REVISED_BID_SCHEDULE_(10-3-2019).pdf
PDF 504 KB Posted
- Attached to
- PROVIDE AND DELIVER VARIOUS STONE BY BARGE
- Solicitation number
- W912EQ19B0004
About this file
REVISED BID SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_ABSTRACT_Bid_Opening.pdf | ||
| AMENDMENT_W912EQ19B0004-0002.pdf | ||
| Amendment_W912EQ19B0004-0001.pdf | ||
| BID_SCHEDULE.pdf | ||
| W912EQ19B0004_(8.28.2019).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
BASE YEAR
LINE ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 BASE YEAR - NOVEMBER 1, 2019 THROUGH OCTOBER 30, 2020
2 BASE YEAR – Stone delivered between Mississippi River mile 953.8 and 735
0002AA CRUSHED STONE 10,000 Tons __________ ______________
0002AB CR-610 2,000 Tons __________ ______________
0002AC 125 LB RIP RAP 2,000 Tons __________ ______________
0002AD 250 LB RIP RAP 2,000 Tons __________ ______________
0002AE 400 LB RIP RAP 2,000 Tons __________ ______________
0002AF 750 LB RIP RAP 2,000 Tons __________ ______________
3 BASE YEAR-Stone Delivered between Mississippi River 735 and 598 including the mouth of the White River
0003AA CRUSHED STONE 10,000 Tons __________ ______________
0003AB CR-610 2,000 Tons __________ ______________
0003AC 125 LB RIP RAP 2,000 Tons __________ ______________
0003AD 250 LB RIP RAP 2,000 Tons __________ ______________
0003AE 400 LB RIP RAP 2,000 Tons __________ ______________
0003AF 750 LB RIP RAP 2,000 Tons __________ ______________
4 BASE YEAR-Stone Delivered between Mississippi River Mile 598 and 435 __________ ______________
0004AA CRUSHED STONE 10,000 Tons __________ ______________
0004AB CR-610 2,000 Tons __________ ______________
0004AC 125 LB RIP RAP 2,000 Tons __________ ______________
0004AD 250 LB RIP RAP 2,000 Tons __________ ______________
0004AE 400 LB RIP RAP 2,000 Tons __________ ______________
0004AF 750 LB RIP RAP 2,000 Tons __________ ______________
5 BASE YEAR-Stone Delivered between Mississippi River mile 435 and 265, as well as Atchafalaya River between mile 0.0 and 125
0005AA CRUSHED STONE 10,000 Tons __________ ______________
0005AB CR-610 2,000 Tons __________ ______________
0005AC 125 LB RIP RAP 2,000 Tons __________ ______________
0005AD 250 LB RIP RAP 2,000 Tons __________ ______________
0005AE 400 LB RIP RAP 2,000 Tons __________ ______________
0005AF 750 LB RIP RAP 2,000 Tons __________ ______________
6 BASE YEAR-Stone Delivered between Mississippi River mile 265 and 167.4
0006AA CRUSHED STONE 10,000 Tons __________ ______________
0006AB CR-610 2,000 Tons __________ ______________
0006AC 125 LB RIP RAP 2,000 Tons __________ ______________
0006AD 250 LB RIP RAP 2,000 Tons __________ ______________
0006AE 400 LB RIP RAP 2,000 Tons __________ ______________
0006AF 750 LB RIP RAP 2,000 Tons __________ ______________
7 BASE YEAR-Stone Delivered between Mississippi River mile 167.4 and 0.0 __________ ______________
0007AA CRUSHED STONE 10,000 Tons __________ ______________
0007AB CR-610 2,000 Tons __________ ______________
0007AC 125 LB RIP RAP 2,000 Tons __________ ______________
0007AD 250 LB RIP RAP 2,000 Tons __________ ______________
0007AE 400 LB RIP RAP 2,000 Tons __________ ______________
INDEFINITE DELIVERY INDEFINTE QUANTITY (IDIQ) TYPE CONTRACT FOR DELIVERY OF VARIOUS STONE BY BARGES. DELIVERIES WILL BE PROVIDED ON THE MISSISSIPPI RIVER, ATCHAFALAYA RIVER, AND TRIBUTARIES OF THE MISISSIPPI RIVER. SITES WILL BE IDENTIFIED PER DELIVERY ORDER.
0007AF 750 LB RIP RAP 2,000 Tons __________ ______________
8 BASE YEAR-Stone Delivered between Upper Mississippi Mile 0 to 180 __________ ______________
0008AA CRUSHED STONE 10,000 Tons __________ ______________
0008AB CR-610 2,000 Tons __________ ______________
0086AC 125 LB RIP RAP 2,000 Tons __________ ______________
0008AD 250 LB RIP RAP 2,000 Tons __________ ______________
0008AE 400 LB RIP RAP 2,000 Tons __________ ______________
0008AF 750 LB RIP RAP 2,000 Tons __________ ______________
9 BASE YEAR – DEMURRAGE-This is the charge for detention of a ship by the 10 Days $150.00 ______________
Government beyond the time allowed for unloading
TOTAL COST BASE YEAR _______________
OPTION YEAR 1
LINE ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1001 OPTION YEAR ONE - NOVEMBER 1, 2020 THROUGH OCTOBER 30, 2021
1002 OPT 1-Stone Delivered between Mississippi River mile 953.8 AND 735
1002AA CRUSHED STONE 10,000 Tons __________ ______________
1002AB CR-610 2,000 Tons __________ ______________
1002AC 125 LB RIP RAP 2,000 Tons __________ ______________
1002AD 250 LB RIP RAP 2,000 Tons __________ ______________
1002AE 400 LB RIP RAP 2,000 Tons __________ ______________
1002AF 750 LB RIP RAP 2,000 Tons __________ ______________
1003 OPT 1-Stone Delivered between Mississippi River mile 735 and 598, including the mouth of White River
1003AA CRUSHED STONE 10,000 Tons __________ ______________
1003AB CR-610 2,000 Tons __________ ______________
1003AC 125 LB RIP RAP 2,000 Tons __________ ______________
1003AD 250 LB RIP RAP 2,000 Tons __________ ______________
1003AE 400 LB RIP RAP 2,000 Tons __________ ______________
1003AF 750 LB RIP RAP 2,000 Tons __________ ______________
1004 OPT 1-Stone Delivered between Mississippi River Mile 598 and 435
1004AA CRUSHED STONE 10,000 Tons __________ ______________
1004AB CR-610 2,000 Tons __________ ______________
1004AC 125 LB RIP RAP 2,000 Tons __________ ______________
1004AD 250 LB RIP RAP 2,000 Tons __________ ______________
1004AE 400 LB RIP RAP 2,000 Tons __________ ______________
1004AF 750 LB RIP RAP 2,000 Tons __________ ______________
1005 OPT 1-Stone Delivered between Mississippi River mile 435 and 265, as wellas, Atchafalaya River between mile 0.0 and 125
1005AA CRUSHED STONE 10,000 Tons __________ ______________
1005AB CR-610 2,000 Tons __________ ______________
1005AC 125 LB RIP RAP 2,000 Tons __________ ______________
1005AD 250 LB RIP RAP 2,000 Tons __________ ______________
1005AE 400 LB RIP RAP 2,000 Tons __________ ______________
1005AF 750 LB RIP RAP 2,000 Tons __________ ______________
1006 OPT 1-Stone Delivered between Mississippi River Mile 265 and 167.4 __________ ______________
1006AA CRUSHED STONE 10,000 Tons __________ ______________
1006AB CR-610 2,000 Tons __________ ______________
1006AC 125 LB RIP RAP 2,000 Tons __________ ______________
1006AD 250 LB RIP RAP 2,000 Tons __________ ______________
1006AE 400 LB RIP RAP 2,000 Tons __________ ______________
1006AF 750 LB RIP RAP 2,000 Tons __________ ______________
1007 OPT 1 – Stone Delivered between Mississippi River Mile 167.4 and 0.0 __________ ______________
1007AA CRUSHED STONE 10,000 Tons __________ ______________
1007AB CR-610 2,000 Tons __________ ______________
1007AC 125 LB RIP RAP 2,000 Tons __________ ______________
1007AD 250 LB RIP RAP 2,000 Tons __________ ______________
1007AE 400 LB RIP RAP 2,000 Tons __________ ______________
1007AF 750 LB RIP RAP 2,000 Tons __________ ______________
1008 OPT 1-Stone Delivered between Upper Mississippi mile 0 to 180 __________ ______________
1008AA CRUSHED STONE 10,000 Tons __________ ______________
1008AB CR-610 2,000 Tons __________ ______________
1008AC 125 LB RIP RAP 2,000 Tons __________ ______________
1008AD 250 LB RIP RAP 2,000 Tons __________ ______________
1008AE 400 LB RIP RAP 2,000 Tons __________ ______________
1008AF 750 LB RIP RAP 2,000 Tons __________ ______________
1009 OPT 1 –DEMMURAGE-This is the charge for detention of a ship by the 10 Days $150.00 _____________
TOTAL COST OPTION YEAR ONE _______________
OPTION YEAR 2
2001 OPTION YEAR 2 - NOVEMBER 1, 2021 THROUGH OCTOBER 30, 2022
2002 OPT 2- Stone Delivered between Mississippi River mile 953.8 and 735
2002AA CRUSHED STONE 10,000 Tons __________ ______________
2002AB CR-610 2,000 Tons __________ ______________
2002AC 125 LB RIP RAP 2,000 Tons __________ ______________
2002AD 250 LB RIP RAP 2,000 Tons __________ ______________
2002AE 400 LB RIP RAP 2,000 Tons __________ ______________
2002AF 750 LB RIP RAP 2,000 Tons __________ ______________
2003 OPT 2-Stone Delivered between Mississippi River mile 735 and 598, including the mouth of White River
2003AA CRUSHED STONE 10,000 Tons __________ ______________
2003AB CR-610 2,000 Tons __________ ______________
2003AC 125 LB RIP RAP 2,000 Tons __________ ______________
2003AD 250 LB RIP RAP 2,000 Tons __________ ______________
2003AE 400 LB RIP RAP 2,000 Tons __________ ______________
2003AF 750 LB RIP RAP 2,000 Tons __________ ______________
2004 OPT 2-Stone delivered between Mississippi River mile 598 and 435 __________ ______________
2004AA CRUSHED STONE 10,000 Tons __________ ______________
2004AB CR-610 2,000 Tons __________ ______________
2004AC 125 LB RIP RAP 2,000 Tons __________ ______________
2004AD 250 LB RIP RAP 2,000 Tons __________ ______________
2004AE 400 LB RIP RAP 2,000 Tons __________ ______________
2004AF 750 LB RIP RAP 2,000 Tons __________ ______________
2005 OPT 2-Stone delivered between Mississippi River mile 435 and 265, as well as, Atchafalaya River between mile 0.0 and 125
2005AA CRUSHED STONE 10,000 Tons __________ ______________
2005AB CR-610 2,000 Tons __________ ______________
2005AC 125 LB RIP RAP 2,000 Tons __________ ______________
2005AD 250 LB RIP RAP 2,000 Tons __________ ______________
2005AE 400 LB RIP RAP 2,000 Tons __________ ______________
2005AF 750 LB RIP RAP 2,000 Tons __________ ______________
2006 OPT 2-Stone delivered between Mississippi River mile 265 and 167.4 __________ ______________
2006AA CRUSHED STONE 10,000 Tons __________ ______________
2006AB CR-610 2,000 Tons __________ ______________
2006AC 125 LB RIP RAP 2,000 Tons __________ ______________
2006AD 250 LB RIP RAP 2,000 Tons __________ ______________
2006AE 400 LB RIP RAP 2,000 Tons __________ ______________
2006AF 750 LB RIP RAP 2,000 Tons __________ ______________
2007 OPT 2 – Stone delivered between Mississippi River mile 167.4 and 0.0 __________ ______________
2007AA CRUSHED STONE 10,000 Tons __________ ______________
2007AB CR-610 2,000 Tons __________ ______________
2007AC 125 LB RIP RAP 2,000 Tons __________ ______________
2007AD 250 LB RIP RAP 2,000 Tons __________ ______________
2007AE 400 LB RIP RAP 2,000 Tons __________ ______________
2007AF 750 LB RIP RAP 2,000 Tons __________ ______________
2008 OPT 2-Stone delivered between Upper Mississippi Mile 0 to 180 __________ ______________
2008AA CRUSHED STONE 10,000 Tons __________ ______________
2008AB CR-610 2,000 Tons __________ ______________
2008AC 125 LB RIP RAP 2,000 Tons __________ ______________
2008AD 250 LB RIP RAP 2,000 Tons __________ ______________
2008AE 400 LB RIP RAP 2,000 Tons __________ ______________
2008AF 750 LB RIP RAP 2,000 Tons __________ ______________
2009 OPT 2 –DEMMURAGE-This is the charge for detention of a ship by the 10 Days $150.00 ______________
TOTAL COST OPTION YEAR TWO _______________
OPTION YEAR 3
3001 OPTION YEAR 3 - NOVEMBER 1, 2022 THROUGH OCTOBER 30, 2023
3002 OPT 3-Stone delivered between Mississippi River mile 953.8 and 735
3002AA CRUSHED STONE 10,000 Tons __________ ______________
3002AB CR-610 2,000 Tons __________ ______________
3002AC 125 LB RIP RAP 2,000 Tons __________ ______________
3002AD 250 LB RIP RAP 2,000 Tons __________ ______________
3002AE 400 LB RIP RAP 2,000 Tons __________ ______________
3002AF 750 LB RIP RAP 2,000 Tons __________ ______________
3003 OPT 3-Stone Delivered between Mississippi River mile 735 and 598, including the mouth of White River
3003AA CRUSHED STONE 10,000 Tons __________ ______________
3003AB CR-610 2,000 Tons __________ ______________
3003AC 125 LB RIP RAP 2,000 Tons __________ ______________
3003AD 250 LB RIP RAP 2,000 Tons __________ ______________
3003AE 400 LB RIP RAP 2,000 Tons __________ ______________
3003AF 750 LB RIP RAP 2,000 Tons __________ ______________
3004 OPT 3-Stone delivered between Mississippi River mile 598 and 435 __________ ______________
3004AA CRUSHED STONE 10,000 Tons __________ ______________
3004AB CR-610 2,000 Tons __________ ______________
3004AC 125 LB RIP RAP 2,000 Tons __________ ______________
3004AD 250 LB RIP RAP 2,000 Tons __________ ______________
3004AE 400 LB RIP RAP 2,000 Tons __________ ______________
3004AF 750 LB RIP RAP 2,000 Tons __________ ______________
3005 OPT 3-Stone delivered between Mississippi River mile 435 and 265, as well as, Atchafalaya River between mile 0.0 and 125
3005AA CRUSHED STONE 10,000 Tons __________ ______________
3005AB CR-610 2,000 Tons __________ ______________
3005AC 125 LB RIP RAP 2,000 Tons __________ ______________
3005AD 250 LB RIP RAP 2,000 Tons __________ ______________
3005AE 400 LB RIP RAP 2,000 Tons __________ ______________
3005AF 750 LB RIP RAP 2,000 Tons __________ ______________
3006 OPT 3-Stone delivered between Mississippi River mile 265 and 167.4 __________ ______________
3006AA CRUSHED STONE 10,000 Tons __________ ______________
3006AB CR-610 2,000 Tons __________ ______________
3006AC 125 LB RIP RAP 2,000 Tons __________ ______________
3006AD 250 LB RIP RAP 2,000 Tons __________ ______________
3006AE 400 LB RIP RAP 2,000 Tons __________ ______________
3006AF 750 LB RIP RAP 2,000 Tons __________ ______________
3007 OPT 3 – Stone delivered between Mississippi River mile 167.4 and 0.0 __________ ______________
3007AA CRUSHED STONE 10,000 Tons __________ ______________
3007AB CR-610 2,000 Tons __________ ______________
3007AC 125 LB RIP RAP 2,000 Tons __________ ______________
3007AD 250 LB RIP RAP 2,000 Tons __________ ______________
3007AE 400 LB RIP RAP 2,000 Tons __________ ______________
3007AF 750 LB RIP RAP 2,000 Tons __________ ______________
3008 OPT 3-Stone delivered between Upper Mississippi Mile 0 to 180 __________ ______________
3008AA CRUSHED STONE 10,000 Tons __________ ______________
3008AB CR-610 2,000 Tons __________ ______________
3008AC 125 LB RIP RAP 2,000 Tons __________ ______________
3008AD 250 LB RIP RAP 2,000 Tons __________ ______________
3008AE 400 LB RIP RAP 2,000 Tons __________ ______________
3008AF 750 LB RIP RAP 2,000 Tons __________ ______________
3009 OPT 3 –Demmurage-This is the charge for detention of a ship by the 10 Days $150.00 ______________
TOTAL COST OPTION YEAR THREE _______________
OPTION YEAR 4
4001 OPTION YEAR 4 - NOVEMBER 1, 2023 THROUGH OCTOBER 30, 2024
4002 OPT 4-Stone delivered between Mississippi River mile 953.8 and 735
4002AA CRUSHED STONE 10,000 Tons __________ ______________
4002AB CR-610 2,000 Tons __________ ______________
4002AC 125 LB RIP RAP 2,000 Tons __________ ______________
4002AD 250 LB RIP RAP 2,000 Tons __________ ______________
4002AE 400 LB RIP RAP 2,000 Tons __________ ______________
4002AF 750 LB RIP RAP 2,000 Tons __________ ______________
4003 OPT 4-Stone delivered between Mississippi River mile 735 and 598, including the mouth of White River
4003AA CRUSHED STONE 10,000 Tons __________ ______________
4003AB CR-610 2,000 Tons __________ ______________
4003AC 125 LB RIP RAP 2,000 Tons __________ ______________
4003AD 250 LB RIP RAP 2,000 Tons __________ ______________
4003AE 400 LB RIP RAP 2,000 Tons __________ ______________
4003AF 750 LB RIP RAP 2,000 Tons __________ ______________
4004 OPT 4-Stone delivered between Mississippi River mile 598 and 435 __________ ______________
4004AA CRUSHED STONE 10,000 Tons __________ ______________
4004AB CR-610 2,000 Tons __________ ______________
4004AC 125 LB RIP RAP 2,000 Tons __________ ______________
4004AD 250 LB RIP RAP 2,000 Tons __________ ______________
4004AE 400 LB RIP RAP 2,000 Tons __________ ______________
4004AF 750 LB RIP RAP 2,000 Tons __________ ______________
4005 OPT 4-Stone delivered between Mississippi River mile 435 and 265, as well as Atchafalaya River between mile 0.0 and 125
4005AA CRUSHED STONE 10,000 Tons __________ ______________
4005AB CR-610 2,000 Tons __________ ______________
4005AC 125 LB RIP RAP 2,000 Tons __________ ______________
4005AD 250 LB RIP RAP 2,000 Tons __________ ______________
4005AE 400 LB RIP RAP 2,000 Tons __________ ______________
4005AF 750 LB RIP RAP 2,000 Tons __________ ______________
4006 OPT 4-Stone delivered between Mississippi River mile 265 and 167.4 __________ ______________
4006AA CRUSHED STONE 10,000 Tons __________ ______________
4006AB CR-610 2,000 Tons __________ ______________
4006AC 125 LB RIP RAP 2,000 Tons __________ ______________
4006AD 250 LB RIP RAP 2,000 Tons __________ ______________
4006AE 400 LB RIP RAP 2,000 Tons __________ ______________
4006AF 750 LB RIP RAP 2,000 Tons __________ ______________
4007 OPT 4 – Stone delivered between Mississippi River mile 167.4 and 0.0 __________ ______________
4007AA CRUSHED STONE 10,000 Tons __________ ______________
4007AB CR-610 2,000 Tons __________ ______________
4007AC 125 LB RIP RAP 2,000 Tons __________ ______________
4007AD 250 LB RIP RAP 2,000 Tons __________ ______________
4007AE 400 LB RIP RAP 2,000 Tons __________ ______________
4007AF 750 LB RIP RAP 2,000 Tons __________ ______________
4008 OPT 4-Stone delivered between Upper Mississippi Mile 0 to 180 __________ ______________
4008AA CRUSHED STONE 10,000 Tons __________ ______________
4008AB CR-610 2,000 Tons __________ ______________
4008AC 125 LB RIP RAP 2,000 Tons __________ ______________
4008AD 250 LB RIP RAP 2,000 Tons __________ ______________
4008AE 400 LB RIP RAP 2,000 Tons __________ ______________
4008AF 750 LB RIP RAP 2,000 Tons __________ ______________
4009 OPT 4 –Demmurage-This is the charge for detention of a ship by the 10 Days $150.00 ______________
Government beyond the time allowed for unloading
TOTAL COST OPTION YEAR FOUR _______________
TOTAL COST OF ALL CONTRACT LINE ITEMS _______________
File details come from the government source that posted it.