W912EQ21B0002 Bid abstract .pdf
PDF 87 KB Posted
- Attached to
- White River Backwater Seepage Federal contract opportunity
- Solicitation number
- W912EQ21B0002
About this file
This abstract of bids is for solicitation number W912EQ21B0002 to perform construction work for the White River Backwater Seepage project. The work includes drilling and installing 71 new relief wells, drilling 71 pilot holes and soil testing, clearing and grubbing, fence removal, grading, fill material procurement, constructing a 150-foot wide by 3,000-foot long seepage berm varying from 6 to 8 feet thick, modifying collector ditches, installing an 18-inch culvert, establishing turf, environmental protection, and other related work. The project limits are along the White River Backwater Levee from station 12/40+00 to 15/28+00. The total estimated value of work is between $1,000,000 to $5,000,000. Nine contractors submitted bids and pricing is provided for each line item. The Department of the Army Corps of Engineers Engineering District Memphis is the agency managing this federal construction contract solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Amendment 0002 W912EQ21B0002.pdf | ||
| Amendment 0001 W912EQ21B0002.pdf | ||
| B08 - White_River_Seepage_Plans.pdf | ||
| B08 - Solicitation (W912EQ21B0002).pdf | ||
| B08 - Solicitation Drawings W912EQ21B0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNOFFICIAL ABSTRACT
I certify that I have read all offers received in response to this solicitation and all offers have been recorded on this abstract Kirk Middleton, Bid Opening Officer
UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED
NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 MOBILIZATION AND DEMOBILIZATION 1 JB XXX 165,014.00$ XXX 797,582.00$ XXX 276,107.00$ XXX 452,941.18$ XXX 1,124,636.00$ XXX 100,000.00$ XXX 630,000.00$ XXX 568,000.00$ XXXX 1,305,480.77$ XXX 184,000.00$
0002 ENVIRONMENTAL PROTECTION 1 JB XXX 9,466.00$ XXX -$ XXX 14,152.00$ XXX 12,941.18$ XXX 11,000.00$ XXX 56,000.00$ XXX 11,960.00$ XXX 50,000.00$ XXXX 18,187.50$ XXX 20,500.00$
0003 DEMOLITION 1 JB XXX 3,018.00$ XXX 5,196.00$ XXX 4,246.00$ XXX 148,823.53$ XXX 5,019.00$ XXX 10,400.00$ XXX 6,800.00$ XXX 33,990.00$ XXXX 5,532.03$ XXX 6,250.00$
0004 STORM WATER POLLUTION PREVENTION XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
0004AA WRITE OR AMEND SWPP AND MATAIN 1 EA 750.00$ 750.00$ 14,157.00$ 14,157.00$ 6,470.59$ 6,470.59$ 22,000.00$ 22,000.00$ 1,000.00$ 1,000.00$ 8,000.00$ 8,000.00$ 5,000.00$ 5,000.00$ 18,187.50$ 18,187.50$ 685.00 685.00$
0004AB SILT FENCE OR EQUIVALENT 13,000 LF 2.18$ 28,340.00$ 2.21$ 28,730.00$ 4.96$ 64,480.00$ 4.53$ 58,890.00$ 2.13$ 27,690.00$ 7.15$ 92,950.00$ 4.95$ 64,350.00$ 3.20$ 41,600.00$ 2.35$ 30,579.25$ 3.10$ 40,300.00$
0004AC CHECK DAM 24 EA 135.13$ 3,243.12$ 746.34$ 17,912.16$ 424.72$ 10,193.28$ 452.94$ 10,870.56$ 720.84$ 17,300.16$ 2,340.00$ 56,160.00$ 2,200.00$ 52,800.00$ 650.00$ 15,600.00$ 79,456.00$ 19,069.52$ 730.00$ 17,520.00$
0004AD CONSTRUCTION EXIT 2 EA 7,308.50$ 14,617.00$ 16,369.56$ 32,739.12$ 2,548.30$ 5,096.60$ 1,294.12$ 2,588.24$ 16,673.48$ 33,346.96$ 5,460.00$ 10,920.00$ 4,750.00$ 9,500.00$ 6,500.00$ 13,000.00$ 18,378.72$ 36,757.45$ 4,100.00$ 8,200.00$
0005 ESTABLISHMENT OF TURF 42 AC 2,144.93$ 90,087.06$ 1,667.08$ 70,017.36$ 3,539.31$ 148,651.02$ 1,941.18$ 81,529.56$ 1,610.00$ 67,620.00$ 650.00$ 27,300.00$ 5,015.00$ 210,630.00$ 6,500.00$ 273,000.00$ 1,774.80$ 74,541.57$ 3,100.00$ 130,200.00$
0006 EXCAVATION 1,500 CY 8.98$ 13,470.00$ 8.22$ 12,330.00$ 5.66$ 8,490.00$ 10.35$ 15,525.00$ 7.94$ 11,940.00$ 13.00$ 19,500.00$ 11.45$ 17,175.00$ 20.00$ 30,000.00$ 8.75$ 13,131.38$ 6.85$ 10,275.00$
0007 COMPACTED FILL XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
0007AA COMPACTED RANDOM FILL 60,000 CY 11.76$ 705,600.00$ 7.08$ 424,800.00$ 14.09$ 845,400.00$ 11.00$ 660,000.00$ 7.12$ 427,200.00$ 6.50$ 390,000.00$ 10.90$ 654,000.00$ 12.50$ 750,000.00$ 7.54$ 452,505.00$ 6.85$ 411,000.00$
0007AB COMPACTED IMPERVIOUS FILL 20,000 CY 11.80$ 236,000.00$ 7.08$ 141,600.00$ 16.71$ 334,200.00$ 11.00$ 220,000.00$ 7.12$ 142,400.00$ 6.69$ 133,800.00$ 11.00$ 220,000.00$ 22.00$ 440,000.00$ 7.54$ 150,835.00$ 6.85$ 137,000.00$
0008 TEMPORARY DRILLING PAD XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
0008AA TEMPORARY DRILLING PAD (3FT MAX HEIGHT, APPROX 110 CY) 8 EA 4,277.50$ 34,220.00$ 1,753.92$ 14,031.36$ 1,415.72$ 11,325.76$ 3,235.29$ 25,882.32$ 1,694.00$ 13,552.00$ 1,950.00$ 15,600.00$ 1,320.00$ 10,560.00$ 2,387.00$ 19,096.00$ 1,867.25$ 14,938.00$ 2,960.00$ 23,680.00$
0008AB TEMPORARY DRILLING PAD (3FT TO 5 FT HEIGHT, APPROX 250 CY) 9 EA 6,355.11$ 57,195.99$ 3,986.18$ 35,875.62$ 1,698.87$ 15,289.83$ 4,529.41$ 40,764.69$ 3,850.00$ 34,650.00$ 1,950.00$ 17,550.00$ 2,750.00$ 24,750.00$ 4,722.00$ 42,498.00$ 4,243.75$ 38,193.75$ 4,440.00$ 39,960.00$
0009 18-INCH CMP 30 LF 42.13$ 1,263.90$ 65.49$ 1,964.70$ 101.93$ 3,057.90$ 97.06$ 2,911.80$ 63.25$ 1,897.50$ 195.00$ 5,850.00$ 78.00$ 2,340.00$ 90.00$ 2,700.00$ 1,867.25$ 56,017.50$ 68.50$ 2,055.00$
0010 PIEZOMETERS 100 LF 94.10$ 9,410.00$ 80.86$ 8,086.00$ 424.72$ 42,472.00$ 129.41$ 12,941.00$ 330.00$ 33,000.00$ 357.50$ 35,750.00$ 65.25$ 6,525.00$ 125.00$ 12,500.00$ 86.09$ 8,608.75$ 81.50$ 8,150.00$
0011 RELIEF WELL: 8-INCH 2,147 LF 458.30$ 983,970.10$ 349.64$ 750,677.08$ 597.57$ 1,270,100.79$ 452.94$ 972,462.18$ 343.00$ 736,850.40$ 357.50$ 767,552.50$ 436.00$ 936,092.00$ 375.00$ 805,125.00$ 372.24$ 799,193.91$ 374.00$ 802,978.00$
0012 PILOT HOLE BORINGS 2,552 LF 94.79$ 241,904.08$ 88.27$ 225,265.04$ 90.61$ 231,236.72$ 103.53$ 264,208.56$ 87.45$ 223,172.40$ 74.10$ 189,103.20$ 74.35$ 189,741.20$ 180.00$ 459,360.00$ 93.97$ 239,808.25$ 93.00$ 237,336.00$
0013 RELIEF WELL PUMP TESTING XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
0013AA PUMP TESTING: FIRST 3 HR PER WELL 81 HR 305.53$ 24,747.93$ 455.56$ 36,900.36$ 747.50$ 60,547.50$ 582.35$ 47,170.35$ 440.00$ 35,640.00$ 260.00$ 21,060.00$ 219.50$ 17,779.50$ 150.00$ 12,150.00$ 485.00$ 39,285.00$ 422.00$ 34,182.00$
0013AB PUMP TESTING: ALL OVER 3 HR PER WELL 27 HR 244.41$ 6,599.07$ 455.56$ 12,300.12$ 747.50$ 20,182.50$ 582.35$ 15,723.45$ 440.00$ 11,880.00$ 260.00$ 7,020.00$ 164.50$ 4,441.50$ 150.00$ 4,050.00$ 485.00$ 13,095.00$ 422.00$ 11,394.00$
0014 GUARD POSTS 87 EA 305.53$ 26,581.11$ 876.96$ 76,295.52$ 42.47$ 3,694.89$ 1,035.29$ 90,070.23$ 847.00$ 73,689.00$ 747.50$ 65,032.50$ 220.00$ 19,140.00$ 350.00$ 30,450.00$ 933.63$ 81,225.38$ 390.00$ 33,930.00$
0015 GEOTEXTILE FILTER FABRIC 260 SY 1.76$ 457.60$ 2.63$ 683.80$ 5.66$ 1,471.60$ 12.94$ 3,364.40$ 2.54$ 660.40$ 13.00$ 3,380.00$ 3.15$ 819.00$ 2.45$ 637.00$ 2.80$ 728.23$ 4.00$ 1,040.00$
0016 RIPRAP: R-90 40 TN 68.83$ 2,753.20$ 95.38$ 3,815.20$ 67.95$ 2,718.00$ 97.06$ 3,882.40$ 92.13$ 3,685.20$ 117.00$ 4,680.00$ 57.00$ 2,280.00$ 65.00$ 2,600.00$ 101.55$ 4,061.38$ 87.50$ 3,500.00$
0017 RIPRAP: R-200 200 TN 68.45$ 13,690.00$ 95.38$ 19,076.00$ 76.45$ 15,290.00$ 97.06$ 19,412.00$ 92.13$ 18,426.00$ 117.00$ 23,400.00$ 57.00$ 11,400.00$ 65.00$ 13,000.00$ 101.55$ 20,309.38$ 87.50$ 17,500.00$
0018 BEDDING MATERIAL 50 TN 60.42$ 3,021.00$ 69.79$ 3,488.00$ 36.64$ 1,982.00$ 97.06$ 4,853.00$ 67.35$ 3,369.00$ 117.00$ 5,850.00$ 50.50$ 2,525.00$ 45.00$ 2,250.00$ 74.27$ 3,713.28$ 80.00$ 4,000.00$
0019 BARBED WIRE FENCE 2,900 LF 10.45$ 30,305.00$ 11.39$ 33,031.00$ 12.03$ 34,887.00$ 9.06$ 26,274.00$ 21.87$ 63,423.00$ 6.50$ 18,850.00$ 11.00$ 31,900.00$ 55.00$ 159,500.00$ 24.10$ 69,903.05$ 13.70$ 39,730.00$
0020 CLEARING AND GRUBBING 6 AC 1,490.50$ 8,943.00$ 2,733.38$ 16,400.28$ 3,397.73$ 20,386.38$ 4,529.41$ 27,176.46$ 2,808.00$ 16,848.00$ 4,550.00$ 27,300.00$ 3,000.00$ 18,000.00$ 6,500.00$ 39,000.00$ 2,910.00$ 17,460.00$ 6,850.00$ 41,100.00$
2,713,917.16$ 2,769,546.72$ 3,459,815.77$ 3,227,676.68$ 3,160,895.02$ 2,106,008.20$ 3,163,508.20$ 3,825,106.00$ 3,531,347.83$ 2,266,465.00$
TRIUMPH CONSTRUCTION LLC
8599 JOOR RD STE D
BATON ROUGE, LA 70818
VUCON LLC
SUB-TOTAL-BASE PERIOD (ITEMS 0001 THRU 0020)
BASE PERIOD
ENGINEERING
UNOFFICIAL ABSTRACT
US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS
NUMBER OF AMENDMENTS: 2
SMALL BUSINESS DETERMINATION: WOMEN-OWNED SMALL BUSINESS SET-ASIDE
14217 W. 95TH STREET
LENEXA, KA 66215
TITLE:WHITE RIVER BACKWATER SEEPAGE
BIDDER #9INVITATION NO.: W912EQ-21-B-0002 GOVT. ESTIMATE
MEMPHIS
DISTRICT
BID OPENING DATE AND TIME: 01/08/2021 AT 1:00 PM COST
BIDDER #1
FIRELAKE CONSTRUCTION, INC.
BIDDER #2
527 NORTH HOLLYWOOD315 WEST McDONOUGH STREET
JOLIET, IL 60436 MEMPHIS, TN 38112
JESSICA YOUNG MANAGEMENT, LLC
BIDDER #3 BIDDER #4 BIDDER #5 BIDDER #6 BIDDER #7 BIDDER #8
2955 KARMEN LANE
POPLAR BLUFF, MO 63901
K-BELLE CONSULTANTS LLC
4622 S. CARROLLTON AVE
GALE CONSTRUCTION COMPANY
NEW ORLEANS, LA 70119
99 AG MART DR
LUVERNE, AL 36049
STEPHENS CONSTRUCTION AND CONCRETE, INC TARPAN CONSTRUCTION LLC
6759 HWY 29
COTTONPORT, LA 71327
TOOTLE CONSTRUCTION, LLC
P.O. BOX 520187
LONGWOOD, FL 32752
CEMVM 967 (REV. JAN 00)
ABSTRACT OF BIDS Page 1 of 2
UNOFFICIAL ABSTRACT
OPTION 1 LINE ITEMS XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
1001 MOBILIZATION AND DEMOBILIZATION 1 JB XXX 53,353.00$ XXX 275,745.00$ XXX 220,274.00$ XXX 77,647.06$ XXX 547,203.79$ XXX 50,000.00$ XXX 131,000.00$ XXX 120,000.00$ XXXX 68,061.35$ XXX 38,000.00$
1002 ENVIRONMENTAL PROTECTION 1 JB XXX 9,049.00$ XXX -$ XXX 14,971.00$ XXX 3,235.29$ XXX 11,000.00$ XXX 11,800.00$ XXX 9,000.00$ XXX 20,000.00$ XXXX 6,062.50$ XXX 10,300.00$
1003 DEMOLITION 1 JB XXX 4,179.00$ XXX 6,044.46$ XXX 6,736.95$ XXX 38,823.53$ XXX 5,843.75$ XXX 9,888.00$ XXX 8,000.00$ XXX 15,000.00$ XXXX 6,441.41$ XXX 7,300.00$
1004 STORM WATER POLLUTION PREVENTION XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
1004AA WRITE OR AMEND SWPP AND MATAIN 1 EA 5,842.00$ 5,842.00$ 500.00$ 500.00$ 14,980.79$ 14,980.79$ 3,235.29$ 3,235.29$ 22,000.00$ 22,000.00$ 7,000.00$ 7,000.00$ 8,000.00$ 8,000.00$ 5,000.00$ 5,000.00$ 6,062.50$ 6,062.50$ 685.00$ 685.00$
1004AB SILT FENCE OR EQUIVALENT 4,400 LF 2.12$ 9,328.00$ 2.21$ 9,724.00$ 5.24$ 23,056.00$ 4.53$ 19,932.00$ 2.13$ 9,372.00$ 6.80$ 29,920.00$ 4.95$ 21,780.00$ 3.20$ 14,080.00$ 2.35$ 10,349.90$ 3.50$ 15,400.00$
1004AC CHECK DAM 8 EA 129.12$ 1,033.04$ 745.60$ 5,964.80$ 449.42$ 3,595.36$ 452.94$ 3,623.52$ 720.84$ 5,766.72$ 2,225.00$ 17,800.00$ 2,200.00$ 17,600.00$ 650.00$ 5,200.00$ 794.56$ 6,359.51$ 730.00$ 5,840.00$
1005 ESTABLISHMENT OF TURF 10 AC 2,089.60$ 20,896.00$ 1,665.43$ 16,654.30$ 3,745.20$ 37,452.00$ 1,941.18$ 19,411.80$ 1,610.13$ 16,101.30$ 618.00$ 6,180.00$ 4,920.00$ 49,200.00$ 6,500.00$ 65,000.00$ 1,774.80$ 17,747.97$ 3,770.00$ 37,700.00$
1006 EXCAVATION 4,700 CY 8.58$ 40,326.00$ 8.21$ 38,587.00$ 5.99$ 28,153.00$ 10.35$ 48,645.00$ 7.94$ 37,318.00$ 12.36$ 58,092.00$ 11.45$ 53,815.00$ 20.00$ 94,000.00$ 8.75$ 41,144.98$ 6.85$ 32,195.00$
1007 COMPACTED IMPERVIOUS FILL 400 CY 11.41$ 4,564.00$ 7.08$ 2,832.00$ 13.41$ 5,364.00$ 11.00$ 4,400.00$ 6.84$ 2,736.00$ 7.42$ 2,968.00$ 11.00$ 4,400.00$ 22.00$ 8,800.00$ 7.54$ 3,016.70$ 6.85$ 2,740.00$
1008 TEMPORARY DRILLING PAD XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
1008AA TEMPORARY DRILLING PAD (3FT MAX HEIGHT APPROX 110 CY) 4 EA 4,277.50$ 17,110.00$ 1,752.18$ 7,008.72$ 1,498.08$ 5,992.32$ 3,235.29$ 12,941.16$ 1,694.00$ 6,776.00$ 2,224.80$ 8,899.20$ 1,320.00$ 5,280.00$ 2,387.00$ 9,548.00$ 1,867.25$ 7,469.00$ 2,960.00$ 11,840.00$
1008AB TEMPORARY DRILLING PAD (3FT TO 5FT APPROX 250 CY) 4 EA 6,355.00$ 25,420.00$ 3,982.23$ 15,928.92$ 1,797.69$ 7,190.76$ 3,235.29$ 12,941.16$ 3,850.00$ 15,400.00$ 2,224.80$ 8,899.20$ 2,750.00$ 11,000.00$ 4,722.00$ 18,888.00$ 4,243.75$ 16,975.00$ 4,440.00$ 17,760.00$
1009 PIEZOMETERS 30 LF 89.97$ 2,699.10$ 80.78$ 2,423.40$ 2,197.18$ 65,915.40$ 129.41$ 3,882.30$ 330.00$ 9,900.00$ 339.90$ 10,197.00$ 65.25$ 1,957.50$ 125.00$ 3,750.00$ 86.09$ 2,582.63$ 81.50$ 2,445.00$
1010 RELIEF WELLS: 8-INCH 2,717 LF 438.13$ 1,190,399.21$ 346.30$ 949,048.10$ 625.99$ 1,700,814.83$ 452.94$ 1,230,637.98$ 337.70$ 917,530.90$ 339.90$ 923,508.30$ 418.00$ 1,135,706.00$ 375.00$ 1,018,875.00$ 372.24$ 1,011,369.29$ 374.00$ 1,016,158.00$
1011 PILOT HOLE BORINGS 3,212 LF 89.29$ 286,799.48$ 88.18$ 283,234.16$ 95.88$ 307,966.56$ 103.53$ 332,538.36$ 85.25$ 273,823.00$ 70.45$ 226,285.40$ 74.35$ 238,812.20$ 180.00$ 578,160.00$ 93.97$ 301,827.63$ 92.00$ 295,504.00$
1012 RELIEF WELL PUMP TESTING XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
1012AA PUMP TESTING: FIRST 3 HR PER WELL 99 HR 233.67$ 23,133.33$ 455.11$ 45,055.89$ 791.00$ 78,309.00$ 582.35$ 57,652.65$ 440.00$ 43,560.00$ 247.00$ 24,453.00$ 219.50$ 21,730.50$ 150.00$ 14,850.00$ 485.00$ 48,015.00$ 422.00$ 41,778.00$
1012AB PUMP TESTING: ALL OVER 3 HR PER WELL 33 HR 233.67$ 7,711.11$ 455.11$ 15,018.63$ 791.00$ 26,103.00$ 582.35$ 19,217.55$ 440.00$ 14,520.00$ 247.00$ 8,151.00$ 164.50$ 5,428.50$ 150.00$ 4,950.00$ 485.00$ 16,005.00$ 422.00$ 13,926.00$
1013 GUARD POSTS 102 EA 292.09$ 29,793.18$ 876.09$ 89,361.18$ 44.94$ 4,583.88$ 1,035.29$ 105,599.58$ 847.00$ 86,394.00$ 711.00$ 72,522.00$ 220.00$ 22,440.00$ 350.00$ 35,700.00$ 933.63$ 95,299.75$ 390.00$ 39,780.00$
1014 GEOTEXTILE FILTER FABRIC 440 SY 1.68$ 739.20$ 2.63$ 1,157.20$ 6.00$ 2,640.00$ 12.94$ 5,693.60$ 2.54$ 1,117.60$ 12.36$ 5,438.40$ 3.15$ 1,386.00$ 2.45$ 1,078.00$ 2.80$ 1,232.39$ 4.10$ 1,804.00$
1015 RIPRAP: R-90 50 TN 65.78$ 3,289.00$ 95.29$ 4,764.50$ 71.91$ 3,595.50$ 97.06$ 4,853.00$ 92.13$ 4,606.50$ 111.24$ 5,562.00$ 57.00$ 2,850.00$ 65.00$ 3,250.00$ 101.55$ 5,077.34$ 86.50$ 4,325.00$
1016 RIPRAP: R-200 370 TN 64.33$ 23,802.10$ 95.29$ 35,257.30$ 80.90$ 29,933.00$ 97.06$ 35,912.20$ 92.13$ 34,088.10$ 111.24$ 41,158.80$ 57.00$ 21,090.00$ 65.00$ 24,050.00$ 101.55$ 37,572.34$ 86.50$ 32,005.00$
1017 BEDDING MATERIAL 100 TN 57.76$ 5,776.00$ 69.69$ 6,969.00$ 41.95$ 4,195.00$ 97.06$ 9,706.00$ 67.38$ 6,738.00$ 111.24$ 11,124.00$ 50.50$ 5,050.00$ 45.00$ 4,500.00$ 74.24$ 7,426.56$ 79.00$ 7,900.00$
1018 BARBED WIRE FENCE 4,200 LF 9.99$ 41,958.00$ 11.38$ 47,796.00$ 13.41$ 56,322.00$ 9.06$ 38,052.00$ 21.87$ 91,854.00$ 6.18$ 25,956.00$ 11.00$ 46,200.00$ 55.00$ 231,000.00$ 24.10$ 101,238.90$ 13.70$ 57,540.00$
1019 CLEARING AND GRUBBING 4 AC 1,517.75$ 6,071.00$ 2,730.67$ 10,922.68$ 3,745.20$ 14,980.80$ 4,529.41$ 18,117.64$ 2,640.00$ 10,560.00$ 4,326.00$ 17,304.00$ 3,000.00$ 12,000.00$ 6,500.00$ 26,000.00$ 2,910.00$ 11,640.00$ 6,850.00$ 27,400.00$
1,813,270.75$ 1,869,997.24$ 2,663,125.15$ 2,106,698.67$ 2,174,209.66$ 1,583,106.30$ 1,833,725.70$ 2,321,679.00$ 1,828,977.65$ 1,720,325.00$
OPTION 2 LINE ITEMS XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
2001 MOBILIZATION AND DEMOBILIZATION 1 JB XXX 57,081.00$ XXX 158,647.00$ XXX 108,470.00$ XXX 58,235.29$ XXX 369,470.23$ XXX 50,000.00$ XXX 86,600.00$ XXX 79,600.00$ XXXX 39,831.43$ XXX 25,000.00$
2002 ENVIRONMENTAL PROTECTION 1 JB XXX 9,682.00$ XXX -$ XXX 12,241.18$ XXX 6,470.59$ XXX 11,000.00$ XXX 14,750.00$ XXX 9,000.00$ XXX 20,000.00$ XXXX 6,052.50$ XXX 6,850.00$
2003 DEMOLITION 1 JB XXX 2,129.00$ XXX 2,631.12$ XXX 5,712.55$ XXX 38,823.53$ XXX 2,543.75$ XXX 15,022.00$ XXX 3,475.00$ XXX 15,000.00$ XXXX 2,803.91$ XXX 3,170.00$
2004 STORM WATER POLLUTION PREVENTION XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
2004AA WRITE OR AMEND SWPP AND MAINTAIN 1 EA 6,250.00$ 6,250.00$ 500.00$ 500.00$ 12,256.05$ 12,256.05$ 1,294.12$ 1,294.12$ 22,000.00$ 22,000.00$ 5,000.00$ 5,000.00$ 8,000.00$ 8,000.00$ 5,000.00$ 5,000.00$ 6,062.50$ 6,062.50$ 685.00$ 685.00$
2004AB SILT FENCE OR EQUIVALENT 2,000 LF 2.27$ 4,540.00$ 2.21$ 4,420.00$ 5.72$ 11,440.00$ 4.53$ 9,060.00$ 2.13$ 4,260.00$ 7.13$ 14,260.00$ 4.95$ 9,900.00$ 3.20$ 6,400.00$ 2.35$ 4,704.50$ 4.80$ 9,600.00$
2004AC CHECK DAM 2 EA 138.00$ 276.00$ 745.60$ 1,491.20$ 490.24$ 980.48$ 452.94$ 905.88$ 720.84$ 1,441.68$ 2,331.00$ 4,662.00$ 2,200.00$ 4,400.00$ 650.00$ 1,300.00$ 794.56$ 1,589.13$ 730.00$ 1,460.00$
2005 ESTABLISHMENT OF TURF 3 AC 2,235.67$ 6,707.01$ 1,665.42$ 4,996.26$ 4,085.35$ 12,256.05$ 1,941.18$ 5,823.54$ 1,610.13$ 4,830.39$ 647.50$ 1,942.50$ 4,920.00$ 14,760.00$ 6,500.00$ 19,500.00$ 1,774.80$ 5,324.35$ 6,500.00$ 19,500.00$
2006 EXCAVATION 300 CY 9.18$ 2,754.00$ 8.21$ 2,463.00$ 7.35$ 2,205.00$ 10.35$ 3,105.00$ 7.94$ 2,382.00$ 12.95$ 3,885.00$ 11.45$ 3,435.00$ 20.00$ 6,000.00$ 8.75$ 2,626.28$ 6.85$ 2,055.00$
2007 TEMPORARY DRILLING PAD XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
2007AA TEMPORARY DRILLING PAD (3FT MAX HEIGHT APPROX 110 CY) 4 EA 8,555.00$ 34,220.00$ 1,752.18$ 7,008.72$ 1,634.14$ 6,536.56$ 3,235.29$ 12,941.16$ 1,694.00$ 6,776.00$ 2,331.00$ 9,324.00$ 1,320.00$ 5,280.00$ 2,387.00$ 9,548.00$ 1,862.25$ 7,469.00$ 2,960.00$ 11,840.00$
2007AB TEMPORARY DRILLING PAD (3FT TO 5FT APPROX 250 CY) 4 EA 14,299.00$ 57,196.00$ 3,982.23$ 15,928.92$ 1,960.97$ 7,843.88$ 3,235.29$ 12,941.16$ 3,850.00$ 15,400.00$ 2,331.00$ 9,324.00$ 2,750.00$ 11,000.00$ 4,722.00$ 18,888.00$ 4,243.75$ 16,975.00$ 4,440.00$ 17,760.00$
2008 PIEZOMETERS 30 LF 96.23$ 2,886.90$ 80.78$ 2,423.40$ 2,396.74$ 71,902.20$ 129.41$ 3,882.30$ 330.00$ 9,900.00$ 356.13$ 10,683.90$ 65.25$ 1,957.50$ 125.00$ 3,750.00$ 86.09$ 2,582.63$ 81.50$ 2,445.00$
2009 RELIEF WELLS: 8-INCH 886 LF 468.75$ 415,312.50$ 349.30$ 309,479.80$ 682.84$ 604,996.24$ 452.94$ 401,304.84$ 337.70$ 299,202.20$ 356.13$ 315,531.18$ 424.00$ 375,664.00$ 375.00$ 332,250.00$ 372.24$ 329,802.43$ 373.00$ 330,478.00$
2010 PILOT HOLE BORINGS 1,051 LF 106.89$ 112,341.39$ 88.18$ 92,677.18$ 104.58$ 109,913.58$ 103.53$ 108,810.03$ 85.25$ 89,597.75$ 73.82$ 77,584.82$ 74.35$ 78,141.85$ 180.00$ 189,180.00$ 93.97$ 98,761.16$ 93.00$ 97,743.00$
2011 RELIEF WELL PUMP TESTING XXX XX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXXX XXXX XXX XXX
2011AA PUMP TESTING: FIRST 3 HR PER WELL 33 HR 312.48$ 10,311.84$ 455.11$ 15,018.63$ 862.83$ 28,473.39$ 582.35$ 19,217.55$ 440.00$ 14,520.00$ 259.00$ 8,547.00$ 220.00$ 7,260.00$ 150.00$ 4,950.00$ 485.00$ 16,005.00$ 422.00$ 13,926.00$
2011AB PUMP TESTING: ALL OVER 3 HR PER WELL 11 HR 250.00$ 2,750.00$ 455.11$ 5,006.21$ 862.62$ 9,488.93$ 582.35$ 6,405.85$ 440.00$ 4,840.00$ 259.00$ 2,849.00$ 164.50$ 1,809.50$ 150.00$ 1,650.00$ 485.00$ 5,335.00$ 422.00$ 4,642.00$
2012 GUARD POSTS 36 EA 312.50$ 11,250.00$ 876.09$ 31,539.24$ 49.02$ 1,764.72$ 1,035.29$ 37,270.44$ 847.00$ 30,492.00$ 744.63$ 26,806.68$ 220.00$ 7,920.00$ 350.00$ 12,600.00$ 933.69$ 33,610.50$ 390.00$ 14,040.00$
2013 GEOTEXTILE FILTER FABRIC 30 SY 1.80$ 54.00$ 2.63$ 78.90$ 6.54$ 196.20$ 12.94$ 388.20$ 2.54$ 76.20$ 12.95$ 388.50$ 3.15$ 94.50$ 2.45$ 73.50$ 2.80$ 84.03$ 4.00$ 120.00$
2014 RIPRAP: R-90 20 TN 70.40$ 1,408.00$ 95.29$ 1,905.80$ 78.44$ 1,568.80$ 97.06$ 1,941.20$ 92.13$ 1,842.60$ 116.55$ 2,331.00$ 57.00$ 1,140.00$ 65.00$ 1,300.00$ 101.55$ 2,030.94$ 86.50$ 1,730.00$
2015 BARBED WIRE FENCE 1,800 LF 10.69$ 19,242.00$ 11.38$ 20,484.00$ 14.63$ 26,334.00$ 9.06$ 16,308.00$ 21.87$ 39,366.00$ 6.48$ 11,664.00$ 11.00$ 19,800.00$ 55.00$ 99,000.00$ 24.10$ 43,388.10$ 13.70$ 24,660.00$
2016 CLEARING AND GRUBBING 2 AC 1,921.50$ 3,843.00$ 2,730.67$ 5,461.34$ 4,085.35$ 8,170.70$ 4,529.41$ 9,058.82$ 2,640.00$ 5,280.00$ 4,532.50$ 9,065.00$ 3,000.00$ 6,000.00$ 6,500.00$ 13,000.00$ 2,910.00$ 5,820.00$ 6,850.00$ 13,700.00$
760,234.64$ 682,160.72$ 1,042,750.51$ 754,187.50$ 935,220.80$ 593,620.58$ 655,637.35$ 838,989.50$ 630,858.39$ 601,404.00$
5,991,183.87$
SUB-TOTAL-OPTION 2 (ITEMS 2001 THRU 2016)
SUB-TOTAL-OPTION 1 (ITEMS 1001 THRU 1019)
GRAND TOTAL (ITEMS 0001-2016) 5,287,422.55$ 7,165,691.43$ 4,588,194.00$ 5,321,704.68$ 6,088,562.85$ 6,270,325.48$ 4,282,735.08$ 5,652,871.25$ 6,985,774.50$
CEMVM 967 (REV. JAN 00)
ABSTRACT OF BIDS Page 2 of 2
File details come from the government source that posted it. Updated .