corrected-bidresults.pdf

PDF 305 KB Posted

Attached to
MAYO DITCH CULVERT SCOUR REPAIRS Federal contract opportunity
Solicitation number
W912EQ-11-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

UPDATE-CORRECTED BIDRESULT

View the file

Other files for this federal contract opportunity

Other files attached to MAYO DITCH CULVERT SCOUR REPAIRS, newest first.
File Type Posted
PART2BIDDER12.pdf PDF
PART1BIDDER12.pdf PDF
PART2BIDDER5.pdf PDF
PART1BIDDER5.pdf PDF
PART2BIDDER4.pdf PDF
PART1BIDDER4.pdf PDF
PART2BIDDER3.pdf PDF
PART1BIDDER3.pdf PDF
BIDDER11.pdf PDF
BIDDER10.pdf PDF
BIDDER9.pdf PDF
BIDDER8.pdf PDF
BIDDER7.pdf PDF
BIDDER6.pdf PDF
BIDDER2.pdf PDF
BIDDER1.pdf PDF
Bidresults.pdf PDF
corrected-bidresults.pdf PDF
ABSTRACT1.pdf PDF
Abstract2.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNOFFICIAL ABSTRACT

I certify that I have opened and read all offers received in response to this solicitation and all offers have been recorded on this abstract Judy Stallion, Bid Opening Officer

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

1 Mobilization and Demobilization-Land Based

Equipment (AREA 1-STATE OF ILLINOIS) LINE ITEM 1-

1 LS

XXX

32,620.00 XXX 17,847.75

2 Remobilization-Land Based Equipment 25 MI 665.77 16,644.25 151.68 3,792.00 3 Clearing 10 AC 2,012.36 20,123.60 1189.93 11,899.30 4 Grubbing 5 AC 575.83 2,879.15 740.73 3,703.65

5 Stripping 5 AC 903.05 4,515.25 1358.91 6,794.55

6 Excavation 5,000 CY 3.61 18,050.00 4.02 20,100.00 7 Geotextile(Filter Fabric) 250 SY 2.46 615.00 13.34 3,335.00 8 Corrugated Metal Pipe, 24-inch 300 LF 75.34 22,602.00 72.33 21,699.00 9 Corrugated Metal Pipe, 36-inch 300 LF 137.56 41,268.00 101.41 30,423.00

10 Corrugated Metal Pipe, 48-inch 360 LF 265.88 95,716.80 117.63 42,346.80

11 Corrugated Metal Pipe, 60-inch 360 LF 323.56 116,481.60 170.11 61,239.60 12 Flared End Section, 24-inch 3 EA 1,160.96 3,482.88 723.97 2,171.91 13 Flared End Section, 36-inch 3 EA 3,695.82 11,087.46 1116.44 3,349.32 14 Flared End Section, 48-inch 3 EA 7,385.22 22,155.66 1816.85 5,450.55 15 Flared End Section, 60-inch 3 EA 10,428.62 31,285.86 2819.17 8,457.51 16 Flapgate, 24-inch 3 EA 6,413.35 19,240.05 1349.20 4,047.60 17 Flapgate, 36-inch 3 EA 9,430.83 28,292.49 3883.28 11,649.84 18 Flapgate, 48-inch 3 EA 16,289.93 48,869.79 7353.94 22,061.82

19 Flapgate, 60-inch 3 EA 25,183.94 75,551.82 9615.10 28845.30 20 Filter Material 750 TN 16.82 12,615.00 12.98 9735.00 21 Embankment 2,500 CY 7.20 18,000.00 5.97 14925.00 22 Semi-compacted Backfill 4,000 CY 8.60 34,400.00 6.01 24040.00 23 Compacted Backfill 1,000 CY 12.63 12,630.00 9.42 9420.00 24 Aggregate Surfacing-Crushed Limestone 500 CY 33.41 16,705.00 27.01 13505.00 25 R-90 (90#) Riprap 2,000 TN 21.51 43,020.00 17.86 35720.00 26 R-200 (200#) Riprap 2,500 TN 22.60 56,500.00 17.63 44075.00 27 R-400 (400#) Riprap 2,500 TN 24.40 61,000.00 17.63 44075.00

MEMPHIS

DISTRICT

TOPEKA, KS 86607

BID OPENING DATE AND TIME: 07/06/2011 AT 2:30 PM COST

NUMBER OF AMENDMENTS: 0008

SMALL BUSINESS DETERMINATION: Competitive 8(a) ENGINEERING

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

BIDDER #3BIDDER #2INVITATION NO.: W912EQ-11-B-0002

TITLE: INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT WITHIN

THE MEMPHIS DISTRICT(IL, MO,AR, KY, TN, AND MS)

GOVT. ESTIMATE

My Company

BIDDER #1

729 SE WEAR AVENUE

28 R-650 (650#) Riprap 1,500 TN 25.69 38,535.00 17.01 25515.00 29 R-2200 (2200#) Riprap 1,500 TN 35.65 53,475.00 17.01 25515.00 30 Transportation of Filter Material, Aggregate Surfacing and /or Riprap

705,000 TN-MI 0.27 190,350.00 0.19 133950.00

31 Grout 50 CY 180.15 9,007.50 198.26 9913.00 32 Turfing 10 AC 1,819.89 18,198.90 1358.02 13580.20 33 Slit Fence 500 LF 1.45 725.00 2.30 1150.00 34 Temporary Environmental Seeding 10 AC 863.47 8,634.70 889.24 8892.40 35 Construction Entrance/Exit 1 EA XXX 3,750.00 2309.40 2309.40 36 Sand/Gravel Bag 50 EA 7.46 373.00 10.20 510.00 37 Erosion Control Berm 500 LF 0.30 150.00 4.20 2100.00 38 Temporary Mulch Stabilization 5 AC 1,373.50 6,867.50 863.18 4315.90 39 Erosion Control Blanket/Temporary Matting 300 SY 0.95 285.00 4.03 1209.00

Mobilization and Demobilization-Land Based Equipment (AREA II-STATE OF MISSOURI) LINE ITEMS 40-78

1 LS

XXX

32,300.00 XXX 17,847.75

41 Remobilization-Land Based Equipment 25 MI 656.65 16,416.25 151.68 3,792.00 42 Clearing 10 AC 1,965.53 19,655.30 1079.49 10,794.90 43 Grubbing 5 AC 558.41 2,792.05 707.21 3,536.05 44 Stripping 5 AC 870.55 4,352.75 1283.50 6,417.50 45 Excavation 5,000 CY 3.52 17,600.00 3.92 19,600.00 46 Geotextile(Filter Fabric) 250 SY 2.45 612.50 12.63 3,157.50 47 Corrugated Metal Pipe, 24-inch 300 LF 74.94 22,482.00 70.52 21,156.00 48 Corrugated Metal Pipe, 36-inch 300 LF 137.02 41,106.00 99.59 29,877.00 49 Corrugated Metal Pipe, 48-inch 360 LF 265.24 95,486.40 116.12 41,803.20 50 Corrugated Metal Pipe, 60-inch 360 LF 322.69 116,168.40 168.60 60,696.00 51 Flared End Section, 24-inch 3 EA 1,156.92 3,470.76 695.71 2,087.13 52 Flared End Section, 36-inch 3 EA 3,691.19 11,073.57 1088.18 3,264.54 53 Flared End Section, 48-inch 3 EA 7,378.74 22,136.22 1788.59 5,365.77 54 Flared End Section, 60-inch 3 EA 10,412.44 31,237.32 2790.91 8,372.73 55 Flapgate, 24-inch 3 EA 6,394.98 19,184.94 1335.08 4,005.24 56 Flapgate, 36-inch 3 EA 9,402.77 28,208.31 3893.42 11,680.26 57 Flapgate, 48-inch 3 EA 16,236.05 48,708.15 7335.11 22,005.33 58 Flapgate, 60-inch 3 EA 25,055.69 75,167.07 9591.54 28,774.62 59 Filter Material 750 TN 15.56 11,670.00 12.64 9,480.00 60 Embankment 2,500 CY 6.96 17,400.00 5.80 14,500.00 61 Semi-compacted Backfill 4,000 CY 8.43 33,720.00 5.72 22,880.00 62 Compacted Backfill 1,000 CY 12.43 12,430.00 9.23 9,230.00 63 Aggregate Surfacing-Crushed Limestone 500 CY 30.89 15,445.00 26.42 13,210.00 64 R-90 (90#) Riprap 2,000 TN 20.00 40,000.00 17.54 35,080.00 65 R-200 (200#) Riprap 2,500 TN 19.68 49,200.00 17.49 43,725.00 66 R-400 (400#) Riprap 2,500 TN 20.77 51,925.00 17.99 44,975.00 67 R-650 (650#) Riprap 1,500 TN 21.09 31,635.00 17.90 26,850.00 68 R-2200 (2200#) Riprap 1,500 TN 42.24 63,360.00 17.90 26,850.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.27 190,350.00 0.26 183,300.00

70 Grout 50 CY 148.17 7,408.50 195.02 9,751.00 71 Turfing 10 AC 1,840.31 18,403.10 1314.05 13,140.50 72 Slit Fence 500 LF 1.45 725.00 2.18 1,090.00 73 Temporary Environmental Seeding 10 AC 834.73 8,347.30 1163.86 11,638.60

74 Construction Entrance/Exit 1 EA XXX 3,670.00 2246.56 2,246.56 75 Sand/Gravel Bag 50 EA 7.41 370.50 9.91 495.50 76 Erosion Control Berm 500 LF 0.29 145.00 3.99 1,995.00 77 Temporary Mulch Stabilization 5 AC 1,366.82 6,834.10 976.67 4,883.35 78 Erosion Control Blanket/Temporary Matting 300 SY 0.94 282.00 3.93 1,179.00

Mobilization and Demobilization-Land Based Equipment (AREA III STATE OF ARKANSAS) LINE

ITEM 79-117)

1 LS

XXX

29,730.00 XXX 17,847.75

80 Remobilization-Land Based Equipment 25 MI 588.17 14,704.25 151.68 3,792.00 81 Clearing 10 AC 1,376.31 13,763.10 905.38 9,053.80 82 Grubbing 5 AC 473.43 2,367.15 558.67 2,793.35 83 Stripping 5 AC 729.73 3,648.65 949.28 4,746.40 84 Excavation 5,000 CY 2.96 14,800.00 3.37 16,850.00 85 Geotextile(Filter Fabric) 250 SY 2.22 555.00 9.24 2,310.00 86 Corrugated Metal Pipe, 24-inch 300 LF 68.70 20,610.00 62.87 18,861.00 87 Corrugated Metal Pipe, 36-inch 300 LF 129.39 38,817.00 91.94 27,582.00 88 Corrugated Metal Pipe, 48-inch 360 LF 257.94 92,858.40 109.74 39,506.40 89 Corrugated Metal Pipe, 60-inch 360 LF 312.39 112,460.40 162.22 58,399.20 90 Flared End Section, 24-inch 3 EA 1,102.08 3,306.24 557.43 1,672.29 91 Flared End Section, 36-inch 3 EA 3,672.02 11,016.06 949.90 2,849.70 92 Flared End Section, 48-inch 3 EA 7,392.50 22,177.50 1650.32 4,950.96 93 Flared End Section, 60-inch 3 EA 10,299.32 30,897.96 2652.63 7,957.89 94 Flapgate, 24-inch 3 EA 6,166.60 18,499.80 1265.94 3,797.82 95 Flapgate, 36-inch 3 EA 9,047.12 27,141.36 3801.23 11,403.69 96 Flapgate, 48-inch 3 EA 15,519.83 46,559.49 7242.92 21,728.76 97 Flapgate, 60-inch 3 EA 23,100.68 69,302.04 9476.32 28,428.96 98 Filter Material 750 TN 15.49 11,617.50 13.94 10,455.00 99 Embankment 2,500 CY 5.94 14,850.00 5.02 12,550.00

100 Semi-compacted Backfill 4,000 CY 6.61 26,440.00 4.28 17,120.00 101 Compacted Backfill 1,000 CY 10.07 10,070.00 8.53 8,530.00 102 Aggregate Surfacing-Crushed Limestone 500 CY 30.29 15,145.00 28.33 14,165.00 103 R-90 (90#) Riprap 2,000 TN 20.46 40,920.00 16.63 33,260.00 104 R-200 (200#) Riprap 2,500 TN 21.12 52,800.00 16.78 41,950.00 105 R-400 (400#) Riprap 2,500 TN 36.89 92,225.00 18.06 45,150.00 106 R-650 (650#) Riprap 1,500 TN 39.51 59,265.00 17.96 26,940.00 107 R-2200 (2200#) Riprap 1,500 TN 42.13 63,195.00 30.47 45,705.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 530,000 TN-MI 0.33 174,900.00 0.25 132,500.00

109 Grout 50 CY 143.44 7,172.00 177.46 8,873.00 110 Turfing 10 AC 1,617.96 16,179.60 1080.55 10,805.50 111 Slit Fence 500 LF 1.39 695.00 1.45 725.00 112 Temporary Environmental Seeding 10 AC 712.83 7,128.30 772.43 7,724.30 113 Construction Entrance/Exit 1 EA XXX 2,900.00 1953.71 1,953.71 114 Sand/Gravel Bag 50 EA 6.31 315.50 8.09 404.50 115 Erosion Control Berm 500 LF 0.24 120.00 3.07 1,535.00 116 Temporary Mulch Stabilization 5 AC 1,204.48 6,022.40 846.55 4,232.75 117 Erosion Control Blanket/Temporary Matting 300 SY 0.68 204.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment (AREA IV- STATE OF KENTUCKY) LINE

ITEM 118-156)

1 LS

XXX

31,570.00 XXX 17,847.75

119 Remobilization-Land Based Equipment 25 MI 637.33 15,933.25 151.68 3,792.00 120 Clearing 10 AC 1,836.03 18,360.30 833.50 8,335.00 121 Grubbing 5 AC 530.44 2,652.20 630.29 3,151.45

122 Stripping 5 AC 829.42 4,147.10 1110.42 5,552.10 123 Excavation 5,000 CY 3.35 16,750.00 3.72 18,600.00 124 Geotextile(Filter Fabric) 250 SY 2.40 600.00 11.34 2,835.00 125 Corrugated Metal Pipe, 24-inch 300 LF 73.47 22,041.00 65.48 19,644.00 126 Corrugated Metal Pipe, 36-inch 300 LF 135.06 40,518.00 96.96 29,088.00 127 Corrugated Metal Pipe, 48-inch 360 LF 262.84 94,622.40 113.92 41,011.20 128 Corrugated Metal Pipe, 60-inch 360 LF 319.51 115,023.60 166.41 59,907.60 129 Flared End Section, 24-inch 3 EA 1,142.14 3,426.42 639.34 1,918.02 130 Flared End Section, 36-inch 3 EA 3,673.42 11,020.26 1031.82 3,095.46 131 Flared End Section, 48-inch 3 EA 7,353.04 22,059.12 1732.23 5,196.69 132 Flared End Section, 60-inch 3 EA 10,351.18 31,053.54 2734.55 8,203.65 133 Flapgate, 24-inch 3 EA 6,327.38 18,982.14 1306.89 3,920.67 134 Flapgate, 36-inch 3 EA 9,299.63 27,898.89 3855.84 11,567.52 135 Flapgate, 48-inch 3 EA 16,038.69 48,116.07 7297.53 21,892.59 136 Flapgate, 60-inch 3 EA 24,590.83 73,772.49 9544.58 28,633.74 137 Filter Material 750 TN 22.04 16,530.00 16.11 12,082.50 138 Embankment 2,500 CY 6,060.00 16,500.00 5.41 13,525.00 139 Semi-compacted Backfill 4,000 CY 8.00 32,000.00 5.12 20,480.00 140 Compacted Backfill 1,000 CY 11.88 11,880.00 8.90 8,900.00 141 Aggregate Surfacing-Crushed Limestone 500 CY 43.09 21,545.00 33.04 16,520.00 142 R-90 (90#) Riprap 2,000 TN 26.73 53,460.00 18.46 36,920.00 143 R-200 (200#) Riprap 2,500 TN 27.82 69,550.00 18.54 46,350.00 144 R-400 (400#) Riprap 2,500 TN 29.62 74,050.00 18.54 46,350.00 145 R-650 (650#) Riprap 1,500 TN 30.91 46,365.00 20.81 31,215.00 146 R-2200 (2200#) Riprap 1,500 TN 35.21 52,815.00 30.95 46,425.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.27 190,350.00 0.25 176,250.00

148 Grout 50 CY 146.65 7,332.50 190.13 9,506.50 149 Turfing 10 AC 1,745.97 17,459.70 1219.93 12,199.30 150 Slit Fence 500 LF 1.44 720.00 2.05 1,025.00 151 Temporary Environmental Seeding 10 AC 791.64 7,916.40 839.13 8,391.30 152 Construction Entrance/Exit 1 EA XXX 3,650.00 2102.33 2,102.33 153 Sand/Gravel Bag 50 EA 7.19 359.50 9.58 479.00 154 Erosion Control Berm 500 LF 0.28 140.00 3.51 1,755.00 155 Temporary Mulch Stabilization 5 AC 1,333.70 6,668.50 936.07 4,680.35 156 Erosion Control Blanket/Temporary Matting 300 SY 0.89 267.00 3.82 1,146.00

Mobilization and Demobilization-Land Based Equipment (AREA V (STATE OF TENNESSEE) LINE

ITEMS 157-195)

1 LS

XXX

29,800.00 XXX 17,847.75

158 Remobilization-Land Based Equipment 25 MI 590.29 14,757.25 151.68 3,792.00 159 Clearing 10 AC 1,392.00 13,920.00 709.40 7,094.00 160 Grubbing 5 AC 476.81 2,384.05 535.74 2,678.70 161 Stripping 5 AC 735.28 3,676.40 897.68 4,488.40 162 Excavation 5,000 CY 2.98 14,900.00 3.32 16,600.00 163 Geotextile(Filter Fabric) 250 SY 2.25 562.50 8.67 2,167.50 164 Corrugated Metal Pipe, 24-inch 300 LF 69.65 20,895.00 63.40 19,020.00 165 Corrugated Metal Pipe, 36-inch 300 LF 131.16 39,348.00 92.47 27,741.00 166 Corrugated Metal Pipe, 48-inch 360 LF 261.45 94,122.00 110.18 39,664.80 167 Corrugated Metal Pipe, 60-inch 360 LF 316.65 113,994.00 162.66 58,557.60 168 Flared End Section, 24-inch 3 EA 1,117.14 3,351.42 543.10 1,629.30 169 Flared End Section, 36-inch 3 EA 3,721.96 11,165.88 935.57 2,806.71 170 Flared End Section, 48-inch 3 EA 7,492.97 22,478.91 1635.98 4,907.94 171 Flared End Section, 60-inch 3 EA 10,439.47 31,318.41 2638.30 7,914.90

172 Flapgate, 24-inch 3 EA 6,250.73 18,752.19 1258.77 3,776.31 173 Flapgate, 36-inch 3 EA 9,170.58 27,511.74 3791.68 11,375.04 174 Flapgate, 48-inch 3 EA 15,731.76 47,195.28 7233.37 21,700.11 175 Flapgate, 60-inch 3 EA 23,417.34 70,252.02 9464.37 28,393.11 176 Filter Material 750 TN 26.34 19,755.00 15.38 11,535.00 177 Embankment 2,500 CY 5.98 14,950.00 4.96 12,400.00 178 Semi-compacted Backfill 4,000 CY 6.66 26,640.00 4.68 18,720.00 179 Compacted Backfill 1,000 CY 10.13 10,130.00 8.68 8,680.00 180 Aggregate Surfacing-Crushed Limestone 500 CY 46.82 23,410.00 33.47 16,735.00 181 R-90 (90#) Riprap 2,000 TN 34.70 69,400.00 17.27 34,540.00 182 R-200 (200#) Riprap 2,500 TN 34.70 86,750.00 18.54 46,350.00 183 R-400 (400#) Riprap 2,500 TN 37.35 93,375.00 19.75 49,375.00 184 R-650 (650#) Riprap 1,500 TN 40.01 60,015.00 21.08 31,620.00 185 R-2200 (2200#) Riprap 1,500 TN 42,066.00 63,990.00 24.52 36,780.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 470,000 TN-MI 0.33 155,100.00 0.24 112,800.00

187 Grout 50 CY 145.26 7,263.00 176.03 8,801.50 188 Turfing 10 AC 1,638.73 16,387.30 1082.75 10,827.50 189 Slit Fence 500 LF 1.39 695.00 1.45 725.00 190 Temporary Environmental Seeding 10 AC 717.64 7,176.40 772.43 7,724.30 191 Construction Entrance/Exit 1 EA XXX 2,870.00 1925.04 1,925.04 192 Sand/Gravel Bag 50 EA 6.41 320.50 8.09 404.50 193 Erosion Control Berm 500 LF 0.24 120.00 2.92 1,460.00 194 Temporary Mulch Stabilization 5 AC 1,221.02 6,105.10 832.21 4,161.05 195 Erosion Control Blanket/Temporary Matting 300 SY 0.69 207.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment (AREA VI-STATE OF MISSISSIPPI) LINE

ITEMS 196-234

1 LS

XXX

29,760.00 XXX 18,753.90

197 Remobilization-Land Based Equipment 25 MI 589.24 14,731.00 157.19 3,929.75 198 Clearing 10 AC 1,384.56 13,845.60 761.87 7,618.70 199 Grubbing 5 AC 475.20 2,376.00 608.64 3,043.20 200 Stripping 5 AC 732.65 3,663.25 983.71 4,918.55 201 Excavation 5,000 CY 2.97 14,850.00 3.44 17,200.00 202 Geotextile(Filter Fabric) 250 SY 2.24 560.00 9.72 2,430.00 203 Corrugated Metal Pipe, 24-inch 300 LF 69.41 20,823.00 63.58 19,074.00 204 Corrugated Metal Pipe, 36-inch 300 LF 130.74 39,222.00 91.74 27,522.00 205 Corrugated Metal Pipe, 48-inch 360 LF 260.66 93,837.60 108.52 39,067.20 206 Corrugated Metal Pipe, 60-inch 360 LF 315.68 113,644.80 159.35 57,366.00 207 Flared End Section, 24-inch 3 EA 1,113.60 3,340.80 549.29 1,647.87 208 Flared End Section, 36-inch 3 EA 3,711.24 11,133.72 929.39 2,788.17 209 Flared End Section, 48-inch 3 EA 7,471.73 22,415.19 1607.72 4,823.16 210 Flared End Section, 60-inch 3 EA 10,409.02 31,227.06 2578.44 7,735.32 211 Flapgate, 24-inch 3 EA 6,231.44 18,694.32 1293.13 3,879.39 212 Flapgate, 36-inch 3 EA 9,142.14 27,426.42 3741.16 11,223.48 213 Flapgate, 48-inch 3 EA 15,682.28 47,046.84 7074.35 21,223.05 214 Flapgate, 60-inch 3 EA 23,337.82 70,013.46 9230.00 27,690.00 215 Filter Material 750 TN 26.27 19,702.50 15.93 11,947.50 216 Embankment 2,500 CY 5.96 14,900.00 5.23 13,075.00 217 Semi-compacted Backfill 4,000 CY 6.64 26,560.00 4.32 17,280.00 218 Compacted Backfill 1,000 CY 10.10 10,100.00 8.73 8,730.00 219 Aggregate Surfacing-Crushed Limestone 500 CY 46.67 23,335.00 33.46 16,730.00 220 R-90 (90#) Riprap 2,000 TN 34.60 69,200.00 17.11 34,220.00

221 R-200 (200#) Riprap 2,500 TN 34.60 86,500.00 18.32 45,800.00 222 R-400 (400#) Riprap 2,500 TN 37.25 93,125.00 19.49 48,725.00 223 R-650 (650#) Riprap 1,500 TN 39.90 59,850.00 20.84 31,260.00 224 R-2200 (2200#) Riprap 1,500 TN 42.54 63,810.00 30.49 45,735.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 470,000 TN-MI 0.33 155,100.00 0.25 117,500.00

226 Grout 50 CY 144.84 7,242.00 173.82 8,691.00 227 Turfing 10 AC 1,632.36 16,323.60 1086.61 10,866.10 228 Slit Fence 500 LF 1.39 695.00 1.14 570.00 229 Temporary Environmental Seeding 10 AC 715.35 7,153.50 741.81 7,418.10 230 Construction Entrance/Exit 1 EA XXX 2,790.00 2229.47 2,229.47 231 Sand/Gravel Bag 50 EA 6.38 319.00 11.18 559.00 232 Erosion Control Berm 500 LF 0.24 120.00 3.56 1,780.00 233 Temporary Mulch Stabilization 5 AC 1,216.64 6,083.20 774.54 3,872.70 234 Erosion Control Blanket/Temporary Matting 300 SY 0.69 207.00 3.62 1,086.00

SCHEDULE A-BASIC YEAR TOTAL ITEMS 0001 THRU

0234 (AREAS 1 THRU VI) XXX XXX XXX 7,258,437.04 XXX 4,423,733.55

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 1-AREA I (STATE OF

ILLINOIS) LINE ITEMS 235-273

1 LS

XXX

33,930.00 XXX 21,797.00

236 Remobilization-Land Based Equipment 25 MI 692.40 17,310.00 151.68 3,792.00 237 Clearing 10 AC 2,092.85 20,928.50 1,189.93 11,899.30 238 Grubbing 5 AC 598.86 2,994.30 740.73 3,703.65 239 Stripping 5 AC 939.17 4,695.85 1,358.91 6,794.55 240 Excavation 5,000 CY 3.76 18,800.00 4.02 20,100.00 241 Geotextile(Filter Fabric) 250 SY 2.56 640.00 13.34 3,335.00 242 Corrugated Metal Pipe, 24-inch 300 LF 78.35 23,505.00 72.33 21,699.00 243 Corrugated Metal Pipe, 36-inch 300 LF 143.06 42,918.00 101.41 30,423.00 244 Corrugated Metal Pipe, 48-inch 360 LF 276.52 99,547.20 117.63 42,346.80 245 Corrugated Metal Pipe, 60-inch 360 LF 336.50 121,140.00 170.11 61,239.60 246 Flared End Section, 24-inch 3 EA 1,207.39 3,622.17 723.97 2,171.91 247 Flared End Section, 36-inch 3 EA 3,843.65 11,530.95 1,116.44 3,349.32 248 Flared End Section, 48-inch 3 EA 7,680.63 23,041.89 1,816.85 5,450.55 249 Flared End Section, 60-inch 3 EA 10,845.76 32,537.28 2,819.17 8,457.51 250 Flapgate, 24-inch 3 EA 6,669.88 20,009.64 1,349.20 4,047.60 251 Flapgate, 36-inch 3 EA 9,808.07 29,424.21 3,883.28 11,649.84 252 Flapgate, 48-inch 3 EA 16,941.53 50,824.59 7,353.94 22,061.82 253 Flapgate, 60-inch 3 EA 26,191.29 78,573.87 9,615.10 28,845.30 254 Filter Material 750 TN 17.49 13,117.50 13.32 9,990.00 255 Embankment 2,500 CY 7.48 18,700.00 5.97 14,925.00 256 Semi-compacted Backfill 4,000 CY 8.95 35,800.00 6.01 24,040.00 257 Compacted Backfill 1,000 CY 13.14 13,140.00 9.42 9,420.00 258 Aggregate Surfacing-Crushed Limestone 500 CY 34.74 17,370.00 28.97 14,485.00 259 R-90 (90#) Riprap 2,000 TN 22.37 44,740.00 18.35 36,700.00 260 R-200 (200#) Riprap 2,500 TN 23.51 58,775.00 18.11 45,275.00 261 R-400 (400#) Riprap 2,500 TN 25.38 63,450.00 18.11 45,275.00 262 R-650 (650#) Riprap 1,500 TN 26.72 40,080.00 17.50 26,250.00 263 R-2200 (2200#) Riprap 1,500 TN 37.08 55,620.00 17.50 26,250.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.28 197,400.00 0.19 133,950.00

265 Grout 50 CY 187.36 9,368.00 198.26 9,913.00 266 Turfing 10 AC 1,892.68 18,926.80 1,358.02 13,580.20 267 Slit Fence 500 LF 1.50 750.00 2.30 1,150.00

268 Temporary Environmental Seeding 10 AC 898.01 8,980.10 889.24 8,892.40 269 Construction Entrance/Exit 1 EA XXX 3,900.00 2,309.40 2,309.40 270 Sand/Gravel Bag 50 EA 7.76 388.00 10.20 510.00 271 Erosion Control Berm 500 LF 0.31 155.00 4.20 2,100.00 272 Temporary Mulch Stabilization 5 AC 1,428.44 7,142.20 863.18 4,315.90 273 Erosion Control Blanket/Temporary Matting 300 SY 0.99 297.00 4.03 1,209.00

Mobilization and Demobilization-Land Based Equipment(OPTION YEAR 1-AREA II (STATE OF

MISSOURI) LINE ITEMS 274-312

1 LS

XXX

33,590.00 XXX 21,797.00

275 Remobilization-Land Based Equipment 25 MI 682.92 17,073.00 151.68 3,792.00 276 Clearing 10 AC 2,044.15 20,441.50 1,079.49 10,794.90 277 Grubbing 5 AC 580.75 2,903.75 707.21 3,536.05 278 Stripping 5 AC 905.37 4,526.85 1,283.50 6,417.50 279 Excavation 5,000 CY 3.66 18,300.00 3.92 19,600.00 280 Geotextile(Filter Fabric) 250 SY 2.55 637.50 12.63 3,157.50 281 Corrugated Metal Pipe, 24-inch 300 LF 77.93 23,379.00 70.52 21,156.00 282 Corrugated Metal Pipe, 36-inch 300 LF 142.50 42,750.00 99.59 29,877.00 283 Corrugated Metal Pipe, 48-inch 360 LF 275.85 99,306.00 116.12 41,803.20 284 Corrugated Metal Pipe, 60-inch 360 LF 335.60 120,816.00 168.60 60,696.00 285 Flared End Section, 24-inch 3 EA 1,203.19 3,609.57 695.71 2,087.13 286 Flared End Section, 36-inch 3 EA 3,838.84 11,516.52 1,088.18 3,264.54 287 Flared End Section, 48-inch 3 EA 7,673.89 23,021.67 1,788.59 5,365.77 288 Flared End Section, 60-inch 3 EA 10,828.93 32,486.79 2,790.91 8,372.73 289 Flapgate, 24-inch 3 EA 6,650.77 19,952.31 1,335.08 4,005.24 290 Flapgate, 36-inch 3 EA 9,778.88 29,336.64 3,893.42 11,680.26 291 Flapgate, 48-inch 3 EA 16,885.49 50,656.47 7,335.11 22,005.33 292 Flapgate, 60-inch 3 EA 26,057.91 78,173.73 9,591.54 28,774.62 293 Filter Material 750 TN 16.18 12,135.00 12.97 9,727.50 294 Embankment 2,500 CY 7.23 18,075.00 5.80 14,500.00 295 Semi-compacted Backfill 4,000 CY 8.77 35,080.00 5.72 22,880.00 296 Compacted Backfill 1,000 CY 12.92 12,920.00 9.23 9,230.00 297 Aggregate Surfacing-Crushed Limestone 500 CY 32.13 16,065.00 27.40 13,700.00 298 R-90 (90#) Riprap 2,000 TN 20.80 41,600.00 17.42 34,840.00 299 R-200 (200#) Riprap 2,500 TN 20.46 51,150.00 17.51 43,775.00 300 R-400 (400#) Riprap 2,500 TN 21.60 54,000.00 17.51 43,775.00 301 R-650 (650#) Riprap 1,500 TN 21.93 32,895.00 17.27 25,905.00 302 R-2200 (2200#) Riprap 1,500 TN 43.93 65,895.00 17.27 25,905.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.28 197,400.00 0.26 183,300.00

304 Grout 50 CY 154.09 7,704.50 195.02 9,751.00 305 Turfing 10 AC 1,913.92 19,139.20 1,314.05 13,140.50 306 Slit Fence 500 LF 1.51 755.00 2.18 1,090.00 307 Temporary Environmental Seeding 10 AC 868.12 8,681.20 1,163.86 11,638.60 308 Construction Entrance/Exit 1 EA XXX 3,820.00 2,246.56 2,246.56 309 Sand/Gravel Bag 50 EA 7.71 385.50 9.91 495.50 310 Erosion Control Berm 500 LF 0.31 155.00 3.99 1,995.00 311 Temporary Mulch Stabilization 5 AC 1,421.49 7,107.45 976.67 4,883.35 312 Erosion Control Blanket/Temporary Matting 300 SY 0.98 294.00 3.93 1,179.00

Mobilization and Demobilization-Land Based Equipment(OPTION YEAR 1-AREA III (STATE OF

ARKANSAS) LINE ITEMS 313-351

1 LS

XXX

30,920.00 XXX 21,797.00

314 Remobilization-Land Based Equipment 25 MI 611.69 15,292.25 151.68 3,792.00 315 Clearing 10 AC 1,431.36 14,313.60 905.38 9,053.80

316 Grubbing 5 AC 492.36 2,461.80 558.67 2,793.35 317 Stripping 5 AC 758.92 3,794.60 949.28 4,746.40 318 Excavation 5,000 CY 3.08 15,400.00 3.37 16,850.00 319 Geotextile(Filter Fabric) 250 SY 2.31 577.50 9.24 2,310.00 320 Corrugated Metal Pipe, 24-inch 300 LF 71.45 21,435.00 62.87 18,861.00 321 Corrugated Metal Pipe, 36-inch 300 LF 134.57 40,371.00 91.94 27,582.00 322 Corrugated Metal Pipe, 48-inch 360 LF 268.25 96,570.00 109.74 39,506.40 323 Corrugated Metal Pipe, 60-inch 360 LF 324.88 116,956.80 162.22 58,399.20 324 Flared End Section, 24-inch 3 EA 1,146.17 3,438.51 557.43 1,672.29 325 Flared End Section, 36-inch 3 EA 3,818.90 11,456.70 949.90 2,849.70 326 Flared End Section, 48-inch 3 EA 7,688.20 23,064.60 1,650.32 4,950.96 327 Flared End Section, 60-inch 3 EA 10,711.29 32,133.87 2,652.63 7,957.89 328 Flapgate, 24-inch 3 EA 6,413.26 19,239.78 1,265.94 3,797.82 329 Flapgate, 36-inch 3 EA 9,409.00 28,227.00 3,801.23 11,403.69 330 Flapgate, 48-inch 3 EA 16,140.62 48,421.86 7,242.92 21,728.76 331 Flapgate, 60-inch 3 EA 24,024.71 72,074.13 9,476.32 28,428.96 332 Filter Material 750 TN 16.11 12,082.50 14.78 11,085.00 333 Embankment 2,500 CY 6.18 15,450.00 5.02 12,550.00 334 Semi-compacted Backfill 4,000 CY 6.87 27,480.00 4.28 17,120.00 335 Compacted Backfill 1,000 CY 10.47 10,470.00 8.53 8,530.00 336 Aggregate Surfacing-Crushed Limestone 500 CY 31.50 15,750.00 29.23 14,615.00 337 R-90 (90#) Riprap 2,000 TN 21.28 42,560.00 17.84 35,680.00 338 R-200 (200#) Riprap 2,500 TN 21.96 54,900.00 17.99 44,975.00 339 R-400 (400#) Riprap 2,500 TN 38.37 95,925.00 19.27 48,175.00 340 R-650 (650#) Riprap 1,500 TN 41.09 61,635.00 19.17 28,755.00 341 R-2200 (2200#) Riprap 1,500 TN 43.81 65,715.00 30.47 45,705.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 530,000 TN-MI 0.34 180,200.00 0.26 137,800.00

343 Grout 50 CY 149.18 7,459.00 177.46 8,873.00 344 Turfing 10 AC 1,682.68 16,826.80 1,080.55 10,805.50 345 Slit Fence 500 LF 1.44 720.00 1.45 725.00 346 Temporary Environmental Seeding 10 AC 741.34 7,413.40 772.43 7,724.30 347 Construction Entrance/Exit 1 EA XXX 3,010.00 1,953.71 1,953.71 348 Sand/Gravel Bag 50 EA 6.56 328.00 8.09 404.50 349 Erosion Control Berm 500 LF 0.25 125.00 3.07 1,535.00 350 Temporary Mulch Stabilization 5 AC 1,252.66 6,263.30 846.55 4,232.75 351 Erosion Control Blanket/Temporary Matting 300 SY 0.71 213.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment(OPTION YEAR 1-AREA IV (STATE OF

KENTUCKY) LINE ITEMS 352-390

1 LS

XXX

32,830.00 XXX 21,797.00

353 Remobilization-Land Based Equipment 25 MI 662.82 16,570.50 151.68 3,792.00 354 Clearing 10 AC 1,909.47 19,094.70 833.50 8,335.00 355 Grubbing 5 AC 551.65 2,758.25 630.29 3,151.45 356 Stripping 5 AC 862.60 4,313.00 1,110.42 5,552.10 357 Excavation 5,000 CY 3.48 17,400.00 3.72 18,600.00 358 Geotextile(Filter Fabric) 250 SY 2.50 625.00 11.34 2,835.00 359 Corrugated Metal Pipe, 24-inch 300 LF 76.41 22,923.00 65.48 19,644.00 360 Corrugated Metal Pipe, 36-inch 300 LF 140.46 42,138.00 96.96 29,088.00 361 Corrugated Metal Pipe, 48-inch 360 LF 273.36 98,409.60 113.92 41,011.20 362 Corrugated Metal Pipe, 60-inch 360 LF 332.29 119,624.40 166.41 59,907.60 363 Flared End Section, 24-inch 3 EA 1,187.82 3,563.46 639.34 1,918.02 364 Flared End Section, 36-inch 3 EA 3,820.36 11,461.08 1,031.82 3,095.46 365 Flared End Section, 48-inch 3 EA 7,647.17 22,941.51 1,732.23 5,196.69

366 Flared End Section, 60-inch 3 EA 10,765.22 32,295.66 2,734.55 8,203.65 367 Flapgate, 24-inch 3 EA 6,580.47 19,741.41 1,306.89 3,920.67 368 Flapgate, 36-inch 3 EA 9,671.61 29,014.83 3,855.84 11,567.52 369 Flapgate, 48-inch 3 EA 16,680.24 50,040.72 7,297.53 21,892.59 370 Flapgate, 60-inch 3 EA 25,574.46 76,723.38 9,544.58 28,633.74 371 Filter Material 750 TN 22.92 17,190.00 16.98 12,735.00 372 Embankment 2,500 CY 6.86 17,150.00 5.41 13,525.00 373 Semi-compacted Backfill 4,000 CY 8.33 33,320.00 5.12 20,480.00 374 Compacted Backfill 1,000 CY 12.36 12,360.00 8.90 8,900.00 375 Aggregate Surfacing-Crushed Limestone 500 CY 44.81 22,405.00 34.66 17,330.00 376 R-90 (90#) Riprap 2,000 TN 27.80 55,600.00 19.45 38,900.00 377 R-200 (200#) Riprap 2,500 TN 28.94 72,350.00 19.53 48,825.00 378 R-400 (400#) Riprap 2,500 TN 30.81 77,025.00 19.53 48,825.00 379 R-650 (650#) Riprap 1,500 TN 32.14 48,210.00 21.97 32,955.00 380 R-2200 (2200#) Riprap 1,500 TN 36.62 54,930.00 32.82 49,230.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.28 197,400.00 0.26 183,300.00

382 Grout 50 CY 152.51 7,625.50 190.13 9,506.50 383 Turfing 10 AC 1,815.81 18,158.10 1,219.93 12,199.30 384 Slit Fence 500 LF 1.49 745.00 2.05 1,025.00 385 Temporary Environmental Seeding 10 AC 823.31 8,233.10 839.13 8,391.30 386 Construction Entrance/Exit 1 EA XXX 3,790.00 2,102.33 2,102.33 387 Sand/Gravel Bag 50 EA 7.48 374.00 9.58 479.00 388 Erosion Control Berm 500 LF 0.29 145.00 3.51 1,755.00 389 Temporary Mulch Stabilization 5 AC 1,387.05 6,935.25 936.07 4,680.35 390 Erosion Control Blanket/Temporary Matting 300 SY 0.93 279.00 3.82 1,146.00

Mobilization and Demobilization-Land Based Equipment(OPTION YEAR 1-AREA V (STATE OF

TENNESSEE) LINE ITEMS 391-429

1 LS

XXX

31,000.00 XXX 22,797.87

392 Remobilization-Land Based Equipment 25 MI 613.91 15,347.75 151.68 3,792.00 393 Clearing 10 AC 1,447.68 14,476.80 709.40 7,094.00 394 Grubbing 5 AC 495.88 2,479.40 535.74 2,678.70 395 Stripping 5 AC 764.69 3,823.45 897.68 4,488.40 396 Excavation 5,000 CY 3.10 15,500.00 3.32 16,600.00 397 Geotextile(Filter Fabric) 250 SY 2.34 585.00 8.67 2,167.50 398 Corrugated Metal Pipe, 24-inch 300 LF 72.43 21,729.00 63.40 19,020.00 399 Corrugated Metal Pipe, 36-inch 300 LF 136.41 40,923.00 92.47 27,741.00 400 Corrugated Metal Pipe, 48-inch 360 LF 271.91 97,887.60 110.18 39,664.80 401 Corrugated Metal Pipe, 60-inch 360 LF 329.32 118,555.20 162.66 58,557.60 402 Flared End Section, 24-inch 3 EA 1,161.82 3,485.46 543.10 1,629.30 403 Flared End Section, 36-inch 3 EA 3,870.84 11,612.52 935.57 2,806.71 404 Flared End Section, 48-inch 3 EA 7,792.69 23,378.07 1,635.98 4,907.94 405 Flared End Section, 60-inch 3 EA 10,857.05 32,571.15 2,638.30 7,914.90 406 Flapgate, 24-inch 3 EA 6,500.76 19,502.28 1,258.77 3,776.31 407 Flapgate, 36-inch 3 EA 9,537.40 28,612.20 3,791.68 11,375.04 408 Flapgate, 48-inch 3 EA 16,361.03 49,083.09 7,233.37 21,700.11 409 Flapgate, 60-inch 3 EA 24,354.03 73,062.09 9,464.37 28,393.11 410 Filter Material 750 TN 27.39 20,542.50 16.62 12,465.00 411 Embankment 2,500 CY 6.22 15,550.00 4.96 12,400.00 412 Semi-compacted Backfill 4,000 CY 6.93 27,720.00 4.68 18,720.00 413 Compacted Backfill 1,000 CY 10.54 10,540.00 8.68 8,680.00 414 Aggregate Surfacing-Crushed Limestone 500 CY 48.69 24,345.00 35.19 17,595.00

415 R-90 (90#) Riprap 2,000 TN 36.09 72,180.00 18.22 36,440.00 416 R-200 (200#) Riprap 2,500 TN 36.09 90,225.00 19.58 48,950.00 417 R-400 (400#) Riprap 2,500 TN 38.85 97,125.00 20.87 52,175.00 418 R-650 (650#) Riprap 1,500 TN 41.61 62,415.00 22.31 33,465.00 419 R-2200 (2200#) Riprap 1,500 TN 44.37 66,555.00 27.72 41,580.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 470,000 TN-MI 0.34 159,800.00 0.24 112,800.00

421 Grout 50 CY 151.07 7,553.50 176.03 8,801.50 422 Turfing 10 AC 1,704.28 17,042.80 1,082.75 10,827.50 423 Slit Fence 500 LF 1.44 720.00 1.45 725.00 424 Temporary Environmental Seeding 10 AC 746.34 7,463.40 772.43 7,724.30 425 Construction Entrance/Exit 1 EA XXX 2,980.00 1,925.04 1,925.04 426 Sand/Gravel Bag 50 EA 6.66 333.00 8.09 404.50 427 Erosion Control Berm 500 LF 0.25 125.00 2.92 1,460.00 428 Temporary Mulch Stabilization 5 AC 1,269.86 6,349.30 832.21 4,161.05 429 Erosion Control Blanket/Temporary Matting 300 SY 0.72 216.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment(OPTION YEAR 1-AREA V (STATE OF

MISSISSIPPI) LINE ITEMS 430-468

1 LS

XXX

30,960.00 XXX 23,847.29

431 Remobilization-Land Based Equipment 25 MI 612.81 15,320.25 157.19 3,929.75 432 Clearing 10 AC 1,439.94 14,399.40 761.87 7,618.70 433 Grubbing 5 AC 494.21 2,471.05 608.64 3,043.20 434 Stripping 5 AC 761.96 3,809.80 983.71 4,918.55 435 Excavation 5,000 CY 3.09 15,450.00 3.44 17,200.00 436 Geotextile(Filter Fabric) 250 SY 2.33 582.50 9.72 2,430.00 437 Corrugated Metal Pipe, 24-inch 300 LF 72.18 21,654.00 63.58 19,074.00 438 Corrugated Metal Pipe, 36-inch 300 LF 135.97 40,791.00 91.74 27,522.00 439 Corrugated Metal Pipe, 48-inch 360 LF 271.09 97,592.40 108.52 39,067.20 440 Corrugated Metal Pipe, 60-inch 360 LF 328.31 118,191.60 159.35 57,366.00 441 Flared End Section, 24-inch 3 EA 1,158.14 3,474.42 549.29 1,647.87 442 Flared End Section, 36-inch 3 EA 3,859.69 11,579.07 929.39 2,788.17 443 Flared End Section, 48-inch 3 EA 7,770.60 23,311.80 1,607.72 4,823.16 444 Flared End Section, 60-inch 3 EA 10,825.38 32,476.14 2,578.44 7,735.32 445 Flapgate, 24-inch 3 EA 6,480.70 19,442.10 1,293.13 3,879.39 446 Flapgate, 36-inch 3 EA 9,507.82 28,523.46 3,741.16 11,223.48 447 Flapgate, 48-inch 3 EA 16,309.57 48,928.71 7,074.35 21,223.05 448 Flapgate, 60-inch 3 EA 24,271.33 72,813.99 9,230.00 27,690.00 449 Filter Material 750 TN 27.32 20,490.00 16.79 12,592.50 450 Embankment 2,500 CY 6.20 15,500.00 5.23 13,075.00 451 Semi-compacted Backfill 4,000 CY 6.90 27,600.00 4.32 17,280.00 452 Compacted Backfill 1,000 CY 10.51 10,510.00 8.73 8,730.00 453 Aggregate Surfacing-Crushed Limestone 500 CY 48.53 24,265.00 35.12 17,560.00 454 R-90 (90#) Riprap 2,000 TN 35.99 71,980.00 18.03 36,060.00 455 R-200 (200#) Riprap 2,500 TN 35.99 89,975.00 19.33 48,325.00 456 R-400 (400#) Riprap 2,500 TN 38.74 96,850.00 20.58 51,450.00 457 R-650 (650#) Riprap 1,500 TN 41.49 62,235.00 22.03 33,045.00 458 R-2200 (2200#) Riprap 1,500 TN 44.25 66,375.00 32.35 48,525.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 470,000 TN-MI 0.38 178,600.00 0.26 122,200.00

460 Grout 50 CY 150.63 7,531.50 173.82 8,691.00 461 Turfing 10 AC 1,697.66 16,976.60 1,086.61 10,866.10 462 Slit Fence 500 LF 1.44 720.00 1.14 570.00 463 Temporary Environmental Seeding 10 AC 743.96 7,439.60 741.81 7,418.10

464 Construction Entrance/Exit 1 EA XXX 2,900.00 2,229.47 2,229.47 465 Sand/Gravel Bag 50 EA 6.64 332.00 11.18 559.00 466 Erosion Control Berm 500 LF 0.25 125.00 3.56 1,780.00 467 Temporary Mulch Stabilization 5 AC 1,265.30 6,326.50 774.54 3,872.70 468 Erosion Control Blanket/Temporary Matting 300 SY 0.72 216.00 3.62 1,086.00

SCHEDULE B-OPTION YEAR ONE-TOTAL ITEMS 0235

THRU 0468 (AREAS 1 THRU VI) XXX XXX XXX 7,561,289.10 XXX 4,523,344.06

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA I (STATE OF

ILLINOIS) LINE ITEMS 469-507

1 LS

XXX

35,890.00 XXX 24,942.22

470 Remobilization-Land Based Equipment 25 MI 732.35 18,308.75 151.68 3,792.00 471 Clearing 10 AC 2,213.59 22,135.90 1,189.93 11,899.30 472 Grubbing 5 AC 633.41 3,167.05 740.73 3,703.65 473 Stripping 5 AC 993.35 4,966.75 1,358.91 6,794.55 474 Excavation 5,000 CY 3.97 19,850.00 4.02 20,100.00 475 Geotextile(Filter Fabric) 250 SY 2.71 677.50 13.34 3,335.00 476 Corrugated Metal Pipe, 24-inch 300 LF 82.87 24,861.00 76.20 22,860.00 477 Corrugated Metal Pipe, 36-inch 300 LF 151.31 45,393.00 108.05 32,415.00 478 Corrugated Metal Pipe, 48-inch 360 LF 292.47 105,289.20 126.32 45,475.20 479 Corrugated Metal Pipe, 60-inch 360 LF 355.91 128,127.60 183.82 66,175.20 480 Flared End Section, 24-inch 3 EA 1,277.05 3,831.15 743.90 2,231.70 481 Flared End Section, 36-inch 3 EA 4,065.40 12,196.20 1,175.61 3,526.83 482 Flared End Section, 48-inch 3 EA 8,123.74 24,371.22 1,946.07 5,838.21 483 Flared End Section, 60-inch 3 EA 11,471.48 34,414.44 3,048.61 9,145.83 484 Flapgate, 24-inch 3 EA 7,054.68 21,164.04 1,457.89 4,373.67 485 Flapgate, 36-inch 3 EA 10,373.92 31,121.76 4,236.62 12,709.86 486 Flapgate, 48-inch 3 EA 17,918.92 53,756.76 8,054.36 24,163.08 487 Flapgate, 60-inch 3 EA 27,702.33 83,106.99 10,532.88 31,598.64 488 Filter Material 750 TN 18.50 13,875.00 13.67 10,252.50 489 Embankment 2,500 CY 7.92 19,800.00 5.97 14,925.00 490 Semi-compacted Backfill 4,000 CY 9.46 37,840.00 6.01 24,040.00 491 Compacted Backfill 1,000 CY 13.90 13,900.00 9.42 9,420.00 492 Aggregate Surfacing-Crushed Limestone 500 CY 36.75 18,375.00 29.57 14,785.00 493 R-90 (90#) Riprap 2,000 TN 23.66 47,320.00 18.85 37,700.00 494 R-200 (200#) Riprap 2,500 TN 24.86 62,150.00 18.62 46,550.00 495 R-400 (400#) Riprap 2,500 TN 26.84 67,100.00 18.62 46,550.00 496 R-650 (650#) Riprap 1,500 TN 28.26 42,390.00 18.00 27,000.00 497 R-2200 (2200#) Riprap 1,500 TN 39.22 58,830.00 18.00 27,000.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.29 204,450.00 0.19 133,950.00

499 Grout 50 CY 198.17 9,908.50 198.26 9,913.00 500 Turfing 10 AC 2,001.87 20,018.70 1,358.02 13,580.20 501 Slit Fence 500 LF 1.59 795.00 2.30 1,150.00 502 Temporary Environmental Seeding 10 AC 949.82 9,498.20 889.24 8,892.40 503 Construction Entrance/Exit 1 EA XXX 4,120.00 2,309.40 2,309.40 504 Sand/Gravel Bag 50 EA 8.21 410.50 10.20 510.00 505 Erosion Control Berm 500 LF 0.33 165.00 4.20 2,100.00 506 Temporary Mulch Stabilization 5 AC 1,510.85 7,554.25 863.18 4,315.90 507 Erosion Control Blanket/Temporary Matting 300 SY 1.05 315.00 4.03 1,209.00

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA II (STATE OF

MISSOURI) LINE ITEMS 508-546

1 LS

XXX

35,530.00 XXX 24,942.22

509 Remobilization-Land Based Equipment 25 MI 722.32 18,058.00 151.68 3,792.00

510 Clearing 10 AC 2,162.08 21,620.80 1,079.49 10,794.90 511 Grubbing 5 AC 614.25 3,071.25 707.21 3,536.05 512 Stripping 5 AC 957.61 4,788.05 1,283.50 6,417.50 513 Excavation 5,000 CY 3.87 19,350.00 3.92 19,600.00 514 Geotextile(Filter Fabric) 250 SY 2.70 675.00 12.63 3,157.50 515 Corrugated Metal Pipe, 24-inch 300 LF 82.43 24,729.00 74.39 22,317.00 516 Corrugated Metal Pipe, 36-inch 300 LF 150.72 45,216.00 106.24 31,872.00 517 Corrugated Metal Pipe, 48-inch 360 LF 291.76 105,033.60 124.81 44,931.60 518 Corrugated Metal Pipe, 60-inch 360 LF 354.96 127,785.60 182.31 65,631.60 519 Flared End Section, 24-inch 3 EA 1,272.61 3,817.83 715.63 2,146.89 520 Flared End Section, 36-inch 3 EA 4,060.31 12,180.93 1,147.35 3,442.05 521 Flared End Section, 48-inch 3 EA 8,116.61 24,349.83 1,917.81 5,753.43 522 Flared End Section, 60-inch 3 EA 11,453.68 34,361.04 3,020.36 9,061.08 523 Flapgate, 24-inch 3 EA 7,034.47 21,103.41 1,443.76 4,331.28 524 Flapgate, 36-inch 3 EA 10,343.05 31,029.15 4,217.78 12,653.34 525 Flapgate, 48-inch 3 EA 17,859.65 53,578.95 8,035.52 24,106.56 526 Flapgate, 60-inch 3 EA 27,561.26 82,683.78 10,509.33 31,527.99 527 Filter Material 750 TN 17.12 12,840.00 13.32 9,990.00 528 Embankment 2,500 CY 7.65 19,125.00 5.80 14,500.00 529 Semi-compacted Backfill 4,000 CY 9.28 37,120.00 5.72 22,880.00 530 Compacted Backfill 1,000 CY 13.67 13,670.00 9.23 9,230.00 531 Aggregate Surfacing-Crushed Limestone 500 CY 33.98 16,990.00 28.01 14,005.00 532 R-90 (90#) Riprap 2,000 TN 22.00 44,000.00 17.93 35,860.00 533 R-200 (200#) Riprap 2,500 TN 21.64 54,100.00 18.02 45,050.00 534 R-400 (400#) Riprap 2,500 TN 22.85 57,125.00 18.02 45,050.00 535 R-650 (650#) Riprap 1,500 TN 23.20 34,800.00 17.78 26,670.00 536 R-2200 (2200#) Riprap 1,500 TN 46.46 69,690.00 17.78 26,670.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.29 204,450.00 0.26 183,300.00

538 Grout 50 CY 162.98 8,149.00 195.02 9,751.00 539 Turfing 10 AC 2,024.34 20,243.40 1,314.05 13,140.50 540 Slit Fence 500 LF 1.59 795.00 2.18 1,090.00 541 Temporary Environmental Seeding 10 AC 918.20 9,182.00 1,163.86 11,638.60 542 Construction Entrance/Exit 1 EA XXX 4,040.00 2,246.56 2,246.56 543 Sand/Gravel Bag 50 EA 8.16 408.00 9.91 495.50 544 Erosion Control Berm 500 LF 0.32 160.00 3.99 1,995.00 545 Temporary Mulch Stabilization 5 AC 1,503.50 7,517.50 976.67 4,883.35 546 Erosion Control Blanket/Temporary Matting 300 SY 1.04 312.00 3.93 1,179.00

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA III (STATE OF

ARKANSAS) LINE ITEMS 547-585

1 LS

XXX

32,700.00 XXX 24,942.22

548 Remobilization-Land Based Equipment 25 MI 646.98 16,174.50 151.68 3,792.00 549 Clearing 10 AC 1,513.94 15,139.40 905.38 9,053.80 550 Grubbing 5 AC 520.77 2,603.85 558.67 2,793.35 551 Stripping 5 AC 802.70 4,013.50 949.28 4,746.40 552 Excavation 5,000 CY 3.26 16,300.00 3.37 16,850.00 553 Geotextile(Filter Fabric) 250 SY 2.44 610.00 9.24 2,310.00 554 Corrugated Metal Pipe, 24-inch 300 LF 75.57 22,671.00 66.73 20,019.00 555 Corrugated Metal Pipe, 36-inch 300 LF 142.33 42,699.00 98.58 29,574.00 556 Corrugated Metal Pipe, 48-inch 360 LF 283.73 102,142.80 118.43 42,634.80 557 Corrugated Metal Pipe, 60-inch 360 LF 343.63 123,706.80 175.92 63,331.20 558 Flared End Section, 24-inch 3 EA 1,212.29 3,636.87 577.36 1,732.08 559 Flared End Section, 36-inch 3 EA 4,039.22 12,117.66 1,009.08 3,027.24

560 Flared End Section, 48-inch 3 EA 8,131.75 24,395.25 1,779.53 5,338.59 561 Flared End Section, 60-inch 3 EA 11,329.25 33,987.75 2,882.08 8,646.24 562 Flapgate, 24-inch 3 EA 6,783.26 20,349.78 1,374.62 4,123.86 563 Flapgate, 36-inch 3 EA 9,951.83 29,855.49 4,125.60 12,376.80 564 Flapgate, 48-inch 3 EA 17,071.81 51,215.43 7,943.33 23,829.99 565 Flapgate, 60-inch 3 EA 25,410.75 76,232.25 10,394.10 31,182.30 566 Filter Material 750 TN 17.04 12,780.00 15.63 11,722.50 567 Embankment 2,500 CY 6.53 16,325.00 5.02 12,550.00 568 Semi-compacted Backfill 4,000 CY 7.27 29,080.00 4.28 17,120.00 569 Compacted Backfill 1,000 CY 11.08 11,080.00 8.53 8,530.00 570 Aggregate Surfacing-Crushed Limestone 500 CY 33.32 16,660.00 30.03 15,015.00 571 R-90 (90#) Riprap 2,000 TN 22.51 45,020.00 18.68 37,360.00 572 R-200 (200#) Riprap 2,500 TN 23.23 58,075.00 18.89 47,225.00 573 R-400 (400#) Riprap 2,500 TN 40.58 101,450.00 20.12 50,300.00 574 R-650 (650#) Riprap 1,500 TN 43.46 65,190.00 20.02 30,030.00 575 R-2200 (2200#) Riprap 1,500 TN 46.34 69,510.00 32.71 49,065.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 530,000 TN-MI 0.36 190,800.00 0.26 137,800.00

577 Grout 50 CY 157.79 7,889.50 177.46 8,873.00 578 Turfing 10 AC 1,779.75 17,797.50 1,080.55 10,805.50 579 Slit Fence 500 LF 1.53 765.00 1.45 725.00 580 Temporary Environmental Seeding 10 AC 784.11 7,841.10 772.43 7,724.30 581 Construction Entrance/Exit 1 EA XXX 3,180.00 1,953.71 1,953.71 582 Sand/Gravel Bag 50 EA 6.94 347.00 8.09 404.50 583 Erosion Control Berm 500 LF 0.27 135.00 3.07 1,535.00 584 Temporary Mulch Stabilization 5 AC 1,324.92 6,624.60 846.55 4,232.75 585 Erosion Control Blanket/Temporary Matting 300 SY 0.75 225.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA IV (STATE OF

KENTUCKY) LINE ITEMS 586-624

1 LS

XXX

34,730.00 XXX 24,942.22

587 Remobilization-Land Based Equipment 25 MI 701.06 17,526.50 151.68 3,792.00 588 Clearing 10 AC 2,019.63 20,196.30 833.50 8,335.00 589 Grubbing 5 AC 583.48 2,917.40 630.29 3,151.45 590 Stripping 5 AC 912.36 4,561.80 1,110.42 5,552.10 591 Excavation 5,000 CY 3.68 18,400.00 3.72 18,600.00 592 Geotextile(Filter Fabric) 250 SY 2.64 660.00 11.34 2,835.00 593 Corrugated Metal Pipe, 24-inch 300 LF 80.82 24,246.00 69.35 20,805.00 594 Corrugated Metal Pipe, 36-inch 300 LF 148.56 44,568.00 103.60 31,080.00 595 Corrugated Metal Pipe, 48-inch 360 LF 289.13 104,086.80 122.62 44,143.20 596 Corrugated Metal Pipe, 60-inch 360 LF 351.46 126,525.60 180.11 64,839.60 597 Flared End Section, 24-inch 3 EA 1,256.35 3,769.05 659.27 1,977.81 598 Flared End Section, 36-inch 3 EA 4,040.77 12,122.31 1,090.99 3,272.97 599 Flared End Section, 48-inch 3 EA 8,088.35 24,265.05 1,861.45 5,584.35 600 Flared End Section, 60-inch 3 EA 11,386.29 34,158.87 2,963.99 8,891.97 601 Flapgate, 24-inch 3 EA 6,960.11 20,880.33 1,415.58 4,246.74 602 Flapgate, 36-inch 3 EA 10,229.59 30,688.77 4,180.21 12,540.63 603 Flapgate, 48-inch 3 EA 17,642.56 52,927.68 7,997.94 23,993.82 604 Flapgate, 60-inch 3 EA 27,049.91 81,149.73 10,462.36 31,387.08 605 Filter Material 750 TN 24.25 18,187.50 17.91 13,432.50 606 Embankment 2,500 CY 7.26 18,150.00 5.41 13,525.00 607 Semi-compacted Backfill 4,000 CY 8.81 35,240.00 5.12 20,480.00 608 Compacted Backfill 1,000 CY 13.07 13,070.00 8.90 8,900.00

609 Aggregate Surfacing-Crushed Limestone 500 CY 47.40 23,700.00 36.37 18,185.00 610 R-90 (90#) Riprap 2,000 TN 29.41 58,820.00 20.52 41,040.00 611 R-200 (200#) Riprap 2,500 TN 30.61 76,525.00 20.59 51,475.00 612 R-400 (400#) Riprap 2,500 TN 32.59 81,475.00 20.59 51,475.00 613 R-650 (650#) Riprap 1,500 TN 34.00 51,000.00 23.21 34,815.00 614 R-2200 (2200#) Riprap 1,500 TN 38.73 58,095.00 34.83 52,245.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 705,000 TN-MI 0.29 204,450.00 0.26 183,300.00

616 Grout 50 CY 161.31 8,065.50 190.13 9,506.50 617 Turfing 10 AC 1,920.57 19,205.70 1,219.93 12,199.30 618 Slit Fence 500 LF 1.58 790.00 2.05 1,025.00 619 Temporary Environmental Seeding 10 AC 870.80 8,708.00 839.13 8,391.30 620 Construction Entrance/Exit 1 EA XXX 4,010.00 2,102.33 2,102.33 621 Sand/Gravel Bag 50 EA 7.91 395.50 9.58 479.00 622 Erosion Control Berm 500 LF 0.31 155.00 3.51 1,755.00 623 Temporary Mulch Stabilization 5 AC 1,467.07 7,335.35 936.07 4,680.35 624 Erosion Control Blanket/Temporary Matting 300 SY 0.98 294.00 3.82 1,146.00

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA V (STATE OF

TENNESSEE) LINE ITEMS 625-663

1 LS

XXX

32,780.00 XXX 24,942.22

626 Remobilization-Land Based Equipment 25 MI 649.32 16,233.00 151.68 3,792.00 627 Clearing 10 AC 1,531.20 15,312.00 709.40 7,094.00 628 Grubbing 5 AC 524.49 2,622.45 535.74 2,678.70 629 Stripping 5 AC 808.81 4,044.05 897.68 4,488.40 630 Excavation 5,000 CY 3.28 16,400.00 3.32 16,600.00 631 Geotextile(Filter Fabric) 250 SY 2.48 620.00 8.67 2,167.50 632 Corrugated Metal Pipe, 24-inch 300 LF 76.61 22,983.00 67.26 20,178.00 633 Corrugated Metal Pipe, 36-inch 300 LF 144.28 43,284.00 99.11 29,733.00 634 Corrugated Metal Pipe, 48-inch 360 LF 287.60 103,536.00 118.88 42,796.80 635 Corrugated Metal Pipe, 60-inch 360 LF 348.31 125,391.60 176.37 63,493.20 636 Flared End Section, 24-inch 3 EA 1,228.85 3,686.55 563.02 1,689.06 637 Flared End Section, 36-inch 3 EA 4,094.16 12,282.48 994.74 2,984.22 638 Flared End Section, 48-inch 3 EA 8,242.26 24,726.78 1,765.20 5,295.60 639 Flared End Section, 60-inch 3 EA 11,483.42 34,450.26 2,867.75 8,603.25 640 Flapgate, 24-inch 3 EA 6,875.81 20,627.43 1,367.45 4,102.35 641 Flapgate, 36-inch 3 EA 10,087.64 30,262.92 4,116.04 12,348.12 642 Flapgate, 48-inch 3 EA 17,304.94 51,914.82 7,933.78 23,801.34 643 Flapgate, 60-inch 3 EA 25,759.07 77,277.21 10,382.15 31,146.45 644 Filter Material 750 TN 28.97 21,727.50 17.56 13,170.00 645 Embankment 2,500 CY 6.58 16,450.00 4.96 12,400.00 646 Semi-compacted Backfill 4,000 CY 7.33 29,320.00 4.68 18,720.00 647 Compacted Backfill 1,000 CY 11.14 11,140.00 8.68 8,680.00 648 Aggregate Surfacing-Crushed Limestone 500 CY 51.50 25,750.00 37.02 18,510.00 649 R-90 (90#) Riprap 2,000 TN 38.17 76,340.00 19.24 38,480.00 650 R-200 (200#) Riprap 2,500 TN 38.17 95,425.00 20.69 51,725.00 651 R-400 (400#) Riprap 2,500 TN 41.09 102,725.00 22.07 55,175.00 652 R-650 (650#) Riprap 1,500 TN 44.01 66,015.00 23.75 35,625.00 653 R-2200 (2200#) Riprap 1,500 TN 46.93 70,395.00 30.14 45,210.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 530,000 TN-MI 0.36 190,800.00 0.25 132,500.00

655 Grout 50 CY 159.79 7,989.50 176.03 8,801.50 656 Turfing 10 AC 1,802.60 18,026.00 1,082.75 10,827.50 657 Slit Fence 500 LF 1.53 765.00 1.45 725.00

658 Temporary Environmental Seeding 10 AC 789.40 7,894.00 772.43 7,724.30 659 Construction Entrance/Exit 1 EA XXX 3,160.00 1,925.04 1,925.04 660 Sand/Gravel Bag 50 EA 7.05 352.50 8.09 404.50 661 Erosion Control Berm 500 LF 0.27 135.00 2.92 1,460.00 662 Temporary Mulch Stabilization 5 AC 1,343.12 6,715.60 832.21 4,161.05 663 Erosion Control Blanket/Temporary Matting 300 SY 0.76 228.00 3.33 999.00

Mobilization and Demobilization-Land Based Equipment (OPTION YEAR 2-AREA VI (STATE OF

MISSISSIPPI) LINE ITEMS 664-702

1 LS

XXX

32,740.00 XXX 26,069.42

665 Remobilization-Land Based Equipment 25 MI 648.16 16,204.00 157.19 3,929.75 666 Clearing 10 AC 1,523.01 15,230.10 761.87 7,618.70 667 Grubbing 5 AC 522.72 2,613.60 608.64 3,043.20 668 Stripping 5 AC 805.92 4,029.60 983.71 4,918.55 669 Excavation 5,000 CY 3.27 16,350.00 3.44 17,200.00 670 Geotextile(Filter Fabric) 250 SY 2.47 617.50 9.72 2,430.00 671 Corrugated Metal Pipe, 24-inch 300 LF 76.35 22,905.00 67.32 20,196.00 672 Corrugated Metal Pipe, 36-inch 300 LF 143.81 43,143.00 98.17 29,451.00 673 Corrugated Metal Pipe, 48-inch 360 LF 286.73 103,222.80 116.95 42,102.00 674 Corrugated Metal Pipe, 60-inch 360 LF 347.25 125,010.00 172.63 62,146.80 675 Flared End Section, 24-inch 3 EA 1,224.96 3,674.88 568.59 1,705.77 676 Flared End Section, 36-inch 3 EA 4,082.37 12,247.11 986.69 2,960.07 677 Flared End Section, 48-inch 3 EA 8,218.91 24,656.73 1,732.86 5,198.58 678 Flared End Section, 60-inch 3 EA 11,449.92 34,349.76 2,800.65 8,401.95 679 Flapgate, 24-inch 3 EA 6,854.58 20,563.74 1,398.39 4,195.17 680 Flapgate, 36-inch 3 EA 10,056.35 30,169.05 4,055.30 12,165.90 681 Flapgate, 48-inch 3 EA 17,250.50 51,751.50 7,752.69 23,258.07 682 Flapgate, 60-inch 3 EA 25,671.60 77,014.80 10,118.85 30,356.55 683 Filter Material 750 TN 28.90 21,675.00 17.70 13,275.00 684 Embankment 2,500 CY 6.56 16,400.00 5.23 13,075.00 685 Semi-compacted Backfill 4,000 CY 7.30 29,200.00 4.32 17,280.00 686 Compacted Backfill 1,000 CY 11.11 11,110.00 8.73 8,730.00 687 Aggregate Surfacing-Crushed Limestone 500 CY 51.33 25,665.00 36.90 18,450.00 688 R-90 (90#) Riprap 2,000 TN 38.07 76,140.00 19.01 38,020.00 689 R-200 (200#) Riprap 2,500 TN 38.07 95,175.00 20.40 51,000.00 690 R-400 (400#) Riprap 2,500 TN 40.98 102,450.00 21.74 54,350.00 691 R-650 (650#) Riprap 1,500 TN 43.89 65,835.00 23.42 35,130.00 692 R-2200 (2200#) Riprap 1,500 TN 46.80 70,200.00 32.35 48,525.00

Transportation of Filter Material, Aggregate Surfacing and /or Riprap 530,000 TN-MI 0.36 190,800.00 0.26 137,800.00

694 Grout 50 CY 159.32 7,966.00 173.82 8,691.00 695 Turfing 10 AC 1,795.60 17,956.00 1,086.61 10,866.10 696 Slit Fence 500 LF 1.53 765.00 1.14 570.00 697 Temporary Environmental Seeding 10 AC 786.88 7,868.80 741.81 7,418.10 698 Construction Entrance/Exit 1 EA XXX 3,070.00 2,229.47 2,229.47 699 Sand/Gravel Bag 50 EA 7.02 351.00 11.18 559.00 700 Erosion Control Berm 500 LF 0.27 135.00 3.56 1,780.00 701 Temporary Mulch Stabilization 5 AC 1,338.30 6,691.50 774.54 3,872.70 702 Erosion Control Blanket/Temporary Matting 300 SY 0.76 228.00 3.62 1,086.00

SCHEDULE C-OPTION YEAR TWO-TOTAL ITEMS

0469THRU 00702 (AREAS 1 THRU VI) XXX XXX XXX $ 8,008,463.47 XXX

$ 4,750,486.14

GRAND TOTAL BASIC PLUS FIRST AND SECOND

YEAR OPTIONS XXX XXX XXX $ 22,828,189.61 XXX

$ 13,697,563.75

-40.00%VARIATION FROM GOVT. EST.--------------------- -------------------------->>

Sheet1

File details come from the government source that posted it. Updated .