Amendment0001.pdf
PDF 228 KB Posted
- Attached to
- DITCH 251 UPPER CHANNEL CLEANOUT Federal contract opportunity
- Solicitation number
- W912EQ20B0005
About this file
This document provides an amendment to a solicitation for channel cleanout services. The U.S. Army Corps of Engineers seeks to clear and snag and excavate Ditch 251 Upper in Missouri through a combination of clearing and snagging and channel excavation along approximately 30 miles of the waterway. Offerors will furnish all labor, materials, equipment and incidental work to complete clearing and snagging of the lower 3.5 miles and clearing, snagging and excavation of the remaining upper 27 miles, disposing of excavated materials and seeding/mulching. The resulting firm-fixed price contract is set aside for Service Disabled Veteran Owned Small Businesses. The NAICS code is 237990. To qualify as a small business, offerors must have average annual sales under $36.5 million. The solicitation was issued on June 3rd, 2020 with bid opening scheduled for July 7th, 2020. The amendment provides specification changes related to compliance surveys and modifies line items in the bidding schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| Amendment0002.pdf | ||
| Solicitation.pdf | ||
| Drawings.pdf | ||
| Technical Specifications.pdf | ||
| Drawings-Revised Size-Section 2.pdf | ||
| Solicitation.pdf | ||
| Drawings-Revised Size-Section 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ20B0005
X 9B. DATED (SEE ITEM 11)
03-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2020
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
167 N. MAIN STREET
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EQ20B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0001
W912EQ20B0005
Amendment 0001
Ditch 251 Upper Channel Cleanout
DESCRIPTION OF CHANGES
SPECIFICATION CHANGE
Section 31 23 00.00 11 Channel Cleanout Excavation
1. Paragraph 1.42 Compliance Surveys -(2nd Sentence): Change note exceeding cross sections as shown on the plans to as specified in Section 00 80 00.00 11, paragraph LAYOUT OF WORK.
Section 00010-Bidding Schedule
2. Change Line item 0005 and 0007 to read HL (100 Linear Foot) not LF(Linear Foot)
1.4.2 Compliance Surveys
The Contractor shall perform, plot, and submit surveyed cross sections both before and after excavation to demonstrate that the required channel grade and cross section have been obtained.
Unless otherwise authorized by the Contracting Officer, sections shall be taken at intervals as specifiec in Section 00 80 00.00 11, paragraph LAYOUT OF WORK. The plotted cross sections shall depict both the surveyed ground surface and the applicable lines and grades from the contract drawings. The sections shall include the excavated material embankment in addition to the bottom width, side slopes, and berms. These survey sections shall be considered incidental to the excavation. Any channel excavation below the grade lines shown on the contract drawings shall be considered incidental to the channel excavation and shall be performed at no additional cost to the Government. The contractor shall use this survey data to develop the as-built drawings.
(End of Summary of Changes)