATION: | Far Far, Away | Base Hourly Labor Rate | Direct Labor Rate | Burdened Labor Rate | ||||||
| ITEM | DESCRIPTION | US Employee | NON US Employee | US Employee | NON US Employee | US Employee | NON US Employee | Total Burdened Rate | Fringe Benefits | Total Hourly Rate |
| LABOR | ||||||||||
| Site Superintendent | ||||||||||
| Foreman | ||||||||||
| Skilled Labor | ||||||||||
| Semi Skilled Labor | ||||||||||
| Unskilled Labor | ||||||||||
| Technician Labor | ||||||||||
| Specialty Trades Labor | ||||||||||
| Operator | ||||||||||
| Driver | ||||||||||
| MATERIALS | 1EA | 1 TON | 1 M2 | 1 M3 | 1 LM | |||||
| 3000 psi Structural Concrete (M3) | $138.00 | |||||||||
| Reinforcing Steel (Ton) | $1,900.00 | |||||||||
| Concrete Masonry Unit (EA) | $0.50 | |||||||||
| Paint (M2) | $13.45 | |||||||||
| Sub-base Gravel (M3) | $27.00 | |||||||||
| Asphalt 3" (M2) | $55.00 | |||||||||
| Concrete Piles 600mm (LM) | $235 | |||||||||
| Concrete Piles 800mm (LM) | $285 |