View the file

Other files

File Type Posted
2022-06-24_100_RTA_SA-468097-9_CLIN06_KANB 5_V1_Part 4.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V1_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V1_Part1.pdf PDF
2022-06-24_100_RTA_SA-468097-9_CLIN06_KANB 5_V1_Part 2.pdf PDF
2022-06-24_100_RTA_SA-468097-8_CLIN05_KANB 4_V1_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V1_Part1.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V3_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-9_CLIN06_KANB 5_V1_Part 1.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V2_Part3.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V2_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-9_CLIN06_KANB 5_V1_Part 3.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V2_Part1.pdf PDF
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V1_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-8_CLIN05_KANB 4_V1_Part1.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V3_Part1.pdf PDF
14 July 22 - Proposal Schedule.pdf PDF
14JUL22 - ProjNet Bidder Inquiry Key.docx DOCX document
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V4.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part6.pdf PDF
2022-06-24_100_RTA_SA-468097-7_CLIN04_KANB 3_V3.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part7.pdf PDF
2022-06-24_100_RTA_SA-468097-5_CLIN02_KANB 1_V4.pdf PDF
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V5.pdf PDF
2022-06-24_100_RTA_SA-468097-7_CLIN04_KANB 3_V1.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part9.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part2.pdf PDF
2022-06-24_100_RTA_SA-468097-9_CLIN06_KANB 5_V2.pdf PDF
2022_06-24_RSNF Tuwaiq Ships IOC_RTA_KANB 01-06_Specs.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part4.pdf PDF
2022-06-24_100_RTA_SA-468097-7_CLIN04_KANB 3_V5.pdf PDF
2022-06-24_100_RTA_SA-468097-7_CLIN04_KANB 3_V2.pdf PDF
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V3.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part1.pdf PDF
2022-06-24_100_RTA_SA-468097-10_CLIN10_KANB 6_V2.pdf PDF
2022-06-24_100_RTA_SA-468097-10_CLIN10_KANB 6_V1.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part8.pdf PDF
2022-06-24_100_RTA_SA-468097-6_CLIN03_KANB 2_V2.pdf PDF
2022-06-24_100_RTA_SA-468097-8_CLIN05_KANB 4_V2.pdf PDF
2022-06-24_100_RTA_SA-468097-7_CLIN04_KANB 3_V4.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part5.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V1_Part3.pdf PDF
2022-06-24_100_RTA_SA-468097-3_Standard Drawings_V2.pdf PDF
2022-06-24_100_RTA_SA-468097-10_CLIN10_KANB 6_V3.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMSC IOC - This is a design-bid-build (D-B-B) requiring the construction of w harf, piers, maintenance and w arehousing facilities, and associated infrastructure and utilities in support of the Royal Saudi Naval Forces (RSNF) Multi-Mission Surface Combatant (MMSC) Ships

Program at King Abdulaziz Naval Base (KANB), Kingdom of Saudi Arabia (KSA).

THE MAGNITUDE OF CONSTRUCTION IS BETWEEN: $250,000,000 - $500,000,000

(a) The Governrrent reserves the right to incorporate the aw ardee proposal into the contract and distribute the proposal as deemed necessary. Any deviations from the proposal must be approved by the Contracting Officer;

(b) The contractor is required to provide all documentation requested in this solicitation (tender) to include Defense Base Act (DBA) Insurance after contract aw ard and prior to Notice to Proceed.

(c) Performance and Payment Bonds (70%) are required for this acquisition.

ANITA M LUDOVICI

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED (RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________1218 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT

P.O. BOX 2250

WINCHESTER VA 22604-1450

W912ER

PAGE OF PAGES

1 OF

CODE W912ER

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912ER23R0005 117

DRAFT

For pla nn ing pu rpo se s o nly

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

DRAFT

For pla nn ing pu rpo se

Section 00 01 10 - Table of Contents

TABLE OF CONTENTS

SECTION TITLE PAGE

SECTION 00 01 10 STANDARD FORM (SF1442) AND CLIN SCHEDULE 1-29

SECTION 00 21 00 INSTRUCTIONS 30-42

SECTION 00 21 16 INSTRUCTIONS TO PROPOSERS 43-73

SECTION 00 45 00 REPRESENTATIONS AND CERTIFICATIONS 74-89

SECTION 00 72 00 GENERAL CONDITIONS 90-109

SECTION 00 73 00 SUPPLEMENTARY CONDITIONS 110-118

DRAFT

For pla nn ing pu rpo se

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mob/Demob

FFP

Mobilization and Demobilization in accordance with contract documents.

FOB: Destination

PSC CD: Y1ED

NET AMT

0002 1 Job Construct Wharf

FFP

Construct Wharf and associated work in accordance with Contract Documents.

Items shall be completed within 1218 calendar days from Notice to Proceed pla nn ing pu rpo se

0003 1 Job Construct Piers

FFP

Construct Piers and all Associated Work in Accordance with Contract Documents.

Items shall be completed within 1218 calendar days from Notice to Proceed.

0004 1 Job Construct Tuwaiq Ships Maintenance

FFP

Construct Tuwaiq Ships Maintenance Facility and all Associated Work in Accordance with Contract Documents. Items shall be completed within 730 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0005 1 Job Construct Four (4) Earth Covered Mag

FFP

Construct Four (4) Earth Covered Magazine and all Associated Work in Accordance with Contract Documents. Items shall be completed within 730 calendar days from Notice to Proceed.

0006 1 Job Construct Harbor Master Control Tower

FFP

Construct Harbor Master Control Tower and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0007 1 Job Construct Electrical Switching Station

FFP

Construct Electrical Switching Station and all Associated Work in Accordance with Contract Documents. Items shall be completed within 730 calendar days from Notice to Proceed.

0008 1 Job Construct Security Fence

FFP

Construct Security Fence and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0009 1 Job Construct Ammunition Pier Mooring

FFP

Construct Ammunition Pier Mooring Dolphins in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0010 1 Job Construct Ammunition Pier Structural

FFP

Construct Ammunition Pier Structural Repairs in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0011 1 Job Construct Site Demolition

FFP

Construct Site Demolition Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0012 1 Job Construct Civil Site Features

FFP

Construct Civil Site Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0013 1 Job Construct Site Electrical Features

FFP

Construct Site Electrical Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0014 1 Job Construct Site Communication Features

FFP

Construct Site Communication Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0015 1 Job Construct Site Domestic Water

FFP

Construct Site Domestic Water, Fire Water, and Sea Water Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0016 1 Job Construct Site Sanitary Sewer

FFP

Construct Site Sanitary Sewer Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0017 1 Job Construct Site Grading

FFP

Construct Site Grading and Drainage Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0018 1 Job Construct Site Compressed Air

FFP

Construct Site Compressed Air Features and all Associated Work in Accordance with Contract Documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0019 1 Job Construct Ammunition Pier

FFP

Construct Ammunition Pier Alternative Electrical Plan including high mast light, lightning protection system, and electrical compact substation with rack mounted electrical control panel, in accordance with contract documents. Items shall be completed within 1218 calendar days from Notice to Proceed.

0020 1 Job Construct Fire Pump House

FFP

Construct Fire Pump House, Site Features, and all Associated Work in Accordance with Contract Documents. Items shall be completed within 730 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0021 1 Job VAT @ 15% of Base Items

FFP

VAT @ 15% for all Base Items in accordance with contract documents.

0022 1 Job OPTION Option #1: Construct Platform Transition

FFP

Option #1: Construct Platform Transition Slab and Piles and all associated Work in Accordance with Contract Documents. If awarded, items shall be completed within

730 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0023 1 Job OPTION Option #2: Construct Fuel System

FFP

Option #2: Construct Fuel System Fire Pump House, Site Features, and all associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 730 calendar days from Notice to Proceed.

0024 1 Job OPTION Option #3: Construct Fuel System

FFP

Option #3: Construct Fuel System Pump House, Fuel System, Fuel Piping, Site Features, and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to

Proceed.

pla nn ing pu rpo se

0025 1 Job OPTION Option #4: Construct NSC Warehouse

FFP

Option #4: Construct NSC Warehouse, Site Features, and all Associated Work in Accordance with Contract Documents. If awarded, Items shall be completed within 1218 calendar days from Notice to Proceed

0026 1 Job OPTION Option #5: Construct Transfer Pit

FFP

Option #5: Construct Transfer Pit, Maintenance Table, Site Features, and all Associated Work in Accordance with Contract Documents. If awarded, Items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0027 1 Job OPTION Option #6: Design and Construct Shiplift

FFP

Option #6: Design and Construct Shiplift, and Construct Site Features and all Associated Work, in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0028 1 Job OPTION Option #7: Construct Squadron Operations

FFP

Option #7: Construct Squadron Operations Facility, Site Features, and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0029 1 Job OPTION Option #8, Construct SRF HAZMAT

FFP

Option #8: Construct SRF HAZMAT Storage and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0030 1 Job OPTION Option #9: Construct Ammunition Pier

FFP

Option #9: Construct Ammunition Pier Administration Building, Road Widening, Site Features, and all Associated Work in Accordance with Contract Documents.

If awarded, items shall be completed within 1218 calendar days from Notice to

Proceed.

pla nn ing pu rpo se

0031 1 Job OPTION Option #10: Construct MMSC Ship Crew

FFP

Option #10: Construct MMSC Ship Crew Parking and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0032 1 Job OPTION Option #11: Construct Gate House

FFP

Option #11: Construct Gate House and Scanner Building and all Associated Work in Accordance with Contract Documents. If awarded, item shall be completed within 730 days from Notice to Proceed.

pla nn ing pu rpo se

0033 1 Job OPTION Option #12: Construct Calibration Lab

FFP

Option #12: Construct Calibration Laboratory and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0034 1 Job OPTION Option #13: Construct SRF Warehouse

FFP

Option #13: Construct SRF Warehouse and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 730 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0035 1 Job OPTION Option #14: Construct Module Test

FFP

Option #14: Construct Module Test and Repair (MTR) and all Associated Work in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0036 1 Job OPTION Option #15: Provide and Place

FFP

Option #15: Provide and Place 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents.

If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0037 1 Job OPTION Option #16: Provide and Place

FFP

Option #16: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0038 1 Job OPTION Option #17: Provide and Place

FFP

Option #17: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract

Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0039 1 Job OPTION Option #18: Provide and Place

FFP

Option #18: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0040 1 Job OPTION Option #19: Provide and Place

FFP

Option #19: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0041 1 Job OPTION Option #20: Provide and Place

FFP

Option #20: Provide and Place 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0042 1 Job OPTION Option #21: Provide and Place

FFP

Option #21: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation

Construction. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0043 1 Job OPTION Option #22: Provide and Place

FFP

Option #22: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0044 1 Job OPTION Option #23: Provide and Place

FFP

Option #23: Provide and Place an Additional 1000 Cubic

Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

pla nn ing pu rpo se

0045 1 Job OPTION Option #24: Provide and Place

FFP

Option #24: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction. If awarded, items shall be completed within 1218 calendar days from Notice to Proceed.

0046 1 Job OPTION VAT @ 15% of Awarded Options

FFP

VAT @ 15% for all Awarded Optional Items in accordance with contract documents

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

pla nn ing pu rpo se

0001 1218 dys. ANP 1 US ARMY CORPS OF ENGINEERS-

CETAM-CT

ANITA M LUDOVICI

MIDDLE EAST DISTRICT

P.O. BOX 2250

WINCHESTER VA 22604-1450

W912ER

0002 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0004 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0006 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0007 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0008 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0009 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0010 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0011 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0012 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0013 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0014 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0015 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0016 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0017 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION) pla nn ing pu rpo se

0018 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0019 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0020 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0021 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0022 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0023 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0024 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0025 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0026 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0027 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0028 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0029 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0030 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0031 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0032 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0033 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0034 730 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0035 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0036 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

W912ER

DRAFT

For pla nn ing pu rpo se

0037 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0038 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0039 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0040 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0041 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0042 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0043 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0044 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0045 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0046 1218 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

W912ER

DRAFT

For pla nn ing pu rpo se

Section 00 21 00 - Instructions

INSTRUCTIONS

Section 00 21 00

ITEM DESCRIPTION

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 MAGNITUDE OF CONSTRUCTION

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 ACCURACY IN PROPOSALS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 SYSTEM FOR AWARD MANAGEMENT (SAM) COSTS

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 PROPOSAL REQUIREMENTS

1.9 PROPOSAL CONTENT

1.10 PROPOSAL FORMAT

1.11 PROPOSAL SUBMISSION INSTRUCTIONS

1.12 SOLICITATION INQUIRIES

PROVISIONS BY REFERENCE

52.217-5 EVALUATION OF OPTIONS

PROVISIONS BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT

52.216-1 TYPE OF CONTRACT

52.222-23 NOTICE OF ACTION FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

52.233-2 SERVICE OF PROTEST

52.236-27, Alt I SITE VISIT (CONSTRUCTION) ALTERNATE I

52.252-1

SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS

252.215-7008 ONLY ONE OFFER

pla nn ing pu rpo se

1.0 INFORMATION

This solicitation pertains to a Full and Open Firm Fixed-Price contract for construction services in support of the U.S. Army Corps of Engineers (USACE) Transatlantic Middle East District (TAM) Foreign Military Sales (FMS)

Multi-Mission Surface Combatant (MMSC) Program, Case SR-P-SBV Line 059 – Construction Requirements.

1.1 DESCRIPTION OF WORK

The work contemplated under this contract includes the procurement and construction, utilizing design-bid-build (D-B-B) to meet the needs of the Royal Saudi Naval Forces (RSNF) MMSC Ship

Program at King Abdulaziz (KANB), Kingdom of Saudi Arabia (KSA). This includes, but is not limited to, construction of a wharf and harbormaster control tower, piers, maintenance and warehousing facilities, fueling system facilities and associated infrastructure and utilities in support of the purchase of four (4) MMSC’s.

1.2 CONSTRUCTION MAGNITUDE

The construction magnitude is between $250,000,000 and $500,000,000.

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Offerors will be provided Standard Form 1442, Solicitation Offer and Award, specifications and drawings, submittal requirements, and the evaluation factors to be used. The RFP will be sent to System for Award Management (SAM) website located at https://SAM.Gov via the Procurement Integrated Enterprise Environment (PIEE).

1.4 ACCURACY OF PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP (including appendices).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.

1.6 SYSTEM FOR AWARD MANAGEMENT (SAM).

Offerors must comply with System for Award Management (SAM) registration requirements in FAR Clause 52.204- 7 and be determined responsible prior to award. For more information, see the SAM website at https://sam.gov/.

Please ensure that NAICS code 236220 – Commercial and Institutional Building Construction is listed in your SAM registration. Those offerors registering for SAM for purposes of this acquisition are cautioned to be cognizant of the corporate name used for SAM registration purposes.

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

The Government will not reimburse any costs incurred or associated with preparation and submission of any responses to this solicitation. Any oral explanations or instructions to offerors if made, are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

1.8 PROPOSAL REQUIREMENTS

pla nn ing pu rpo se s o https://sam.gov/

1.8.1 Offerors shall not modify the terms and conditions of the solicitation in either the non-price (technical) or price proposal or add conditions or qualifications to their offers. Should an offeror include terms and conditions that conflict with the terms and conditions of the solicitation, that offeror may be determined to be ineligible for award.

The offeror should resolve any questions related to specific terms and conditions contained within the solicitation prior to submission of their offer.

1.8.2 References to “confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of an offeror’s technical proposal. Offerors that include information in their proposals they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall clearly mark their proposals in accordance with the instructions at FAR clause 52.215-1, Instructions to Offerors-Competitive Acquisition, paragraph (e), Restriction on Disclosure and Use of Data.

1.8.3 Use of the words “will”, “shall”, or “must” indicates a mandatory requirement. Failure to comply with a mandatory requirement at the time and date for submission of proposals, shall result in an offeror’s proposal being disqualified from consideration for award, unless the Government determines to conduct discussions in accordance with FAR 15.306, thereby providing a means by which appropriate corrections by the offeror(s) involved could be made. Failure to comply with requirements annotated with the words “should” or “may” could result in an unacceptable rating of an offeror’s non-pricing ratings and may have a significant effect upon an offeror being selected for the contract award. Time periods, if stated as a number of days, are calendar days unless otherwise specified.

1.9 PROPOSAL CONTENT

1.9.1 Offerors are required to submit proposals with at least the minimum content specified herein. A proposal without the minimum content may result in a determination that the proposal is unacceptable. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of an offeror.

1.9.2 All information that the offeror intends to be evaluated as part of the non-price (technical) proposal shall be submitted with the non-price proposal. Do not include references to material or information not found within the technical proposal. Referencing information not found within the proposal could lead to an offeror’s proposal being determined unacceptable if materially incomplete in any aspect.

1.9.3 All proposals shall be submitted electronically and shall be comprised of two files, in Adobe portable Document Format (PDF), or comparable format. The first file will include the offeror’s Volume I - Non-Price (Technical) Proposal, and the second file will include the offeror’s Volume II - Price Proposal. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

1.9.4 VOLUME I – NON-PRICE (TECHNICAL) PROPOSAL

Volume I shall include the information listed below; specific submission requirements for each factor are identified in Section 00 21 16. Offerors are reminded to adhere to any page limitations stated in a specific factor. Do not submit pricing information with the non-price (technical) proposal.

All four (4) non price factors are equal to each other. When combined, all four (4) non price factors are equal to each other. All four (4) non price factors, when combined, are significantly more important than price. (FAR 15.101-1)

1.9.4.1 Cover Page: A cover page shall appear at the beginning of Volume I and, at a minimum, shall consist of the following information:

a. Solicitation number.

pla nn ing pu rpo se

b. Offeror’s name, physical mailing address(es), telephone number, and email address of the official having the authority to bind the offeror contractually; and

c. Offeror’s DUNS Number, CAGE Code, SAM UEI, and Tax ID (TIN), if applicable.

1.9.4.2 Table of Contents: A table of contents shall be placed in Volume I, which identifies major areas by title and page numbers.

1.9.4.3 Non-Price (Technical Proposal)

a. Factor 1: Performance Capabilities

b. Factor 2: Management Approach

c. Factor 3: Construction Experience

d. Factor 4: Past Performance

1.9.4.4 Representations and Certifications (Section 00 45 00).

1.9.4.5 (As applicable) Completed Corporate Certificate (Section 00 45 00)

a. If the offeror is a corporation, completed Corporate Certificate, OR

b. If the offeror is a joint venture (JV), completed Corporate Certificate for each member of the joint venture and a copy of the joint venture agreement.

1.9.4.5.1 Failure to submit the required information, including the Completed Representation and Certifications (Section 00 45 00), or Corporate Certificate and joint venture agreement (if applicable), may result in a determination that the proposal is non-responsive or unacceptable, and therefore, un-awardable.

1.9.4.5.2 If the offeror is submitting a proposal as a JV, the JV agreement shall:

a. Only be formed between offerors amongst firms eligible to compete for this requirement.

b. Be in English, signed by all parties of the JV.

c. Contain a detailed statement outlining the following:

i. The relationship of the JV parties, expressed as percentages and/or other appropriate means, in terms of business ownership, capital contribution, and profit distribution or loss sharing.

ii. The management approach of the JV in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the JV and perform the duties necessary to complete the work.

iii. The structure of the JV and decision-ranking responsibilities of the JV parties in terms of who will control the manner and method of performance of the work.

iv. Identification of the key personnel having authority to legally bind the JV to subcontracts and state who will provide or contract for the labor and materials for the JV.

v. Identification of party maintaining the JV bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the JV.

vi. Identification of party furnishing the facilities, such as office supplies and telephone service.

vii. Identification of party having overall control of the JV.

d. Contain a statement in the agreement that each member of the JV will be jointly and severally liable for any obligations under the contract.

DRAFT

For pla nn ing pu rpo se

e. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual JV parties and identify the party or hired as employees of the JV.

1.9.5 VOLUME II – PRICE PROPOSAL

Volume II shall include the following: specific submission requirements for the price factor are identified in Section

00 21 16.

1.9.5.1 Cover Page: A cover page shall appear at the beginning of Volume II and, at a minimum, shall consist of the following information:

a. Solicitation number.

b. Offeror’s name, physical mailing address(es), telephone number, and email address of the official having the authority to bind the offeror contractually; and

c. Offeror’s DUNS Number, CAGE Code, SAM UEI, and Tax ID (TIN), if applicable.

1.9.5.2 Table of Contents: A table of contents shall be placed in Volume II, which identifies major areas by title and page numbers.

1.9.5.3 PRICE PROPOSAL

a. Signed Solicitation, Offer, and Award (SF 1442) with blocks 14-20c completed, including acknowledgment of all amendments.

b. Completed SF 1442, Section 00 10 00, CLIN Schedule; and

c. Completed Proposal Schedule and Cost Breakdown Sheet Appendix J).

1.9.6 Offerors shall verify that the information for all forms submitted is current, correct, and complete, including names of points of contact, email addresses, and telephone numbers.

1.9.7 Failing to submit or completely fill out the solicitation appendices may result in a determination that the proposal is unacceptable. Therefore, offerors are urged to follow instructions and raise questions through the Bidder Inquiry process (via ProjNet) described herein.

1.10 PROPOSAL FORMAT

1.10.1 Proposals, including all appendices and supporting documents, must be typed, and submitted in English.

Proposals submitted in a language other than English will be considered unacceptable. Letters of Intent, licenses, or joint venture agreements, if not written in English, must be accompanied by an English translated copy with a signed statement, in English, by an authorized representative who can bind each partner, that the English translation is true and correct.

1.10.2 An offeror’s proposal must be submitted as two separate files in PDF: one file which includes the Volume I – Non-Price (Technical) proposal, and the second file which includes the Volume II - Price proposal. Each volume must include the content and adhere to the format discussed herein.

1.10.3 Page limits apply to Factor 1 – Performance Capabilities, Factor 2 - Management Approach, Factor 3 – Construction Experience, and Factor 4 – Past Performance. Each factor’s page limits are discussed in the respective section. The Government will not evaluate any material that exceeds the page limits specified herein. Pages

DRAFT

For pla nn ing pu rpo se furnished for organizational purposes only, such as a cover page, tabs or separator page or a table of contents are not included in the page limitation. Corporate certificates, joint venture agreements, and Letters of Intent a re also not included in page limitations.

1.10.4 The Volume I – Non-Price (Technical) proposal shall be sized to print on 8 1/2” x 11” paper or its equivalent A4 paper; the equivalent to 11” X 17” for drawings, that is A3 (with the exception of the preliminary schedule, which may be printed on the equivalent 24” X 36”).

1.10.5 Offerors shall include the following notification on the bottom of each page of their proposals: “Source Selection Information – See FAR 2.101 and 3.104. Do not disclose any source selection information to any unauthorized person.” Proprietary information must be clearly marked.

1.10.6 All information must be confined to the appropriate Volume. The offeror should limit the proposal to the required information sufficient to provide the Government an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of their proposal.

1.10.7 Proposal revisions, if required, shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.

1.10.8 Within three (3) days of contract award, the contractor receiving the award shall submit their conformed proposal through PIEE to the points of contact identified herein.

1.11 PROPOSAL SUBMISSION INSTRUCTIONS

1.11.1 Proposals must be submitted electronically. Electronic Proposal Submission is REQUIRED through the Procurement Integrated Enterprise Environment (PIEE) website located at https://piee.eb.mil. Please read and follow the language below for registration and submitting proposals through PIEE. Registration with PIEE is required to submit an offer: https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf

Registration is a multi-step process requiring vendor self-validation of roles. Please allow for sufficient system processing time. Offerors will need to take interactive steps to establish an account in PIEE Complete Vendor activation requirements specified in the Vendors Getting Started section of the Help/Training page.

Self-register as a Vendor or Contractor with the user's CAGE code(s).

Select “SOL-Solicitation” in the drop-down list and choose the “Proposal Manager” role to be able to submit a proposal in PIEE.

File Size Limitations: Offerors must follow the PIEE instructions for uploading files. PIEE supports up to 1.9 GB per file, an unlimited number of uploaded files, and supports multiple file formats. If necessary, Offerors must separate files into smaller sections to upload them to the system.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912ER23R0005 – (Firm’s Name) – VOLUME I - Non-Price (Technical) Proposal W912ER23R0005 – (Firm’s Name) – VOLUME II – Price Proposal

*When required to separate files into smaller sections, using the following naming convention:

W912ER23R0005 – (Firm’s Name) – VOLUME I PART 1 - Non-Price (Technical) proposal pla nn ing pu rpo se s o nly https://piee.eb.mil/ https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold- outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors.

Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208. The Contract Specialist may verify offer submission receipt upon request; e-mail requests for confirmation are preferred.

Offerors are encouraged to submit offer files early to mitigate potential issues that may include (but are not limited

to) accessing PIEE, correcting data entry errors, encountering system issues, or technical difficulties.

Offerors shall immediately notify the Contracting Officer if PIEE is inaccessible before the submission deadline.

Contractor notification shall be in writing and may be in conjunction with verbal notification, but verbal notification alone shall not be sufficient.

1.11.2. Electronic Files: Files shall be submitted in PDF format and shall be searchable. Some files shall be in their native format (i.e., doc, xls, ppt, etc.). Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Nov 2021).” The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

Further training is available at this link: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml. This link shows information regarding the Solicitation application in PIEE and the different roles available.

Link for Offerors regarding an Overview of the Proposal Manager function and instruction on submitting a proposal- https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

Each potential offeror must submit its proposals via PIEE no later than 10:00 AM Eastern Daylight Time (EDT) on 26 October 2022. Company information must include the official business name as it appears in the System for

Award Management (SAM), email address, DUNS number, SAM UEI and CAGE Code. The Government will verify the offeror is registered in the SAM.

1.11.3 Proposals are due no later than 10:00 AM Eastern Daylight Time (EDT) on 26 October 2022. Proposals received after this date and time will not be accepted. Facsimile proposals are not permitted. It is an offeror’s responsibility to ensure its proposal is received by the Government system by the date and time of the proposal deadline. Undeliverable messages due to an offeror’s proposal size or IT issues are not the responsibility of the Government. It is recommended that offerors submit their proposals with sufficient time remaining for the electronic files to get to the recipient and confirmation of receipt can be obtained.

1.11.4 Solicitation points of contact are:

Ms. Anita Ludovici at anita.m.ludovici@usace.army.mil AND

Mr. Kenneth Baker at kenneth.g.baker@usace.army.mil pla nn ing pu rpo se s o nly https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml mailto:anita.m.ludovici@usace.army.mil mailto:kenneth.g.baker@usace.army.mil

1.11.5 Late Proposals

See INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021), paragraph (c)(3)(ii) regarding late submission of proposals, modifications, or revisions.

1.12 SOLICITATION INQUIRIES

1.12.1 All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-based program that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at https://www.projnet.org/projnet/.

a. Offerors shall only submit one question per inquiry. All inquiries containing multiple questions will be rejected.

b. Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question(s) after it has been processed by our technical team. Offerors may view all bidder inquiries through ProjNet.

c. The bidder inquiry system in ProjNet is scheduled to be closed seven (7) calendar days prior to the proposal due date. After this date, USACE will not accept further inquiry postings.

1.12.2 To submit and review bid inquiries, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access.

The Bidder Inquiry Key is: YBR5U5-HB5H8X

1.12.3 Specific Instructions for ProjNet Bid Inquiry Access:

a. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

b. Identify the Agency as USACE.

c. Key. Enter the Bidder Inquiry Key listed above.

d. Email. Enter the email address you would like to use for communication.

e. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

f. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

g. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

1.12.4 Submit questions or review questions and answers. A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer are then available for all other bidders to review.

pla nn ing pu rpo se s o https://www.projnet.org/projnet/

CLAUSES INCORPORATED BY REFERENCE

52.204-16 Commercial and Government Entity Code Reporting AUG 2020

52.204-22 Alternative Line-Item Proposal JAN 2017 52.214-34 Submission Of Offers in The English Language APR 1991 52.214-35 Submission Of Offers in U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-20 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

NOV 2021

52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.215-7008 Only One Offer JUL 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for

Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding

Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM.

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM.

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification

Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ̀ `Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or

Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

DRAFT

For pla nn ing pu rpo se s o http://www.sam.gov/

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offer or is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Trade style, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state, and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

DRAFT

For pla nn ing pu rpo se s o nly http://www.sam.gov/ https://www.sam.gov/

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

NA NA

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .