B.07.01 W912EP23R0003 Memo Pre-Proposal Site Visit RPN CNT 2 09-19-2023 and Attendance.pdf
PDF 2 MB Posted
- Solicitation number
- W912EP23R0003
About this file
This memorandum documents a pre-proposal site visit for solicitation W912EP23R0003 to replace the Roosevelt Avenue bridge and improve the channel of the Rio Puerto Nuevo in San Juan, Puerto Rico. The site visit was conducted on September 19, 2023 and included observation of the existing bridge, proposed staging areas near the Roberto Clemente Coliseum parking area, the detour bridge area, and the Ecomaxx gas station sign structure marked for demolition in contract drawings. Participants were reminded to submit any questions to the Contracting Officer through ProjNet. The solicitation seeks to replace the Roosevelt Avenue bridge and improve the channel of the Rio Puerto Nuevo between stations A. 118+50 to 123+50 in San Juan, Puerto Rico. The opportunity is issued by the Department of the Army Corps of Engineers Engineering District Jacksonville.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, TASK FORCE VIRGIN ISLANDS PUERTO RICO
FUNDACION A. RAMOS, ANNEX BLDG 202
383 FRANKLIN D. ROOSEVELT AVE
SAN JUAN, PUERTO RICO 00918
September 19, 2023
CESAJ-TFC-D
MEMORANDUM FOR CESAJ-TFC-T
SUBJECT: Solicitation W912EP23R0003, Rio Puerto Nuevo Supplemental Contract 2 Roosevelt Avenue Bridge Replacement and Channel Improvements ST A. 118+50 to 123+50, San Juan, PR: Pre-Proposal Site Visit
1. A pre-proposal site visit for subject project was conducted on September 19, 2023, from 0930 to 1025 hours. The participants are included on the attendance sheet attached to this memorandum.
2. The participants met at the Rio Puerto Nuevo Supplemental Contract 2 Project Site.
The site visit initiated at one of the proposed staging areas around the Roberto Clemente Coliseum parking area, then the participants walked to the Roosevelt Avenue bridge, observed channel areas upstream and downstream of the bridge, observed the detour bridge area, the different staging areas, and the Ecomaxx gas station prices sign (refer to contract Drawing CD101 for demolition details on this sign structure).
3. Participants were reminded to submit any questions to the Contracting Officer through ProjNet.
4. If you have any questions or require additional information regarding this matter, please contact the undersigned at 787-370-4485.
Enclosure:
Site Visit Attendance Sheet
AYALA Digitally signed by AYALA
BURGOS.JORGE.L.1298 BURGOS.JORGE.L.129823
231111 1111
Jorge Ayala-Burgos Contracting Officer's Representative