About this file

This file summary describes a federal contract opportunity for construction services. The U.S. Army Corps of Engineers is soliciting proposals for Contract 2 of the Comprehensive Everglades Restoration Plan in Broward County, Florida. The scope of work includes improvements to the C-11 Impoundment and Mitigation Area A. Proposals are due by the date listed in the Special Notice solicitation number W912EP24Z0002. The contract award is expected to occur shortly thereafter. The opportunity is not set aside for small businesses. The work location is in Broward County and the contracting agency is the Army Corps of Engineers Jacksonville District.

View the file

Other files

File Type Posted
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (2 of 6).pdf PDF
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (6 of 6).pdf PDF
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (5 of 6).pdf PDF
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (4 of 6).pdf PDF
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (1 of 6).pdf PDF
BCWPA C-11-REPACK_CNT2_GDR_FINAL USACE_20230929_DRAFT (3 of 6).pdf PDF
Site visit list 3.jpg JPG image
Presentation attendance list 1.jpg JPG image
Site visit list 1.jpg JPG image
Site visit list 2.jpg JPG image
Presentation attendance list 2.jpg JPG image
Site visit list 4.jpg JPG image
BCWPA_CNT2_DRAFT_PLANS_09of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_27of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_13of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_44of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_43of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_36of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_15of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_38of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_46of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_20of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_29of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_07of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_17of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_19of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_14of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_30of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_08of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_31of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_04of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_02of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_33of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_05of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_21of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_22of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_26of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_45of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_11of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_37of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_10of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_18of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_16of46.pdf PDF
BCWPA_CNT2_DRAFT_VOL2_SPECS_SEP23.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_39of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_01of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_35of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_24of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_28of46.pdf PDF
BCWPA_CNT2_DRAFT_PLANS_41of46.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S H

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N T

A B

L E

S U

R V

E

IL

L A

N C

E A

N D

M O

N

IT

O R

IN

G

CF0076

W W

E B

E R

S

P O

P H

A M

V

S E

V E

R A

N C

E

T G

R E

E N

W E

L L

Upper LimestonePiezometer with VWP Open Standpipe

Cover Flushmount

-3.07.7Downstream Toe75422+00

C11IMP14-GW-7

Piezometer with VWP Open Standpipe

Cover Flushmount

0.09.8Downstream Toe58422+05

C11IMP14-GW-6

Lower Silty SandPiezometer with VWP Open Standpipe

Cover Flushmount

-15.011.7Downstream Slope40422+00

C11IMP14-GW-5

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

2.511.7Downstream Slope40422+05

C11IMP14-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.017.7Downstream Slope11422+00

C11IMP14-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

1.518.5Crest-7422+00

C11IMP14-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest-7422+05

C11IMP14-GW-1

Embankment FillSensorN/A8.512.5Upstream Slope-25422+00

C11IM14-PS-2

Embankment FillSensorN/A4.07.5Upstream Slope-40422+00

C11IMP14-PS-1

VWPN/A0.04.5Impoundment-110422+00

C11IMP14-VWP-1

IMP 14

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

-3.09.4Downstream Toe56407+00

C11IMP13-GW-7

Piezometer with VWP Open Standpipe

Riser Above Grade

0.010.8Downstream Toe52407+05

C11IMP13-GW-6

Lower Silty SandPiezometer with VWP Open Standpipe

Cover Flushmount

-15.011.6Downstream Slope30407+00

C11IMP13-GW-5

Upper LimestonePiezometer with VWP Open Standpipe

Cover Flushmount

-2.511.6Downstream Slope30407+05

C11IMP13-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

8.017.7Downstream Slope11407+00

C11IMP13-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

1.518.5Crest-7407+00

C11IMP13-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest-7407+05

C11IMP13-GW-1

Embankment FillSensorN/A8.512.5Upstream Slope-26407+00

C11IM13-PS-2

Embankment FillSensorN/A4.07.5Upstream Slope-40407+00

C11IMP13-PS-1

VWPN/A0.04.5Impoundment-110407+00

C11IMP13-VWP-1

IMP 13

Material

Instrument Type Surface

Tip Elev.

Ground Instrument ID

C-11 SURVEILLANCE AND MONITORING PROGRAM

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-15.08.4Downstream Toe-90291+85

C11IMP12-GW-7

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

-0.58.4Downstream Toe-90291+90

C11IMP12-GW-6

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-15.08.9Downstream Slope-36291+85

C11IMP12-GW-5

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

2.58.9Downstream Slope-36291+90

C11IMP12-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

8.017.7Downstream Slope-11291+85

C11IMP12-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

2.518.5Crest7291+85

C11IMP12-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest7291+90

C11IMP12-GW-1

Embankment FillSensorN/A8.512.2Upstream Slope26291+85

C11IM12-PS-2

Embankment FillSensorN/A4.08.2Upstream Slope40291+85

C11IMP12-PS-1

VWPN/A2.54.2Impoundment100291+85

C11IMP12-VWP-1

IMP 12

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

-10.06.0Downstream Toe-92276+00

C11IMP11-GW-7

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

-2.06.0Downstream Toe-92276+05

C11IMP11-GW-6

Upper LimestonePiezometer with VWP Open Standpipe

Riser Above Grade

-2.07.1Downstream Slope-42276+00

C11IMP11-GW-5

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

2.58.5Downstream Slope-38276+05

C11IMP11-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

8.017.7Downstream Slope-11276+00

C11IMP11-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

1.518.5Crest10276+00

C11IMP11-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest10276+05

C11IMP11-GW-1

Embankment FillSensorN/A8.512.5Upstream Slope26276+00

C11IM11-PS-2

Embankment FillSensorN/A4.07.5Upstream Slope40276+00

C11IMP11-PS-1

VWPN/A1.04.0Impoundment110276+00

C11IMP11-VWP-1

IMP 11

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-7.06.0Downstream Toe-92256+00

C11IMP10-GW-7

Piezometer with VWP Open Standpipe

Riser Above Grade

1.56.0Downstream Toe-92256+05

C11IMP10-GW-6

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-7.08.3Downstream Slope-42256+00

C11IMP10-GW-5

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

2.58.3Downstream Slope-42256+05

C11IMP10-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

8.017.7Downstream Slope-11256+00

C11IMP10-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

1.518.5Crest10256+00

C11IMP10-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest10256+05

C11IMP10-GW-1

Embankment FillSensorN/A8.512.5Upstream Slope26256+00

C11IM10-PS-2

Embankment FillSensorN/A4.07.5Upstream Slope40256+00

C11IMP10-PS-1

VWPN/A1.05.8Impoundment110256+00

C11IMP10-VWP-1

IMP 10

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-7.06.0Downstream Toe-92236+00

C11IMP9-GW-7

Piezometer with VWP Open Standpipe

Riser Above Grade

1.06.0Downstream Toe-92236+05

C11IMP9-GW-6

Lower Silty SandPiezometer with VWP Open Standpipe

Riser Above Grade

-7.07.5Downstream Slope-42236+00

C11IMP9-GW-5

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

2.57.5Downstream Slope-42236+05

C11IMP9-GW-4

Embankment FillPiezometer with VWP Open Standpipe

Riser Above Grade

8.017.7Downstream Slope-11236+00

C11IMP9-GW-3

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

1.518.5Crest10236+00

C11IMP9-GW-2

Embankment FillPiezometer with VWP Open Standpipe

Cover Flushmount

8.518.5Crest10236+05

C11IMP9-GW-1

Embankment FillSensorN/A8.512.5Upstream Slope26236+00

C11IMP9-PS-2

Embankment FillSensorN/A4.07.5Upstream Slope40236+00

C11IMP9-PS-1

VWPN/A1.05.8Impoundment110236+00

C11IMP9-VWP-1

IMP 9

Material

Instrument Type Surface

Tip Elev.

Ground Instrument ID

C-11 SURVEILLANCE AND MONITORING PROGRAM

BE CONFIRMED FOLLOWING INITIAL SURVEY AFTER CONSTRUCTION COMPLETION.

CREST CENTERLINE AT DESIGN ELEVATION OF 18.6 FEET (NAVD 88). ELEVATIONS TO

1. SURVEY SETTLEMENT MARKERS MUST BE LOCATED ALONG THE EMBANKMENT

NOTES:

260+00CSM-10597+50CSM-40

442+50CSM-144257+50CSM-10495+00CSM-39

440+00CSM-143255+00CSM-10392+50CSM-38

437+50CSM-142252+50CSM-10290+00CSM-37

435+00CSM-141250+00CSM-10187+50CSM-36

432+50CSM-140247+50CSM-10085+00CSM-35

430+00CSM-139245+00CSM-9982+50CSM-34

427+50CSM-138242+50CSM-9880+00CSM-33

425+00CSM-137240+00CSM-9777+50CSM-32

422+50CSM-136237+50CSM-9675+00CSM-31

420+00CSM-135235+00CSM-9572+50CSM-30

417+50CSM-134232+50CSM-9470+00CSM-29

415+00CSM-133230+00CSM-9367+50CSM-28

412+50CSM-132227+50CSM-9265+00CSM-27

410+00CSM-131225+00CSM-9162+50CSM-26

407+50CSM-130222+50CSM-9060+00CSM-25

405+00CSM-129220+00CSM-8957+50CSM-24

402+50CSM-128217+50CSM-8855+00CSM-23

400+00CSM-127215+00CSM-8752+50CSM-22

312+50CSM-126212+50CSM-8650+00CSM-21

310+00CSM-125210+00CSM-8547+50CSM-20

307=50CSM-124207+50CSM-8445+00CSM-19

305+00CSM-123142+50CSM-5842+50CSM-18

302+50CSM-122140+00CSM-5740+00CSM-17

300+00CSM-121137+50CSM-5637+50CSM-16

297+50CSM-120135+00CSM-5535+00CSM-15

295+00CSM-119132+50CSM-5432+50CSM-14

292+50CSM-118130+00CSM-5330+00CSM-13

290+00CSM-117127+50CSM-5227+50CSM-12

287+50CSM-116125+00CSM-5125+00CSM-11

285+00CSM-115122+50CSM-5022+50CSM-10

282+50CSM-114120+00CSM-4920+00CSM-9

280+00CSM-113117+50CSM-4817+50CSM-8

277+50CSM-112115+00CSM-4715+00CSM-7

275+00CSM-111112+50CSM-4612+50CSM-6

272+50CSM-110110+00CSM-4510+00CSM-5

270+00CSM-109107+50CSM-4407+50CSM-4

267+50CSM-108105+00CSM-4305+00CSM-3

265+00CSM-107102+50CSM-4202+50CSM-2

262+50CSM-106100+00CSM-410+00CSM-1

Inst. IDInst. IDInst. ID

EMBANKMENT SURVEY SETTLEMENT MARKERS

C-11 SURVEILLANCE AND MONITORING PROGRAM

2. VWPS = VIBRATING WIRE PRESSURE SENSOR (LOW-PRESSURE)

APPROXIMATELY 6 INCHES ABOVE DESIGN INVERT.

1. INSTRUMENT TIP ELEVATION IS BASED UPON DESIGN INVERT ELEVATION. TIP ELEVATION MUST BE

NOTES:

VWPS1.5-35254+99.43C11IMP10-VWPS-1IMP 10

VWPS1.5-35236+99.43C11IMP9-VWPS-1IMP 9

VWPS1.5-35140+98.53C11IMP5-VWPS-1IMP 5

VWPS1.5-3564+27.5C11IMP3-VWPS-1IMP 3

VWPS1.5-3501+66.11C11IMP1-VWPS-1IMP 1

Instrument Type

Tip Elev.

Instrument ID

EMBANKMENT TOE DRAIN MONITORING

C-11 SURVEILLANCE AND MONITORING PROGRAM

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 ta n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

VWP = VIBRATING WIRE PIEZOMETER3.

TIME OF INSTALLATION.

ELEVATION AND SCREENED ZONE MUST BE DETERMINED IN THE FIELD AT THE

TYPICAL DESIGN CROSS SECTIONS AND SELECT BORING LOGS. THE FINAL TIP

INSTRUMENT TIP ELEVATION AND SCREENED MATERIAL ARE BASED UPON 2.

FOLLOWING INSTRUMENTATION INSTALLATION.

DOCUMENTS. THE FINAL SURFACE ELEVATIONS SHOULD BE SURVEYED

GROUND SURFACE ELEVATIONS HAVE BEEN ESTIMATED FROM THE DESIGN 1.

GENERAL NOTES

DRAFT

k3endlml Rectangle k3endlml Rectangle k3endlml Rectangle

CF0077

T Y

P

IC

A L

I N

S T

R U

M E

N T

A T

IO

N

P L

A N

A N

D S

E C

T

IO

N

G

R E

E N

W E

L L

T B

R O

W N

V

S E

V E

R A

N C

E

W W

E B

E R

A1

TYPICAL INSTRUMENTATION CROSS SECTION

D1

TYPICAL INSTRUMENTATION PLAN

RTU/DATA COLLECTOR

STONE TYPE E

PVC PIPE

12" SCH 80 SLOTTED

CHIMNEY SAND (C33 SAND)

RTU/DATA COLLECTOR

MARKER

SURVEY SETTLEMENT

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

CANAL ARMORING

2" CONDUIT (TYP.)

EXISTING GRADE

INSPECTION ROAD

CL D-511 EMBANKMENT

ACCESS ROAD

BENCH

DRAINAGE DITCH

LIMITS OF MUCK EXCAVATION

RTU/DATA COLLECTOR

C11IMPXX-VWPS-1

C11IMPXX-GW-6

C11IMPXX-GW-7

C11IMPXX-VWP-1

C11IMPXX-GW-1

C11IMPXX-GW-4

C11IMPXX-GW-3

C11IMPXX-GW-5

C11IMPXX-PS-1

C11IMPXX-GW-2

C11IMPXX-PS-2

CANAL TOE

TOP OF BANK

RTU/DATA COLLECTOR

(TYP)

VEHICLE BOLLARD

C11IMPXX-GW-6

RTU/DATA COLLECTOR

(TYP)

VEHICLE BOLLARD

C11IMPXX-GW-7C-511 CANAL CL

D

-180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-40

-20

-40

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

A N

S I

D

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

GENERAL NOTESGENERAL NOTES

SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.

SENSOR, AND SURVEY SETTLEMENT MARKER SPECIFICATIONS. FOR

REFER TO SPECIFICATION SECTION 31 75 00 FOR PIEZOMETER, PRESSURE 5.

AND CF0083.

TYPICAL INSTRUMENT INSTALLATION DETAILS ARE SHOWN ON SHEETS CF0082 4.

AND IZ0045.

RTU/DATA COLLECTOR INSTALLATION DETAILS ARE SHOWN ON SHEETS IZ0044 3.

INSTRUMENT, REFER TO SHEETS CF0078 THROUGH CF0081.

INSTRUMENTATION MONITORING CROSS-SECTION AND/OR SPECIFIC

GEOMETRY, AND RELATED INFORMATION. FOR SPECIFIC DETAILS ON AN

DEPENDENT UPON SUBSURFACE STRATIGRAPHY, CONSTRUCTED EMBANKMENT

2. INSTRUMENTATION LOCATION IN BOTH SECTION AND PLAN VIEW ARE

INSTRUMENT.

MAY NOT BE INDICATIVE OF THE ELEVATIONS OR LOCATIONS FOR A GIVEN

IDEALIZED FOR A TYPICAL INSTRUMENTATION MONITORING CROSS-SECTION AND

INSTRUMENT ELEVATIONS AND LOCATIONS SHOWN ON THIS SHEET ARE 1.

TYPICAL PLAN AND SECTION

C-511 CANAL

EL. VARIES

EL. VARIES

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

EL. 2.5'

EL. VARIES

EL. 8.0'

D-511 EMBANKMENT

EL. 8.5'

EL. VARIES

EL. 4.0'

EL. 8.5'

EL. VARIES

100' 200'0

N

(HORIZ.)

-20

3H:1V 3H:1V3H:1V

3H:1V 3H:1V

3H:1V

3H:1V

3H:1V

CZ0010

E6

CZ0010

A6

DRAFT

k3endlml Rectangle k3endlml Rectangle

INSTRUMENTATION CROSS SECTION IMP1 - D-511 STA 4+00

C1

INSTRUMENTATION CROSS SECTION IMP2 - D-511 STA 34+49

INSTRUMENTATION CROSS SECTION IMP3 - D-511 STA 65+00

E1

STONE TYPE E CHIMNEY SAND (C33 SAND)STONE TYPE E

C11IMP1C

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

C11IMP1T

RTU/DATA COLLECTOR

S H

E E

T

O F

T Y

P

IC

A L

D A

M E

M B

A N

K M

E N

T

IN

S

T R

U M

E N

T A

T

IO

N C

R O

S S

S E

C T

IO

N

S

CF0078

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

CHIMNEY SAND (C33 SAND)

STONE TYPE E

PVC PIPE

12" SCH 80 SLOTTED

C11IMP2C

RTU/DATA COLLECTOR

C11IMP2T

RTU/DATA COLLECTOR

C11IMP3T

RTU/DATA COLLECTOR

STONE TYPE E

PVC PIPE

12" SCH 80 SLOTTED

CHIMNEY SAND (C33 SAND)

C11IMP3C

RTU/DATA COLLECTOR

MARKER

SURVEY SETTLEMENT

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

CANAL ARMORING

CANAL ARMORING

2" CONDUIT (TYP.)

2" CONDUIT (TYP.)

2" CONDUIT (TYP.)

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

W W

E B

E R

S

P O

P H

A M

V

S E

V E

R A

N C

E

T G

R E

E N

W E

L L

PVC PIPE

12" SCH 80 SLOTTED

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-40 -40

-20 -20

0 0

20 20

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-40 -40

-20 -20

0 0

20 20

40 40

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20 -20

0 0

20 20

40 40

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

(HORIZ.) (VERT.)(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)

20' 40'0

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

C-511 CANAL

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

D-511 EMBANKMENT

EL. -8.0' EL. -8.0'

EL. 2.5'

EL. 8.0'EL. 8.0' EL. 8.5'

EL. 1.0'

EL. 8.5'

EL. 4.0'

EL. 0.0'

EL. 1.0'

EL. 8.5'EL. 8.0'

EL. 4.0'

EL. 8.5'

EL. 0.0'

D-511 EMBANKMENT

EL. 2.5'

EL. -15.0'EL. -15.0'

EL. 1.0'

C-511 CANAL

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

C-511 CANAL

EL. -17.0'

EL. -4.0'

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

EL. 2.5'

EL. -4.0'

EL. 8.0'

D-511 EMBANKMENT

EL. 8.5'

EL. 1.5'

EL. 4.0'

EL. 8.5'

EL. 0.0'

P R

O P

R

/W

EL. 1.0'

CF0073

A1

SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.

SENSOR, AND SURVEY SETTLEMENT MARKER SPECIFICATIONS. FOR

REFER TO SPECIFICATION SECTION 31 75 00 FOR PIEZOMETER, PRESSURE 4.

CF0082 AND CF0083.

TYPICAL INSTRUMENT INSTALLATION DETAILS ARE SHOWN ON SHEETS 3.

IZ0044 AND IZ0045.

RTU/DATA COLLECTOR INSTALLATION DETAILS ARE SHOWN ON SHEETS 2.

FOR FURTHER DETAILS.

SEE GEOTECHNICAL DATA REPORT INCLUDED AS SPECIFICATION 00 31 32

BETWEEN BORINGS ARE UNKNOWN AND MAY DIFFER FROM THOSE SHOWN.

GENERALLY BASED ON STRAIGHT LINE INTERPOLATION. ACTUAL CONDITIONS

CONDITIONS AT THE BORING LOCATIONS. STRATIGRAPHY SHOWN ARE

PASSAGE OF TIME MAY RESULT IN A CHANGE IN THE SUBSURFACE

DIFFER FROM THOSE OCCURRING AT THE BORING LOCATIONS. ALSO, THE

THE SPECIFIC TIME OF DRILLING. CONDITIONS AT OTHER LOCATIONS MAY

THIS DRAWING DEPICT APPROXIMATE SUBSURFACE CONDITIONS ONLY AT

THE SUBSURFACE STRATIGRAPHY AND RELATED INFORMATION SHOWN ON 1.

GENERAL NOTES

CF0073

A1

CF0073

A1

DRAFT

k3endlml Rectangle k3endlml Rectangle

CHIMNEY SAND (C33 SAND)

C11IMP4C

RTU/DATA COLLECTOR

STONE TYPE E

SLOTTED PVC PIPE

12" SCH 80

C11IMP4T

INSTRUMENTATION CROSS SECTION IMP4 - D-511 STA 111+01

T Y

P

IC

A L

D A

M E

M B

A N

K M

E N

T

S H

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N C

R O

S S

S E

C T

IO

CF0079

INSTRUMENTATION CROSS SECTION IMP5 - D-511 STA 140+00

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

CHIMNEY SAND (C33 SAND)

MARKER

SURVEY SETTLEMENT

STONE TYPE E

SLOTTED PVC PIPE

12" SCH 80

CANAL ARMORING

(TYP.)

2" CONDUIT

2" CONDUIT (TYP.)

EXISTING GRADE

EXISTING GRADE

C11IMP5T

RTU/DATA COLLECTOR

C11IMP5C

RTU/DATA COLLECTOR

W W

E B

E R

S

P O

P H

A M

V

S E

V E

R A

N C

E

T G

R E

E N

W E

L L

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

AND EMBANKMENT DETAILS (TYP)

SEE SHEET CZ0027 FOR SLURRY WALL

BENTONITE AMENDED SOIL

BENTONITE AMENDED SOIL

INSTRUMENTATION CROSS SECTION IMP8 - D-511 STA 216+00

STONE TYPE E

PVC PIPE

SLOTTED

12" SCH 80

C11IMP8T

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

2" CONDUIT (TYP.)

EXISTING GRADE

C11IMP8C

RTU/DATA COLLECTOR

WALL AND EMBANKMENT DETAILS

SEE SHEET CZ0027 FOR SLURRY

BENTONITE AMENDED SOIL

WALL TRANSITION DETAILS

SEE SHEET CZ0028 FOR SLURRY

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-40 -40

-20 -20

0 0

20 20

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-40 -40

-20 -20

0 0

20 20

40 40

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20 -20

0 0

20 20

40 40

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

EL. 2.0'EL. 1.5'

EL. 8.5'EL. 8.0'

D-511 EMBANKMENT

EL. -17.0'

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

EL. 2.5'

EL. -17.0'

EL. 1.5'

C-511 CANAL

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

EL. 2.0'

EL. 4.0'

EL. 8.5'EL. 8.5'

EL. 1.5'

EL. 8.0'

D-511 EMBANKMENT

EL. -18.0'

(TYP.)

PIEZOMETERS

DOWNSTREAM VW

EL. 2.5'

EL. -3.0'

EL. -18.0'

C-511 CANAL

CF0074

SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.

SENSOR, AND SURVEY SETTLEMENT MARKER SPECIFICATIONS. FOR

REFER TO SPECIFICATION SECTION 31 75 00 FOR PIEZOMETER, PRESSURE 4.

CF0082 AND CF0083.

TYPICAL INSTRUMENT INSTALLATION DETAILS ARE SHOWN ON SHEETS 3.

IZ0044 AND IZ0045.

RTU/DATA COLLECTOR INSTALLATION DETAILS ARE SHOWN ON SHEETS 2.

FOR FURTHER DETAILS.

SEE GEOTECHNICAL DATA REPORT INCLUDED AS SPECIFICATION 00 31 32

BETWEEN BORINGS ARE UNKNOWN AND MAY DIFFER FROM THOSE SHOWN.

GENERALLY BASED ON STRAIGHT LINE INTERPOLATION. ACTUAL CONDITIONS

CONDITIONS AT THE BORING LOCATIONS. STRATIGRAPHY SHOWN ARE

PASSAGE OF TIME MAY RESULT IN A CHANGE IN THE SUBSURFACE

DIFFER FROM THOSE OCCURRING AT THE BORING LOCATIONS. ALSO, THE

THE SPECIFIC TIME OF DRILLING. CONDITIONS AT OTHER LOCATIONS MAY

THIS DRAWING DEPICT APPROXIMATE SUBSURFACE CONDITIONS ONLY AT

THE SUBSURFACE STRATIGRAPHY AND RELATED INFORMATION SHOWN ON 1.

GENERAL NOTES

CF0074

A1

EL. 6.0'

EL. -35.0'

EL. 8.5'

EL. 4.0'

EL. -35.0'

(HORIZ.) (VERT.)

20' 40'0 20' 40'0CF0074

A1

C-511 CANAL

D-511 EMBANKMENT

EL. 2.0'

EL. 4.0'

EL. 8.5'

EL. 1.5'

EL. 8.0'

EL. 2.5'

EL. -10.0'EL. -10.0'

EL. 8.5'

PIEZOMETERS (TYP.)

DOWNSTREAM VW

EL. -3.0'

EL. 6.0'

EL. -17.0'

EL. 8.5'

EL. 1.5'

DRAFT

k3endlml Rectangle k3endlml Rectangle

Y P

IC

A

L D

A M

E M

B A

N K

M E

N T

S H

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N C

R O

S S

S E

C R

IO

CF0080

INSTRUMENTATION CROSS SECTION IMP9 - D-511 STA 236+00

2" CONDUIT (TYP.)

STONE TYPE E

PVC PIPE

SLOTTED

12" SCH 80

C11IMP9C

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

PIEZOMETERS (TYP.)

DOWNSTREAM VW

EXISTING GRADE

C11IMP9T

W W

E B

E R

S

P O

P H

A M

V

S E

V E

R A

N C

E

T G

R E

E N

W E

L L

INSTRUMENTATION CROSS SECTION IMP10 - D-511 STA 256+00

C11IMP10C

RTU/DATA COLLECTOR

C11IMP10T

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

INSTRUMENTATION CROSS SECTION IMP11 - D-511 STA 276+00

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

C11IMP11C

RTU/DATA COLLECTOR

C11IMP11T

RTU/DATA COLLECTOR

CHIMNEY SAND (C33 SAND)STONE TYPE E

SLOTTED PVC PIPE

12" SCH 80

CHIMNEY SAND (C33 SAND)

STONE TYPE E

SLOTTED PVC PIPE

12" SCH 80

EXISTING GRADE

EXISTING GRADE

2" CONDUIT (TYP.)

2" CONDUIT (TYP.)

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20 -20

0 0

20 20

40 40

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20 -20

0 0

20 20

40 40

-340 -320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20 -20

0 0

20 20

40 40

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

D-511 EMBANKMENT

C-511 CANAL

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

EL. 1.0'

EL. 4.0'

EL. 8.5'EL. 8.5'EL. 8.0'

EL. 1.5'EL. 2.5'

EL. -7.0'

EL. 1.0'

EL. -7.0'

SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.

SENSOR, AND SURVEY SETTLEMENT MARKER SPECIFICATIONS. FOR

REFER TO SPECIFICATION SECTION 31 75 00 FOR PIEZOMETER, PRESSURE 4.

CF0082 AND CF0083.

TYPICAL INSTRUMENT INSTALLATION DETAILS ARE SHOWN ON SHEETS 3.

IZ0044 AND IZ0045.

RTU/DATA COLLECTOR INSTALLATION DETAILS ARE SHOWN ON SHEETS 2.

FOR FURTHER DETAILS.

SEE GEOTECHNICAL DATA REPORT INCLUDED AS SPECIFICATION 00 31 32

BETWEEN BORINGS ARE UNKNOWN AND MAY DIFFER FROM THOSE SHOWN.

GENERALLY BASED ON STRAIGHT LINE INTERPOLATION. ACTUAL CONDITIONS

CONDITIONS AT THE BORING LOCATIONS. STRATIGRAPHY SHOWN ARE

PASSAGE OF TIME MAY RESULT IN A CHANGE IN THE SUBSURFACE

DIFFER FROM THOSE OCCURRING AT THE BORING LOCATIONS. ALSO, THE

THE SPECIFIC TIME OF DRILLING. CONDITIONS AT OTHER LOCATIONS MAY

THIS DRAWING DEPICT APPROXIMATE SUBSURFACE CONDITIONS ONLY AT

THE SUBSURFACE STRATIGRAPHY AND RELATED INFORMATION SHOWN ON 1.

GENERAL NOTES

CF0074

A1

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

C-511 CANAL

D-511 EMBANKMENT

EL. 8.5'

EL. 4.0'

EL. 8.5'

EL. 1.5'

EL. 8.0'

EL. 2.5'

EL. -7.0'

EL. 1.5'

EL. -7.0'

PIEZOMETERS (TYP.)

DOWNSTREAM VW

EL. 1.0'

20' 40'0 20' 40'0

EL. 1.0'

EL. 8.5'

EL. 4.0'

EL. 8.5'

EL. 1.5'

PIEZOMETERS (TYP.)

DOWNSTREAM VW

EL. 8.0'

EL. 2.5'

EL. -2.0'EL. -2.0'

EL. -10.0'

D-511 EMBANKMENT

C-511 CANAL

CF0074

A1

CF0073

A1

(HORIZ.) (VERT.)

DRAFT

k3endlml Rectangle k3endlml Rectangle

CF0081

Y

P

IC

A L

D A

M E

M B

A N

K M

E N

T

S H

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N C

R O

S S

S E

C T

IO

N

S

T G

R E

E N

W E

L L

S

P O

P H

A M

V

S E

V E

R A

N C

E

W W

E B

E

INSTRUMENTATION CROSS SECTION IMP12 - D-511 STA 291+85

EXISTING GRADE

CHIMNEY SAND (C33 SAND)STONE TYPE E

SLOTTED PVC PIPE

12" SCH 80

C11IMP12T

RTU/DATA COLLECTOR

C11IMP12C

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

2" CONDUIT (TYP.)

INSTRUMENTATION CROSS SECTION IMP14 - D-511 STA 422+00

INSTRUMENTATION CROSS SECTION IMP13 - D-511 STA 407+00

BLANKET DRAIN

(C33 SAND)

CHIMNEY SAND

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

CHIMNEY SAND (C33 SAND) BLANKET DRAIN CHIMNEY SAND (C33 SAND)BLANKET DRAIN

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

C11IMP13T

RTU/DATA COLLECTOR

C11IMP13C

RTU/DATA COLLECTOR

TO AVOID ACCESS DRIVE)

(LOCATED AT STA 422+30

C11IMP14T

RTU/DATA COLLECTOR

C11IMP14C

RTU/DATA COLLECTOR

UNDER SOIL-CEMENT

UPSTREAM PRESSURE SENSORS

2" CONDUIT (TYP.)

2" CONDUIT (TYP.)

FOR RTU PLACEMENT REFERENCE

CANAL BOTTOM SHOWN AT STATION 422+30

PIEZOMETERS (TYP.)

DOWNSTREAM VW

-320 -300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120

-20

-220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220

-20 -20

0 0

20 20

40 40

-140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300

-20 -20

0 0

20 20

40 40

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

F

IL

E

N A

M E

U S

E R

D A

T E

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.

SENSOR, AND SURVEY SETTLEMENT MARKER SPECIFICATIONS. FOR

REFER TO SPECIFICATION SECTION 31 75 00 FOR PIEZOMETER, PRESSURE 4.

CF0082 AND CF0083.

TYPICAL INSTRUMENT INSTALLATION DETAILS ARE SHOWN ON SHEETS 3.

IZ0044 AND IZ0045.

RTU/DATA COLLECTOR INSTALLATION DETAILS ARE SHOWN ON SHEETS 2.

FOR FURTHER DETAILS.

SEE GEOTECHNICAL DATA REPORT INCLUDED AS SPECIFICATION 00 31 32

BETWEEN BORINGS ARE UNKNOWN AND MAY DIFFER FROM THOSE SHOWN.

GENERALLY BASED ON STRAIGHT LINE INTERPOLATION. ACTUAL CONDITIONS

CONDITIONS AT THE BORING LOCATIONS. STRATIGRAPHY SHOWN ARE

PASSAGE OF TIME MAY RESULT IN A CHANGE IN THE SUBSURFACE

DIFFER FROM THOSE OCCURRING AT THE BORING LOCATIONS. ALSO, THE

THE SPECIFIC TIME OF DRILLING. CONDITIONS AT OTHER LOCATIONS MAY

THIS DRAWING DEPICT APPROXIMATE SUBSURFACE CONDITIONS ONLY AT

THE SUBSURFACE STRATIGRAPHY AND RELATED INFORMATION SHOWN ON 1.

GENERAL NOTES

20' 40'0 20' 40'0CF0073

A1

D-511 EMBANKMENTC-511 CANAL

EL. -0.5'

EL. -15.0'

EL. 8.0' EL. 8.5'

EL. 2.5'

EL. 4.0'

EL. 8.5'

EL. 2.5'

EL. -15.0'

EL. 2.5'

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

(HORIZ.) (VERT.)

20' 40'0 20' 40'0

C-514 CANAL

D-511 ESA EMBANKMENT

PIEZOMETERS (TYP.)

DOWNSTREAM VW

D-511 ESA EMBANKMENT

EL. 0.0'

EL. 8.5'

EL. 1.5'

EL. 8.0'

EL. 2.5'

EL. -15.0'

EL. -3.0'EL. 0.0'

EL. 8.5'

EL. 4.0'

EL. 0.0'

EL. 8.5'

EL. 4.0'

EL. 8.5'

EL. 1.5'

EL. 8.0'

EL. -2.5' EL. -3.0'

EL. 0.0'

EL. -15.0'

CF0073

A1

CF0074

A1

D-511 ESA EMBANKMENT

DRAFT

k3endlml Rectangle k3endlml Rectangle

W

E B

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N D

E T

A

IL

S

CF0082

S

P O

P H

A M

V

S E

V E

R A

N C

G

R E

E N

W E

SURVEY SETTLEMENT MARKER DETAIL

SURVEY SETTLEMENT MARKER INSTALLATION DETAIL

E3

VIBRATING WIRE PRESSURE SENSOR INSTALLATION DETAIL

E6

A3

6"

6" 6" 30" DIA

6'-0" DIA

60" DIA

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

BRASS/BRONZE

3-1/2 INCH DIAMETER

RECESSED LETTERS

A

YEAR

GENCY

SIHT

M

A R

K

MAR

K

F O

R D

IS

T

RU

BING

S

U

RVEY

SCALE: NTS SCALE: NTS

FI

NEORIPRISO

N M E

N

T

C A T

S T

IO

N

DESIGN

AT

I

ON

O R

M

P S

O

F

ENGINEERS-

U .S

.A R

M Y

12.0"

2.0'

FINAL GRADE

FLUSH WITH SURFACE

COUNTERSINK DISK

RECOMMENDATION

GROUT PER MANUFACTURER'S

RECOMMENDATION

AND DEPTH PER MANUFACTURER'S

DRILL HOLE DIAMETER

3,000 PSI CONCRETE (MIN)

MANUFACTURER'S RECOMMENDATIONS FOR GROUTING.

DRILLING INTO EXISTING CONCRETE AND FOLLOWING

CONCRETE WORK. INSTALLATION MAY BE COMPLETED BY

OVERFLOW SPILLWAY DOES NOT REQUIRE ADDITIONAL

CONCRETE PORTION OF THE EMBANKMENT, SUCH AS THE

1. SURVEY SETTLEMENT MARKER INSTALLATION WITHIN A

NOTE:

CABLE

VIBRATING WIRE

SCALE: NTS

SCALE: NTS

8"

STANDPIPE PIEZOMETER DETAIL

TYPICAL FLUSHMOUNT OPEN

SPECIFICATION SECTION 31 75 00.

PIEZOMETER SCREEN DIMENSIONS MUST BE IN ACCORDANCE WITH 4.

MUST BE CONSISTENT WITH DETAIL A5 ON SHEET CZ0001.

CENTERLINE OF THE STANDPIPE PROTECTIVE CASING. BOLLARD CONSTRUCTION

MINIMUM OF THREE BOLLARDS SPACED EQUIDISTANT APART AND 3'-6" FROM THE

ABOVE GRADE OPEN STANDPIPE PIEZOMETERS MUST BE PROTECTED BY A 3.

EACH LOCATION.

BELOW THE CORRESPONDING VIBRATING WIRE PIEZOMETER TIP ELEVATION AT

ELEVATION MUST BE A MINIMUM OF 6 INCHES THE STANDPIPE PIEZOMETER TIP 2.

ON SHEET CF0075 AND CF0076.

THE CORRESPONDING INSTRUMENT AS LISTED IN THE INSTRUMENTATION TABLES

BE INSTALLED AT THE TIP ELEVATION FOR THE VIBRATING WIRE PIEZOMETER MUST 1.

8"

STANDPIPE PIEZOMETER DETAIL

TYPICAL ABOVE GRADE OPEN

SCALE: NTS

:PIEZOMETER NOTES

GROUND SURFACE

PIEZOMETER CABLE

VIBRATING WIRE

FLUSHMOUNT MANHOLE

CONCRETE PAD

GROUT

PVC PIPE

2" DIA. SCH. 40

BENTONITE SEAL

SAND

SCREEN

NO. 10 SLOT WELL

RTU/DATA COLLECTOR

2" DIA. CONDUIT TO

V A

R

IE

S V

A R

IE

S

M

IN

6" MIN.

6" MIN.

V A

R

IE

S V

A R

IE

S

6" MIN.

6" MIN.

M

IN

PROTECTIVE CASING

PIEZOMETER CABLE

VIBRATING WIRE

RTU/DATA COLLECTOR

2" DIA. CONDUIT TO

GROUND SURFACE

CONCRETE PAD

GROUT

PVC PIPE

2" DIA. SCH. 40

BENTONITE SEAL

SAND

SCREEN

NO. 10 SLOT WELL

LOCATIONS.

1. SEE SHEET CF0076 FOR SURVEY SETTLEMENT MARKER INSTALLATION

NOTE:

MANHOLE SECTIONS

PRECAST CONCRETE

BASE

CONCRETE

6"

PRESSURE SENSOR

VIBRATING WIRE

SEE DETAIL E6 ON SHEET CZ0016 FOR MANHOLE DETAILS.2.

SEE SHEET CF0076 FOR STRUCTURE LOCATIONS.1.

NOTE:

RTU/DATA COLLECTOR

2" DIA CONDIUT TO

DRAFT

k3endlml Rectangle k3endlml Rectangle

W

E B

E E

T

O F

IN

S

T R

U M

E N

T A

T

IO

N D

E T

A

IL

S

CF0083

S

P O

P H

A M

V

S E

V E

R A

N

G

R E

E N

W E

VIBRATING WIRE PIEZOMETER INSTALLATION DETAIL WITHIN IMPOUNDMENT

PRESSURE-SENSORS UNDER SOIL-CEMENT INSTALLATION DETAIL

F1

TYPICAL INSTRUMENT CONDUIT EMBANKMENT INSTALLATION DETAIL

F5

O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

SCALE: NTS

1' MAX.

TIP ELEV. (NOTE 1)

:NOTES

EXISTING GROUND SURFACE

TRENCH TO RTU/DATA COLLECTOR

GREATER THAN 6" LIFTS

BACKFILL HAND TAMPED IN NO

EXCAVATED MATERIAL USED AS

SCALE: NTS

:NOTES

GEOTEXTILE FABRIC

2" CONDUIT

18" THICK SOIL-CEMENT

EMBANKMENT FILL

18" THICK SOIL-CEMENT

2%

2" CONDUIT

SCALE: NTS

:NOTE

SEE SHEET CZ0018

STONE TYPE E,

TRENCHED EXCAVATION A MINIMUM OF 1 FOOT BELOW THE GROUND SURFACE.

VIBRATING WIRE CABLES TO BE INSTALLED THROUGH 2" PVC CONDUIT. PVC CONDUIT MUST BE INSTALLED WITHIN 2.

AND CF0076.

VIBRATING WIRE PIEZOMETERS MUST BE INSTALLED TO THE CORRESPONDING TIP ELEVATION AS SHOWN ON CF0075 1.

9" THICK SOIL-CEMENT

2. STONE TYPE E MUST BE HAND TAMPED AROUND THE PVC CONDUIT TO THE DESIGNATED LIFT THICKNESS.

WITHIN STONE TYPE E LAYER BENEATH THE SOIL-CEMENT.

1. VIBRATING WIRE CABLES TO BE INSTALLED THROUGH 2" PVC CONDUIT. PVC CONDUIT MUST BE INSTALLED

DOWNSTREAM EMBANKMENT SLOPES.

LAYER ON THE UPSTREAM SLOPE. ADDITIONALLY, THE CONDUIT MUST BE INSTALLED ONE FOOT BELOW THE SURFACE OF

THE CONDUIT MUST BE INSTALLED TWO FEET BELOW THE CREST ROADWAY AND THEN FIELD FIT TO ALIGN WITH STONE TYPE E 2.

LAYER MUST BE CONSTRUCTED IN ACCORDANCE WITH ORIGINAL SPECIFICATIONS FOR CREST ROAD CONSTRUCTION.

EXCAVATED MATERIAL USED AS BACKFILL HAND TAMPED IN NO GREATER THAN 6" LIFTS, EXCEPT FOR SOIL-CEMENT. SOIL-CEMENT 1.

SEE SHEET CZ0018

STONE TYPE E,

GEOTEXTILE FABRIC

DRAFT

k3endlml Rectangle k3endlml Rectangle

W

E B

L A

R G

E P

L A

N A

N D

S E

C T

IO

N

S

C E

N T

R A

L L

A K

E

CF0084

S

P O

P H

A M

V

S E

V E

R A

N

J

B

U R

K

THIS SHEETEXISTING GRADE

EXISTING GRADE

TOP OF MUCK BACKFILL EL. 4.0'

TOP OF MUCK BACKFILL EL 4.0'

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

-400 -300 -200 -100 0 100 200 300 400

-60 -60

-50 -50

-40 -40

-30 -30

-20 -20

-10 -10

0 0

10 10

-300 -200 -100 0 100 200 300

-60 -60

-50 -50

-40 -40

-30 -30

-20 -20

-10 -10

0 0

10 10

U S

SW 36TH ST

S O

U T H P

O S T R

O A

D

SW 26TH ST

GRIFFIN ROAD

N

KEY PLAN

100' 200'0

100' 200'0 10' 20'0

(NGS PID #AD8107). NGVD29 = NAVD88 +1.49' (FT) FOR THIS LOCATION.

VERTICAL DATUM OF 1988 (NAVD88) AND GEOID12B. BENCH MARK "Y 408"

THE ELEVATIONS SHOWN HEREIN ARE BASED ON THE NORTH AMERICA1.

GENERAL NOTES

N

3E

ENLARGED PLAN OF CENTRAL LAKE

1"=100'SCALE:

CENTRAL LAKE CROSS SECTION

A5

CENTRAL LAKE CROSS SECTION

(HORIZ)

(HORIZ) (VERT)

100' 200'0 10' 20'0

EXISTING WATER SURFACE EL 3.8'

BACKFILL NOTES

CD0001

A1

CF0084

E3

CF0084

E3

USED AS BORROW PIT BACKFILL.

SEE SHEETS C-0004 & C-0005 FOR RESTRICTED USE MUCK AREAS NOT TO BE 9.

OFFICER.

TO THE OWNER’S ENGINEER REVIEW AND APPROVAL OF THE CONTRACTING

USED TO PERFORM THE BACKFILL DEPTH MEASUREMENTS WILL BE SUBJECT

SMALLER) TO ENSURE UNIFORM PLACEMENT OF MATERIAL. THE METHODS

EVERY 50,000 CUBIC YARDS OR FIVE FEET IN LIFT THICKNESS (WHICHEVER IS

THE CONTRACTOR MUST CHECK THE DEPTH OF BACKFILL PLACEMENT 8.

ARE NOT IMPEDED.

ON A WEEKLY INTERVAL OR AS NEEDED SUCH THAT THE BACKFILL EFFORTS

DURING THE BACKFILLING PROCESS. THIS MATERIAL SHOULD BE REMOVED

OFFSITE ORGANIC MATERIAL WHICH MAY FLOAT TO THE WATER SURFACE

THE CONTRACTOR MUST BE PREPARED TO HANDLE AND DISPOSE OF 7.

THE OWNER.

STANDARD D7263 AND FROM AN ACCREDITED LABORATORY APPROVED BY

YARDS. THE LABORATORY TESTING MUST BE IN ACCORDANCE WITH ASTM

THE WET UNIT WEIGHT OF THE MUCK WILL BE CHECKED EVERY 25,000 CUBIC 6.

ADDITIONAL DETAIL.

REFER TO CLSM SPECIFICATION 03 34 00 LOW STRENGTH MATERIAL FOR 5.

PLACEMENT.

CONTRACTOR MAY ELECT TO MIX THE MUCK WITH CLSM PRIOR TO

IF THE WET UNIT WEIGHT OF THE MUCK IS LESS THAN 70 PCF, THE 4.

THICKNESS TO THE SURROUNDING EDGES.

THAT THE CENTER OF THE LAKE/PIT CAN BE BACKFILLED IN SIMILAR LIFT(S)

CONSIDER A FLOATING CONVEYOR SYSTEM (OR SIMILAR METHOD) SUCH

PLACED IN UNIFORM LIFTS. THIS MAY REQUIRE THE CONTRACTOR TO

THE MUCK MUST HAVE A MINIMUM WET UNIT WEIGHT OF 70 PCF AND BE 3.

BRANCHES, ETC.) FROM THE MUCK PRIOR TO PLACEMENT.

LARGE (GREATER THAN 4-INCH DIA) ORGANIC MATERIAL (WOOD, GRASS,

EXTRA HANDLING OF THE BACKFILL MATERIAL TO REMOVE DEBRIS AND

THE CONTRACTOR MUST BE PREPARED TO PERFORM SORTING AND/OR 2.

ONSITE MUCK TO THE GRADES AND SLOPES SHOWN ON THIS DRAWING.

CONTRACTOR MUST BACKFILL THE BORROW PIT AND CENTRAL LAKE WITH 1.

PILOT TESTING REQUIREMENTS

VERSUS PLAN TO THE GOVERNMENT WEEKLY.

MEASUREMENTS OF PLACED FILL, AND CONSTRUCTION METHODS USED

REPORT UNIT WEIGHT TEST RESULTS OF MUCK PLACED, DEPTH

DURING PRODUCTION PLACEMENT CONTRACTOR MUST COLLECT AND 6.

NO ADDITIONAL COST TO THE GOVERNMENT.

TO ACHIEVE BACKFILL PLACEMENT OBJECTIVES MUST BE IMPLEMENTED AT

APPROACH AND / OR REVISIONS TO MATERIALS, EQUIPMENT OR ADDITIVES

PRODUCTION PLACEMENT. REQUIRED REVISIONS TO PLACEMENT

THE PILOT TEST BEFORE THE CONTRACTOR CAN PROCEED WITH

THE CONTRACTING OFFICER MUST REVIEW AND APPROVE THE RESULTS OF 5.

GOVERNMENT.

PLACEMENT PROVIDE ALL LABORATORY AND FIELD TEST RESULTS TO THE

GOVERNMENT WEEKLY. IF A MIX DESIGN IS REQUIRED TO ACHIEVE BACKFILL

FILL, AND CONSTRUCTION METHODS USED VERSUS PLAN TO THE

MUCK PLACED DURING THE PILOT TEST, DEPTH MEASUREMENTS OF PLACED

CONTRACTOR MUST COLLECT AND REPORT UNIT WEIGHT TEST RESULTS OF 4.

NOT SINK UNDER SELF-WEIGHT.

IN LIGHTER ORGANIC MATERIALS THAT FLOAT ON THE WATER SURFACE AND

MUST BE PREPARED TO ADDRESS SEGREGATION OF THE MUCK RESULTING

DO NOT INDUCE HARM TO GROUNDWATER RESOURCES. THE CONTRACTOR

WEIGHT OF THE MUCK BACKFILL VIA ADMIXTURES AND AMENDMENTS THAT

CASE, THE CONTRACTOR MUST BE PREPARED TO INCREASE THE UNIT

PIT TO EXISTING GROUND SURFACE ELEVATIONS. SHOULD THAT NOT BE THE

FOR PLACEMENT OF MUCK BACKFILLING CENTRAL LAKE AND THE BORROW

IT IS ASSUMED THAT UNIT WEIGHT ALONE WILL PROVIDE SUFFICIENT MEANS 3.

BORROW PIT FROM GROUND SURFACE IS NOT AN ACCEPTABLE APPROACH.

PLACEMENT APPROACH. PUSHING BACKFILL INTO CENTRAL LAKE OR THE

EQUIPMENT, MATERIALS, FILL AMENDMENTS IF NECESSARY, MIXING AND

CONTRACTORS PROPOSED APPROACH FOR FILL PLACEMENT, PROPOSED

GOVERNMENT REVIEW. THE BACKFILLING PLAN MUST PRESENT THE

MATERIAL INTO CENTRAL LAKE BEFORE INITIATING THE PILOT TEST FOR

CONTRACTOR MUST PROVIDE A BACKFILLING PLAN FOR PLACEMENT OF 2.

CENTRAL LAKE AND THE BORROW PIT.

WILL BE APPLICABLE TO BACKFILL PLACEMENT REQUIREMENTS FOR BOTH

BORROW PIT AND CENTRAL LAKE AREA. THE RESULTS OF THE PILOT TEST

METHODS USED AND DETERMINE IF IT IS A VIABLE OPTION TO BACKFILL THE

ENGINEER WILL BE PRESENT DURING THE PILOT TEST TO OBSERVE THE

METHODS TO BE USED DURING THE BACKFILLING PROCESS. THE OWNER’S

(PRIOR TO CONSTRUCTION) TO ESTABLISH THE SUCCESSFUL MEANS AND

CONTRACTOR AT AND ON THE BACKFILL TO BE PLACED INTO CENTRAL LAKE

A PILOT TEST OF 50,000 CUBIC YARDS MUST BE PERFORMED BY THE 1.

A1

CF0084

A5

CF0084

DRAFT

k3endlml Rectangle k3endlml Rectangle

0 -10 -5

-15-15 -20

W

E B

P

A N

A N

D S

E C

T

IO

N S

B O

R R

O W

P

IT

CF0085

S

P O

P H

A M

V

S E

V E

R A

N

B

U R

THIS SHEET

BORROW PIT CROSS SECTION

TOP OF MUCK BACKFILL EL. 4.0'

BACKFILL EL. 4.0'

TOP OF MUCK

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

-500 -400 -300 -200 -100 0 100 200 300 400

-20 -20

-10 -10

0 0

10 10

-100 0 100

-20 -20

-10 -10

0 0

10 10

U S

SW 36TH ST

S O

U T H P

O S T R

O A

D

SW 26TH ST

GRIFFIN ROAD

N

KEY PLAN

F2

BORROW PIT PLAN

100' 200'0 10' 20'0

100' 200'0 10' 20'0

(HORIZ) (VERT)

100' 200'0

N

(HORIZ)

C6

BORROW PIT CROSS SECTION

CD0002

CF0085

F2

CF0085

F2

(NGS PID #AD8107). NGVD29 = NAVD88 +1.49' (FT) FOR THIS LOCATION.

VERTICAL DATUM OF 1988 (NAVD88) AND GEOID12B. BENCH MARK "Y 408"

THE ELEVATIONS SHOWN HEREIN ARE BASED ON THE NORTH AMERICA1.

GENERAL NOTES

BACKFILL NOTES

USED AS BORROW PIT BACKFILL.

SEE SHEETS C-0004 & C-0005 FOR RESTRICTED USE MUCK AREAS NOT TO BE 9.

OFFICER.

TO THE OWNER’S ENGINEER REVIEW AND APPROVAL OF THE CONTRACTING

USED TO PERFORM THE BACKFILL DEPTH MEASUREMENTS WILL BE SUBJECT

SMALLER) TO ENSURE UNIFORM PLACEMENT OF MATERIAL. THE METHODS

EVERY 50,000 CUBIC YARDS OR FIVE FEET IN LIFT THICKNESS (WHICHEVER IS

THE CONTRACTOR MUST CHECK THE DEPTH OF BACKFILL PLACEMENT 8.

ARE NOT IMPEDED.

ON A WEEKLY INTERVAL OR AS NEEDED SUCH THAT THE BACKFILL EFFORTS

DURING THE BACKFILLING PROCESS. THIS MATERIAL SHOULD BE REMOVED

OFFSITE ORGANIC MATERIAL WHICH MAY FLOAT TO THE WATER SURFACE

THE CONTRACTOR MUST BE PREPARED TO HANDLE AND DISPOSE OF 7.

BY THE OWNER.

ASTM STANDARD D7263 AND FROM AN ACCREDITED LABORATORY APPROVED

CUBIC YARDS. THE LABORATORY TESTING MUST BE IN ACCORDANCE WITH

THE WET UNIT WEIGHT OF THE MUCK MUST BE CHECKED EVERY 25,000 6.

ADDITIONAL DETAIL.

REFER TO CLSM SPECIFICATION 03 34 00 LOW STRENGTH MATERIAL FOR 5.

PLACEMENT.

CONTRACTOR MAY ELECT TO MIX THE MUCK WITH CLSM PRIOR TO

IF THE WET UNIT WEIGHT OF THE MUCK IS LESS THAN 70 PCF, THE 4.

THICKNESS TO THE SURROUNDING EDGES.

THAT THE CENTER OF THE LAKE/PIT CAN BE BACKFILLED IN SIMILAR LIFT(S)

CONSIDER A FLOATING CONVEYOR SYSTEM (OR SIMILAR METHOD) SUCH

PLACED IN UNIFORM LIFTS. THIS MAY REQUIRE THE CONTRACTOR TO

THE MUCK MUST HAVE A MINIMUM WET UNIT WEIGHT OF 70 PCF AND BE 3.

BRANCHES, ETC.) FROM THE MUCK PRIOR TO PLACEMENT.

LARGE (GREATER THAN 4-INCH DIA) ORGANIC MATERIAL (WOOD, GRASS,

EXTRA HANDLING OF THE BACKFILL MATERIAL TO REMOVE DEBRIS AND

THE CONTRACTOR MUST BE PREPARED TO PERFORM SORTING AND/OR 2.

ONSITE MUCK TO THE GRADES AND SLOPES SHOWN ON THIS DRAWING.

CONTRACTOR MUST BACKFILL THE BORROW PIT AND CENTRAL LAKE WITH 1.

PILOT TESTING REQUIREMENTS

VERSUS PLAN TO THE GOVERNMENT WEEKLY.

MEASUREMENTS OF PLACED FILL, AND CONSTRUCTION METHODS USED

REPORT UNIT WEIGHT TEST RESULTS OF MUCK PLACED, DEPTH

DURING PRODUCTION PLACEMENT CONTRACTOR MUST COLLECT AND 6.

NO ADDITIONAL COST TO THE GOVERNMENT.

TO ACHIEVE BACKFILL PLACEMENT OBJECTIVES MUST BE IMPLEMENTED AT

APPROACH AND / OR REVISIONS TO MATERIALS, EQUIPMENT OR ADDITIVES

PRODUCTION PLACEMENT. REQUIRED REVISIONS TO PLACEMENT

THE PILOT TEST BEFORE THE CONTRACTOR CAN PROCEED WITH

THE CONTRACTING OFFICER MUST REVIEW AND APPROVE THE RESULTS OF 5.

GOVERNMENT.

PLACEMENT PROVIDE ALL LABORATORY AND FIELD TEST RESULTS TO THE

GOVERNMENT WEEKLY. IF A MIX DESIGN IS REQUIRED TO ACHIEVE BACKFILL

FILL, AND CONSTRUCTION METHODS USED VERSUS PLAN TO THE

MUCK PLACED DURING THE PILOT TEST, DEPTH MEASUREMENTS OF PLACED

CONTRACTOR MUST COLLECT AND REPORT UNIT WEIGHT TEST RESULTS OF 4.

NOT SINK UNDER SELF-WEIGHT.

IN LIGHTER ORGANIC MATERIALS THAT FLOAT ON THE WATER SURFACE AND

MUST BE PREPARED TO ADDRESS SEGREGATION OF THE MUCK RESULTING

DO NOT INDUCE HARM TO GROUNDWATER RESOURCES. THE CONTRACTOR

WEIGHT OF THE MUCK BACKFILL VIA ADMIXTURES AND AMENDMENTS THAT

CASE, THE CONTRACTOR MUST BE PREPARED TO INCREASE THE UNIT

PIT TO EXISTING GROUND SURFACE ELEVATIONS. SHOULD THAT NOT BE THE

FOR PLACEMENT OF MUCK BACKFILLING CENTRAL LAKE AND THE BORROW

IT IS ASSUMED THAT UNIT WEIGHT ALONE WILL PROVIDE SUFFICIENT MEANS 3.

BORROW PIT FROM GROUND SURFACE IS NOT AN ACCEPTABLE APPROACH.

PLACEMENT APPROACH. PUSHING BACKFILL INTO CENTRAL LAKE OR THE

EQUIPMENT, MATERIALS, FILL AMENDMENTS IF NECESSARY, MIXING AND

CONTRACTORS PROPOSED APPROACH FOR FILL PLACEMENT, PROPOSED

GOVERNMENT REVIEW. THE BACKFILLING PLAN MUST PRESENT THE

MATERIAL INTO CENTRAL LAKE BEFORE INITIATING THE PILOT TEST FOR

CONTRACTOR MUST PROVIDE A BACKFILLING PLAN FOR PLACEMENT OF 2.

CENTRAL LAKE AND THE BORROW PIT.

WILL BE APPLICABLE TO BACKFILL PLACEMENT REQUIREMENTS FOR BOTH

BORROW PIT AND CENTRAL LAKE AREA. THE RESULTS OF THE PILOT TEST

METHODS USED AND DETERMINE IF IT IS A VIABLE OPTION TO BACKFILL THE

ENGINEER WILL BE PRESENT DURING THE PILOT TEST TO OBSERVE THE

METHODS TO BE USED DURING THE BACKFILLING PROCESS. THE OWNER’S

(PRIOR TO CONSTRUCTION) TO ESTABLISH THE SUCCESSFUL MEANS AND

CONTRACTOR AT AND ON THE BACKFILL TO BE PLACED INTO CENTRAL LAKE

A PILOT TEST OF 50,000 CUBIC YARDS MUST BE PERFORMED BY THE 1.

C1

CF0085

C6

CF0085

DRAFT

k3endlml Rectangle k3endlml Rectangle

CB-006

CP05-BCWPA-

CP06-BCWPA-CB-0051

CP18-BCWPA-CB-09

.2

W

E B

E R

S

IT

E W

O R

K

S -5

A E

N L

A R

G E

D P

L A

CF1901

P O

P H

A M

V

S E

V E

R A

N

B

U R

S-500A

CONSTRUCTION LIMITS

THIS SHEET

TOE OF SLOPE

TOE OF SLOPE

TOE OF SLOPE

CONSTRUCTION LIMITS

S-500A UNGATED CULVERT (SEE NOTE 1)

L-514 LEVEE

EL -1.0'

EL -0.5'

23'

7'

EL 7.62

EL 7.30

EL 6.40

EL 3.33

EL 3.33

EL 3.33

EL 6.68

EL 7.30

EL 7.02

EL 7.02

EL 7.3

LIMITS OF MUCK EXCAVATION

LIMITS OF MUCK EXCAVATION

WALKWAY STA 658+76.4

CL STILLING WELL

MATCH EXISTING

STRUCTURE ALIGNMENT START844,573.89640,686.2717

VERTICAL TRANSITION844,608.55640,594.8816

CORNER OF RIPRAP844,599.42640,608.7915

CORNER OF RIPRAP844,594.21640,628.7814

CORNER OF RIPRAP844,553.71640,628.3613

CORNER OF RIPRAP844,539.42640,608.1712

END CURVE844,544.96640,585.0311

BEGIN CURVE844,554.06640,594.2810

END TRANSITION844,389.34640,714.909

BEGIN TRANSITION844,372.02640,739.018

END CURVE844,595.47640,506.487

BEGIN CURVE844,545.26640,555.676

VERTICAL TRANSITION844,513.09640,607.905

END CURVE844,419.10640,606.944

BEGIN CURVE844,393.88640,630.593

STA 11+02.78

CL SOUTH END STRUCTURE

844,574.43640,583.492

STA 10+66.37

CL NORTH END STRUCTURE

844,574.05640,619.901

DESCRIPTIONEASTINGNORTHINGPOINT

EL. 6.68

EL 6.68

EL 6.68

EL. 7.62 EL. 6.68

EL 6.40

EL 6.68

L-512 LEVEE

R

EL 6.4

EL 7.3

BEGIN ROAD TRANSITION STA 659+42.94

END ROAD TRANSITION STA 660+42.94

CL S-500A

STA 11+00

EL 4.3'

EL 7.0

EL 7.0

.7

R

DESCRIPTIONEASTINGNORTHINGPOINT

END TRANSITION844,891.68640,511.4621

BEGIN TRANSITION844,791.71640,508.5020

VERTICAL TRANSITION844,594.67640,594.7419

STRUCTURE ALIGNMENT END844,574.97640,486.2818

10'

EL 6.0

EL -1.0

EL -1.0

.8

+00

653+00

654+00

+00

10+00

12+00

11+00

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/2

/2

/2

/2

/2

/2 n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

F

IN

A

L S

U B

M

IT

T A

L S

E P

T E

M B

E R

N

O T

F O

R C

O N

S T

R U

C T

IO

N

U S

SW 36TH ST

S O

U T H P

O S T R

O A

D

SW 26TH ST

GRIFFIN ROAD

N

KEY PLAN

30' 60'0

MITIGATION AREA "A"

H :1

V

H :1

V

3H:1V

3H:1V3H:1V

DURING CONSTRUCTION.

AROUND S-500A TO MAINTAIN STORMWATER FLOW THROUGH CANAL A/5

A TEMPORARY STORMWATER BYPASS FOR CANAL A/5 WILL BE REQUIRED 5.

AND SEALED BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER.

SECTION 31 52 10 DEWATERING AND COFFERDAM. DESIGN MUST BE SIGNED

SYSTEM DESIGN FOR REVIEW IN ACCORDANCE WITH SPECIFICATION

4. CONTRACTOR MUST PROVIDE A TEMPORARY COFFERDAM AND DEWATERING

GEOGRID MUST EXTEND A MINIMUM OF 5' BEYOND LIMITS OF THE CULVERTS.

LAYER OR AS RECOMMENDED BY CULVERT MANUFACTURER. BIAXIAL

LAYER 6" ABOVE TOP OF CULVERT AND SECOND LAYER 12" ABOVE THE FIRST

DISTRIBUTE ROADWAY LOADING AT SHALLOW CULVERT COVER. PLACE FIRST

TWO LAYERS OF BIAXIAL GEOGRID MUST BE PLACED ABOVE S-500A TO 3.

FOR SPECIFICATIONS ON STONE TYPES, SEE SECTION 35 31 19.2.

REFER TO SHEETS S-2101 AND S-2102 FOR STRUCTURAL DETAILS1.

GENERAL NOTES

3H:1V

C-512 CANAL

EL -0.5

3H:1V

3H:1V

H :1

V

2%

(HORIZ.)

2%

3H:1V

2%

FLOW

SHEET KEYNOTES

POINT TABLE

H :1

V

3H:1V

2%

CONFLICTS WITH OTHER POSTS.

CENTER MID POST BETWEEN CULVERTS AND SPAN TO AVOID CULVERT

SECURITY FENCE INSTALLED BEHIND HEADWALL SEE DETAIL E1 SHEET CZ0007. 8.

AND CLOSE GAP TO THE SIDE OF STILLING WELL.

USE DETAIL D1 SHEET CZ0008 TO AVOID FOUNDATION CONFLICT WITH CULVERT

SECURITY FENCE INSTALLED BEHIND HEADWALL SEE DETAIL E1 SHEET CZ0007. 7.

ACCESS ON SHALLOW COVER CULVERTS.

LOCATED WITH GOVERNMENT REPRESENTATIVE TO ELIMINATE VEHICULAR

ACCESS RESTRICTION BOLLARDS (SEE SHEET CZ0001). NINE TOTAL TO BE 6.

STONE TYPE D STONE MIN. 2' DEPTH (SEE SHEET CZ0025)5.

3-POLE MOUNT RTU (SEE SHEETS IZ0044 & IZ0048)4.

VEHICLE BOLLARD (SEE SHEET CZ0001)3.

STAFF GAUGE (SEE SHEET IZ0020)2.

WALKWAY STILLING WELL (SEE SHEETS IZ0030 AND SZ0017-SZ0018)1.

3H:1V

2%0%

:1 V

H

D1/CF0026

A1/C-0002

(S E

E N

O T

E

E X

IS

T

IN

G

C A

N A

L A

/5 E

X

IS

T

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .