W912EP25Z0019 DoS INL Hangar - Industry Day Questions.pdf

PDF 47 KB Posted

Attached to
VIRTUAL INDUSTRY DAY: Department of State, Bureau of International Narcotics and Law Enforcement, Patrick Space Force Hangar Renovations
Solicitation number
W912EP25Z0019
Issued by

About this file

The document is an Industry Day Questions file for a Department of State renovation project at Patrick Space Force Base in Brevard County, Florida. The project involves renovating Hangar 985 (40,053 SF, expanding to 44,053 SF) and Building 986 (19,495 SF, with 3,000 SF of additions), which were originally constructed in the 1950s. Base work includes complete deconstruction of Hangar 985 to structural elements, interior demolition of Building 986's east wing, system and envelope renovations, new interior office/shop spaces, and an elevator addition. Optional work includes CMU elevator core, concrete pads, window replacements, fencing, roof upgrades, fire protection, and various infrastructure improvements.

The U.S. Army Corps of Engineers, Jacksonville District is hosting a virtual Industry Day on 26 March 2025 at 1:00 PM EST to engage the construction community, with a contract award planned for March 2026. Interested firms must register via Eventbrite and be registered in SAM.gov. The government is seeking contractor feedback on estimated project timelines, potential risks, and mitigation strategies, with respondents asked to answer six specific questions by 24 March 2025. The project scope emphasizes minimal site alterations, maintaining existing infrastructure, and addressing health hazards like mold and bird droppings while ensuring compliance with current antiterrorism/force protection requirements.

View the file

Other files

File Type Posted
DoS Hangar_Industry Day Attendance Tracker_SAM.xlsx XLSX spreadsheet
PSFB_Hangers_120.jpg JPG image
985_HANGAR_ROOF STRUCTURE.mp4 MP4 file
PSFB_004.mp4 MP4 file
PSFB_Hangers_119.jpg JPG image
PSFB_Hangers_126.jpg JPG image
DoS INL BLDG 985986 Reno - Industry Day (3.25.25)R3.pptx PPTX presentation
PSFB_Hangers_114.jpg JPG image
PSFB_Hangers_098.jpg JPG image
PSFB_007.mp4 MP4 file
PSFB_Hangers_134.jpg JPG image
PSFB_Hangers_038.jpg JPG image
PSFB_001.mp4 MP4 file
PSFB_Hangers_124.jpg JPG image
PSFB_002.mp4 MP4 file
PSFB_006.mp4 MP4 file
PSFB_Hangers_121.jpg JPG image
PSFB_003.mp4 MP4 file
PSFB_005r.mp4 MP4 file
PSFB_Hangers_086.jpg JPG image
DoS INL Hangar - Industry Day Questions (Updated 3.26.25).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Description

The project is located at Patrick Space Force Base in Brevard County, Florida an includes the renovation of existing Hangar 985 and Building 986 which were originally constructed in the early 1950’s. Hangar 985 and Building 986 are bounded by an aircraft apron to the north, an access road to the west and east, and a parking lot to the south. Existing aprons, parking, roads, and other adjacent facilities will remain in place and in operation during construction except for parking immediately south of Hangar 985 and the aircraft apron north of the project site which will be used for construction laydown areas.

Hangar 985 will be unoccupied prior to the start of abatement and demolition activities. The contractor will be required to completely gut and refurbish Hangar 985 from the building envelope

in. Enlarging the wings for operational and maintenance functions to create additional space will also be required. Hangar 985 existing square footage is 40,053 SF. Additions will increase the total by approximately 4,000 SF.

Contractor will renovate various spaces within Building 986 to improve the functionality of building services and eliminate current health hazards such as mold and bird droppings. A portion of the building will be occupied during renovations. Building 986 existing square footage being renovated is approximately 19,495 SF. Additions are approximately 3000 SF. Renovation of Building 986 will include the replacement of the existing hangar roof, replacement of the roof and roof structure of the east wing, replacement of bird netting in the hangar spaces, and the addition of fans and ventilation in those spaces as well as updates to the office spaces and building services for these office spaces. The project is not expected to reach any trigger points requiring upgrades to fire protection, antiterrorism/force protection (ATFP), accessibility, etc.; nonetheless, the project will ensure that the replacement of windows and doors will meet current ATFP requirements.

The project site is generally flat with no significant drainage features on the project site.

Landscaping is minimal. To the best extent possible, no alterations to the project site will occur except as required for infrastructure needed to support the facility renovation and reconstruction.

Hangar 985 – Net Square Feet is 40,236 Building 986 – Net Square Feet is 19,495

Base Work:

• Separate utilities for each facility currently all fed through Hangar 985 (HVAC, FP, electrical) and Building 988 (electrical and chilled water).

• Complete deconstruction/demo of Hangar 985 to structural elements.

• Complete demolition of Building 986 interior finishes and building systems in east wing.

• Renovate all systems and building envelope for Hangar 985.

• Renovate finishes and building systems for east wing of Hangar 985.

• Construct additions of interior office/shop space in Hangar 985.

• Construct elevator addition in Hangar 985.

• Exterior site improvements (as required for restoration, replacement of aging water and sewer services to mains, new ARMAG utilities, ATFP striping)

Optional Work:

Hangar 985

• Stick to CMU Elevator Core

• Concrete Pads for Woodshop Area

• Small/Narrow High Placed Windows to Standard Windows

• Stick-Built Screening Wall to CMU Wall

• FOD Fencing and Construction Barrier (Full Perimeter)

• Decorative Screening Wall Gates

Building 986

• Metal Panel Roof (Hangar Bay)

• Highbay Fire Protection

• Clerestory Panel Replacement

• Overhead Door in Hangar Door

• Overhead Door Electric Operator

• High Volume Low Speed Fans

• Bathroom Renovations

• Warehouse Light

• Connecting Building

The Government is making the following assumptions:

• The results of a Hazardous, Toxic, and Radioactive Waste (HTRW) Survey of the buildings to be renovated will be included in the planned Request for Proposal.

• The results of forensic material testing of concrete, reinforced steel as well as structural steel will be included in the planned Request for Proposal.

• Abatement will be completed concurrently with design.

• The initiation of construction will overlap with the completion of the design.

• Award will be in March 2026.

• The Government intends to award the Base Work at a minimum but will award Optional

Work depending on sufficient budget.

• Fast Track exterior utilities and demolition design

If you are interested in participating in the Industry Day, please respond in writing to the following questions by March 24, 2025. Answers to these questions will facilitate constructive discussion during the Industry Day as well as assist the Government in establishing a reasonable period of performance. Respondents will remain anonymous.

1. Based on the information provided, how long does your firm roughly estimate it will take to complete abatement and design, if completed concurrently?

2. Based on the information provided, how long does your firm roughly estimate it will take to complete construction?

3. Based on the information provided, how long does your firm roughly estimate it will take to complete the entire contract assuming the completion of abatement/design overlaps with the initiation of construction?

4. If all options awarded with the base work; does your firm believe the optional work can be done concurrently with the Base Work or will additional time be required? If so, are their any optional items in particular you feel will require additional time to complete.

5. What risks do you see with this project?

6. In your opinion, what can the Government do/provide to mitigate these risks identified?