Drawings-Revised Size-Section 2.pdf
PDF 28 MB Posted
- Attached to
- DITCH 251 UPPER CHANNEL CLEANOUT Federal contract opportunity
- Solicitation number
- W912EQ20B0005
About this file
This solicitation is for a firm-fixed price contract to perform clearing, snagging, channel excavation, and related work along Ditch 251 Upper Channel in Missouri. The work includes clearing and snagging along the lower 3.5 miles of the channel, and clearing, snagging and excavation along the remaining upper 27 miles. The total estimated value is between $5-10 million. The solicitation will be issued on June 3rd, with bid opening on July 7th. The NAICS code is 237990. To qualify as a small business, average annual sales cannot exceed $36.5 million. The solicitation and additional details will be posted to SAM. Interested parties should contact the identified Corps of Engineers representative for more information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| Amendment0002.pdf | ||
| Solicitation.pdf | ||
| Drawings.pdf | ||
| Technical Specifications.pdf | ||
| Amendment0001.pdf | ||
| Solicitation.pdf | ||
| Drawings-Revised Size-Section 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CL STA 1560+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1570+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1580+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1590+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1600+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1610+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1619+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1623+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1633+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1643+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1653+86
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1663+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1560+54
MATERIAL NAME
CUT AREA
EARTHWORK
254.56
MATERIAL(S) AT STATION 1570+54
MATERIAL NAME
CUT AREA
EARTHWORK
191.92
MATERIAL(S) AT STATION 1580+54
MATERIAL NAME
CUT AREA
EARTHWORK
215.04
MATERIAL(S) AT STATION 1590+54
MATERIAL NAME
CUT AREA
EARTHWORK
381.71
MATERIAL(S) AT STATION 1600+54
MATERIAL NAME
CUT AREA
EARTHWORK
196.68
MATERIAL(S) AT STATION 1610+54
MATERIAL NAME
CUT AREA
EARTHWORK
206.88
MATERIAL(S) AT STATION 1619+88
MATERIAL NAME
CUT AREA
EARTHWORK
297.59
MATERIAL(S) AT STATION 1623+88
MATERIAL NAME
CUT AREA
EARTHWORK
154.77
MATERIAL(S) AT STATION 1633+89
MATERIAL NAME
CUT AREA
EARTHWORK
276.54
MATERIAL(S) AT STATION 1643+88
MATERIAL NAME
CUT AREA
EARTHWORK
229.10
MATERIAL(S) AT STATION 1653+86
MATERIAL NAME
CUT AREA
EARTHWORK
205.89
MATERIAL(S) AT STATION 1663+88
MATERIAL NAME
CUT AREA
EARTHWORK
226.44
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
CL STA 1673+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1683+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1673+88
MATERIAL NAME
CUT AREA
EARTHWORK
290.53
MATERIAL(S) AT STATION 1683+88
MATERIAL NAME
CUT AREA
EARTHWORK
296.02
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-303
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
FOR SOLICITATION - NOT FOR CONSTRUCTION
CL STA 1693+87
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1703+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1713+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1723+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1733+77
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1743+66
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1753+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1763+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1773+97
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1783+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1793+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1803+94
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1693+87
MATERIAL NAME
CUT AREA
EARTHWORK
297.84
MATERIAL(S) AT STATION 1703+89
MATERIAL NAME
CUT AREA
EARTHWORK
192.22
MATERIAL(S) AT STATION 1713+91
MATERIAL NAME
CUT AREA
EARTHWORK
238.03
MATERIAL(S) AT STATION 1723+89
MATERIAL NAME
CUT AREA
EARTHWORK
239.34
MATERIAL(S) AT STATION 1733+77
MATERIAL NAME
CUT AREA
EARTHWORK
234.32
MATERIAL(S) AT STATION 1743+66
MATERIAL NAME
CUT AREA
EARTHWORK
225.98
MATERIAL(S) AT STATION 1753+95
MATERIAL NAME
CUT AREA
EARTHWORK
221.74
MATERIAL(S) AT STATION 1763+95
MATERIAL NAME
CUT AREA
EARTHWORK
219.60
MATERIAL(S) AT STATION 1773+97
MATERIAL NAME
CUT AREA
EARTHWORK
303.62
MATERIAL(S) AT STATION 1783+95
MATERIAL NAME
CUT AREA
EARTHWORK
168.37
MATERIAL(S) AT STATION 1793+95
MATERIAL NAME
CUT AREA
EARTHWORK
163.43
MATERIAL(S) AT STATION 1803+94
MATERIAL NAME
CUT AREA
EARTHWORK
172.55
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
CL STA 1813+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1823+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1813+96
MATERIAL NAME
CUT AREA
EARTHWORK
216.26
MATERIAL(S) AT STATION 1823+96
MATERIAL NAME
CUT AREA
EARTHWORK
250.31
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-304
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
CL STA 1833+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1843+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1853+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1863+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1873+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1883+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1893+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1903+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1913+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1923+92
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1933+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1943+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1833+95
MATERIAL NAME
CUT AREA
EARTHWORK
215.17
MATERIAL(S) AT STATION 1843+95
MATERIAL NAME
CUT AREA
EARTHWORK
188.00
MATERIAL(S) AT STATION 1853+96
MATERIAL NAME
CUT AREA
EARTHWORK
222.78
MATERIAL(S) AT STATION 1863+96
MATERIAL NAME
CUT AREA
EARTHWORK
176.54
MATERIAL(S) AT STATION 1873+96
MATERIAL NAME
CUT AREA
EARTHWORK
188.64
MATERIAL(S) AT STATION 1883+88
MATERIAL NAME
CUT AREA
EARTHWORK
168.21
MATERIAL(S) AT STATION 1893+89
MATERIAL NAME
CUT AREA
EARTHWORK
151.37
MATERIAL(S) AT STATION 1903+90
MATERIAL NAME
CUT AREA
EARTHWORK
180.80
MATERIAL(S) AT STATION 1913+91
MATERIAL NAME
CUT AREA
EARTHWORK
153.12
MATERIAL(S) AT STATION 1923+92
MATERIAL NAME
CUT AREA
EARTHWORK
152.59
MATERIAL(S) AT STATION 1933+90
MATERIAL NAME
CUT AREA
EARTHWORK
167.56
MATERIAL(S) AT STATION 1943+90
MATERIAL NAME
CUT AREA
EARTHWORK
156.75
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
CL STA 1953+92
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1963+93
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1953+92
MATERIAL NAME
CUT AREA
EARTHWORK
183.53
MATERIAL(S) AT STATION 1963+93
MATERIAL NAME
CUT AREA
EARTHWORK
419.83
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-305
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
CL STA 1966+68
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1969+84
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1972+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1982+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 1992+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2002+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2012+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2022+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2032+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2042+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2052+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2062+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 1966+68
MATERIAL NAME
CUT AREA
EARTHWORK
604.50
MATERIAL(S) AT STATION 1969+84
MATERIAL NAME
CUT AREA
EARTHWORK
342.54
MATERIAL(S) AT STATION 1972+90
MATERIAL NAME
CUT AREA
EARTHWORK
324.16
MATERIAL(S) AT STATION 1982+91
MATERIAL NAME
CUT AREA
EARTHWORK
195.73
MATERIAL(S) AT STATION 1992+90
MATERIAL NAME
CUT AREA
EARTHWORK
293.92
MATERIAL(S) AT STATION 2002+90
MATERIAL NAME
CUT AREA
EARTHWORK
385.38
MATERIAL(S) AT STATION 2012+91
MATERIAL NAME
CUT AREA
EARTHWORK
269.01
MATERIAL(S) AT STATION 2022+91
MATERIAL NAME
CUT AREA
EARTHWORK
447.51
MATERIAL(S) AT STATION 2032+90
MATERIAL NAME
CUT AREA
EARTHWORK
346.48
MATERIAL(S) AT STATION 2042+91
MATERIAL NAME
CUT AREA
EARTHWORK
380.64
MATERIAL(S) AT STATION 2052+90
MATERIAL NAME
CUT AREA
EARTHWORK
257.49
MATERIAL(S) AT STATION 2062+90
MATERIAL NAME
CUT AREA
EARTHWORK
269.20
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E C
/E C
/E
CL STA 2071+97
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2075+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2071+97
MATERIAL NAME
CUT AREA
EARTHWORK
445.88
MATERIAL(S) AT STATION 2075+95
MATERIAL NAME
CUT AREA
EARTHWORK
281.74
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-306
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
BL
CL STA 2085+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2095+94
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2105+45
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2107+56
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2110+01
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2112+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2122+92
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2132+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2142+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2150+43
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2153+00
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2159+19
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2085+95
MATERIAL NAME
CUT AREA
EARTHWORK
145.58
MATERIAL(S) AT STATION 2095+94
MATERIAL NAME
CUT AREA
EARTHWORK
253.86
MATERIAL(S) AT STATION 2105+45
MATERIAL NAME
CUT AREA
EARTHWORK
286.69
MATERIAL(S) AT STATION 2107+56
MATERIAL NAME
CUT AREA
EARTHWORK
263.53
MATERIAL(S) AT STATION 2110+01
MATERIAL NAME
CUT AREA
EARTHWORK
136.83
MATERIAL(S) AT STATION 2112+88
MATERIAL NAME
CUT AREA
EARTHWORK
68.85
MATERIAL(S) AT STATION 2122+92
MATERIAL NAME
CUT AREA
EARTHWORK
202.36
MATERIAL(S) AT STATION 2132+89
MATERIAL NAME
CUT AREA
EARTHWORK
166.67
MATERIAL(S) AT STATION 2142+90
MATERIAL NAME
CUT AREA
EARTHWORK
81.62
MATERIAL(S) AT STATION 2150+43
MATERIAL NAME
CUT AREA
EARTHWORK
249.29
MATERIAL(S) AT STATION 2153+00
MATERIAL NAME
CUT AREA
EARTHWORK
45.91
MATERIAL(S) AT STATION 2159+19
MATERIAL NAME
CUT AREA
EARTHWORK
49.32
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E C
/E C
/E
CL STA 2161+33
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2171+34
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2161+33
MATERIAL NAME
CUT AREA
EARTHWORK
177.58
MATERIAL(S) AT STATION 2171+34
MATERIAL NAME
CUT AREA
EARTHWORK
97.25
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-307
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
CL STA 2274+38
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2181+33
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2186+14
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2190+12
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2200+13
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2210+13
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2220+13
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2230+14
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2240+13
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2250+13
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2259+33
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2269+35
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2181+33
MATERIAL NAME
CUT AREA
EARTHWORK
70.47
MATERIAL(S) AT STATION 2186+14
MATERIAL NAME
CUT AREA
EARTHWORK
187.86
MATERIAL(S) AT STATION 2190+12
MATERIAL NAME
CUT AREA
EARTHWORK
147.27
MATERIAL(S) AT STATION 2200+13
MATERIAL NAME
CUT AREA
EARTHWORK
83.11
MATERIAL(S) AT STATION 2210+13
MATERIAL NAME
CUT AREA
EARTHWORK
185.56
MATERIAL(S) AT STATION 2220+13
MATERIAL NAME
CUT AREA
EARTHWORK
176.46
MATERIAL(S) AT STATION 2230+14
MATERIAL NAME
CUT AREA
EARTHWORK
187.98
MATERIAL(S) AT STATION 2240+13
MATERIAL NAME
CUT AREA
EARTHWORK
115.06
MATERIAL(S) AT STATION 2250+13
MATERIAL NAME
CUT AREA
EARTHWORK
149.72
MATERIAL(S) AT STATION 2259+33
MATERIAL NAME
CUT AREA
EARTHWORK
140.48
MATERIAL(S) AT STATION 2269+35
MATERIAL NAME
CUT AREA
EARTHWORK
157.06
MATERIAL(S) AT STATION 2274+38
MATERIAL NAME
CUT AREA
EARTHWORK
85.84
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2281+86
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2284+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2281+86
MATERIAL NAME
CUT AREA
EARTHWORK
215.22
MATERIAL(S) AT STATION 2284+11
MATERIAL NAME
CUT AREA
EARTHWORK
240.52
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9 C
/E C
/E
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-308
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2286+78
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2289+20
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2291+46
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2293+95
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2296+45
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2298+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2301+39
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2306+40
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2309+01
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2311+62
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2314+08
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2316+52
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2286+78
MATERIAL NAME
CUT AREA
EARTHWORK
316.04
MATERIAL(S) AT STATION 2289+20
MATERIAL NAME
CUT AREA
EARTHWORK
373.22
MATERIAL(S) AT STATION 2291+46
MATERIAL NAME
CUT AREA
EARTHWORK
408.99
MATERIAL(S) AT STATION 2293+95
MATERIAL NAME
CUT AREA
EARTHWORK
143.50
MATERIAL(S) AT STATION 2296+45
MATERIAL NAME
CUT AREA
EARTHWORK
374.44
MATERIAL(S) AT STATION 2298+96
MATERIAL NAME
CUT AREA
EARTHWORK
129.63
MATERIAL(S) AT STATION 2301+39
MATERIAL NAME
CUT AREA
EARTHWORK
217.26
MATERIAL(S) AT STATION 2306+40
MATERIAL NAME
CUT AREA
EARTHWORK
334.58
MATERIAL(S) AT STATION 2309+01
MATERIAL NAME
CUT AREA
EARTHWORK
203.15
MATERIAL(S) AT STATION 2311+62
MATERIAL NAME
CUT AREA
EARTHWORK
165.87
MATERIAL(S) AT STATION 2314+08
MATERIAL NAME
CUT AREA
EARTHWORK
289.63
MATERIAL(S) AT STATION 2316+52
MATERIAL NAME
CUT AREA
EARTHWORK
206.32
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2318+97
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2321+45
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2318+97
MATERIAL NAME
CUT AREA
EARTHWORK
104.42
MATERIAL(S) AT STATION 2321+45
MATERIAL NAME
CUT AREA
EARTHWORK
158.74
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-309
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2326+43
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2329+04
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2331+49
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2334+35
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2338+37
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2341+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2345+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2347+74
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2350+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2355+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2357+59
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2362+52
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2326+43
MATERIAL NAME
CUT AREA
EARTHWORK
380.31
MATERIAL(S) AT STATION 2329+04
MATERIAL NAME
CUT AREA
EARTHWORK
275.45
MATERIAL(S) AT STATION 2331+49
MATERIAL NAME
CUT AREA
EARTHWORK
165.18
MATERIAL(S) AT STATION 2334+35
MATERIAL NAME
CUT AREA
EARTHWORK
153.59
MATERIAL(S) AT STATION 2338+37
MATERIAL NAME
CUT AREA
EARTHWORK
97.79
MATERIAL(S) AT STATION 2341+96
MATERIAL NAME
CUT AREA
EARTHWORK
183.47
MATERIAL(S) AT STATION 2345+54
MATERIAL NAME
CUT AREA
EARTHWORK
397.24
MATERIAL(S) AT STATION 2347+74
MATERIAL NAME
CUT AREA
EARTHWORK
578.89
MATERIAL(S) AT STATION 2350+11
MATERIAL NAME
CUT AREA
EARTHWORK
163.48
MATERIAL(S) AT STATION 2355+11
MATERIAL NAME
CUT AREA
EARTHWORK
313.76
MATERIAL(S) AT STATION 2357+59
MATERIAL NAME
CUT AREA
EARTHWORK
243.99
MATERIAL(S) AT STATION 2362+52
MATERIAL NAME
CUT AREA
EARTHWORK
353.16
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
CL STA 2364+99
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2367+44
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2364+99
MATERIAL NAME
CUT AREA
EARTHWORK
328.61
MATERIAL(S) AT STATION 2367+44
MATERIAL NAME
CUT AREA
EARTHWORK
287.67
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-310
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BLBL
CL STA 2369+81
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2372+18
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2374+64
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2377+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2379+60
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2382+16
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2384+17
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2386+75
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2389+31
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2399+31
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2401+77
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2404+25
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2369+81
MATERIAL NAME
CUT AREA
EARTHWORK
329.47
MATERIAL(S) AT STATION 2372+18
MATERIAL NAME
CUT AREA
EARTHWORK
274.04
MATERIAL(S) AT STATION 2374+64
MATERIAL NAME
CUT AREA
EARTHWORK
141.85
MATERIAL(S) AT STATION 2377+11
MATERIAL NAME
CUT AREA
EARTHWORK
174.08
MATERIAL(S) AT STATION 2379+60
MATERIAL NAME
CUT AREA
EARTHWORK
263.37
MATERIAL(S) AT STATION 2382+16
MATERIAL NAME
CUT AREA
EARTHWORK
256.44
MATERIAL(S) AT STATION 2384+17
MATERIAL NAME
CUT AREA
EARTHWORK
308.86
MATERIAL(S) AT STATION 2386+75
MATERIAL NAME
CUT AREA
EARTHWORK
189.68
MATERIAL(S) AT STATION 2389+31
MATERIAL NAME
CUT AREA
EARTHWORK
148.63
MATERIAL(S) AT STATION 2399+31
MATERIAL NAME
CUT AREA
EARTHWORK
321.13
MATERIAL(S) AT STATION 2401+77
MATERIAL NAME
CUT AREA
EARTHWORK
197.57
MATERIAL(S) AT STATION 2404+25
MATERIAL NAME
CUT AREA
EARTHWORK
179.16
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2408+57
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2411+12
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2408+57
MATERIAL NAME
CUT AREA
EARTHWORK
168.28
MATERIAL(S) AT STATION 2411+12
MATERIAL NAME
CUT AREA
EARTHWORK
192.48
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
C /E
C /E C
/E C
/E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-311
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W
2E Q
-2 0-
B-
JU
N
E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2413+61
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2416+12
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2418+62
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2421+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2431+11
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2441+16
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2451+21
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2461+25
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2467+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2471+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2481+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2483+83
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2413+61
MATERIAL NAME
CUT AREA
EARTHWORK
321.20
MATERIAL(S) AT STATION 2416+12
MATERIAL NAME
CUT AREA
EARTHWORK
125.50
MATERIAL(S) AT STATION 2418+62
MATERIAL NAME
CUT AREA
EARTHWORK
103.71
MATERIAL(S) AT STATION 2421+11
MATERIAL NAME
CUT AREA
EARTHWORK
185.23
MATERIAL(S) AT STATION 2431+11
MATERIAL NAME
CUT AREA
EARTHWORK
146.76
MATERIAL(S) AT STATION 2441+16
MATERIAL NAME
CUT AREA
EARTHWORK
35.62
MATERIAL(S) AT STATION 2451+21
MATERIAL NAME
CUT AREA
EARTHWORK
169.69
MATERIAL(S) AT STATION 2461+25
MATERIAL NAME
CUT AREA
EARTHWORK
176.10
MATERIAL(S) AT STATION 2467+90
MATERIAL NAME
CUT AREA
EARTHWORK
253.77
MATERIAL(S) AT STATION 2471+90
MATERIAL NAME
CUT AREA
EARTHWORK
259.44
MATERIAL(S) AT STATION 2481+90
MATERIAL NAME
CUT AREA
EARTHWORK
171.72
MATERIAL(S) AT STATION 2483+83
MATERIAL NAME
CUT AREA
EARTHWORK
256.29
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C
/EC
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
CL STA 2486+33
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2488+91
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2486+33
MATERIAL NAME
CUT AREA
EARTHWORK
198.41
MATERIAL(S) AT STATION 2488+91
MATERIAL NAME
CUT AREA
EARTHWORK
283.17
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
C /E
C /E
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-312
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2492+48
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2494+40
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2496+27
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2506+28
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2515+09
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2517+58
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2524+53
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2528+72
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2531+88
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2534+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2538+87
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2542+57
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2492+48
MATERIAL NAME
CUT AREA
EARTHWORK
394.36
MATERIAL(S) AT STATION 2494+40
MATERIAL NAME
CUT AREA
EARTHWORK
229.23
MATERIAL(S) AT STATION 2496+27
MATERIAL NAME
CUT AREA
EARTHWORK
97.99
MATERIAL(S) AT STATION 2506+28
MATERIAL NAME
CUT AREA
EARTHWORK
259.75
MATERIAL(S) AT STATION 2515+09
MATERIAL NAME
CUT AREA
EARTHWORK
202.64
MATERIAL(S) AT STATION 2517+58
MATERIAL NAME
CUT AREA
EARTHWORK
235.12
MATERIAL(S) AT STATION 2524+53
MATERIAL NAME
CUT AREA
EARTHWORK
90.40
MATERIAL(S) AT STATION 2528+72
MATERIAL NAME
CUT AREA
EARTHWORK
287.08
MATERIAL(S) AT STATION 2531+88
MATERIAL NAME
CUT AREA
EARTHWORK
117.25
MATERIAL(S) AT STATION 2534+89
MATERIAL NAME
CUT AREA
EARTHWORK
245.80
MATERIAL(S) AT STATION 2538+87
MATERIAL NAME
CUT AREA
EARTHWORK
276.30
MATERIAL(S) AT STATION 2542+57
MATERIAL NAME
CUT AREA
EARTHWORK
197.84
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2543+84
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2546+68
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2543+84
MATERIAL NAME
CUT AREA
EARTHWORK
139.22
MATERIAL(S) AT STATION 2546+68
MATERIAL NAME
CUT AREA
EARTHWORK
193.85
O
FF
SE
T
-7
EL
EV
.4
O
FF
SE
T
0.
EL
EV
.4 O
FF
SE
T
0.
EL
EV
.4
O
FF
SE
T
+7
EL
EV
.4
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-313
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BL BL
BL
BL
BL
BL
BL
CL STA 2548+19
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2552+93
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2554+67
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2557+25
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2558+83
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2568+85
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2578+89
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2581+42
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2583+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2586+35
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2588+85
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2591+36
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2548+19
MATERIAL NAME
CUT AREA
EARTHWORK
222.21
MATERIAL(S) AT STATION 2552+93
MATERIAL NAME
CUT AREA
EARTHWORK
170.92
MATERIAL(S) AT STATION 2554+67
MATERIAL NAME
CUT AREA
EARTHWORK
132.46
MATERIAL(S) AT STATION 2557+25
MATERIAL NAME
CUT AREA
EARTHWORK
366.12
MATERIAL(S) AT STATION 2558+83
MATERIAL NAME
CUT AREA
EARTHWORK
229.03
MATERIAL(S) AT STATION 2568+85
MATERIAL NAME
CUT AREA
EARTHWORK
233.80
MATERIAL(S) AT STATION 2578+89
MATERIAL NAME
CUT AREA
EARTHWORK
230.05
MATERIAL(S) AT STATION 2581+42
MATERIAL NAME
CUT AREA
EARTHWORK
246.11
MATERIAL(S) AT STATION 2583+90
MATERIAL NAME
CUT AREA
EARTHWORK
260.78
MATERIAL(S) AT STATION 2586+35
MATERIAL NAME
CUT AREA
EARTHWORK
144.98
MATERIAL(S) AT STATION 2588+85
MATERIAL NAME
CUT AREA
EARTHWORK
210.48
MATERIAL(S) AT STATION 2591+36
MATERIAL NAME
CUT AREA
EARTHWORK
199.64
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2595+82
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2598+23
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2595+82
MATERIAL NAME
CUT AREA
EARTHWORK
370.27
MATERIAL(S) AT STATION 2598+23
MATERIAL NAME
CUT AREA
EARTHWORK
173.05
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-314
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BL BL
BL
BL
BL
BL
BL
CL STA 2636+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2602+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2604+10
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2605+68
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2608+21
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2618+31
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2620+62
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2621+87
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2623+14
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2629+03
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2631+55
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2634+02
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2636+54
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2602+90
MATERIAL NAME
CUT AREA
EARTHWORK
280.60
MATERIAL(S) AT STATION 2604+10
MATERIAL NAME
CUT AREA
EARTHWORK
157.59
MATERIAL(S) AT STATION 2605+68
MATERIAL NAME
CUT AREA
EARTHWORK
313.49
MATERIAL(S) AT STATION 2608+21
MATERIAL NAME
CUT AREA
EARTHWORK
241.03
MATERIAL(S) AT STATION 2618+31
MATERIAL NAME
CUT AREA
EARTHWORK
186.86
MATERIAL(S) AT STATION 2620+62
MATERIAL NAME
CUT AREA
EARTHWORK
81.52
MATERIAL(S) AT STATION 2621+87
MATERIAL NAME
CUT AREA
EARTHWORK
199.58
MATERIAL(S) AT STATION 2623+14
MATERIAL NAME
CUT AREA
EARTHWORK
222.03
MATERIAL(S) AT STATION 2629+03
MATERIAL NAME
CUT AREA
EARTHWORK
318.59
MATERIAL(S) AT STATION 2631+55
MATERIAL NAME
CUT AREA
EARTHWORK
202.80
MATERIAL(S) AT STATION 2634+02
MATERIAL NAME
CUT AREA
EARTHWORK
154.09
MATERIAL(S) AT STATION 2636+54
MATERIAL NAME
CUT AREA
EARTHWORK
267.88
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.5
O
FF
SE
T
0.
EL
EV
.5 O
FF
SE
T
0.
EL
EV
.5
O
FF
SE
T
+7
EL
EV
.5
O
FF
SE
T
-7
EL
EV
.6
O
FF
SE
T
0.
EL
EV
.6 O
FF
SE
T
0.
EL
EV
.6
O
FF
SE
T
+7
EL
EV
.6
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
O
FF
SE
T
-7
EL
EV
.7
O
FF
SE
T
0.
EL
EV
.7 O
FF
SE
T
0.
EL
EV
.7
O
FF
SE
T
+7
EL
EV
.7
C /E
C /E C
/E C
/E
C /E
C /E C
/E C
/E C
/E C
/E
C /E
C /E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
CL STA 2638+98
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2641+40
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2638+98
MATERIAL NAME
CUT AREA
EARTHWORK
259.08
MATERIAL(S) AT STATION 2641+40
MATERIAL NAME
CUT AREA
EARTHWORK
122.66
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-315
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2644+00
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2646+57
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2649+55
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2652+25
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2654+85
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2657+15
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2658+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2660+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2664+06
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2667+29
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2668+78
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2672+72
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2644+00
MATERIAL NAME
CUT AREA
EARTHWORK
193.21
MATERIAL(S) AT STATION 2646+57
MATERIAL NAME
CUT AREA
EARTHWORK
406.42
MATERIAL(S) AT STATION 2649+55
MATERIAL NAME
CUT AREA
EARTHWORK
342.34
MATERIAL(S) AT STATION 2652+25
MATERIAL NAME
CUT AREA
EARTHWORK
286.12
MATERIAL(S) AT STATION 2654+85
MATERIAL NAME
CUT AREA
EARTHWORK
352.37
MATERIAL(S) AT STATION 2657+15
MATERIAL NAME
CUT AREA
EARTHWORK
337.79
MATERIAL(S) AT STATION 2658+96
MATERIAL NAME
CUT AREA
EARTHWORK
347.49
MATERIAL(S) AT STATION 2660+90
MATERIAL NAME
CUT AREA
EARTHWORK
269.89
MATERIAL(S) AT STATION 2664+06
MATERIAL NAME
CUT AREA
EARTHWORK
346.46
MATERIAL(S) AT STATION 2667+29
MATERIAL NAME
CUT AREA
EARTHWORK
305.33
MATERIAL(S) AT STATION 2668+78
MATERIAL NAME
CUT AREA
EARTHWORK
238.92
MATERIAL(S) AT STATION 2672+72
MATERIAL NAME
CUT AREA
EARTHWORK
259.68
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
0.
EL
EV
.2
O
FF
SE
T
+7
EL
EV
.2
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9 C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E C
/E C
/E
CL STA 2674+65
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2676+65
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2674+65
MATERIAL NAME
CUT AREA
EARTHWORK
252.65
MATERIAL(S) AT STATION 2676+65
MATERIAL NAME
CUT AREA
EARTHWORK
286.53
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
O
FF
SE
T
-7
EL
EV
.3
O
FF
SE
T
0.
EL
EV
.3 O
FF
SE
T
0.
EL
EV
.3
O
FF
SE
T
+7
EL
EV
.3
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M
EM
PH
IS
, T N
N
. M
AI
N S
TR
EE
T M
EM
PH
IS
D
IS
TR
IC
T
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C-316
C R
O
SS
S
EC
TI
O
N S
LA
U
R
IE
G R
EE
N
TH
O
M
AS
C O
LE
M
AN
JO
SH
G
IA
N N
IN
I
D .S
H
AN
E C
AL
LA
H
AN
SO
LI
C
IT
AT
IO
N N
O
W 2E
Q -2 0- B-
JU
N E
PE
M
IS
C
O T
C O
U N
TY
, M
O
N
EW
M
AD
R
ID
, M O
LI
TT
LE
R
IV
ER
D R
AI
N
AG
E
D
IS
TR
IC
T D
IT
C
H
U
PP
ER
C H
AN
N
EL
C
LE
AN
O U
T
ST
. F R
AN
C
IS
R
IV
ER
B
AS
IN
M
AI
N
TE
N
AN
C
E
50' 100'0
NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWEDFACING DOWNSTREAM
BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS
SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'
HORIZONTAL VERTICAL
50' 100'0
BL
BL
BL
BL
BL
BL
BLBL
BL
BL
BL
BL
BL
CL STA 2644+00
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2646+57
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2649+55
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2652+25
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2654+85
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2657+15
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2658+96
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2660+90
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2664+06
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2667+29
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2668+78
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
CL STA 2672+72
0+50+100+150+200+250 0 -50 -100 -150 -200 -250
MATERIAL(S) AT STATION 2644+00
MATERIAL NAME
CUT AREA
EARTHWORK
193.21
MATERIAL(S) AT STATION 2646+57
MATERIAL NAME
CUT AREA
EARTHWORK
406.42
MATERIAL(S) AT STATION 2649+55
MATERIAL NAME
CUT AREA
EARTHWORK
342.34
MATERIAL(S) AT STATION 2652+25
MATERIAL NAME
CUT AREA
EARTHWORK
286.12
MATERIAL(S) AT STATION 2654+85
MATERIAL NAME
CUT AREA
EARTHWORK
352.37
MATERIAL(S) AT STATION 2657+15
MATERIAL NAME
CUT AREA
EARTHWORK
337.79
MATERIAL(S) AT STATION 2658+96
MATERIAL NAME
CUT AREA
EARTHWORK
347.49
MATERIAL(S) AT STATION 2660+90
MATERIAL NAME
CUT AREA
EARTHWORK
269.89
MATERIAL(S) AT STATION 2664+06
MATERIAL NAME
CUT AREA
EARTHWORK
346.46
MATERIAL(S) AT STATION 2667+29
MATERIAL NAME
CUT AREA
EARTHWORK
305.33
MATERIAL(S) AT STATION 2668+78
MATERIAL NAME
CUT AREA
EARTHWORK
238.92
MATERIAL(S) AT STATION 2672+72
MATERIAL NAME
CUT AREA
EARTHWORK
259.68
O
FF
SE
T
-7
EL
EV
.8
O
FF
SE
T
0.
EL
EV
.8 O
FF
SE
T
0.
EL
EV
.8
O
FF
SE
T
+7
EL
EV
.8
O
FF
SE
T
-7
EL
EV
.9
O
FF
SE
T
0.
EL
EV
.9 O
FF
SE
T
0.
EL
EV
.9
O
FF
SE
T
+7
EL
EV
.9
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.0
O
FF
SE
T
0.
EL
EV
.0 O
FF
SE
T
0.
EL
EV
.0
O
FF
SE
T
+7
EL
EV
.0
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.1
O
FF
SE
T
0.
EL
EV
.1 O
FF
SE
T
0.
EL
EV
.1
O
FF
SE
T
+7
EL
EV
.1
O
FF
SE
T
-7
EL
EV
.2
O
FF
SE
T
0.
EL
EV
.2 O
FF
SE
T
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .