This document provides details for a federal contract solicitation and opportunity for the Rio Puerto Nuevo Project in San Juan, Puerto Rico. The solicitation number is W912EP22B0003 and seeks preparation of the La Chuleta site to serve as a 36-acre clean soil disposal location. Work includes clearing and grading, construction of berms, retention ponds, a freeway entrance/exit with guardrails and signage, a barge offloading area with crane pad, site access roads, a security fence and guardhouse. The invitation for bid will issue on April 29th, 2022 with bids due May 31st, 2022. The NAICS code is 237990 and size standard is $39.5 million. The estimated value is between $5-10 million with a 450 calendar day period of performance. The solicitation will post to SAM and interested vendors must register as interested vendors to receive amendments. Registration in SAM is required for award eligibility. The Department of the Army Corps of Engineers Engineering District Jacksonville is the issuing agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RIO PUERTO NUEVO PROJECT, LA CHULETA DISPOSAL SITE, SAN JUAN, PUERTO RICO
1. See SF30 Continuation Sheet for Amendment Details.
2. The Bid Opening Date of May 31, 2022 at 2:00 pm, EDT, remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP22B0003
X 9B. DATED (SEE ITEM 11)
29-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
23-May-2022
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Rio Puerto Nuevo La Chuleta Disposal Site
San Juan, Puerto Rico
W912EP22B0003 1 AMENDMENT 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. For other sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
DELETE Amendment 0002 - SF 30 Continuation Sheet and REPLACE with the attached Amendment 0002 - SF 30 Continuation Sheet.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses:
N/A
Volume 2 of 2 – Technical Specifications:
N/A
2. DRAWINGS:
N/A
(End of Summary of Changes)
SF 30 CONTINUATION SHEET
Rio Puerto Nuevo La Chuleta Disposal Site
San Juan, Puerto Rico
W912EP22B0003 1 AMENDMENT 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. For other sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses:
DELETE Line Item and Pricing Schedule 00010A and REPLACE with the attached Line Item and Pricing Schedule 00010A
Volume 2 of 2 – Technical Specifications:
DELETE Section 01 11 00 and REPLACE with the attached Section 01 11 00.
DELETE Section 01 22 00 and REPLACE with the attached Section 01 22 00.
2. DRAWINGS:
DELETE C-102 and REPLACE with the Attached Drawing C-102
DELETE C-112 and REPLACE with the Attached Drawing C-112
DELETE C-502 501 and REPLACE with the Attached Drawing C-502 501
(End of Summary of Changes) k3ctcain Cross-Out k3ctcain Cross-Out
| SF30 am0003 |
| sf30 cont am0003 |
| sf30 cont am0002 |