Drawings-Revised Size-Section 2.pdf

PDF 28 MB Posted

Attached to
DITCH 251 UPPER CHANNEL CLEANOUT Federal contract opportunity
Solicitation number
W912EQ20B0005
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

This solicitation is for a firm-fixed price contract to perform clearing, snagging, channel excavation, and related work along Ditch 251 Upper Channel in Missouri. The work includes clearing and snagging along the lower 3.5 miles of the channel, and clearing, snagging and excavation along the remaining upper 27 miles. The total estimated value is between $5-10 million. The solicitation will be issued on June 3rd, with bid opening on July 7th. The NAICS code is 237990. To qualify as a small business, average annual sales cannot exceed $36.5 million. The solicitation and additional details will be posted to SAM. Interested parties should contact the identified Corps of Engineers representative for more information.

View the file

Other files for this federal contract opportunity

Other files attached to DITCH 251 UPPER CHANNEL CLEANOUT, newest first.
File Type Posted
Abstract.pdf PDF
Amendment0002.pdf PDF
Solicitation.pdf PDF
Drawings.pdf PDF
Technical Specifications.pdf PDF
Amendment0001.pdf PDF
Solicitation.pdf PDF
Drawings-Revised Size-Section 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CL STA 1560+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1570+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1580+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1590+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1600+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1610+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1619+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1623+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1633+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1643+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1653+86

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1663+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1560+54

MATERIAL NAME

CUT AREA

EARTHWORK

254.56

MATERIAL(S) AT STATION 1570+54

MATERIAL NAME

CUT AREA

EARTHWORK

191.92

MATERIAL(S) AT STATION 1580+54

MATERIAL NAME

CUT AREA

EARTHWORK

215.04

MATERIAL(S) AT STATION 1590+54

MATERIAL NAME

CUT AREA

EARTHWORK

381.71

MATERIAL(S) AT STATION 1600+54

MATERIAL NAME

CUT AREA

EARTHWORK

196.68

MATERIAL(S) AT STATION 1610+54

MATERIAL NAME

CUT AREA

EARTHWORK

206.88

MATERIAL(S) AT STATION 1619+88

MATERIAL NAME

CUT AREA

EARTHWORK

297.59

MATERIAL(S) AT STATION 1623+88

MATERIAL NAME

CUT AREA

EARTHWORK

154.77

MATERIAL(S) AT STATION 1633+89

MATERIAL NAME

CUT AREA

EARTHWORK

276.54

MATERIAL(S) AT STATION 1643+88

MATERIAL NAME

CUT AREA

EARTHWORK

229.10

MATERIAL(S) AT STATION 1653+86

MATERIAL NAME

CUT AREA

EARTHWORK

205.89

MATERIAL(S) AT STATION 1663+88

MATERIAL NAME

CUT AREA

EARTHWORK

226.44

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

CL STA 1673+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1683+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1673+88

MATERIAL NAME

CUT AREA

EARTHWORK

290.53

MATERIAL(S) AT STATION 1683+88

MATERIAL NAME

CUT AREA

EARTHWORK

296.02

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-303

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

FOR SOLICITATION - NOT FOR CONSTRUCTION

CL STA 1693+87

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1703+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1713+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1723+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1733+77

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1743+66

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1753+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1763+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1773+97

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1783+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1793+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1803+94

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1693+87

MATERIAL NAME

CUT AREA

EARTHWORK

297.84

MATERIAL(S) AT STATION 1703+89

MATERIAL NAME

CUT AREA

EARTHWORK

192.22

MATERIAL(S) AT STATION 1713+91

MATERIAL NAME

CUT AREA

EARTHWORK

238.03

MATERIAL(S) AT STATION 1723+89

MATERIAL NAME

CUT AREA

EARTHWORK

239.34

MATERIAL(S) AT STATION 1733+77

MATERIAL NAME

CUT AREA

EARTHWORK

234.32

MATERIAL(S) AT STATION 1743+66

MATERIAL NAME

CUT AREA

EARTHWORK

225.98

MATERIAL(S) AT STATION 1753+95

MATERIAL NAME

CUT AREA

EARTHWORK

221.74

MATERIAL(S) AT STATION 1763+95

MATERIAL NAME

CUT AREA

EARTHWORK

219.60

MATERIAL(S) AT STATION 1773+97

MATERIAL NAME

CUT AREA

EARTHWORK

303.62

MATERIAL(S) AT STATION 1783+95

MATERIAL NAME

CUT AREA

EARTHWORK

168.37

MATERIAL(S) AT STATION 1793+95

MATERIAL NAME

CUT AREA

EARTHWORK

163.43

MATERIAL(S) AT STATION 1803+94

MATERIAL NAME

CUT AREA

EARTHWORK

172.55

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

CL STA 1813+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1823+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1813+96

MATERIAL NAME

CUT AREA

EARTHWORK

216.26

MATERIAL(S) AT STATION 1823+96

MATERIAL NAME

CUT AREA

EARTHWORK

250.31

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-304

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

CL STA 1833+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1843+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1853+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1863+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1873+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1883+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1893+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1903+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1913+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1923+92

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1933+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1943+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1833+95

MATERIAL NAME

CUT AREA

EARTHWORK

215.17

MATERIAL(S) AT STATION 1843+95

MATERIAL NAME

CUT AREA

EARTHWORK

188.00

MATERIAL(S) AT STATION 1853+96

MATERIAL NAME

CUT AREA

EARTHWORK

222.78

MATERIAL(S) AT STATION 1863+96

MATERIAL NAME

CUT AREA

EARTHWORK

176.54

MATERIAL(S) AT STATION 1873+96

MATERIAL NAME

CUT AREA

EARTHWORK

188.64

MATERIAL(S) AT STATION 1883+88

MATERIAL NAME

CUT AREA

EARTHWORK

168.21

MATERIAL(S) AT STATION 1893+89

MATERIAL NAME

CUT AREA

EARTHWORK

151.37

MATERIAL(S) AT STATION 1903+90

MATERIAL NAME

CUT AREA

EARTHWORK

180.80

MATERIAL(S) AT STATION 1913+91

MATERIAL NAME

CUT AREA

EARTHWORK

153.12

MATERIAL(S) AT STATION 1923+92

MATERIAL NAME

CUT AREA

EARTHWORK

152.59

MATERIAL(S) AT STATION 1933+90

MATERIAL NAME

CUT AREA

EARTHWORK

167.56

MATERIAL(S) AT STATION 1943+90

MATERIAL NAME

CUT AREA

EARTHWORK

156.75

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

CL STA 1953+92

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1963+93

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1953+92

MATERIAL NAME

CUT AREA

EARTHWORK

183.53

MATERIAL(S) AT STATION 1963+93

MATERIAL NAME

CUT AREA

EARTHWORK

419.83

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-305

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

CL STA 1966+68

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1969+84

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1972+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1982+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 1992+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2002+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2012+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2022+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2032+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2042+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2052+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2062+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 1966+68

MATERIAL NAME

CUT AREA

EARTHWORK

604.50

MATERIAL(S) AT STATION 1969+84

MATERIAL NAME

CUT AREA

EARTHWORK

342.54

MATERIAL(S) AT STATION 1972+90

MATERIAL NAME

CUT AREA

EARTHWORK

324.16

MATERIAL(S) AT STATION 1982+91

MATERIAL NAME

CUT AREA

EARTHWORK

195.73

MATERIAL(S) AT STATION 1992+90

MATERIAL NAME

CUT AREA

EARTHWORK

293.92

MATERIAL(S) AT STATION 2002+90

MATERIAL NAME

CUT AREA

EARTHWORK

385.38

MATERIAL(S) AT STATION 2012+91

MATERIAL NAME

CUT AREA

EARTHWORK

269.01

MATERIAL(S) AT STATION 2022+91

MATERIAL NAME

CUT AREA

EARTHWORK

447.51

MATERIAL(S) AT STATION 2032+90

MATERIAL NAME

CUT AREA

EARTHWORK

346.48

MATERIAL(S) AT STATION 2042+91

MATERIAL NAME

CUT AREA

EARTHWORK

380.64

MATERIAL(S) AT STATION 2052+90

MATERIAL NAME

CUT AREA

EARTHWORK

257.49

MATERIAL(S) AT STATION 2062+90

MATERIAL NAME

CUT AREA

EARTHWORK

269.20

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E C

/E C

/E

CL STA 2071+97

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2075+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2071+97

MATERIAL NAME

CUT AREA

EARTHWORK

445.88

MATERIAL(S) AT STATION 2075+95

MATERIAL NAME

CUT AREA

EARTHWORK

281.74

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-306

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

BL

CL STA 2085+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2095+94

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2105+45

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2107+56

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2110+01

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2112+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2122+92

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2132+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2142+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2150+43

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2153+00

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2159+19

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2085+95

MATERIAL NAME

CUT AREA

EARTHWORK

145.58

MATERIAL(S) AT STATION 2095+94

MATERIAL NAME

CUT AREA

EARTHWORK

253.86

MATERIAL(S) AT STATION 2105+45

MATERIAL NAME

CUT AREA

EARTHWORK

286.69

MATERIAL(S) AT STATION 2107+56

MATERIAL NAME

CUT AREA

EARTHWORK

263.53

MATERIAL(S) AT STATION 2110+01

MATERIAL NAME

CUT AREA

EARTHWORK

136.83

MATERIAL(S) AT STATION 2112+88

MATERIAL NAME

CUT AREA

EARTHWORK

68.85

MATERIAL(S) AT STATION 2122+92

MATERIAL NAME

CUT AREA

EARTHWORK

202.36

MATERIAL(S) AT STATION 2132+89

MATERIAL NAME

CUT AREA

EARTHWORK

166.67

MATERIAL(S) AT STATION 2142+90

MATERIAL NAME

CUT AREA

EARTHWORK

81.62

MATERIAL(S) AT STATION 2150+43

MATERIAL NAME

CUT AREA

EARTHWORK

249.29

MATERIAL(S) AT STATION 2153+00

MATERIAL NAME

CUT AREA

EARTHWORK

45.91

MATERIAL(S) AT STATION 2159+19

MATERIAL NAME

CUT AREA

EARTHWORK

49.32

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E C

/E C

/E

CL STA 2161+33

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2171+34

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2161+33

MATERIAL NAME

CUT AREA

EARTHWORK

177.58

MATERIAL(S) AT STATION 2171+34

MATERIAL NAME

CUT AREA

EARTHWORK

97.25

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-307

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

CL STA 2274+38

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2181+33

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2186+14

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2190+12

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2200+13

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2210+13

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2220+13

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2230+14

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2240+13

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2250+13

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2259+33

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2269+35

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2181+33

MATERIAL NAME

CUT AREA

EARTHWORK

70.47

MATERIAL(S) AT STATION 2186+14

MATERIAL NAME

CUT AREA

EARTHWORK

187.86

MATERIAL(S) AT STATION 2190+12

MATERIAL NAME

CUT AREA

EARTHWORK

147.27

MATERIAL(S) AT STATION 2200+13

MATERIAL NAME

CUT AREA

EARTHWORK

83.11

MATERIAL(S) AT STATION 2210+13

MATERIAL NAME

CUT AREA

EARTHWORK

185.56

MATERIAL(S) AT STATION 2220+13

MATERIAL NAME

CUT AREA

EARTHWORK

176.46

MATERIAL(S) AT STATION 2230+14

MATERIAL NAME

CUT AREA

EARTHWORK

187.98

MATERIAL(S) AT STATION 2240+13

MATERIAL NAME

CUT AREA

EARTHWORK

115.06

MATERIAL(S) AT STATION 2250+13

MATERIAL NAME

CUT AREA

EARTHWORK

149.72

MATERIAL(S) AT STATION 2259+33

MATERIAL NAME

CUT AREA

EARTHWORK

140.48

MATERIAL(S) AT STATION 2269+35

MATERIAL NAME

CUT AREA

EARTHWORK

157.06

MATERIAL(S) AT STATION 2274+38

MATERIAL NAME

CUT AREA

EARTHWORK

85.84

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2281+86

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2284+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2281+86

MATERIAL NAME

CUT AREA

EARTHWORK

215.22

MATERIAL(S) AT STATION 2284+11

MATERIAL NAME

CUT AREA

EARTHWORK

240.52

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9 C

/E C

/E

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-308

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2286+78

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2289+20

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2291+46

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2293+95

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2296+45

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2298+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2301+39

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2306+40

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2309+01

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2311+62

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2314+08

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2316+52

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2286+78

MATERIAL NAME

CUT AREA

EARTHWORK

316.04

MATERIAL(S) AT STATION 2289+20

MATERIAL NAME

CUT AREA

EARTHWORK

373.22

MATERIAL(S) AT STATION 2291+46

MATERIAL NAME

CUT AREA

EARTHWORK

408.99

MATERIAL(S) AT STATION 2293+95

MATERIAL NAME

CUT AREA

EARTHWORK

143.50

MATERIAL(S) AT STATION 2296+45

MATERIAL NAME

CUT AREA

EARTHWORK

374.44

MATERIAL(S) AT STATION 2298+96

MATERIAL NAME

CUT AREA

EARTHWORK

129.63

MATERIAL(S) AT STATION 2301+39

MATERIAL NAME

CUT AREA

EARTHWORK

217.26

MATERIAL(S) AT STATION 2306+40

MATERIAL NAME

CUT AREA

EARTHWORK

334.58

MATERIAL(S) AT STATION 2309+01

MATERIAL NAME

CUT AREA

EARTHWORK

203.15

MATERIAL(S) AT STATION 2311+62

MATERIAL NAME

CUT AREA

EARTHWORK

165.87

MATERIAL(S) AT STATION 2314+08

MATERIAL NAME

CUT AREA

EARTHWORK

289.63

MATERIAL(S) AT STATION 2316+52

MATERIAL NAME

CUT AREA

EARTHWORK

206.32

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2318+97

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2321+45

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2318+97

MATERIAL NAME

CUT AREA

EARTHWORK

104.42

MATERIAL(S) AT STATION 2321+45

MATERIAL NAME

CUT AREA

EARTHWORK

158.74

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-309

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2326+43

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2329+04

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2331+49

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2334+35

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2338+37

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2341+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2345+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2347+74

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2350+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2355+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2357+59

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2362+52

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2326+43

MATERIAL NAME

CUT AREA

EARTHWORK

380.31

MATERIAL(S) AT STATION 2329+04

MATERIAL NAME

CUT AREA

EARTHWORK

275.45

MATERIAL(S) AT STATION 2331+49

MATERIAL NAME

CUT AREA

EARTHWORK

165.18

MATERIAL(S) AT STATION 2334+35

MATERIAL NAME

CUT AREA

EARTHWORK

153.59

MATERIAL(S) AT STATION 2338+37

MATERIAL NAME

CUT AREA

EARTHWORK

97.79

MATERIAL(S) AT STATION 2341+96

MATERIAL NAME

CUT AREA

EARTHWORK

183.47

MATERIAL(S) AT STATION 2345+54

MATERIAL NAME

CUT AREA

EARTHWORK

397.24

MATERIAL(S) AT STATION 2347+74

MATERIAL NAME

CUT AREA

EARTHWORK

578.89

MATERIAL(S) AT STATION 2350+11

MATERIAL NAME

CUT AREA

EARTHWORK

163.48

MATERIAL(S) AT STATION 2355+11

MATERIAL NAME

CUT AREA

EARTHWORK

313.76

MATERIAL(S) AT STATION 2357+59

MATERIAL NAME

CUT AREA

EARTHWORK

243.99

MATERIAL(S) AT STATION 2362+52

MATERIAL NAME

CUT AREA

EARTHWORK

353.16

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

CL STA 2364+99

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2367+44

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2364+99

MATERIAL NAME

CUT AREA

EARTHWORK

328.61

MATERIAL(S) AT STATION 2367+44

MATERIAL NAME

CUT AREA

EARTHWORK

287.67

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-310

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BLBL

CL STA 2369+81

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2372+18

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2374+64

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2377+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2379+60

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2382+16

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2384+17

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2386+75

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2389+31

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2399+31

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2401+77

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2404+25

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2369+81

MATERIAL NAME

CUT AREA

EARTHWORK

329.47

MATERIAL(S) AT STATION 2372+18

MATERIAL NAME

CUT AREA

EARTHWORK

274.04

MATERIAL(S) AT STATION 2374+64

MATERIAL NAME

CUT AREA

EARTHWORK

141.85

MATERIAL(S) AT STATION 2377+11

MATERIAL NAME

CUT AREA

EARTHWORK

174.08

MATERIAL(S) AT STATION 2379+60

MATERIAL NAME

CUT AREA

EARTHWORK

263.37

MATERIAL(S) AT STATION 2382+16

MATERIAL NAME

CUT AREA

EARTHWORK

256.44

MATERIAL(S) AT STATION 2384+17

MATERIAL NAME

CUT AREA

EARTHWORK

308.86

MATERIAL(S) AT STATION 2386+75

MATERIAL NAME

CUT AREA

EARTHWORK

189.68

MATERIAL(S) AT STATION 2389+31

MATERIAL NAME

CUT AREA

EARTHWORK

148.63

MATERIAL(S) AT STATION 2399+31

MATERIAL NAME

CUT AREA

EARTHWORK

321.13

MATERIAL(S) AT STATION 2401+77

MATERIAL NAME

CUT AREA

EARTHWORK

197.57

MATERIAL(S) AT STATION 2404+25

MATERIAL NAME

CUT AREA

EARTHWORK

179.16

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2408+57

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2411+12

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2408+57

MATERIAL NAME

CUT AREA

EARTHWORK

168.28

MATERIAL(S) AT STATION 2411+12

MATERIAL NAME

CUT AREA

EARTHWORK

192.48

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

C /E

C /E C

/E C

/E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-311

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W

2E Q

-2 0-

B-

JU

N

E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2413+61

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2416+12

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2418+62

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2421+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2431+11

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2441+16

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2451+21

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2461+25

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2467+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2471+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2481+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2483+83

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2413+61

MATERIAL NAME

CUT AREA

EARTHWORK

321.20

MATERIAL(S) AT STATION 2416+12

MATERIAL NAME

CUT AREA

EARTHWORK

125.50

MATERIAL(S) AT STATION 2418+62

MATERIAL NAME

CUT AREA

EARTHWORK

103.71

MATERIAL(S) AT STATION 2421+11

MATERIAL NAME

CUT AREA

EARTHWORK

185.23

MATERIAL(S) AT STATION 2431+11

MATERIAL NAME

CUT AREA

EARTHWORK

146.76

MATERIAL(S) AT STATION 2441+16

MATERIAL NAME

CUT AREA

EARTHWORK

35.62

MATERIAL(S) AT STATION 2451+21

MATERIAL NAME

CUT AREA

EARTHWORK

169.69

MATERIAL(S) AT STATION 2461+25

MATERIAL NAME

CUT AREA

EARTHWORK

176.10

MATERIAL(S) AT STATION 2467+90

MATERIAL NAME

CUT AREA

EARTHWORK

253.77

MATERIAL(S) AT STATION 2471+90

MATERIAL NAME

CUT AREA

EARTHWORK

259.44

MATERIAL(S) AT STATION 2481+90

MATERIAL NAME

CUT AREA

EARTHWORK

171.72

MATERIAL(S) AT STATION 2483+83

MATERIAL NAME

CUT AREA

EARTHWORK

256.29

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C

/EC

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

CL STA 2486+33

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2488+91

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2486+33

MATERIAL NAME

CUT AREA

EARTHWORK

198.41

MATERIAL(S) AT STATION 2488+91

MATERIAL NAME

CUT AREA

EARTHWORK

283.17

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

C /E

C /E

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-312

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2492+48

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2494+40

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2496+27

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2506+28

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2515+09

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2517+58

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2524+53

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2528+72

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2531+88

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2534+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2538+87

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2542+57

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2492+48

MATERIAL NAME

CUT AREA

EARTHWORK

394.36

MATERIAL(S) AT STATION 2494+40

MATERIAL NAME

CUT AREA

EARTHWORK

229.23

MATERIAL(S) AT STATION 2496+27

MATERIAL NAME

CUT AREA

EARTHWORK

97.99

MATERIAL(S) AT STATION 2506+28

MATERIAL NAME

CUT AREA

EARTHWORK

259.75

MATERIAL(S) AT STATION 2515+09

MATERIAL NAME

CUT AREA

EARTHWORK

202.64

MATERIAL(S) AT STATION 2517+58

MATERIAL NAME

CUT AREA

EARTHWORK

235.12

MATERIAL(S) AT STATION 2524+53

MATERIAL NAME

CUT AREA

EARTHWORK

90.40

MATERIAL(S) AT STATION 2528+72

MATERIAL NAME

CUT AREA

EARTHWORK

287.08

MATERIAL(S) AT STATION 2531+88

MATERIAL NAME

CUT AREA

EARTHWORK

117.25

MATERIAL(S) AT STATION 2534+89

MATERIAL NAME

CUT AREA

EARTHWORK

245.80

MATERIAL(S) AT STATION 2538+87

MATERIAL NAME

CUT AREA

EARTHWORK

276.30

MATERIAL(S) AT STATION 2542+57

MATERIAL NAME

CUT AREA

EARTHWORK

197.84

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2543+84

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2546+68

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2543+84

MATERIAL NAME

CUT AREA

EARTHWORK

139.22

MATERIAL(S) AT STATION 2546+68

MATERIAL NAME

CUT AREA

EARTHWORK

193.85

O

FF

SE

T

-7

EL

EV

.4

O

FF

SE

T

0.

EL

EV

.4 O

FF

SE

T

0.

EL

EV

.4

O

FF

SE

T

+7

EL

EV

.4

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-313

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BL BL

BL

BL

BL

BL

BL

CL STA 2548+19

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2552+93

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2554+67

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2557+25

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2558+83

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2568+85

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2578+89

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2581+42

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2583+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2586+35

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2588+85

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2591+36

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2548+19

MATERIAL NAME

CUT AREA

EARTHWORK

222.21

MATERIAL(S) AT STATION 2552+93

MATERIAL NAME

CUT AREA

EARTHWORK

170.92

MATERIAL(S) AT STATION 2554+67

MATERIAL NAME

CUT AREA

EARTHWORK

132.46

MATERIAL(S) AT STATION 2557+25

MATERIAL NAME

CUT AREA

EARTHWORK

366.12

MATERIAL(S) AT STATION 2558+83

MATERIAL NAME

CUT AREA

EARTHWORK

229.03

MATERIAL(S) AT STATION 2568+85

MATERIAL NAME

CUT AREA

EARTHWORK

233.80

MATERIAL(S) AT STATION 2578+89

MATERIAL NAME

CUT AREA

EARTHWORK

230.05

MATERIAL(S) AT STATION 2581+42

MATERIAL NAME

CUT AREA

EARTHWORK

246.11

MATERIAL(S) AT STATION 2583+90

MATERIAL NAME

CUT AREA

EARTHWORK

260.78

MATERIAL(S) AT STATION 2586+35

MATERIAL NAME

CUT AREA

EARTHWORK

144.98

MATERIAL(S) AT STATION 2588+85

MATERIAL NAME

CUT AREA

EARTHWORK

210.48

MATERIAL(S) AT STATION 2591+36

MATERIAL NAME

CUT AREA

EARTHWORK

199.64

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2595+82

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2598+23

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2595+82

MATERIAL NAME

CUT AREA

EARTHWORK

370.27

MATERIAL(S) AT STATION 2598+23

MATERIAL NAME

CUT AREA

EARTHWORK

173.05

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-314

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BL BL

BL

BL

BL

BL

BL

CL STA 2636+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2602+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2604+10

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2605+68

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2608+21

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2618+31

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2620+62

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2621+87

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2623+14

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2629+03

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2631+55

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2634+02

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2636+54

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2602+90

MATERIAL NAME

CUT AREA

EARTHWORK

280.60

MATERIAL(S) AT STATION 2604+10

MATERIAL NAME

CUT AREA

EARTHWORK

157.59

MATERIAL(S) AT STATION 2605+68

MATERIAL NAME

CUT AREA

EARTHWORK

313.49

MATERIAL(S) AT STATION 2608+21

MATERIAL NAME

CUT AREA

EARTHWORK

241.03

MATERIAL(S) AT STATION 2618+31

MATERIAL NAME

CUT AREA

EARTHWORK

186.86

MATERIAL(S) AT STATION 2620+62

MATERIAL NAME

CUT AREA

EARTHWORK

81.52

MATERIAL(S) AT STATION 2621+87

MATERIAL NAME

CUT AREA

EARTHWORK

199.58

MATERIAL(S) AT STATION 2623+14

MATERIAL NAME

CUT AREA

EARTHWORK

222.03

MATERIAL(S) AT STATION 2629+03

MATERIAL NAME

CUT AREA

EARTHWORK

318.59

MATERIAL(S) AT STATION 2631+55

MATERIAL NAME

CUT AREA

EARTHWORK

202.80

MATERIAL(S) AT STATION 2634+02

MATERIAL NAME

CUT AREA

EARTHWORK

154.09

MATERIAL(S) AT STATION 2636+54

MATERIAL NAME

CUT AREA

EARTHWORK

267.88

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.5

O

FF

SE

T

0.

EL

EV

.5 O

FF

SE

T

0.

EL

EV

.5

O

FF

SE

T

+7

EL

EV

.5

O

FF

SE

T

-7

EL

EV

.6

O

FF

SE

T

0.

EL

EV

.6 O

FF

SE

T

0.

EL

EV

.6

O

FF

SE

T

+7

EL

EV

.6

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

O

FF

SE

T

-7

EL

EV

.7

O

FF

SE

T

0.

EL

EV

.7 O

FF

SE

T

0.

EL

EV

.7

O

FF

SE

T

+7

EL

EV

.7

C /E

C /E C

/E C

/E

C /E

C /E C

/E C

/E C

/E C

/E

C /E

C /E C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

CL STA 2638+98

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2641+40

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2638+98

MATERIAL NAME

CUT AREA

EARTHWORK

259.08

MATERIAL(S) AT STATION 2641+40

MATERIAL NAME

CUT AREA

EARTHWORK

122.66

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-315

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWED FACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2644+00

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2646+57

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2649+55

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2652+25

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2654+85

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2657+15

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2658+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2660+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2664+06

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2667+29

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2668+78

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2672+72

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2644+00

MATERIAL NAME

CUT AREA

EARTHWORK

193.21

MATERIAL(S) AT STATION 2646+57

MATERIAL NAME

CUT AREA

EARTHWORK

406.42

MATERIAL(S) AT STATION 2649+55

MATERIAL NAME

CUT AREA

EARTHWORK

342.34

MATERIAL(S) AT STATION 2652+25

MATERIAL NAME

CUT AREA

EARTHWORK

286.12

MATERIAL(S) AT STATION 2654+85

MATERIAL NAME

CUT AREA

EARTHWORK

352.37

MATERIAL(S) AT STATION 2657+15

MATERIAL NAME

CUT AREA

EARTHWORK

337.79

MATERIAL(S) AT STATION 2658+96

MATERIAL NAME

CUT AREA

EARTHWORK

347.49

MATERIAL(S) AT STATION 2660+90

MATERIAL NAME

CUT AREA

EARTHWORK

269.89

MATERIAL(S) AT STATION 2664+06

MATERIAL NAME

CUT AREA

EARTHWORK

346.46

MATERIAL(S) AT STATION 2667+29

MATERIAL NAME

CUT AREA

EARTHWORK

305.33

MATERIAL(S) AT STATION 2668+78

MATERIAL NAME

CUT AREA

EARTHWORK

238.92

MATERIAL(S) AT STATION 2672+72

MATERIAL NAME

CUT AREA

EARTHWORK

259.68

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

0.

EL

EV

.2

O

FF

SE

T

+7

EL

EV

.2

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9 C

/E C

/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E C

/E C

/E

CL STA 2674+65

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2676+65

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2674+65

MATERIAL NAME

CUT AREA

EARTHWORK

252.65

MATERIAL(S) AT STATION 2676+65

MATERIAL NAME

CUT AREA

EARTHWORK

286.53

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

O

FF

SE

T

-7

EL

EV

.3

O

FF

SE

T

0.

EL

EV

.3 O

FF

SE

T

0.

EL

EV

.3

O

FF

SE

T

+7

EL

EV

.3

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

M

EM

PH

IS

, T N

N

. M

AI

N S

TR

EE

T M

EM

PH

IS

D

IS

TR

IC

T

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C-316

C R

O

SS

S

EC

TI

O

N S

LA

U

R

IE

G R

EE

N

TH

O

M

AS

C O

LE

M

AN

JO

SH

G

IA

N N

IN

I

D .S

H

AN

E C

AL

LA

H

AN

SO

LI

C

IT

AT

IO

N N

O

W 2E

Q -2 0- B-

JU

N E

PE

M

IS

C

O T

C O

U N

TY

, M

O

N

EW

M

AD

R

ID

, M O

LI

TT

LE

R

IV

ER

D R

AI

N

AG

E

D

IS

TR

IC

T D

IT

C

H

U

PP

ER

C H

AN

N

EL

C

LE

AN

O U

T

ST

. F R

AN

C

IS

R

IV

ER

B

AS

IN

M

AI

N

TE

N

AN

C

E

50' 100'0

NOTE: CROSS SECTIONS ARE ORIENTED AS VIEWEDFACING DOWNSTREAM

BUT THE RIGHT OFFSETS ARE NEGATIVE AND LEFT OFFSETS ARE POSITIVE.A1 CROSS SECTIONS

SCALE: HORIZONTAL 1"=50' VERTICAL 1"=50'

HORIZONTAL VERTICAL

50' 100'0

BL

BL

BL

BL

BL

BL

BLBL

BL

BL

BL

BL

BL

CL STA 2644+00

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2646+57

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2649+55

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2652+25

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2654+85

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2657+15

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2658+96

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2660+90

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2664+06

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2667+29

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2668+78

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

CL STA 2672+72

0+50+100+150+200+250 0 -50 -100 -150 -200 -250

MATERIAL(S) AT STATION 2644+00

MATERIAL NAME

CUT AREA

EARTHWORK

193.21

MATERIAL(S) AT STATION 2646+57

MATERIAL NAME

CUT AREA

EARTHWORK

406.42

MATERIAL(S) AT STATION 2649+55

MATERIAL NAME

CUT AREA

EARTHWORK

342.34

MATERIAL(S) AT STATION 2652+25

MATERIAL NAME

CUT AREA

EARTHWORK

286.12

MATERIAL(S) AT STATION 2654+85

MATERIAL NAME

CUT AREA

EARTHWORK

352.37

MATERIAL(S) AT STATION 2657+15

MATERIAL NAME

CUT AREA

EARTHWORK

337.79

MATERIAL(S) AT STATION 2658+96

MATERIAL NAME

CUT AREA

EARTHWORK

347.49

MATERIAL(S) AT STATION 2660+90

MATERIAL NAME

CUT AREA

EARTHWORK

269.89

MATERIAL(S) AT STATION 2664+06

MATERIAL NAME

CUT AREA

EARTHWORK

346.46

MATERIAL(S) AT STATION 2667+29

MATERIAL NAME

CUT AREA

EARTHWORK

305.33

MATERIAL(S) AT STATION 2668+78

MATERIAL NAME

CUT AREA

EARTHWORK

238.92

MATERIAL(S) AT STATION 2672+72

MATERIAL NAME

CUT AREA

EARTHWORK

259.68

O

FF

SE

T

-7

EL

EV

.8

O

FF

SE

T

0.

EL

EV

.8 O

FF

SE

T

0.

EL

EV

.8

O

FF

SE

T

+7

EL

EV

.8

O

FF

SE

T

-7

EL

EV

.9

O

FF

SE

T

0.

EL

EV

.9 O

FF

SE

T

0.

EL

EV

.9

O

FF

SE

T

+7

EL

EV

.9

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.0

O

FF

SE

T

0.

EL

EV

.0 O

FF

SE

T

0.

EL

EV

.0

O

FF

SE

T

+7

EL

EV

.0

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.1

O

FF

SE

T

0.

EL

EV

.1 O

FF

SE

T

0.

EL

EV

.1

O

FF

SE

T

+7

EL

EV

.1

O

FF

SE

T

-7

EL

EV

.2

O

FF

SE

T

0.

EL

EV

.2 O

FF

SE

T

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .