This federal contract opportunity solicitation seeks proposals for a coastal storm risk management project to renourish approximately 3.0 miles of shoreline along portions of south Ponte Vedra and Vilano Beaches in St. Johns County, Florida. The project includes construction of both a dune and beach berm, as well as beach tilling, turbidity monitoring, and environmental species monitoring. Proposals are due by the date and time specified in the solicitation. Offerors must be registered in SAM to be eligible for award. The period of performance is 235 calendar days after issuance of the notice to proceed. The stated time includes 60 calendar days for mobilization and demobilization. The magnitude of construction is between $10-25 million. The NAICS code is 237990.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
COASTAL STORM RISK MANGEMENT PROJECT SOUTH PONTE VEDRA AND VILANO BEACHES RENOURISHMENT 2023 ST. JOHNS COUNTY
FLORIDA
See SF 30 continuation sheet for additional details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 47
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP23B0010
X 9B. DATED (SEE ITEM 11)
28-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2023
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Coastal Storm Risk Management Project South Ponte Vedra and Vilano Beaches
Renourishment and FCCE Project 2023
St. Johns County Florida
Amendment 0003
W912EP23B0010 2 Amendment 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.
Volume 1 of 2 – Technical Specifications:
NONE.
Volume 2 of 2 – Technical Specifications:
DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.
DELETE Section 35 20 25 and REPLACE with the attached revised Section 35 20 25.
2. DRAWINGS:
DELETE Drawing G-01 and REPLACE with the attached revised Drawing G-01.
DELETE Drawing G-09 and REPLACE with the attached revised Drawing G-09.
DELETE Drawing G-10 and REPLACE with the attached revised Drawing G-10.
DELETE Drawing G-11 and REPLACE with the attached revised Drawing G-11.
DELETE Drawing G-12 and REPLACE with the attached revised Drawing G-12.
DELETE Drawing G-13 and REPLACE with the attached revised Drawing G-13.
DELETE Drawing C-03 and REPLACE with the attached revised Drawing C-03.
DELETE Drawing C-04 and REPLACE with the attached revised Drawing C-04.
DELETE Drawing C-05 and REPLACE with the attached revised Drawing C-05.
DELETE Drawing C-06 and REPLACE with the attached revised Drawing C-06.
DELETE Drawing C-07 and REPLACE with the attached revised Drawing C-07.
DELETE Drawing C-16 and REPLACE with the attached revised Drawing C-16.
(End of Summary of Changes)
CSRM St. Johns County, SPV/Vilano Beaches Renourishment 2023
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Safety Requirements
1.2.4 Work Restrictions
1.2.5 Work Performed by Others
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel
1.5.6 Hydrographic Surveys
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 EXISTING WORK
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 W912EP23B0010 Amendment 0003
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for Coastal Storm Risk Management Project South Ponte Vedra and Vilano Beach St.
Johns County, Florida
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The proposed project will renourish approximately 3.0 miles of shoreline along portions of south Ponte Vedra and Vilano Beaches, in St. Johns County, Florida, between FDEP Range Monuments R-102.5 and R-117.5. The northernmost and southernmost approximately 1,000 feet of the fill area include tapers transitioning the beach from the berm template to the existing shoreline.
The project includes construction of both a dune and beach berm. Planting of dune vegetation will take place following completion of constructed segments. Sand for the project will be dredged from Borrow Area N-3, approximately 7.3 nautical miles offshore of St Johns County in Federal waters. Project work also includes, but is not limited to, beach tilling/vibration monitoring, turbidity monitoring, and environmental species monitoring.
1.2.2 Location
The project is located in south Ponte Vedra and Vilano Beaches in St.
Johns County Florida.
1.2.3 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.4 Work Restrictions
Construction (including) mobilization of equipment on the beach) may start no earlier than July 30, 2023. See Section 01 57 20 ENVIRONMENTAL
PROTECTION.
SECTION 01 11 00 Page 2
1.2.5 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE
PROCEDURES.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Marine Traffic in the project area consists of Naval, cruise ships, commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. Conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, promptly move said plant on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work, promptly remove the plant, including ranges, buoys, piles, and other marks placed under the Contract in navigable waters or on shore.
SECTION 01 11 00 Page 3
1.5.6 Hydrographic Surveys
Hydrographic surveys are provided on the ehydro web site:
https://www.arcgis.com/apps/opsdashboard/index.html#/4b8f2ba307684cf597617bf1b6d2f85d Survey numbers are indicated on the drawings.
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.
For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. Calibrate all projects constructed and maintained to a tidal datum to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
1.6.2 Layout
From the monuments, control data and elevations established by the Government, complete the layout of the work and obtain all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
Provide equipment, tools, material, labor for laying out any part of the work from the monuments, control data, and elevations established by the Government. Maintain and preserve all monuments, stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks or monuments are destroyed by the Contractor or through negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at their discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor.
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
SECTION 01 11 00 Page 4
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work will be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable Contract unit or job prices as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, repair damage to all work (including temporary construction), utilities, materials, equipment and plant to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 EXISTING WORK
In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 11 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 25
BEACH FILL
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Acceptance Sections
1.3.2 Compensating Slopes
1.3.3 Construction Baseline (CBL)
1.3.4 Target Depth
1.3.5 Maximum Dredging Depth
1.3.6 Disturbance Depth
1.3.7 Work Area
1.4 SYMBOL AND ACRONYM USE
1.5 SUBMITTALS
1.6 NOTICE OF INTENT TO DREDGE
1.7 WORK PLAN
1.8 PROGRESS MAP
1.9 PUBLIC PROTECTION PLAN
1.10 PROJECT SCOPE
1.10.1 Project Order of Work
1.10.2 Project Coordination
1.10.3 Project Work Permits and Responsibilities
1.10.3.1 Project Traffic and Navigation
1.10.4 Protection of Existing Structures from Construction Activity
1.10.4.1 Damages to Adjacent Property and Structures
1.10.5 Project Work Violations
1.10.6 Project Final Cleanup
1.11 ENVIRONMENTAL PROTECTION
1.11.1 Pumping of Bilges
1.11.2 Fuel Oil Transfer Operations
1.11.3 Turbidity
1.11.4 Notification of Discovery of Historical Period Shipwreck Sites
1.12 NOTIFICATION OF COAST GUARD
1.12.1 Navigation Aids
1.12.2 Dredging Aids
1.13 WORK AND ACCESS AREA
1.14 SIGNAL LIGHTS
1.15 CRANE AND DRAGLINE SAFETY REQUIREMENTS
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 DAILY/MONTHLY REPORT OF OPERATIONS
3.2 OVERALL WORK AREA PROVISIONS
SECTION 35 20 25 Page 1
3.2.1 Construction Plans and Contract Documents
3.2.2 Staging and Access Areas
3.2.3 Public Protection
3.2.3.1 Work Area Signs and Barriers
3.2.3.2 Dedicated Safety and Flag Person
3.2.4 Noise Control
3.2.4.1 Hauling and Excavating Equipment
3.2.4.2 Booster Pumps Noise Control
3.2.5 Buoy and Anchoring Inventory
3.2.6 Protection of Existing Vegetation
3.3 EXCAVATION
3.3.1 General
3.3.2 Borrow Area Dredging
3.3.3 Overflow Dredging
3.3.4 Borrow Area Excavation Limitations
3.3.5 Unsuitable Material
3.3.6 Magnetic Anomalies
3.3.7 Probability of Oversized Material in Borrow Area
3.3.8 Dredge Location Control
3.3.9 Deduction for Nonconforming Work
3.4 TRANSPORT OF EXCAVATED MATERIALS
3.4.1 Hopper Dredge/Scow
3.4.1.1 Mis-Dump
3.4.2 Pipeline Transportation
3.4.2.1 Submerged Pipeline
3.4.2.2 Floating Pipeline
3.4.2.3 Upland Pipeline
3.4.2.4 Visual Inspection of Pumpout and Pipeline Locations
3.4.2.5 Mis-Dump
3.4.3 Spillage and Leakage
3.4.3.1 Hopper Dredge/Scows
3.4.3.2 Pipeline
3.4.4 Oversized Material Screening and Removal
3.5 BEACH FILL
3.5.1 General
3.5.2 Construction
3.5.2.1 Construction Equipment Limitations
3.5.2.2 Grade Stake Installation and Recovery Operations
3.5.2.3 Control of Fill
3.5.2.4 Ramps and Walkways
3.5.3 Placement
3.5.3.1 Dressing for Payment
3.5.3.2 Dressing of Compensating Slopes
3.5.3.3 Dressing for Final Acceptance
3.5.3.4 Tilling
3.5.4 Removal of Beach Escarpment
3.5.5 Tolerances
3.5.6 Misplaced Material
3.5.7 Unacceptable Material Truck Tickets
3.6 QUALITY CONTROL
3.6.1 Preparatory Inspection
3.6.2 Initial Inspections
3.6.3 Follow-up Inspection
3.7 QUALITY CONTROL FOR BEACH FILL
3.7.1 Compliance Criteria for Beach Fill Material
3.7.2 Beach Fill Observation and Sampling
3.7.3 Determination of Areal Extent of Noncompliant Beach Fill
3.7.4 Remediation
3.7.5 Noncompliant and Unacceptable Material Contingency Plan
SECTION 35 20 25 Page 2
3.8 ENCOUNTER OF MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) IN PROJECT
AREA
3.8.1 Munitions or Explosives of Concern
3.8.2 Procedure upon MEC encounter
3.8.3 Munitions use and disposal throughout Florida
3.8.4 MEC at the project site
3.9 INSPECTION
3.9.1 Quality Assurance Representative (QAR)
3.9.2 Failure to Comply
3.10 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 35 20 25 Page 3
SECTION 35 20 25
BEACH FILL
PART 1 GENERAL
1.1 SUMMARY
The project work covered by this section consists of furnishing all plant, labor, equipment, supplies, and material, and of performing all operations in connection with excavating, transporting, and placing beach fill along the project shoreline as indicated on the drawings, as described by applicable permits, and/or as specified herein. Related sections are
01 11 00 SUMMARY OF WORK, 01 57 20 ENVIRONMENTAL PROTECTION, 01 57 25
TURBIDITY AND DISPOSAL MONITORING, and 02 22 13 VIBRATION MONITORING
REQUIREMENTS FOR EXISTING STRUCTURES.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
EM 385-1-97 (2013) Explosives -- Safety and Health Requirements Manual
MEC Probability Assessment St. Johns County, MEC Probability Assessment
1.3 DEFINITIONS
1.3.1 Acceptance Sections
For purposes of payment, the work to be done will be divided into acceptance sections. Prior to any sand placement, prepare and provide the proposed locations of Acceptance Sections as part of the Progress Map submittal for approval by the Contracting Officer. Generally, the work should be divided into areas that equate to approximately 30 days of sand placement or that constitute separable or definable features of work.
1.3.2 Compensating Slopes
The allowance for pay volume above the fill tolerance to compensate for foreshore slope vacancies within the fill template due to sediment relocated by natural forces between the time of placement and payment surveys. See drawings for details.
SECTION 35 20 25 Page 4
1.3.3 Construction Baseline (CBL)
A Construction Baseline (CBL) has been established along the project shoreline and is defined in the drawings. Project features are laid out based on their distance along and offset from the CBL. The CBL will be used for the stationing of payment surveys.
1.3.4 Target Depth
Target depth is the depth to which a borrow area subdivision must be excavated in order for that subdivision to be considered adequately cleared before relocating the dredge to another subdivision.
1.3.5 Maximum Dredging Depth
The maximum dredging depth is the maximum depth from which material may be removed from a borrow area or subdivision thereof, as shown on the plans.
The Contractor will not be penalized for locations in the borrow area that were already deeper than the maximum dredging depth prior to dredging.
1.3.6 Disturbance Depth
The Florida Department of Environmental Protection (FDEP) designated "disturbance depth" is a 2-foot layer located beneath maximum dredging depth in which material can be agitated but not removed.
1.3.7 Work Area
Work area is defined as the area where Contract work is to be performed, as shown on the contract drawings, impacted by contractor operations, and additional areas agreed by the Contracting Officer.
1.4 SYMBOL AND ACRONYM USE
/ = or b/c = because CBL = Construction Baseline FDEP = Florida Department of Environmental Protection
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Unless otherwise indicated below, submit Shop Drawings no later than 30 calendar days after Notice to Proceed. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notice of Intent to Dredge ; G, RO
SD-02 Shop Drawings
General Work Plan ; G, RO
SECTION 35 20 25 Page 5
Relocation of Navigation Aids
Public Protection Plan ; G, RO
Progress Map ; G, RO
Construction and Grade Stakes Recovery Plan ; G, RO
Oversized Material Removal Plan ; G, DO
Noncompliant and Unacceptable Material Contingency Plan
Dredge Location Control Color-Coded Plots
Tilling Maps
SD-04 Samples
Quality Control for Beach Fill
SD-07 Certificates
Grade Stake Recovery ; G, DO
Buoy and Anchoring Inventory Recovery ; G, DO
Notification of Discovery of Historical Period Shipwreck Sites
Daily/Monthly Report of Operations
Misplaced Material
Declaration of Inspection
Unacceptable Material Truck Tickets ; G, RO
SD-11 Closeout Submittals
Consolidated Job Report
1.6 NOTICE OF INTENT TO DREDGE
Prior to commencement of work on this Contract, notify the Commander, Seventh Coast Guard District of the intent to dredge and request that it be published in the Local Notice to Mariners. Provide notification with enough time so that it appears in the Notice to Mariners at least 30 calendar days prior to the commencement at each project segment. Provide a copy of the notification to the Contracting Officer.
1.7 WORK PLAN
At minimum, include the following in the general work plan :
a. Bor r ow Ar ea Conser vat i on and Dept h Pr ot ect i on: Provide a detailed description of the methods, equipment, and sequence of operations, including cut order, that is consistent with the drawings and specifications. Include sketches showing how no excavation will occur below the maximum excavation depth at the borrow area(s) as indicated in the drawings. Unless an alternative methodology is approved by the
SECTION 35 20 25 Page 6
Contracting Officer, perform and submit a survey consistent with the methodology, spacing, and frequency as that shown on the drawings to demonstrate clearance of borrow cut areas to target depth when requesting permission to move on to the subsequent borrow cut area.
Alternate cut sequencing proposed by the Contractor may be accepted by the Contracting Officer if consistent with these requirements.
b. Buoy Log: Develop a method of inventory for all anchors, buoys, and buoy cables used in the construction of the project. Use this record to recover all buoys and anchoring equipment at the completion of the project.
c. Gr ade St ake Log: Provide a sample Grade Stake Log used on the project and indicate how the log is prepared and maintained to inventory the grade stakes used on the project. Include information concerning the location, installation, and recovery of all grade stakes in the log.
Make this log available for review by the appropriate Government personnel upon request. Upon completion of the project, furnish the log to the Contracting Officer.
1.8 PROGRESS MAP
Provide a progress schedule map of the Contractor's design. The progress schedule map is a plan view drawing depicting the beach fill site and access areas to be used on the project. Show all acceptance sections (AS), access/staging areas, R-monuments, adjacent street names, building names, and pipeline landings anticipated to be used on the project on the map. List the following information for each AS: Anticipated quantity of material per acceptance section, projected dates for fill to be placed and completed. Provide dates when access areas are to be used and ready for public use on the map. Color coordinated the map with the following color scheme: Red depicting an area not ready for construction; Orange depicting an area currently being worked, and Green meaning an area accepted by the Contracting Officer and ready for public use. At minimum, update the map weekly and whenever significant changes occur to the projected dates. Since the map will be used by the Government for coordination with the public and to track progress, provide the updated map prior to the weekly project progress meeting.
1.9 PUBLIC PROTECTION PLAN
Provide a Contractor's plan for ensuring pedestrian, worker, and vehicular safety at each access location used by the Contractor. Submit means and methods for pedestrian protection during beach fill operations for review and approval by the Contracting Officer. Have a dedicated safety and flag person on site at all times, whose sole responsibility is preventing the public from entering the work area and answering any questions they may have. Submit product information and methods of installation for orange safety fencing for crowd control. Submit methods of staking in place and maintenance of system for duration of construction.
1.10 PROJECT SCOPE
Provide the dredge and support vessels, labor, equipment, supplies, and materials to perform all operations for excavating, transporting, placing, dressing, grading, and tilling the beach fill on the beaches as indicated in the drawings and further specified herein. Minimize disruption to road and maritime traffic or use of the public beach as well as minimize impacts to existing infrastructure.
SECTION 35 20 25 Page 7
1.10.1 Project Order of Work
At the Preconstruction Conference, propose the order in which the work will be performed, including the anticipated progression of fill placement throughout the project area and excavation of the borrow areas. Within each fill placement site, begin filling operations at any point along the project beach, but maintain a continuous filling operation without any intervening gaps.
Dredge the borrow cut areas in the following order and consistent with paragraph EXCAVATION below:
(1) Cut F. Cuts E and F. May be dredged concurrently.
(2) Cut E.
( 32) Cut D.
( 43) Cut C.
(4) Cut B.
(5) Cut A.
Complete the project and obtain acceptance by the Contracting Officer prior to the specified project end date as provided in clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK of Section 00700
CONTRACT CLAUSES.
1.10.2 Project Coordination
Accomplish project coordination with the Contracting Officer during all phases of construction. Coordination also includes but is not limited to coordinating with local officials including police, Public, FDEP, U.S.
Coast Guard, and others as agreed during coordination meetings. See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE PROCEDURES and paragraph COORDINATION MEETING of Section 01 45 05
DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL.
1.10.3 Project Work Permits and Responsibilities
Refer to Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES and paragraph PERMITS AND AUTHORIZATIONS of Section 01 57 20 ENVIRONMENTAL PROTECTION. Secure and pay for any other licenses or approvals required for the prosecution of the work. Obtain all approvals required to conduct work in the Atlantic Ocean.
1.10.3.1 Project Traffic and Navigation
Conduct the operations without closing any thoroughfare or interfere in any way with traffic on railway, highways, or on water, without the written consent of the Contracting Officer. Adhere to the regulations established by, but not limited to, the Department of the Navy, U.S. Coast Guard, Department of the Army, American Bureau of Shipping, Florida Department of Environmental Protection, Florida Department of Transportation, Florida Law Enforcement Agencies, county and municipal.
1.10.4 Protection of Existing Structures from Construction Activity
Determine and document the pre-construction condition of existing structures within the project area. Take appropriate measures to prevent damage to any structures during construction, and for performing a post-construction verification inspection of those structures previously inspected. Refer to Section 02 22 13 VIBRATION MONITORING REQUIREMENTS
SECTION 35 20 25 Page 8
FOR EXISTING STRUCTURES for further details and guidelines.
1.10.4.1 Damages to Adjacent Property and Structures
Repair any damage to private or public property within the project boundaries, including staging site(s) and work and access areas/roads.
Repair any damage as a result of the Contractor's operations at no cost to the Government. No final payment will be issued until all damages are restored to the satisfaction of the Contracting Officer.
1.10.5 Project Work Violations
Work done in violation of these specifications or a verbal or written stop order of the Contracting Officer will be considered as unsatisfactory progress for purposes of progress payments in accordance with clause PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700
CONTRACT CLAUSES.
1.10.6 Project Final Cleanup
Final cleanup, as stated in the paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK of Section 00700 CONTRACT CLAUSES, include the removal of all the Contractor's plant and equipment either for disposal or reuse.
Dispose of plant and/or equipment in a manner and at locations approved by the Contracting Officer. Unless otherwise approved in writing by the Contracting Officer, do not abandon pipelines, pipeline supports, pontoons, or other equipment in the disposal area, pipeline access areas, water areas, or other areas adjacent to the work site. Dispose of pilings and any other debris removed or created as a result of the execution of this Contract in a manner and at locations approved by the Contracting Officer.
1.11 ENVIRONMENTAL PROTECTION
Protect the environment during all phases of work. See Section 01 57 20 ENVIRONMENTAL PROTECTION for additional details.
1.11.1 Pumping of Bilges
Contractors are warned that pumping oil or bilge water containing oil into navigable waters, or into areas which would permit the oil to flow into such waters, is prohibited by Section 13 of the River and Harbor Act of 1899, approved 3 March 1899 (30 Stat. 1152; 33 U.S.C. 407). Violation of this prohibition is subject to penalties provided under the referenced Act.
1.11.2 Fuel Oil Transfer Operations
In accordance with U.S. Coast Guard regulations (33 CFR 156.120), couplings used in fuel oil transfer operations on any vessel with a capacity of 250 or more barrels of oil must be either a bolted or full-threaded connection; or a quick-connect coupling approved by the Commandant; or an automatic back-pressure shutoff nozzle used to fuel the vessel. Submit an executed fuel oil transfer ( Declaration of Inspection ) form signed by the tanker operator to the Contracting Officer for each refueling operation. Notify the U.S. Coast Guard prior to any refueling.
A copy of the Declaration of Inspection for Refueling is on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below.
SECTION 35 20 25 Page 9
1.11.3 Turbidity
Perform excavation, transport, and filling operations in a manner that will minimize turbidity. Meet the requirements to maintain the quality of the State's waters as stipulated in Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING, project permits, and in the Florida Administrative Code Rule 62-3.121. Conduct inspections, measurements, and observations required by those regulations and the FDEP permit in the vicinity of the dredge and at the placement site (beach).
1.11.4 Notification of Discovery of Historical Period Shipwreck Sites
If any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered, the Contractor acknowledges that:
a. The site(s), articles, or other materials are the property of the State of Florida, with title vested in the Department of State, and
b. Immediately notify the Contracting Officer.
Refer to subparagraph PRESERVATION AND RECOVERY OF HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES of Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.12 NOTIFICATION OF COAST GUARD
Within 7 calendar days following receipt of Notice of Award, notify the Commander, Seventh Coast Guard District, Miami, Florida of plans to dredge adjacent to any aids which require relocation to facilitate dredging for each project fill segment. Send the notification of relocation of navigation aids via Fax to 305-415-6757, ATTN: Mr. Gene Stratten. After sending notification, submit a formal written request to the Commander with a copy to the Contracting Officer. Contact the U.S. Coast Guard at 305-415-6750 for information concerning the position to which the aids will be relocated
1.12.1 Navigation Aids
Navigation aids located within or near the areas required to be dredged will be removed, if necessary, by the U.S. Coast Guard in advance of dredging operations. Do not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid to navigation.
1.12.2 Dredging Aids
Obtain approval from the U.S. Coast Guard for all buoys, dredging aid markers to be placed in the water, and dredging aid markers affixed with a light prior to the installation. Do not place colored dredging aid markers and lights or in a manner that will obstruct or be confused with navigation aids.
1.13 WORK AND ACCESS AREA
Comply with work and access area requirements indicated herein and in Section 01 57 20 ENVIRONMENTAL PROTECTION.
SECTION 35 20 25 Page 10
1.14 SIGNAL LIGHTS
Display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals. Display lights and day signals by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations. Display lights on dredge pipelines and day signals by vessels of more than 65 feet in length and floating plant vessels moored or anchored in a fairway or navigable channels where other vessels pass. Comply with the requirements of Section 01 57 20 ENVIRONMENTAL PROTECTION, the Secretary of the Army, and Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules:
International-Inland (COMDTINST M16672.2), or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable for lights and day signals.
1.15 CRANE AND DRAGLINE SAFETY REQUIREMENTS
Comply with EM 385-1-1 for all cranes and draglines used in performing the work set forth in these specifications. Please refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS for further details.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 DAILY/MONTHLY REPORT OF OPERATIONS
Prepare in RMS and submit the Daily Report of Operations, using either ENG Form No. 27A or ENG Form No. 4267, for each dredge and/or unloader working. Submit report daily and not in groups (groups = multi-days reports packaged together at one time). In addition to the daily report, prepare and submit a Monthly Report of Operations for each month or partial month's work. Submit the monthly report on or before the 7th of each month, consolidating the previous month's work. Submit a consolidated job report combining the monthly reports upon completion of the construction. Submit reports on a monthly basis with daily reports accompanying the monthly report and job report. Further instructions on the preparation of the reports will be furnished at the Preconstruction Conference.
3.2 OVERALL WORK AREA PROVISIONS
The construction and borrow area limits available to the Contractor for accomplishing the work are shown on the drawings. Complete the work in such a manner to minimize disruption to road traffic and use of the public beach as well as keep all work areas in a neat, orderly and in a safe manner. Maintain all access roads and all other work areas within or without the project boundaries free from dust and noise which would cause a hazard or nuisance to others.
3.2.1 Construction Plans and Contract Documents
Keep a minimum of one complete set of construction plans (drawings) and contract documents (with permits and Notice to Proceed placards) in the construction site field office. Always keep a complete set of drawings including borrow area coordinates on the dredge to avoid dredging outside of the borrow areas.
SECTION 35 20 25 Page 11
3.2.2 Staging and Access Areas
See section 01 50 02 TEMPORARY CONSTRUCTION FACILITIES and section 01 57 20
ENVIRONMENTAL PROTECTION.
3.2.3 Public Protection
Comply with the requirements of Section 01 50 02 TEMPORARY CONSTRUCTION FACILITIES and the approved Public Protection Plan. Conduct enforcement at no additional cost to the Government. Coordinate the enforcement with local enforcement agencies and will be subject to approval of the Contracting Officer. All equipment transiting the beach outside the Contractor's designated work area (i.e. beyond the beach fill discharge areas that are otherwise already temporarily closed to public with orange safety fencing) shall be escorted by a safety vehicle (e.g. ATV, utility vehicle, or truck). The Contractor must access the following web address and complete the necessary application/training prior to any vehicular access to the beach: http:/www.sjcfl.us/HCP/CoastalConstruction.aspx
3.2.3.1 Work Area Signs and Barriers
Install warning signs to warn the public and all commercial and recreational boats of all construction activities. Block adjacent accesses to the beach as needed; however, provide signage directing pedestrians to the nearest available access. The Contracting Officer reserves the right to make final determination regarding accessibility following fill placement and may direct Contractor to improve pedestrian access.
a. Protect and/or remove any existing signs, buoys or other structures within the work lines and later replaced by the Contractor as directed.
b. Erect, maintain, and move as necessary, a restrictive barrier around the active construction zone including the area of discharge of the hydraulic pipeline (or other mechanical off loader), where bulldozers are working, or any other active area where Work may present a safety hazard to the public. Construct the barrier in the vicinity of the discharge to prevent the public from approaching the discharge from any direction closer than 100 feet and provide an area sufficient in size for the safe progression of the Work. Post signs in a conspicuous manner designating the closed area.
c. Post signs in a conspicuous manner stating "DANGER - HIGH PRESSURE
DISCHARGE FROM DREDGE".
3.2.3.2 Dedicated Safety and Flag Person
Provide a dedicated safety and flag person on site at all times, whose sole responsibility is preventing the public from entering the work area.
Additionally, place a safety person at the discharge end of the disposal pipeline. The safety person must always be present during discharge operations and will maintain radio communication between the dredge and the disposal operation.
SECTION 35 20 25 Page 12
3.2.4 Noise Control
3.2.4.1 Hauling and Excavating Equipment
Equip all hauling and excavation equipment including dredges used on this work with satisfactory mufflers or other noise abatement devices. Conduct operations to comply with all federal, state, and local laws or ordinances pertaining to noise abatement. Hold the use of horns, bells, or the use of whistle signals to the minimum necessary in order to insure as safe and as quiet an operation as possible.
3.2.4.2 Booster Pumps Noise Control
Equip booster pumps used on this work with satisfactory mufflers and/or other sound abatement devices to reduce engine noise. Construct a sound barrier landward of booster pumps in order to reflect noise waterward.
Booster pumps will not be allowed within 1,000 feet of residential areas but will be allowed on or adjacent to the public beach. Conduct operations to comply with all Federal, State, and local laws pertaining to noise.
3.2.5 Buoy and Anchoring Inventory
Inventory all anchors, buoys, and buoy cables deployed in the prosecution of work in a manner acceptable to the Contracting Officer. Use this information to account for and recover these items upon completion of work.
After completion of the project, provide a letter to the Contracting Officer certifying that all anchors, buoys, buoy cables used in the construction of the project have been recovered in accordance with the Contractor's approved Anchor and Buoy Recovery. Submit the completed Buoy and Anchoring Inventory Recovery with the certification.
3.2.6 Protection of Existing Vegetation
Prior to fill placement, coordinate landward extent of fill with Contracting Officer in areas where the construction fill template may cover existing vegetation.
3.3 EXCAVATION
3.3.1 General
Equipment mobilized to the project site for excavation will be suitable for excavation in the borrow area shown on the drawings and capable of dredging at the borrow area's maximum depth.
3.3.2 Borrow Area Dredging
Completely excavate the borrow area and each subdivision to target depth before requesting permission from the Contracting Officer to use a subsequent borrow cut area. The Contracting Officer may permit the Contractor to relocate to another borrow area or subdivision prior to complete clearance to target depth if 1) the remaining quantity is the result of minor side slope sloughing, 2) in isolated areas the remaining sand thickness cannot be efficiently removed after suitable effort by the Contractor to clear the entire borrow area or subdivision to target depth, or 3) other reasons determined valid by the Contracting Officer. Perform excavation in a uniform and continuous manner so as to avoid creating
SECTION 35 20 25 Page 13 multiple holes, valleys, or ridges. Dredge the borrow area to maximize the removal of sand from each sub-area of each provided borrow area. The purpose of this requirement is to avoid "wasting" sediment which could be used to renourish the beach now and in the future.
3.3.3 Overflow Dredging
Overflow is considered a part of the dredging process and is permitted to occur within the borrow site during loading to the extent that turbidity and water quality standards required by Sections 01 57 20 ENVIRONMENTAL PROTECTION and 01 57 25 TURBIDITY AND DISPOSAL MONITORING are met.
3.3.4 Borrow Area Excavation Limitations
Perform all excavation within the horizontal limits of the borrow areas shown in the drawings. Under no circumstances will excavation occur below the maximum depth shown in the drawings. Sloughing of material from outside those limits is anticipated and will not be a permit violation as long as dredging is performed within specified limits noted on the drawings. The Contractor will be required to certify in each Daily Quality Control Report that the excavation was conducted in compliance with the drawings and specifications including excavation and sediment tolerance depth.
3.3.5 Unsuitable Material
If continuous reaches of rock, clay or other unsuitable materials or unacceptable materials as defined in the paragraph titled "QUALITY CONTROL FOR BEACH FILL" are encountered in the borrow area, change the location and depth of excavation within the borrow limits when necessary to provide the best fill material available at no additional cost to the Government.
Note the location of unsuitable material encountered within the borrow area on the Contractor's Quality Control Report (see Section 01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL). If the Contracting Officer determines the quality of beach fill is being adversely affected, that location will be avoided in future passes of the dredge.
3.3.6 Magnetic Anomalies
A magnetometer survey was conducted at the borrow site with buffered returns shown on the drawings.
3.3.7 Probability of Oversized Material in Borrow Area
It is possible that material greater than 3/4 inch will be encountered at the borrow area. See subparagraph OVERSIZED MATERIAL SCREENING AND REMOVAL below.
3.3.8 Dredge Location Control
Submit the required dredge location control color-coded plots to the Contracting Officer. Record daily a color-coded plot, in the project reference datum, of the draghead, cutterhead, or other hydraulic or mechanical dredging device depicting the vertical and horizontal limits of the material dredged that day. Clearly define any horizontal or vertical dredge violations. Hopper dredges must submit dredge track lines withdraghead depths that indicate dredge status: dredging, transiting, unloading, and hotelling.
SECTION 35 20 25 Page 14
See Section 35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW - ULLAGE PROFILE, Section 35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE HYDRAULIC DREDGE, and Section 35 20 28 NATIONAL DREDGING
QUALITY MANAGEMENT PROGRAM HOPPER DREDGE.
3.3.9 Deduction for Nonconforming Work
Obtain beach fill from the designated borrow area only. Beach fill that is obtained from unauthorized areas will not be paid for under this Contract. Excavation in such area(s) is a violation of State of Florida Permits. The Government will perform pre-dredge and after-dredge surveys in the borrow area(s). If it is determined that dredging has been performed outside the borrow area(s) limits or below the limiting elevation plus a 2 foot disturbance depth within the borrow area(s), the quantity of the material dredged from these areas will be computed and subtracted directly from the pay quantity of material placed on the beach.
3.4 TRANSPORT OF EXCAVATED MATERIALS
Submit the method of transporting the fill from the offshore borrow area(s) to the fill area for approval by the Contracting Officer. Prior to pipeline or equipment placement, submit the hardbottom surveys conducted as described in Section 01 57 20 ENVIRONMENTAL PROTECTION.
3.4.1 Hopper Dredge/Scow
A hopper dredge or barge with pump-out capabilities may be used for transport of the excavated material. Overflow at the borrow site during loading will be permitted to the extent that turbidity and water quality standards required by Section 01 57 20 ENVIRONMENTAL PROTECTION are met.
Limit the loading to partial loads, if necessary, to meet turbidity and water quality requirements permitted at the borrow site. No overflow or spillout will be permitted during transport to the discharge site.
3.4.1.1 Mis-Dump
Any scow load or hopper dredge load that is released within state waters will be classified as a mis-dump and will result in a suspension of disposal operations and prompt monitoring of affected hardbottom areas.
Redredging of such materials may be required as a prerequisite to the resumption of dredging unless the Contracting Officer, at their discretion, determines that redredging of such material is not practical or will impact more neighboring hardbottom. In addition, notify the Contracting Officer within 24 hours of a misplaced dump. Implement corrective actions by the next offload at no additional expense to the Government. Inform the Contracting Officer of actions taken.
3.4.2 Pipeline Transportation
A pipeline dredge or hydraulic unloader may be used to transport material to the project placement site. Always maintain a tight discharge pipeline. Construct the joints so as to preclude spillage and leakage.
If a dredging technique is used for this project that requires anchoring, do not anchor within 400 feet of hardbottoms or cultural resources. If pilings are used for anchorage at the beach fill site, mark the pilings and remove in their entirety upon completion of the Contractor's operation.
SECTION 35 20 25 Page 15
3.4.2.1 Submerged Pipeline
In the event the Contractor elects to submerge their pipeline, rest the pipeline on the bottom, and the top of the submerged pipeline and any anchor securing the submerged pipeline cannot be no higher than the project depth for any navigation channel in which the submerged pipeline is placed. Should the Contractor elect to use a pipeline material which is buoyant or semi-buoyant, such as PVC pipe or similar low-density materials, the securely anchor the pipeline to prevent the pipeline from lifting off the bottom under any conditions. Conduct daily inspections of the submerged pipeline to ensure buoyancy has not loosened the anchors.
Remove all anchors when the submerged pipeline is removed. Mark the location of the entire length of submerged pipeline with signs, buoys, lights, and flags conforming to U.S. Coast Guard regulations.