RFP: W912ER22R0033 P2# 468097
PROJECT:
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
Base Contract Items
0001 Mobilization and Demobilization in accordance with the Contract Documents
1 LS
0002 Construct Wharf and all Associated Work in Accordance with Contract Documents. Item shall be completed within 730 days from Notice to Proceed.
1 LS
0003 Construct Piers and all Associated Work in Accordance with Contract Documents
1 LS
Construct Tuwaiq Ships Maintenance Facility and all Associated Work in Accordance with Contract Documents.
Item shall be completed within 730 days from Notice to Proceed.
1 LS
Construct Four (4) Earth Covered Magazine and all Associated Work in Accordance with Contract Documents.
Item shall be completed within 730 days from Notice to Proceed.
1 LS
Construct Harbor Master Control Tower and all Associated Work in Accordance with Contract Documents
1 LS
0007 Construct Electrical Switching Station and all Associated Work in Accordance with Contract Documents. Item shall be completed within 730 days from Notice to Proceed.
1 LS
0008 Construct Security Fence and all Associated Work in Accordance with Contract Documents
1 LS
Construct Ammunition Pier Mooring Dolphins in Accordance with Contract Documents
1 LS
Construct Ammunition Pier Structural Repairs in Accordance with Contract Documents
1 LS
PROPOSAL SCHEDULE
RSNF TUWAIQ SHIP INITIAL OPERATIONAL CAPABILITY MMSC SHIP SUPPORT AND
ASSOCIATED FACILITIES
LOCATION: King Abdulaziz Naval Base, KSA
NOTE: All Base Contract and Option Items shall be completed within the timeline specified in the item Description. If no period is listed, item shall be completed within the Contract Period of Performance (1340 days).
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
PROPOSAL SCHEDULE
RSNF TUWAIQ SHIP INITIAL OPERATIONAL CAPABILITY MMSC SHIP SUPPORT AND
ASSOCIATED FACILITIES
LOCATION: King Abdulaziz Naval Base, KSA
NOTE: All Base Contract and Option Items shall be completed within the timeline specified in the item Description. If no period is listed, item shall be completed within the Contract Period of Performance (1340 days).
Construct Site Demolition Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Civil Site Features and all Associated Work in Accordance with Contract Documents.
1 LS
Construct Site Electrical Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Site Communication Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Site Domestic Water, Fire Water, and Sea Water Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Site Sanitary Sewer Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Site Drainage Features and all Associated Work in Accordance with Contract Documents
1 LS
Construct Site Compressed Air Features and all Associated Work in Accordance with Contract Documents
1 LS
0019 Construct Ammunition Pier Alternative Electrical Plan including high mast light, lightning protection system, and electrical compact substation with rack mounted electrical control panel, in accordance with contract documents
1 LS
Construct Fire Pump House, Site Features, and all Associated Work in Accordance with Contract Documents.
Item shall be completed within 730 days from Notice to Proceed.
1 LS
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
PROPOSAL SCHEDULE
RSNF TUWAIQ SHIP INITIAL OPERATIONAL CAPABILITY MMSC SHIP SUPPORT AND
ASSOCIATED FACILITIES
LOCATION: King Abdulaziz Naval Base, KSA
NOTE: All Base Contract and Option Items shall be completed within the timeline specified in the item Description. If no period is listed, item shall be completed within the Contract Period of Performance (1340 days).
0045 1 LS
VAT @ 15% for all Base Items in accordance with contract documents
VAT @ 15% for all Awarded Optional Items in accordance with contract documents
1 LS
Optional Items
0021 Option #1: Construct Platform Transition Slab and Piles and all Associated Work in Accordance with Contract Documents. If not awarded, Option #5 shall be Awarded
1 LS
Option #2: Construct Fuel System Fire Pump House, Site Features, and all Associated Work in Accordance with Contract Documents. If awarded, option shall be completed within 730 days from Notice to Proceed.
1 LS
Option #3: Construct Fuel System Pump House, Fuel System, Fuel Piping, Site Features, and all Associated Work in Accordance with Contract Documents. If Awarded, Option #2 shall be Awarded. If awarded, option shall be completed within 730 days from Notice to Proceed.
1 LS
0024 Option #4: Construct NSC Warehouse, Site Features, and all Associated Work in Accordance with Contract Documents. If Awarded, Option #2 shall be Awarded
1 LS
Option #5: Construct Transfer Pit, Maintenance Table, Site Features, and all Associated Work in Accordance with Contract Documents. If not awarded, Option #1 shall be Awarded.
1 LS
Option #6: Design and Construct Ship Lift, and Construct Site Features and all Associated Work, in Accordance with Contract Documents
1 LS
Option #7: Construct Squadron Operations Facility, Site Features, and all Associated Work in Accordance with Contract Documents
1 LS
TOTAL Base Contract Item(s) Price (ITEMS 0001-0020, 0045-0046)
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
PROPOSAL SCHEDULE
RSNF TUWAIQ SHIP INITIAL OPERATIONAL CAPABILITY MMSC SHIP SUPPORT AND
ASSOCIATED FACILITIES
LOCATION: King Abdulaziz Naval Base, KSA
NOTE: All Base Contract and Option Items shall be completed within the timeline specified in the item Description. If no period is listed, item shall be completed within the Contract Period of Performance (1340 days).
Option #8: Construct SRF HAZMAT Storage and all Associated Work in Accordance with Contract Documents
1 LS
0029 Option #9: Construct Ammunition Pier Administration Building, Road Widening, Site Features, and all Associated Work in Accordance with Contract Documents
1 LS
Option #10: Construct MMSC Ship Crew Parking and all Associated Work in Accordance with Contract Documents
1 LS
Option #11: Construct Gate House and Scanner Building and all Associated Work in Accordance with Contract Documents
1 LS
Option #12: Construct Calibration Laboratory and all Associated Work in Accordance with Contract Documents.
If awarded, option shall be completed within 730 days from notice to proceed.
1 LS
Option #13: Construct SRF Warehouse and all Associated Work in Accordance with Contract Documents.
1 LS
Option #14: Construct Module Test and Repair (MTR) and all Associated Work in Accordance with Contract Documents. If awarded, option shall be completed within 730 days from Notice to Proceed.
1 LS
0035 Option #15: Provide and Place 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents
1000 M3
Option #16: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents
1000 M3
ITEM NO. DESCRIPTION QTY UNIT TOTAL ($)
PROPOSAL SCHEDULE
RSNF TUWAIQ SHIP INITIAL OPERATIONAL CAPABILITY MMSC SHIP SUPPORT AND
ASSOCIATED FACILITIES
LOCATION: King Abdulaziz Naval Base, KSA
NOTE: All Base Contract and Option Items shall be completed within the timeline specified in the item Description. If no period is listed, item shall be completed within the Contract Period of Performance (1340 days).
Option #17: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents
1000 M3
Option #18: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents
1000 M3
Option #19: Provide and Place an Additional 1000 Cubic Meters of Over Dredge in Support of Wharf and Pier Foundation Construction in Accordance with Contract Documents
1000 M3
0040 Option #20: Provide and Place 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction
1000 M3
Option #21: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction
1000 M3
Option #22: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction
1000 M3
Option #23: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction
1000 M3
Option #24: Provide and Place an Additional 1000 Cubic Meters of Rock Bed Material to Accommodate Over Dredge in Support of Wharf and Pier Foundation Construction
1000 M3
TOTAL BASE AND OPTION(S) PRICE (ITEMS 0001-0046)
TOTAL Option Item(s) Price (ITEMS 0021-0044)