B01_ABSTRACT_Bid_Opening.pdf

PDF 292 KB Posted

Attached to
PROVIDE AND DELIVER VARIOUS STONE BY BARGE
Solicitation number
W912EQ19B0004
Issued by

About this file

Unofficial Abstract from Bid Opening

View the file

Other files

File Type Posted
REVISED_BID_SCHEDULE_(10-3-2019).pdf PDF
AMENDMENT_W912EQ19B0004-0002.pdf PDF
Amendment_W912EQ19B0004-0001.pdf PDF
BID_SCHEDULE.pdf PDF
W912EQ19B0004_(8.28.2019).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNOFFICIAL ABSTRACT

I certify that I have read all offers received in response to this solicitation and all offers have been recorded on this abstract Valeire Marshall, Bid Opening Officer

TARPAN CONSTRUCTION LLC CROWLEY HOLDINGS, LLC

6756 HWY 29 5041 FRERET ST.

COTTONPORT, LA 71327 NEW ORLEANS, LA 70115

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 BASE YEAR NOVEMBER 1, 2019 THROUGH OCTOBER 30, 2020

0002 BASE YEAR - Stone delivered between Mississippi River Mile 953.8 and 735

0002AA CRUSHED STONE 10,000 Tons 19.50$ 195,000.00$ 26.50$ 265,000.00$ 30.00$ 300,000.00$

0002AB CR-610 2,000 Tons 16.75$ 33,500.00$ 22.50$ 45,000.00$ 30.00$ 60,000.00$

0002AC 125 LB RIP RAP 2,000 Tons 19.75$ 39,500.00$ 24.00$ 48,000.00$ 48.00$ 96,000.00$

0002AD 250 LB RIP RAP 2,000 Tons 19.75$ 39,500.00$ 24.00$ 48,000.00$ 51.60$ 103,200.00$

0002AE 400 LB RIP RAP 2,000 Tons 20.75$ 41,500.00$ 25.00$ 50,000.00$ 54.00$ 108,000.00$

0002AF 750 LB RIP RAP 2,000 Tons 21.75$ 43,500.00$ 26.25$ 52,500.00$ 58.80$ 117,600.00$

0003 BASE YEAR - Stone delivered between Mississippi River Mile 735 and 598 including the mouth of the White River

0003AA CRUSHED STONE 10,000 Tons 21.50$ 215,000.00$ 28.75$ 287,500.00$ 31.50$ 315,000.00$

0003AB CR-610 2,000 Tons 18.75$ 37,500.00$ 24.50$ 49,000.00$ 31.50$ 63,000.00$

0003AC 125 LB RIP RAP 2,000 Tons 21.75$ 43,500.00$ 26.25$ 52,500.00$ 52.80$ 105,600.00$

0003AD 250 LB RIP RAP 2,000 Tons 21.75$ 43,500.00$ 26.25$ 52,500.00$ 55.20$ 110,400.00$

0003AE 400 LB RIP RAP 2,000 Tons 22.75$ 45,500.00$ 27.25$ 54,500.00$ 56.40$ 112,800.00$

0003AF 750 LB RIP RAP 2,000 Tons 23.75$ 47,500.00$ 28.25$ 56,500.00$ 60.00$ 120,000.00$

0004 BASE YEAR - Stone delivered between Mississippi River mile 598 and 435

0004AA CRUSHED STONE 10,000 Tons 23.50$ 235,000.00$ 31.00$ 310,000.00$ 31.50$ 315,000.00$

0004AB CR-610 2,000 Tons 20.75$ 41,500.00$ 26.75$ 53,500.00$ 31.50$ 63,000.00$

0004AC 125 LB RIP RAP 2,000 Tons 23.75$ 47,500.00$ 28.25$ 56,500.00$ 54.00$ 108,000.00$

0004AD 250 LB RIP RAP 2,000 Tons 23.75$ 47,500.00$ 28.25$ 56,500.00$ 57.60$ 115,200.00$

0004AE 400 LB RIP RAP 2,000 Tons 24.75$ 49,500.00$ 29.50$ 59,000.00$ 60.00$ 120,000.00$

0004AF 750 LB RIP RAP 2,000 Tons 25.75$ 51,500.00$ 30.50$ 61,000.00$ 66.00$ 132,000.00$

0005 BASE YEAR - Stone delivered between Mississippi River mile 435 and 265, as well as Atchafalaya River between mile 0.0 and 125

UNOFFICIAL ABSTRACT

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

NUMBER OF AMENDMENTS: 2

SMALL BUSINESS DETERMINATION: SMALL BUSINESS SET-ASIDE

TITLE: IDIQ REVETMENT CRUSHED STONE

INVITATION NO.: W912EQ-19-B-0004 GOVT. ESTIMATE

MEMPHIS

DISTRICT

BID OPENING DATE AND TIME: 10/22/2019 AT 2:00 PM COST

BIDDER #1 BIDDER #2

ENGINEERING

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 1 of 9

0005AA CRUSTED STONE 10,000 Tons 25.75$ 257,500.00$ 33.50$ 335,000.00$ 37.50$ 375,000.00$

0005AB CR-610 2,000 Tons 23.00$ 46,000.00$ 29.25$ 58,500.00$ 37.50$ 75,000.00$

0005AC 125 LB RIP RAP 2,000 Tons 26.00$ 52,000.00$ 30.75$ 61,500.00$ 61.20$ 122,400.00$

0005AD 250 LB RIP RAP 2,000 Tons 26.00$ 52,000.00$ 30.75$ 61,500.00$ 66.00$ 132,000.00$

0005AE 400 LB RIP RAP 2,000 Tons 27.00$ 54,000.00$ 32.00$ 64,000.00$ 69.60$ 139,200.00$

0005AF 750 LB RIP RAP 2,000 Tons 28.00$ 56,000.00$ 33.00$ 66,000.00$ 73.20$ 146,400.00$

0006 BASE YEAR-Stone delivered between Mississippi River mile 265 and 167.4

0006AA CRUSHED STONE 10,000 Tons 27.00$ 270,000.00$ 35.00$ 350,000.00$ 39.00$ 390,000.00$

0006AB CR-610 2,000 Tons 24.25$ 48,500.00$ 31.00$ 62,000.00$ 39.00$ 78,000.00$

0006AC 125 LB RIP RAP 2,000 Tons 27.25$ 54,500.00$ 32.25$ 64,500.00$ 64.80$ 129,600.00$

0006AD 250 LB RIP RAP 2,000 Tons 27.25$ 54,500.00$ 32.25$ 64,500.00$ 67.20$ 134,400.00$

0006AE 400 LB RIP RAP 2,000 Tons 28.25$ 56,500.00$ 33.25$ 66,500.00$ 70.80$ 141,600.00$

0006AF 750 LB RIP RAP 2,000 Tons 29.25$ 58,500.00$ 34.25$ 68,500.00$ 74.40$ 148,800.00$

0007 BASE YEAR-Stone delivered between Mississippi River mile 167.4 and 0.0

0007AA CRUSHED STONE 10,000 Tons 28.75$ 287,500.00$ 36.75$ 367,500.00$ 40.50$ 405,000.00$

0007AB CR-610 2,000 Tons 26.00$ 52,000.00$ 32.50$ 65,000.00$ 40.50$ 81,000.00$

0007AC 125 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.25$ 68,500.00$ 120.00$ 240,000.00$

0007AD 250 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.25$ 68,500.00$ 132.00$ 264,000.00$

0007AE 400 LB RIP RAP 2,000 Tons 30.00$ 60,000.00$ 35.25$ 70,500.00$ 144.00$ 288,000.00$

0007AF 750 LB RIP RAP 2,000 Tons 31.00$ 62,000.00$ 36.25$ 72,500.00$ 156.00$ 312,000.00$

0008 BASE YEAR-Stone delivered between Upper Mississippi mile 0 to 180

0008AA CRUSHED STONE 10,000 Tons 17.75$ 177,500.00$ 24.75$ 247,500.00$ 30.00$ 300,000.00$

0008AB CR-610 2,000 Tons 15.00$ 30,000.00$ 20.50$ 41,000.00$ 30.00$ 60,000.00$

0086AC 125 LB RIP RAP 2,000 Tons 18.00$ 36,000.00$ 22.00$ 44,000.00$ 120.00$ 240,000.00$

0008AD 250 LB RIP RAP 2,000 Tons 18.00$ 36,000.00$ 22.00$ 44,000.00$ 132.00$ 264,000.00$

0008AE 400 LB RIP RAP 2,000 Tons 19.00$ 38,000.00$ 23.25$ 46,500.00$ 144.00$ 288,000.00$

0008AF 750 LB RIP RAP 2,000 Tons 20.00$ 40,000.00$ 24.25$ 48,500.00$ 156.00$ 312,000.00$

0009 BASE YEAR- DEMURRAGE- This is the charge for detention of a ship by the Government beyond the time allowed for unloading10 Days $150.00 1,500.00$ 150.00$ 1,500.00$ 500.00$ 5,000.00$

TOTAL COST BASE YEAR 3,294,000.00$ 4,165,500.00$ 7,536,200.00$

OPTION YEAR ONE

1001 OPTION YEAR ONE - NOVEMBER 1, 2020 THROUGH OCTOBER 30, 2021

1002 OPT 1-Stone delivered between Mississippi River mile 953.8 and 735

1002AA CRUSHED STONE 10,000 Tons 20.00$ 200,000.00$ 27.25$ 272,500.00$ 31.50$ 315,000.00$

ABSTRACT OF BIDS Page 2 of 9

1002AB CR-610 2,000 Tons 17.00$ 34,000.00$ 23.25$ 46,500.00$ 31.50$ 63,000.00$

1002AC 125 LB RIP RAP 2,000 Tons 20.00$ 40,000.00$ 25.00$ 50,000.00$ 55.20$ 110,400.00$

1002AD 250 LB RIP RAP 2,000 Tons 20.00$ 40,000.00$ 25.00$ 50,000.00$ 58.80$ 117,600.00$

1002AE 400 LB RIP RAP 2,000 Tons 21.00$ 42,000.00$ 25.50$ 51,000.00$ 61.20$ 122,400.00$

1002AF 750 LB RIP RAP 2,000 Tons 22.00$ 44,000.00$ 26.00$ 52,000.00$ 66.00$ 132,000.00$

1003 OPT 1-Stone delivered between Mississippi River mile 735 and 598, including the mouth of White River

1003AA CRUSHED STONE 10,000 Tons 22.00$ 220,000.00$ 29.50$ 295,000.00$ 33.08$ 330,800.00$

1003AB CR-610 2,000 Tons 19.00$ 38,000.00$ 25.50$ 51,000.00$ 33.08$ 66,160.00$

1003AC 125 LB RIP RAP 2,000 Tons 22.00$ 44,000.00$ 26.00$ 52,000.00$ 58.80$ 117,600.00$

1003AD 250 LB RIP RAP 2,000 Tons 22.00$ 44,000.00$ 26.00$ 52,000.00$ 61.20$ 122,400.00$

1003AE 400 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.75$ 55,500.00$ 63.60$ 127,200.00$

1003AF 750 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.50$ 57,000.00$ 67.20$ 134,400.00$

1004 OPT 1-Stone delivered between Mississippi River mile 598 and 435

1004AA CRUSHED STONE 10,000 Tons 24.00$ 240,000.00$ 31.50$ 315,000.00$ 33.08$ 330,800.00$

1004AB CR-610 2,000 Tons 21.00$ 42,000.00$ 27.50$ 55,000.00$ 33.08$ 66,160.00$

1004AC 125 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.50$ 57,000.00$ 61.20$ 122,400.00$

1004AD 250 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.50$ 57,000.00$ 64.80$ 129,600.00$

1004AE 400 LB RIP RAP 2,000 Tons 25.00$ 50,000.00$ 30.00$ 60,000.00$ 67.20$ 134,400.00$

1004AF 750 LB RIP RAP 2,000 Tons 26.00$ 52,000.00$ 30.75$ 61,500.00$ 73.20$ 146,400.00$

1005 OPT 1-Stone delivered between Mississippi River mile 435 and 265, as wellas, Atchafalaya River between mile 0.0 and 125

1005AA CRUSHED STONE 10,000 Tons 26.50$ 265,000.00$ 33.75$ 337,500.00$ 39.38$ 393,800.00$

1005AB CR-610 2,000 Tons 23.50$ 47,000.00$ 29.75$ 59,500.00$ 39.38$ 78,760.00$

1005AC 125 LB RIP RAP 2,000 Tons 26.50$ 53,000.00$ 30.50$ 61,000.00$ 68.40$ 136,800.00$

1005AD 250 LB RIP RAP 2,000 Tons 26.50$ 53,000.00$ 30.50$ 61,000.00$ 73.20$ 146,400.00$

1005AE 400 LB RIP RAP 2,000 Tons 27.50$ 55,000.00$ 32.25$ 64,500.00$ 76.80$ 153,600.00$

1005AF 750 LB RIP RAP 2,000 Tons 28.50$ 57,000.00$ 32.75$ 65,500.00$ 80.40$ 160,800.00$

1006 OPT 1-Stone delivered between Mississippi River Mile 265 and 167.4

1006AA CRUSHED STONE 10,000 Tons 28.00$ 280,000.00$ 36.00$ 360,000.00$ 40.95$ 409,500.00$

1006AB CR-610 2,000 Tons 25.00$ 50,000.00$ 32.00$ 64,000.00$ 40.95$ 81,900.00$

1006AC 125 LB RIP RAP 2,000 Tons 28.00$ 56,000.00$ 32.75$ 65,500.00$ 72.00$ 144,000.00$

1006AD 250 LB RIP RAP 2,000 Tons 28.00$ 56,000.00$ 32.75$ 65,500.00$ 73.20$ 146,400.00$

1006AE 400 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.50$ 69,000.00$ 79.20$ 158,400.00$

1006AF 750 LB RIP RAP 2,000 Tons 30.00$ 60,000.00$ 35.00$ 70,000.00$ 81.60$ 163,200.00$

1007 OPT 1 - Stone delivered between Mississippi River Mile 167.4 and 0.0

ABSTRACT OF BIDS Page 3 of 9

1007AA CRUSHED STONE 10,000 Tons 30.00$ 300,000.00$ 38.25$ 382,500.00$ 42.53$ 425,300.00$

1007AB CR-610 2,000 Tons 27.00$ 54,000.00$ 34.25$ 68,500.00$ 42.53$ 85,060.00$

1007AC 125 LB RIP RAP 2,000 Tons 30.00$ 60,000.00$ 35.00$ 70,000.00$ 126.00$ 252,000.00$

1007AD 250 LB RIP RAP 2,000 Tons 30.00$ 60,000.00$ 35.00$ 70,000.00$ 138.60$ 277,200.00$

1007AE 400 LB RIP RAP 2,000 Tons 31.00$ 62,000.00$ 36.50$ 73,000.00$ 151.20$ 302,400.00$

1007AF 750 LB RIP RAP 2,000 Tons 32.00$ 64,000.00$ 37.25$ 74,500.00$ 163.80$ 327,600.00$

1008 OPT 1-Stone delivered between Upper Mississippi mile 0 to 180

1008AA CRUSHED STONE 10,000 Tons 18.00$ 180,000.00$ 25.00$ 250,000.00$ 31.50$ 315,000.00$

1008AB CR-610 2,000 Tons 15.00$ 30,000.00$ 21.00$ 42,000.00$ 31.50$ 63,000.00$

1008AC 125 LB RIP RAP 2,000 Tons 18.00$ 36,000.00$ 22.00$ 44,000.00$ 126.00$ 252,000.00$

1008AD 250 LB RIP RAP 2,000 Tons 18.00$ 36,000.00$ 22.00$ 44,000.00$ 138.60$ 277,200.00$

1008AE 400 LB RIP RAP 2,000 Tons 19.00$ 38,000.00$ 23.50$ 47,000.00$ 151.20$ 302,400.00$

1008AF 750 LB RIP RAP 2,000 Tons 20.00$ 40,000.00$ 24.00$ 48,000.00$ 163.80$ 327,600.00$

1009 OPT 1 - DEMMURAGE- This is the charge for detention of a ship by the Government beyond the time allowed for unloading 10 Days $150.00 1,500.00$ 150.00$ 1,500.00$ 500.00$ 5,000.00$

TOTAL COST OPTION YEAR ONE 3,371,500.00$ 4,248,000.00$ 8,074,040.00$

OPTION YEAR TWO

2001 OPTION YEAR 2 - NOVEMBER 1, 2021 THROUGH OCTOBER 30, 2022

2002 OPT 2- Stone delivered between Mississippi River mile 953.8 and 735

2002AA CRUSHED STONE 10,000 Tons 20.75$ 207,500.00$ 28.50$ 285,000.00$ 33.09$ 330,900.00$

2002AB CR-610 2,000 Tons 17.75$ 35,500.00$ 24.00$ 48,000.00$ 33.08$ 66,160.00$

2002AC 125 LB RIP RAP 2,000 Tons 20.75$ 41,500.00$ 25.00$ 50,000.00$ 62.40$ 124,800.00$

2002AD 250 LB RIP RAP 2,000 Tons 20.75$ 41,500.00$ 25.00$ 50,000.00$ 67.20$ 134,400.00$

2002AE 400 LB RIP RAP 2,000 Tons 22.00$ 44,000.00$ 26.00$ 52,000.00$ 68.40$ 136,800.00$

2002AF 750 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.50$ 55,000.00$ 73.20$ 146,400.00$

2003 OPT 2- Stone delivered between Mississippi River mile 735 and 598, including the mouth of White River

2003AA CRUSHED STONE 10,000 Tons 23.00$ 230,000.00$ 31.00$ 310,000.00$ 34.73$ 347,300.00$

2003AB CR-610 2,000 Tons 20.00$ 40,000.00$ 26.50$ 53,000.00$ 34.73$ 69,460.00$

2003AC 125 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.25$ 54,500.00$ 67.20$ 134,400.00$

2003AD 250 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.25$ 54,500.00$ 68.40$ 136,800.00$

2003AE 400 LB RIP RAP 2,000 Tons 24.25$ 48,500.00$ 28.50$ 57,000.00$ 70.80$ 141,600.00$

2003AF 750 LB RIP RAP 2,000 Tons 25.25$ 50,500.00$ 30.00$ 60,000.00$ 74.40$ 148,800.00$

2004 OPT 2-Stone delivered between Mississippi River mile 598 and 435

2004AA CRUSHED STONE 10,000 Tons 25.25$ 252,500.00$ 33.50$ 335,000.00$ 34.73$ 347,300.00$

ABSTRACT OF BIDS Page 4 of 9

2004AB CR-610 2,000 Tons 22.25$ 44,500.00$ 29.00$ 58,000.00$ 34.73$ 69,460.00$

2004AC 125 LB RIP RAP 2,000 Tons 25.25$ 50,500.00$ 30.25$ 60,500.00$ 68.40$ 136,800.00$

2004AD 250 LB RIP RAP 2,000 Tons 25.25$ 50,500.00$ 30.25$ 60,500.00$ 72.00$ 144,000.00$

2004AE 400 LB RIP RAP 2,000 Tons 26.50$ 53,000.00$ 31.00$ 62,000.00$ 74.40$ 148,800.00$

2004AF 750 LB RIP RAP 2,000 Tons 27.50$ 55,000.00$ 32.00$ 64,000.00$ 84.00$ 168,000.00$

2005 OPT 2-Stone delivered between Mississippi River mile 435 and 265, as well as, Atchafalaya River between mile 0.0 and 125

2005AA CRUSHED STONE 10,000 Tons 27.75$ 277,500.00$ 36.25$ 362,500.00$ 41.34$ 413,400.00$

2005AB CR-610 2,000 Tons 24.75$ 49,500.00$ 31.75$ 63,500.00$ 41.34$ 82,680.00$

2005AC 125 LB RIP RAP 2,000 Tons 27.75$ 55,500.00$ 32.75$ 65,500.00$ 79.20$ 158,400.00$

2005AD 250 LB RIP RAP 2,000 Tons 27.75$ 55,500.00$ 32.75$ 65,500.00$ 81.60$ 163,200.00$

2005AE 400 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.00$ 68,000.00$ 85.20$ 170,400.00$

2005AF 750 LB RIP RAP 2,000 Tons 30.00$ 60,000.00$ 35.00$ 70,000.00$ 87.60$ 175,200.00$

2006 OPT 2-Stone delivered between Mississippi River mile 265 and 167.4

2006AA CRUSHED STONE 10,000 Tons 29.00$ 290,000.00$ 37.50$ 375,000.00$ 43.00$ 430,000.00$

2006AB CR-610 2,000 Tons 26.00$ 52,000.00$ 33.25$ 66,500.00$ 43.00$ 86,000.00$

2006AC 125 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.25$ 68,500.00$ 81.60$ 163,200.00$

2006AD 250 LB RIP RAP 2,000 Tons 29.00$ 58,000.00$ 34.25$ 68,500.00$ 84.00$ 168,000.00$

2006AE 400 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.50$ 71,000.00$ 91.20$ 182,400.00$

2006AF 750 LB RIP RAP 2,000 Tons 31.25$ 62,500.00$ 36.50$ 73,000.00$ 93.60$ 187,200.00$

2007 OPT 2 - Stone delivered between Mississippi River mile 167.4 and 0.0

2007AA CRUSHED STONE 10,000 Tons 31.25$ 312,500.00$ 40.00$ 400,000.00$ 44.65$ 446,500.00$

2007AB CR-610 2,000 Tons 28.25$ 56,500.00$ 35.50$ 71,000.00$ 44.65$ 89,300.00$

2007AC 125 LB RIP RAP 2,000 Tons 31.25$ 62,500.00$ 36.75$ 73,500.00$ 132.30$ 264,600.00$

2007AD 250 LB RIP RAP 2,000 Tons 31.25$ 62,500.00$ 36.75$ 73,500.00$ 145.53$ 291,060.00$

2007AE 400 LB RIP RAP 2,000 Tons 32.50$ 65,000.00$ 37.75$ 75,500.00$ 158.76$ 317,520.00$

2007AF 750 LB RIP RAP 2,000 Tons 33.50$ 67,000.00$ 39.00$ 78,000.00$ 171.99$ 343,980.00$

2008 OPT 2-Stone delivered between Upper Mississippi Mile 0 to 180

2008AA CRUSHED STONE 10,000 Tons 18.75$ 187,500.00$ 26.50$ 265,000.00$ 33.08$ 330,800.00$

2008AB CR-610 2,000 Tons 15.75$ 31,500.00$ 22.25$ 44,500.00$ 33.08$ 66,160.00$

2008AC 125 LB RIP RAP 2,000 Tons 18.75$ 37,500.00$ 23.00$ 46,000.00$ 132.30$ 264,600.00$

2008AD 250 LB RIP RAP 2,000 Tons 18.75$ 37,500.00$ 23.00$ 46,000.00$ 145.53$ 291,060.00$

2008AE 400 LB RIP RAP 2,000 Tons 20.00$ 40,000.00$ 24.00$ 48,000.00$ 158.76$ 317,520.00$

2008AF 750 LB RIP RAP 2,000 Tons $21.00 42,000.00$ 25.00$ 50,000.00$ 171.99$ 343,980.00$

2009 OPT 2 -DEMMURAGE-This is the charge for detention of a ship by the Government beyond the time allowed for unloading10 Days $150.00 1,500.00$ 150.00$ 1,500.00$ 500.00$ 5,000.00$

ABSTRACT OF BIDS Page 5 of 9

TOTAL COST OPTION YEAR TWO 3,523,500.00$ 4,459,000.00$ 8,684,340.00$

OPTION YEAR THREE

3001 OPTION YEAR 3 - NOVEMBER 1, 2022 THROUGH OCTOBER 30, 2023

3002 OPT 3 - Stone delivered between Mississippi River mile 953.8 and 735

3002AA CRUSHED STONE 10,000 Tons 21.75$ 217,500.00$ 29.75$ 297,500.00$ 34.73$ 347,300.00$

3002AB CR-610 2,000 Tons 18.50$ 37,000.00$ 24.75$ 49,500.00$ 34.73$ 69,460.00$

3002AC 125 LB RIP RAP 2,000 Tons 21.50$ 43,000.00$ 25.75$ 51,500.00$ 70.80$ 141,600.00$

3002AD 250 LB RIP RAP 2,000 Tons 21.50$ 43,000.00$ 25.75$ 51,500.00$ 75.60$ 151,200.00$

3002AE 400 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.50$ 55,000.00$ 76.80$ 153,600.00$

3002AF 750 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.75$ 57,500.00$ 81.60$ 163,200.00$

3003 OPT 3-Stone Delivered between Mississippi River mile 735 and 598, including the mouth of White River

3003AA CRUSHED STONE 10,000 Tons 24.25$ 242,500.00$ 33.75$ 337,500.00$ 36.47$ 364,700.00$

3003AB CR-610 2,000 Tons 21.00$ 42,000.00$ 27.25$ 54,500.00$ 36.47$ 72,940.00$

3003AC 125 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.75$ 57,500.00$ 79.20$ 158,400.00$

3003AD 250 LB RIP RAP 2,000 Tons 24.00$ 48,000.00$ 28.75$ 57,500.00$ 76.80$ 153,600.00$

3003AE 400 LB RIP RAP 2,000 Tons 25.50$ 51,000.00$ 30.00$ 60,000.00$ 80.40$ 160,800.00$

3003AF 750 LB RIP RAP 2,000 Tons 26.50$ 53,000.00$ 31.50$ 63,000.00$ 82.80$ 165,600.00$

3004 OPT 3 - Stone delivered between Mississippi River mile 598 and 435

3004AA CRUSHED STONE 10,000 Tons 26.50$ 265,000.00$ 35.25$ 352,500.00$ 36.47$ 364,700.00$

3004AB CR-610 2,000 Tons 23.25$ 46,500.00$ 30.25$ 60,500.00$ 36.47$ 72,940.00$

3004AC 125 LB RIP RAP 2,000 Tons 26.25$ 52,500.00$ 31.25$ 62,500.00$ 80.40$ 160,800.00$

3004AD 250 LB RIP RAP 2,000 Tons 26.25$ 52,500.00$ 31.25$ 62,500.00$ 84.00$ 168,000.00$

3004AE 400 LB RIP RAP 2,000 Tons 27.75$ 55,500.00$ 32.50$ 65,000.00$ 86.40$ 172,800.00$

3004AF 750 LB RIP RAP 2,000 Tons 28.75$ 57,500.00$ 33.75$ 67,500.00$ 96.00$ 192,000.00$

3005 OPT 3-Stone delivered between Mississippi River mile 435 and 265, as well as, Atchafalaya River between mile 0.0 and 125

3005AA CRUSHED STONE 10,000 Tons 29.00$ 290,000.00$ 37.75$ 377,500.00$ 43.41$ 434,100.00$

3005AB CR-610 2,000 Tons 25.75$ 51,500.00$ 32.75$ 65,500.00$ 43.41$ 86,820.00$

3005AC 125 LB RIP RAP 2,000 Tons 28.75$ 57,500.00$ 34.00$ 68,000.00$ 87.60$ 175,200.00$

3005AD 250 LB RIP RAP 2,000 Tons 28.75$ 57,500.00$ 34.00$ 68,000.00$ 93.60$ 187,200.00$

3005AE 400 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.25$ 70,500.00$ 98.40$ 196,800.00$

3005AF 750 LB RIP RAP 2,000 Tons 31.25$ 62,500.00$ 36.75$ 73,500.00$ 111.60$ 223,200.00$

3006 OPT 3 - Stone delivered between Mississippi River mile 265 and 167.4

3006AA CRUSHED STONE 10,000 Tons 30.50$ 305,000.00$ 39.50$ 395,000.00$ 45.15$ 451,500.00$

ABSTRACT OF BIDS Page 6 of 9

3006AB CR-610 2,000 Tons 27.25$ 54,500.00$ 34.25$ 68,500.00$ 45.15$ 90,300.00$

3006AC 125 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.50$ 71,000.00$ 90.00$ 180,000.00$

3006AD 250 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.50$ 71,000.00$ 96.00$ 192,000.00$

3006AE 400 LB RIP RAP 2,000 Tons 31.75$ 63,500.00$ 37.00$ 74,000.00$ 103.20$ 206,400.00$

3006AF 750 LB RIP RAP 2,000 Tons 32.75$ 65,500.00$ 38.25$ 76,500.00$ 105.60$ 211,200.00$

3007 OPT 3-Stone delivered between Mississippi River mile 167.4 and 0.0

3007AA CRUSHED STONE 10,000 Tons 32.50$ 325,000.00$ 41.75$ 417,500.00$ 46.88$ 468,800.00$

3007AB CR-610 2,000 Tons 29.25$ 58,500.00$ 36.50$ 73,000.00$ 46.88$ 93,760.00$

3007AC 125 LB RIP RAP 2,000 Tons 32.25$ 64,500.00$ 37.75$ 75,500.00$ 138.92$ 277,840.00$

3007AD 250 LB RIP RAP 2,000 Tons 32.25$ 64,500.00$ 37.75$ 75,500.00$ 152.81$ 305,620.00$

3007AE 400 LB RIP RAP 2,000 Tons 33.75$ 67,500.00$ 39.00$ 78,000.00$ 166.70$ 333,400.00$

3007AF 750 LB RIP RAP 2,000 Tons 34.75$ 69,500.00$ 40.75$ 81,500.00$ 180.59$ 361,180.00$

3008 OPT-3-Stone delivered between Upper Mississippi mile 0 to 180

3008AA CRUSHED STONE 10,000 Tons 19.75$ 197,500.00$ 27.75$ 277,500.00$ 34.73$ 347,300.00$

3008AB CR-610 2,000 Tons 16.50$ 33,000.00$ 22.25$ 44,500.00$ 34.73$ 69,460.00$

3008AC 125 LB RIP RAP 2,000 Tons 19.50$ 39,000.00$ 23.75$ 47,500.00$ 138.92$ 277,840.00$

3008AD 250 LB RIP RAP 2,000 Tons 19.50$ 39,000.00$ 23.75$ 47,500.00$ 152.81$ 305,620.00$

3008AE 400 LB RIP RAP 2,000 Tons 21.00$ 42,000.00$ 25.00$ 50,000.00$ 166.70$ 333,400.00$

3008AF 750 LB RIP RAP 2,000 Tons 22.00$ 44,000.00$ 26.75$ 53,500.00$ 180.59$ 361,180.00$

3009 OPT 3 - Demmurage- This is the charge for detention of a ship by the Government beyond the time allowed for unloading10 Days $150.00 1,500.00$ 150.00$ 1,500.00$ 500.00$ 5,000.00$

TOTAL COST OPTION YEAR THREE 3,683,000.00$ 4,665,000.00$ 9,408,760.00$

OPTION YEAR FOUR

4001 OPTION YEAR 4 - NOVEMBER 1, 2023 THROUGH OCTOBER 30, 2024

4002 OPT 4 - Stone delivered between Mississippi River mile 953.8 and 735

4002AA CRUSHED STONE 10,000 Tons 23.25$ 232,500.00$ 32.00$ 320,000.00$ 36.47$ 364,700.00$

4002AB CR-610 2,000 Tons 20.00$ 40,000.00$ 26.25$ 52,500.00$ 36.47$ 72,940.00$

4002AC 125 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.50$ 55,000.00$ 70.80$ 141,600.00$

4002AD 250 LB RIP RAP 2,000 Tons 23.00$ 46,000.00$ 27.50$ 55,000.00$ 75.60$ 151,200.00$

4002AE 400 LB RIP RAP 2,000 Tons 24.50$ 49,000.00$ 29.00$ 58,000.00$ 76.80$ 153,600.00$

4002AF 750 LB RIP RAP 2,000 Tons 25.50$ 51,000.00$ 31.00$ 62,000.00$ 81.60$ 163,200.00$

4003 OPT 4 - Stone delivered between Mississippi River mile 735 and 598, including the mouth of White River

4003AA CRUSHED STONE 10,000 Tons 25.75$ 257,500.00$ 34.75$ 347,500.00$ 38.29$ 382,900.00$

4003AB CR-610 2,000 Tons 22.50$ 45,000.00$ 29.25$ 58,500.00$ 38.29$ 76,580.00$

ABSTRACT OF BIDS Page 7 of 9

4003AC 125 LB RIP RAP 2,000 Tons 25.50$ 51,000.00$ 30.00$ 60,000.00$ 79.20$ 158,400.00$

4003AD 250 LB RIP RAP 2,000 Tons 25.50$ 51,000.00$ 30.00$ 60,000.00$ 76.80$ 153,600.00$

4003AE 400 LB RIP RAP 2,000 Tons 27.00$ 54,000.00$ 32.00$ 64,000.00$ 80.40$ 160,800.00$

4003AF 750 LB RIP RAP 2,000 Tons 28.00$ 56,000.00$ 33.50$ 67,000.00$ 82.80$ 165,600.00$

4004 OPT 4 - Stone delivered between Mississippi River mile 598 and 435

4004AA CRUSHED STONE 10,000 Tons 28.00$ 280,000.00$ 37.25$ 372,500.00$ 38.29$ 382,900.00$

4004AB CR-610 2,000 Tons 24.75$ 49,500.00$ 31.50$ 63,000.00$ 38.29$ 76,580.00$

4004AC 125 LB RIP RAP 2,000 Tons 27.75$ 55,500.00$ 32.50$ 65,000.00$ 80.40$ 160,800.00$

4004AD 250 LB RIP RAP 2,000 Tons 27.75$ 55,500.00$ 32.50$ 65,000.00$ 84.00$ 168,000.00$

4004AE 400 LB RIP RAP 2,000 Tons 29.25$ 58,500.00$ 34.25$ 68,500.00$ 86.40$ 172,800.00$

4004AF 750 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.75$ 71,500.00$ 96.00$ 192,000.00$

4005 OPT 4-Stone delivered between Mississippi River mile 435 and 265, as well Atchafalaya River between mile 0.0 and 125

4005AA CRUSHED STONE 10,000 Tons 30.50$ 305,000.00$ 40.00$ 400,000.00$ 45.58$ 455,800.00$

4005AB CR-610 2,000 Tons 27.25$ 54,500.00$ 34.25$ 68,500.00$ 45.58$ 91,160.00$

4005AC 125 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.25$ 70,500.00$ 87.60$ 175,200.00$

4005AD 250 LB RIP RAP 2,000 Tons 30.25$ 60,500.00$ 35.25$ 70,500.00$ 93.60$ 187,200.00$

4005AE 400 LB RIP RAP 2,000 Tons 31.75$ 63,500.00$ 37.00$ 74,000.00$ 98.40$ 196,800.00$

4005AF 750 LB RIP RAP 2,000 Tons 32.75$ 65,500.00$ 38.50$ 77,000.00$ 116.60$ 233,200.00$

4006 OPT 4-Stone delivered between Mississippi River mile 265 and 167.4

4006AA CRUSHED STONE 10,000 Tons 32.00$ 320,000.00$ 41.75$ 417,500.00$ 47.40$ 474,000.00$

4006AB CR-610 2,000 Tons 28.75$ 57,500.00$ 35.75$ 71,500.00$ 47.40$ 94,800.00$

4006AC 125 LB RIP RAP 2,000 Tons 31.75$ 63,500.00$ 37.00$ 74,000.00$ 90.00$ 180,000.00$

4006AD 250 LB RIP RAP 2,000 Tons 31.75$ 63,500.00$ 37.00$ 74,000.00$ 96.00$ 192,000.00$

4006AE 400 LB RIP RAP 2,000 Tons 33.25$ 66,500.00$ 38.50$ 77,000.00$ 103.20$ 206,400.00$

4006AF 750 LB RIP RAP 2,000 Tons 34.25$ 68,500.00$ 40.00$ 80,000.00$ 105.60$ 211,200.00$

4007 OPT 4 - Stone delivered between Mississippi River mile 167.4 and 0.0

4007AA CRUSHED STONE 10,000 Tons 34.25$ 342,500.00$ 44.25$ 442,500.00$ 49.23$ 492,300.00$

4007AB CR-610 2,000 Tons 31.00$ 62,000.00$ 38.25$ 76,500.00$ 49.23$ 98,460.00$

4007AC 125 LB RIP RAP 2,000 Tons 34.00$ 68,000.00$ 39.50$ 79,000.00$ 145.86$ 291,720.00$

4007AD 250 LB RIP RAP 2,000 Tons 34.00$ 68,000.00$ 39.50$ 79,000.00$ 160.45$ 320,900.00$

4007AE 400 LB RIP RAP 2,000 Tons 35.50$ 71,000.00$ 41.00$ 82,000.00$ 175.03$ 350,060.00$

4007AF 750 LB RIP RAP 2,000 Tons 36.50$ 73,000.00$ 42.50$ 85,000.00$ 189.62$ 379,240.00$

4008 OPT 4 - Stone delivered between Upper Mississippi Mile 0 to 180

4008AA CRUSHED STONE 10,000 Tons 21.00$ 210,000.00$ 29.50$ 295,000.00$ 36.47$ 364,700.00$

ABSTRACT OF BIDS Page 8 of 9

4008AB CR-610 2,000 Tons 17.75$ 35,500.00$ 23.75$ 47,500.00$ 36.47$ 72,940.00$

4008AC 125 LB RIP RAP 2,000 Tons 20.75$ 41,500.00$ 24.75$ 49,500.00$ 145.86$ 291,720.00$

4008AD 250 LB RIP RAP 2,000 Tons 20.75$ 41,500.00$ 24.75$ 49,500.00$ 160.45$ 320,900.00$

4008AE 400 LB RIP RAP 2,000 Tons 22.25$ 44,500.00$ 26.50$ 53,000.00$ 175.03$ 350,060.00$

4008AF 750 LB RIP RAP 2,000 Tons 23.25$ 46,500.00$ 28.00$ 56,000.00$ 189.62$ 379,240.00$

4009 OPT 4 - Demmurage - This is the charge for detention of a ship by the Government beyond the time allowed for unloading10 Days $150.00 1,500.00$ 150.00$ 1,500.00$ 500.00$ 5,000.00$

TOTAL COST OPTION YEAR FOUR 3,893,000.00$ 4,915,500.00$ 9,713,200.00$

s

TOTAL COST OF ALL CONTRACT LINE ITEMS (0001-4009) 17,765,000.00$ 22,453,000.00$ 43,416,540.00$

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 9 of 9

I certify that all bid(s) received in response to this solicitation have been opened, read and recorded on this abstract.

Valerie Marshall, Contract Specialist

File details come from the government source that posted it.