CERP_C2324STA_IntermediateATRBCOES_SPECS_marked.pdf
PDF 8 MB Posted
- Solicitation number
- W912EP21Z0011
About this file
This notice announces an industry day for two upcoming Corps of Engineers projects in Florida. The Indian River Lagoon South (IRL-S) project involves constructing a stormwater treatment area with cells, levees, culverts and channels west and east of County Road 613 to treat agricultural runoff. Phase one requires building a sag culvert and access road by 2023. The Everglades Agricultural Area A-2 Reservoir project entails excavating parallel open channels and a maintenance road totaling 7.2 miles near existing Florida Power & Light and South Florida Water Management District infrastructure by 2028. Both projects will require experienced personnel for working near utilities and ongoing construction. Interested parties must RSVP by January 22nd for the January 25th WebEx industry day presentation to discuss project details, challenges and answer questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EP21R00__
Jacksonville District
Comprehensive Everglades Restoration Plan, Indian River Lagoon - South C-23/24 Stormwater Treatment Area
St. Lucie County, Florida
Construction Solicitation and Specifications Volume 1 of 2
21 JUNE 2021 INTERMEDIATE ATR/BCOES
DRAFT
W912EP-21-R-00nn
Comprehensive Everglades Restoration Plan, Indian River Lagoon – South, C-23/C-24 Stormwater Treatment Area
DESIGN AUTHENTICATION
This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
CHRISTOPHER D. RALPH, P.E.
CHIEF, CIVIL SECTION
DESIGN BRANCH, ENGINEERING DIVISION
JASON A. ENGLE, P.E.
CHIEF, WATERWAYS BRANCH
ENGINEERING DIVISION
DENNIS J. ZEVENEY, P.E.
CHIEF, GEOSYSTEMS BRANCH
DAVID DUDLEY, P.E.
CHIEF, DESIGN BRANCH
LAUREEN A. BOROCHANER, P.E.
CHIEF, ENGINEERING DIVISION
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
COMPREHENSIVE EVERGLADES RESTORATION PLAN,
INDIAN RIVER LAGOON - SOUTH,
C-23/24 STORMWATER TREATMENT AREA
ST LUCIE COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 PROJECT INITIATION ACTIVITIES JOB $_______________
0002 STRUCTURE: S-425 GATED SAG CULVERT JOB $_______________
0003 STRUCTURES: S-451 UNGATED CULVERTS JOB $_______________
0004 STRUCTURES: S-441 GATED CULVERTS JOB $_______________
0005 UTILITY CONNECTION AND RELOCATION JOB $_______________
0006 DEMOLITION JOB $_______________
0007 ENDANGERED SPECIES MONITORING JOB $_______________
0008 TURBIDITY MONITORING JOB $_______________
0009 CONNECTION CANAL JOB $_______________
0010 CLEARING AND GRUBBING ACRES $____________ $_______________
0011 EXCAVATION CUBIC YARD $____________ $_______________
0012 EMBANKMENT FOUNDATION EXCAVATION CUBIC YARD $____________ $_______________
0013 EMBANKMENT AND BERM FILL CUBIC YARD $____________ $_______________
0014 BEDDING STONE AND GEOTEXTILE CUBIC YARD $____________ $_______________
0015 S-431A AND S-431B UNGATED CULVERT EACH $____________ $_______________
0016 S-432A, S-432B, S-433A, S-433B, S-436A, S-436B, EACH $____________ $_______________
AND S-436C GATED BOX CULVERT
0017 S-434A, S-434B, S-435A, AND S-435B UNGATED EACH $____________ $_______________
CULVERT WITH WEIR
0018 S-437A, S-437B, S-438A, S-438B, S-439A, and S-439B EACH $____________ $_______________
GATED CULVERT WITH WEIR
0019 PARTNERING REGROUP 1 EACH $____________ $_______________
0020 CONTRACTING OFFICER'S FIELD OFFICE MONTH $____________ $_______________
0021 MONITORING WELLS JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0021) $_______________
OPTION A
0022 TEMPORARY PUMP STATION JOB $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0022) $_______________
NOTES: (1) ALL OFFERS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
W912EP-21-R-00__ 00010A-1
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) May 31, 2021, End of Day. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: W912EP21R00NN
The Bidder Inquiry Key is: XXXXXX-XXXXXX
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
W912EP21R00__
Jacksonville District
Comprehensive Everglades Restoration Plan, Indian River Lagoon South C-23/24 Stormwater Treatment Area
St. Lucie County, Florida
Construction Solicitation and Specifications Volume 2 of 2
See Volume 1 of 2 for Issue Date
INTERMEDIATE ATR/BCOES
CERP, Indian River Lagoon South C-23/24 Stormwater Treatment Area, St. Lucie, Florida
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT (SEE SEPARATE FILE)
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 45 08 GEOGRAPHIC INFORMATION SYSTEM DATA REQUIREMENTS - QUALITY
CONTROL AND QUALITY ASSURANCE DATA
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
01 78 02 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
DIVISION 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 50 15 CIVIL WORKS FABRICATIONS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 23 PRECAST CONCRETE BUILDINGS
13 50 00 INSTRUMENTATION AND MONITORING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
PROJECT TABLE OF CONTENTS Page 1 W912EP21R00__ Intermediate ATR/BCOES
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 31 01 STRUCTURE REMOTE TERMINAL UNIT (RTU)
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 29 10 ELECTRIC MOTOR ACTUATOR FOR LIFT GATES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 10 00 CLEARING AND DEBRIS REMOVAL FOR CIVIL WORKS
31 11 00 CLEARING AND GRUBBING
31 23 13 SUBGRADE PREPARATION
31 23 24 CONTROLLED LOW STRENGTH MATERIAL (CLSM FLOWABLE FILL)
31 41 16 METAL SHEET PILING
31 52 10 DEWATERING AND COFFERDAM
31 62 20 ROUND TIMBER PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 LIMEROCK BASE FOR ROADS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 29 00 PLUGGING AND ABANDONMENT OF WELLS
33 40 00 STORM DRAINAGE UTILITIES
33 45 00 TEMPORARY PUMP STATION
33 51 39 MONITORING WELLS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 16 SLIDE GATES AND ELECTRIC MOTOR ACTUATORS
35 20 18 VERTICAL LIFT DUAL LEAF GATES
35 31 19 STONE PROTECTION
35 42 01 CONSTRUCTION DATA REPORT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 00 31 21
CONTROL MONUMENT DESCRIPTIONS
DESIGNATION - LAG
PID - AA7671
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - SAINT JOHNS MARSH SOUTH (1970)
MARKER: DD = SURVEY DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: LAG
MARK LOGO: FL-111
MAGNETIC: N = NO MAGNETIC MATERIAL
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - September 14, 1999
HISTORY - Date Condition Report By
HISTORY - 1993 MONUMENTED LAWNOA
HISTORY - 19990914 GOOD FLDEP
STATION DESCRIPTION
DESCRIBED BY LAWSON NOBLE AND ASSOCIATES 1993 (GB)
TO REACH POINT, START AT THE INTERSECTION OF ORANGE AVENUE EXTENSION
(STATE ROAD 68) AND THE CENTERLINE OF MINUTE MAID ROAD. RUN WEST ON
ORANGE AVENUE EXTENSION APPROXIMATELY 1.2 MI (1.93 KM) TO THE CONTROL
MONUMENT. MONUMENT CAN BE FOUND 8 FT (2.44 M) NORTH OF THE NORTH EDGE
OF PAVEMENT OF ORANGE AVENUE, ALSO BEING 3.6 FT (1.10 M) SOUTH OF THE
GUARD RAIL RUNNING EAST AND WEST. THE POINT ALSO LIES BENEATH A POWER
LINE RUNNING NORTH AND SOUTH, HAVING A WOOD POWER POLE 70.5 FT (21.49
M) DIRECTLY TO THE SOUTH OF CONTROL STATION AND HAVING A METAL WITNESS
POST 5.2 FT (1.58 M) NORTH.
SET P.K. NAIL AND DISK LB3432 ON THE NORTH EDGE OF ORANGE AVENUE
EXTENSION WITH A MAGNETIC AZIMUTH OF 120 DEGREES AT A DISTANCE OF
21.82 FT (6.65 M) . ALSO SET P.K. NAIL AND DISK LB3432 ON THE NORTH
EDGE OF PAVEMENT OF ORANGE AVENUE EXTENSION WITH A MAGNETIC AZIMUTH OF
254 DEGREES, 24 MINUTES, 40 SECONDS, A DISTANCE OF 25.28 FT (7.71 M) .
ALSO SET P.K. NAIL AND DISK LB3432 ON THE NORTH EDGE OF PAVEMENT OF
ORANGE AVENUE EXTENSION WITH A MAGNETIC AZIMUTH OF 182 DEGREES, 25
MINUTES AT A DISTANCE OF 9.10 FT (2.77 M) .
STATION RECOVERY (1999)
RECOVERY NOTE BY FL DEPT OF ENV PRO 1999 (JLM)
THE STATION IS ABOUT 18.9 MI (30.4 KM) NORTHEAST OF OKEECHOBEE, 16.4
MI (26.4 KM) WEST OF FT PIERCE, ON COUNTY ROAD 68 (ORANGE AVENUE), IN
SECTION 12, TOWNSHIP 35 SOUTH, RANGE 37 EAST. TO REACH THE STATION
FROM THE JUNCTION OF U.S. HIGHWAY 1 AND STATE ROAD A1A SOUTH (SEAWAY
DRIVE) IN FORT PIERCE, GO SOUTH ON U.S. HIGHWAY 1 FOR 0.6 MI (1.0 KM)
TO THE JUNCTION OF COUNTY ROAD 68 WEST (ORANGE AVENUE), TURN RIGHT ON
COUNTY ROAD 68 (ORANGE AVENUE) AND GO WEST FOR 12.7 MI (20.4 KM) TO
THE JUNCTION OF SNEED ROAD (COUNTY ROAD 613) ON THE LEFT, CONTINUE
WEST ON COUNTY ROAD 68 (ORANGE AVENUE) FOR 3.15 MI (5.07 KM) TO THE
MARK ON THE RIGHT, SET IN THE TOP OF A CONCRETE MONUMENT RECESSED 0.3
FT (9.1 CM) BELOW THE LEVEL OF THE GROUND AND 0.6 FT (18.3 CM) BELOW
THE LEVEL OF COUNTY ROAD 68. LOCATED 112.0 FT (34.1 M) NORTH OF AND
ACROSS COUNTY ROAD 68 FROM A POWER POLE, 70.5 FT (21.5 M) NORTH OF AND
ACROSS COUNTY ROAD 68 FROM A POWER POLE, 19.0 FT (5.8 M) NORTH OF THE
CENTERLINE OF COUNTY ROAD 68, 3.7 FT (1.1 M) SOUTH OF A CARSONITE
WITNESS POST, 3.5 FT (1.1 M) SOUTH OF A METAL GUARDRAIL AND 2.0 FT
(0.6 M) SOUTH OF A METAL WITNESS POST.
DESIGNATION - BOB
PID - AB2474
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - NORTH OF BLUEFIELD (1970)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL4489323957(NAD 83)
MARKER: DH = HORIZONTAL CONTROL DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: BOB
MARK LOGO: FL-111
PROJECTION: FLUSH
MAGNETIC: N = NO MAGNETIC MATERIAL
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - September 22, 2001
HISTORY - Date Condition Report By
HISTORY - 1993 MONUMENTED FL-111
HISTORY - 19950208 GOOD SFLWMD
HISTORY - 20010922 GOOD FOST
STATION DESCRIPTION
DESCRIBED BY S FL WATER MGMT DIST 1995 (MEH)
RECOVERED AS DESCRIBED.
STATION RECOVERY (2001)
RECOVERY NOTE BY CHARLEY FOSTER AND ASSOCIATES 2001 (JB)
THE MONUMENT WAS RECOVERED AS DESCRIBED.
DESIGNATION - STL 7
PID - AF6665
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - NORTH OF BLUEFIELD (1970)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL4306327830(NAD 83)
MARKER: DB = BENCH MARK DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: FCD BM STL-7 1976
MARK LOGO: FLDT
PROJECTION: FLUSH
MAGNETIC: N = NO MAGNETIC MATERIAL
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - April 14, 2002
HISTORY - Date Condition Report By
HISTORY - 1976 MONUMENTED FLDT
HISTORY - 1979 GOOD NGS
HISTORY - 20010520 GOOD EMCINC
HISTORY - 20020414 GOOD MAPTEC
STATION DESCRIPTION
DESCRIBED BY NATIONAL GEODETIC SURVEY 1979
16.4 MI WEST FROM FORT PIERCE.
16.4 MILES WEST ALONG STATE HIGHWAY 70 FROM THE JUNCTION OF U. S.
HIGHWAY 1 IN FORT PIERCE, SET IN THE CENTER OF THE 4 LEGS OF A STATE
FOREST SERVICE LOOKOUT TOWER, 150 FEET NORTH OF THE CENTERLINE OF THE
HIGHWAY.
STATION RECOVERY (2001)
RECOVERY NOTE BY EMC INCORPORATED 2001 (WJB)
MARK RECOVERED IN GOOD CONDITION. NOTE-- THE
FOLLOWING CHANGES THE FOREST SERVICE LOOKOUT TOWER HAS BEEN REMOVED,
THE CONCRETE FOOTINGS REMAIN IN PLACE. THE MARK IS LOCATED 20.9
METERS (68.5 FEET) WEST OF THE NORTHWEST CORNER OF AN ABANDONED
WOOD FRAME HOUSE, 5.5 METERS (18.1 FEET) EAST OF A CARSONITE
WITNESS POST IN A NORTH-SOUTH FENCE, 5.7 METERS (18.7 FEET)
SOUTHWEST OF THE NORTHEAST CONCRETE FOOTING OF TOWER AND 2.8
METERS (9.2 FEET) NORTHEAST OF THE SOUTHWEST CONCRETE FOOTING
OF THE LOOKOUT TOWER.
TOWNSHIP 36 SOUTH, RANGE 38-E
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (CDP)
RECOVERED AS DESCRIBED
DESIGNATION - DUCK
PID - AF7699
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - FORT PIERCE NW (1983)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL5893232099(NAD 83)
MARKER: F = FLANGE-ENCASED ROD
SETTING: 59 = STAINLESS STEEL ROD IN SLEEVE (10 FT.+)
STAMPING: DUCK 1993
MARK LOGO: NGS
PROJECTION: RECESSED 1 CENTIMETERS
MAGNETIC: M = MARKER EQUIPPED WITH BAR MAGNET
STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - April 15, 2002 ROD/PIPE-DEPTH: 14 meters SLEEVE-DEPTH : 1 meters
HISTORY - Date Condition Report By
HISTORY - 1993 MONUMENTED NGS
HISTORY - 19950214 GOOD SFLWMD
HISTORY - 20010524 GOOD EMCINC
HISTORY - 20020226 GOOD MAPTEC
HISTORY - 20020415 GOOD MAPTEC
STATION DESCRIPTION
DESCRIBED BY NATIONAL GEODETIC SURVEY 1993
THE STATION IS LOCATED ABOUT 19.3 KM (12.00 MI) NORTHWEST OF PORT ST
LUCIE, 8.05 KM (5.00 MI) SOUTHWEST OF FORT PIERCE, 0.16 KM (0.10 MI)
WEST OF THE FLORIDA TURNPIKE 0.16 KM (0.10 MI) SOUTH OF STATE ROAD 70
IN THE NORTHEAST CORNER OF LUCIE COUNTY AND ALONG THE WEST SIDE OF
GORDY ROAD. OWNERSHIP--HIGHWAY RIGHT OF WAY.
TO REACH THE STATION FROM THE JUNCTION OF STATE ROAD 70 AND THE
FLORIDA TURNPIKE, GO WEST ON STATE ROAD 70 FOR 0.16 KM (0.10 MI) TO A
SIDE ROAD LEFT. TURN LEFT AND GO SOUTH ON GORDY ROAD 0.16 KM
(0.10 MI) TO THE STATION ON THE RIGHT.
LOCATED 92.7 M (304.1 FT) NORTH OF A PRIVATE DRIVEWAY (ADDRESS 3075
GORDY ROAD), 9.7 M (31.8 FT) EAST OF A POWER POLE WITH WITNESS POST,
6.8 M (22.3 FT) SOUTH OF A 35 MPH SIGN AND 5.2 M (17.1 FT) WEST OF
THE CENTERLINE OF GORDY ROAD.
STATION RECOVERY (1995)
RECOVERY NOTE BY S FL WATER MGMT DIST 1995 (MEH)
THE STATION IS LOCATED IN FORT PIERCE ON STATE ROAD 70 NEAR THE
FLORIDA TURNPIKE IN SECTION 26, TOWNSHIP 35 SOUTH, RANGE 39 EAST. TO
REACH THE STATION FROM THE INTERSECTION OF STATE ROAD 70 (OKEECHOBEE
ROAD) AND STATE ROAD 713 (KINGS HIGHWAY) IN FORT PIERCE, GO SOUTHWEST
ON STATE ROAD 70 (OKEECHOBEE ROAD) FOR 0.3 MI (0.5 KM) TO THE JUNCTION
OF GORDY ROAD ON THE LEFT, TURN LEFT ON GORDY ROAD AND GO SOUTH FOR
0.05 MI (0.08 KM) TO THE STATION ON THE RIGHT. LOCATED 39.4 FT (12.0
M) SOUTH OF A METAL POST FOR A SPEED LIMIT SIGN, 31.6 FT (9.6 M) EAST
OF A CARSONITE WITNESS POST, 31.6 FT (9.6 M) EAST OF A POWER POLE,
17.1 FT (5.2 M) WEST OF THE APPROXIMATE CENTERLINE OF GORDY ROAD AND
9.6 FT (2.9 M) WEST OF THE WEST EDGE OF THE PAVEMENT. NOTE ACCESS TO
DATUM POINT IS HAD THROUGH A 5-INCH LOGO CAP.
STATION RECOVERY (2001)
RECOVERY NOTE BY EMC INCORPORATED 2001 (WJB)
RECOVERED IN GOOD CONDITION. NOTE--DESCRIBED IN SEC 26, T-35
SOUTH, R-39-E.
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (RLT)
RECOVERED AS DESCRIBED
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (CDP)
DESIGNATION - Q 483
PID - AJ3249
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - FORT PIERCE NW (1983)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL513361(NAD 83)
MARKER: DD = SURVEY DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: Q 483 1999
MARK LOGO: FLDEP
MAGNETIC: N = NO MAGNETIC MATERIAL
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - 1999
HISTORY - Date Condition Report By
HISTORY - 1999 MONUMENTED FLDEP
STATION DESCRIPTION
DESCRIBED BY FL DEPT OF ENV PRO 1999 (JLM)
THE MARK IS ABOUT 27.0 MI (43.5 KM) NORTHEAST OF OKEECHOBEE, 10.0 MI
(16.1 KM) NORTHWEST OF FT PIERCE, ON GOODWIN ROAD, IN SECTION 12,
TOWNSHIP 35 SOUTH, RANGE 38 EAST, TO REACH THE MARK FROM THE JUNCTION
OF U.S. HIGHWAY 1 AND STATE ROAD A1A SOUTH (SEAWAY DRIVE) IN FORT
PIERCE, GO NORTH OF U.S. HIGHWAY 1 FOR 0.5 MI (0.8 KM) TO THE JUNCTION
OF AVENUE O ON THE LEFT, TURN LEFT ON AVENUE O AND GO WEST FOR 0.45 MI
(0.72 KM) TO THE INTERSECTION OF 13TH STREET, TURN RIGHT ON 13TH
STREET AND GO NORTH FOR 0.3 MI (0.5 KM) TO A LOCKED GATE, PASSING
THROUGH THE GATE GO WEST ON THE SOUTH SIDE OF CANAL 25 FOR 0.8 MI (1.3
KM) TO THE INTERSECTION OF 25TH STREET AND AVENUE T, CONITUE WEST ON
AVENUE T FOR 1.85 MI (2.98 KM) TO THE JUNCTION OF ANGLE ROAD AND NORTH
53RD STREET, TURN RIGHT ON ANGLE ROAD AND GO WEST FOR 6.35 MI (10.22
KM) TO A 90 DEGREE TURN SOUTH AND THE INTERSECTION OF GOODWIN ROAD,
CONTINUE SOUTH ON GOODWIN ROAD FOR 1.6 MI (2.6 KM) TO THE INTERSECTION
OF COUNTY ROAD 68 (ORANGE AVENUE) AND THE MARK ON THE LEFT. THE MARK
CAN ALSO BE REACHED FROM THE JUNCTION OF U.S HIGHWAY 1 AND STATE ROAD
A1A (SEAWAY DRIVE) IN FORT PIERCE, GO SOUTH ON U.S. HIGHWAY 1 FOR 0.6
MI (1.0 KM) TO THE JUNCTION OF COUNTY ROAD 68 WEST (ORANGE AVENUE),
TURN RIGHT ON COUNTY ROAD 68 (ORANGE AVENUE) AND GO WEST FOR 9.6 MI
(15.4 KM) TO THE JUNCTION OF GOODWIN ROAD ON THE RIGHT AND THE MARK ON
THE RIGHT, SET IN THE TOP OF A ROUND CONCRETE MONUMENT FLUSH WITH THE
GROUND AND 2.0 FT (0.6 M) BELOW THE LEVEL OF COUNTY ROAD 68. LOCATED
158.0 FT (48.2 M) SOUTH OF THE CENTERLINE OF THE ENTRANCE ROAD TO THE
SUNLIGHT TRUCKING CO., 103.5 FT (31.5 M) EAST OF THE APPROXIMATE
CENTERLINE OF GOODWIN ROAD, 81.8 FT (24.9 M) EAST OF A POWER POLE WITH
A LIGHT ATTACHED, 61.5 FT (18.7 M) WEST OF A POWER POLE, 32.2 FT (9.8
M) NORTH OF THE CENTERLINE OF COUNTY ROAD 68 AND 1.8 FT (0.5 M) SOUTH
OF THE SOUTHWEST CORNER OF A 6.0 FT (1.8 M) TALL CHAINLINK FENCE.
DESIGNATION - E 528
PID - AJ5656
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - FORT PIERCE NW (1983)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL5217228632(NAD 83)
MARKER: DD = SURVEY DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: E 528 2001 CERP
MARK LOGO: USE
PROJECTION: RECESSED 15 CENTIMETERS
MAGNETIC: N = NO MAGNETIC MATERIAL
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - April 05, 2002
HISTORY - Date Condition Report By
HISTORY - 20010521 MONUMENTED EMCINC
HISTORY - 20020405 GOOD MAPTEC
STATION DESCRIPTION
DESCRIBED BY EMC INCORPORATED 2001 (CHP)
THE STATION IS LOCATED APPROXIMATELY 9.67 KILOMETERS (6.0 MILES)
SOUTHWEST OF FORT PIERCE, FLORIDA ON THE SOUTH SIDE STATE ROAD 70
AT THE EDGE OF THE RIGHT OF WAY AND APPROXIMATELY 49 METERS (161.0
FEET) EAST OF COUNTY ROAD 609A. THE MARK IS LOCATED ON THE FORT
PIERCE NORTHWEST QUAD SECTION 6, TOWNSHIP 36 SOUTH, RANGE 39 EAST.
OWNERSHIP FLDT.
TO REACH THE STATION FROM THE INTERSECTION OF INTERSTATE 95 AND
STATE ROAD 70 IN FORT PIERCE, FLORIDA, GO 9.68 KILOMETERS (6.0 MILES)
WEST ON STATE ROAD 70 TO THE MARK ON LEFT, APPROXIMATELY 43
METERS (141 FEET) SOUTH OF CENTER OF STATE ROAD 70 AT THE EDGE OF
THE RIGHT OF WAY.
THE STATION IS LOCATED SOUTH 42.8 METERS (140.8 FEET) OF THE CENTER
OF COUNTY ROAD 609A (SHINN ROAD), SOUTHEAST 8.3 METERS (27.3 FEET)
OF POWER POLE, NORTHEAST 4.8 METERS (15.8 FEET) FROM FENCE CORNER,
NORTH 0.6 METERS (1.9 FEET) FROM A CARSONITE WITNESS POST IN FENCE
AND SOUTH 0.25 METERS (0.8 FEET) FROM A MAGNET BURIED 0.10 METERS
(0.3 FEET).
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (CDP)
RECOVERED AS DESCRIBED
PID Reference Object Distance Geod. Az | dddmmss.s |
AJ8595 TT 62 BBS 118.633 METERS 33226 |
DESIGNATION - H 528
PID - AJ5658
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - NORTH OF BLUEFIELD (1970)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL4648727119(NAD 83)
MARKER: DD = SURVEY DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: H 528 2001 CERP
MARK LOGO: USE
PROJECTION: RECESSED 15 CENTIMETERS
MAGNETIC: O = OTHER; SEE DESCRIPTION
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - April 14, 2002
HISTORY - Date Condition Report By
HISTORY - 20010522 MONUMENTED EMCINC
HISTORY - 20020414 GOOD MAPTEC
STATION DESCRIPTION
DESCRIBED BY EMC INCORPORATED 2001 (CHP)
THE STATION IS LOCATED APPROXIMATELY 15.6 KILOMETERS (9.7 MILES)
SOUTHWEST OF FORT PIERCE, FLORIDA AT THE INTERSECTION OF STATE
ROAD 70 AND SNEED ROAD, COUNTY ROAD 613. LOCATED ON THE NORTH OF
BLUEFIELD QUAD ON SECTION LINE BETWEEN SECTION 9 AND 10, TOWNSHIP
36 SOUTH, RANGE 38 EAST.
OWNERSHIP FLDT.
TO REACH THE STATION FROM THE INTERSECTION OF INTERSTATE 95 AND
STATE ROAD 70, GO SOUTHWEST ON STATE ROAD 70 AND SNEED ROAD TO
THE NORTH, AND THE MARK ON THE LEFT ON SOUTH RIGHT OF WAY OF
STATE ROAD 70 IN THE PROJECTED CENTER LINE OF SNEED ROAD, COUNTY
ROAD 613.
THE STATION IS 21.8 METERS (71.5 FEET) SOUTH OF THE CENTER OF STATE
ROAD 70 (TWO LANE ROAD), 7.3 METERS (24.7 FEET) SOUTHWEST OF A
TELEPHONE POLE NUMBER 404, 5.0 METERS (16.4 FEET) NORTH OF THE TOP
BANK OF A DITCH, 1.0 METER (3.3 FEET) NORTH OF A CARSONITE WITNESS
POST AND 0.25 METERS (0.8 FEET) SOUTH OF A MAGNET BURIED 0.10
METERS (0.3 FEET).
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (CDP)
DESIGNATION - M 528
PID - AJ5681
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - JONES HAMMOCK (1970)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL3697226349(NAD 83)
MARKER: F = FLANGE-ENCASED ROD
SETTING: 49 = STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)
STAMPING: M 528 2001 CERP
MARK LOGO: NONE
PROJECTION: RECESSED 10 CENTIMETERS
MAGNETIC: M = MARKER EQUIPPED WITH BAR MAGNET
STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - April 14, 2002 ROD/PIPE-DEPTH: 24.3 meters
HISTORY - Date Condition Report By
HISTORY - 20010520 MONUMENTED EMCINC
HISTORY - 20020226 GOOD MAPTEC
HISTORY - 20020414 GOOD MAPTEC
STATION DESCRIPTION
DESCRIBED BY EMC INCORPORATED 2001 (CHP)
THE STATION IS LOCATED APPROXIMATELY 25.8 KILOMETERS (16.0 MILES)
SOUTHWEST OF FORT PIERCE, FLORIDA APPROXIMATELY 25.6 KILOMETERS
(15.9 MILES) NORTHEAST OF OKEECHOBEE, FLORIDA ON THE NORTH RIGHT
OF WAY ON STATE ROAD 70 AT THE ENTRANCE TO V BAR 2 RANCH.
LOCATED ON THE JONES HAMMOCK QUAD SECTION 10, TOWNSHIP 36 SOUTH,
RANGE 37 EAST.
OWNERSHIP FLDT.
TO REACH THE STATION FROM THE INTERSECTION OF INTERSTATE 95 AND
STATE ROAD 70 GO SOUTHEAST ON STATE ROAD 70 FOR 25.80 KILOMETERS
(16.0 MILES) TO A PRIVATE ROAD NORTH TO V BAR 2 RANCH AND THE
MARK. THE MARK MAY ALSO BE REACHED FROM THE INTERSECTION OF U.S.
HIGHWAY 441 AND STATE ROAD 70 IN OKEECHOBEE, GO NORTHEAST ON
STATE ROAD 70 FOR 25.64 KILOMETERS (15.9 MILES) TO THE MARK ON THE
LEFT AT PRIVATE ROAD NORTH TO V BAR 2 RANCH.
THE STATION IS LOCATED 11.7 METERS (38.4 FEET) NORTH OF THE CENTER
OF STATE ROAD 70 (TWO LANE ROAD), 18.6 METERS (61.0 FEET) WEST OF THE
CENTER OF PRIVATE ROAD LEADING NORTH, 0.4 METERS (1.3 FEET) SOUTH
OF A FENCE CORNER AND 1.0 METER (3.3 FEET) EAST OF A CARSONITE
WITNESS POST.
THE MARK IS A STEEL ROD IN A 5 INCH LOGO COVER RECESSED 0.10 METERS
(0.3 FEET) BELOW GROUND. A MAGNET WAS PLACE INSIDE THE LOGO COVER.
NOTE ACCESS TO THE DATUM POINT IS HAD THROUGH A 5-INCH LOGO CAP.
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (RLT)
RECOVERED AS DESCRIBED WITH THE FOLLOWING CHANGES
FROM THE INTERSECTION OF I-95 AND SR 70 GO SOUTHWEST THEN FOLLOW
ORIGINAL DESCRIPTION.
STATION RECOVERY (2002)
RECOVERY NOTE BY MAPTECH INCORPORATED 2002 (CDP)
RECOVERED AS DESCRIBED
PID Reference Object Distance Geod. Az | dddmmss.s |
AF6670 U 356 417.908 METERS 0701022.4 |
DESIGNATION - HAWK
PID - AJ8590
STATE/COUNTY- FL/ST LUCIE
USGS QUAD - FORT PIERCE SW (1953)
U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNL520240(NAD 83)
MARKER: DD = SURVEY DISK
SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT
STAMPING: HAWK 2001
MARK LOGO: FL-111
PROJECTION: RECESSED 8 CENTIMETERS
MAGNETIC: O = OTHER; SEE DESCRIPTION
STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO
STABILITY: SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE: SATELLITE OBSERVATIONS - September 23, 2001
HISTORY - Date Condition Report By
HISTORY - 2001 MONUMENTED FL-111
HISTORY - 20010923 GOOD FOST
STATION DESCRIPTION
DESCRIBED BY CHARLEY FOSTER AND ASSOCIATES 2001 (JB)
THE MONUMENT IS LOCATED 22.9 MILES (36.80 KM) NORTHEAST OF OKEECHOBEE,
FL. AND 11.5 MILES (18.50 KM)
SOUTHWEST OF FT. PIERCE, SECTION 19, TOWNSHIP 36 SOUTH, RANGE 39 EAST.
OWNERSHIP IS SOUTH FLORIDA WATER MANAGEMENT DISTRICT.
TO REACH THE MONUMENT FROM THE INTERSECTION OF STATE ROAD 70 AND
COUNTY ROAD 609A (SHINN
ROAD), 10.5 MILES (16.96 KM) WEST OF THE JUNCTION OF U.S. HIGHWAY 1
AND STATE ROAD 70 IN FT. PIERCE FL.,
GO SOUTH ON COUNTY ROAD 609A FOR 0.4 MILES (0.64 KM) TO THE
INTERSECTION OF SHINN ROAD AND COUNTY
ROAD 712 (MIDWAY ROAD), GO SOUTH (STRAIGHT) 2.5 MILES (4.02 KM) ON
SCHINN ROAD TO THE MONUMENT
LOCATION, ON THE NORTHWEST CORNER OF BRIDGE NO. 940018 (THE NORTH SIDE
OF RIM DITCH). THE
MONUMENT IS 0.05 MILES (0.08 KM) NORTH OF THE JUNCTION OF SCHINN ROAD
AND C-24 CANAL ROAD
(JUNCTION ON THE SOUTH SIDE OF RIM DITCH).
THE MONUMENT IS 13.5 FEET (4.11 M) WEST OF THE CENTER OF BEND IN
GUARDRAIL, 3.5 FEET (1.07 M)
SOUTHEAST OF THE END OF GUARDRAIL, 9.0 FEET (2.74 M) NORTH OF THE WEST
POST OF A SIGN READING C-24
RIM DITCH SFLWMD PROTECTING OUR WATER RESOURCES, 15.5 FEET (4.72 M)
SOUTH OF THE CENTER OF A
DIRT ROAD RUNNING PARALLEL TO RIM DITCH, 27.5 FEET (8.38 M) WEST OF
THE CENTER OF SCHINN ROAD AND
3.0 FEET (0.91 M) NORTH OF A CARSONITE WITNESS POST. NOTE A MAGNET WAS
BURIED NEARBY AT AN
UNSPECIFIED POSITION.
REFERENCE OBJECTS AZ. BACK DIREC.
(GEOD) (GRID)
(MAG)
BACK AZ GEOD. DIST.
(FT) (M)
GRID. DIST.
(FT) (M)
Nail W/Disk In Guard Rail 076 31.900 Nail W/Disk In Edge PVMT 095 35.540 Nail W/Disk In Wood Pole 167 61.980
DESCRIPTION
To reach the mark, begin at the intersection of S.R. 70 and the Florida Turnpke in Ft. Pierce, FL. Go west on S.R. 70 for 6.8 miles to a North/South running canal and C.R. 609 (Header Canal Rd.), turn right and go north on C.R. 609 for 2.1 miles to an East/West running canal (canal goes under C.R. 609) and the mark on the left.
The mark is a USACE Brass Disk, set approximately 0.3 feet below ground level in a 6 inch P.V.C. pipe filled with concrete. The mark is 33 feet south of the East/West canal centerline and 42 feet West of the C.R. 609 centerline.
DESCRIPTION RECORDED BY PROJECT DATE DESCRIBED (yyyy-mm-dd) FIELDBOOK
Denis Riordan - FSI IRLS 2004-10-23
SKETCH/PHOTOGRAPH (INSERT FROM FILE, SCANNER OR CAMERA)
STATE COUNTY TYPE OF MARK STATION STAMPING
Florida St. Lucie Disk In Concrete Monument IRLS-1 IRLS-1 2004 JAX DIST
SURVEY NUMBER (XX-XXX) AGENCY ELEVATION (FT) (M) VERTICAL DATUM
04-059 USACE NAVD88
LATITUDE (dd mm ss.sssss) LONGITUDE (ddd mm ss.sssss) HORIZONTAL ORDER HORIZONTAL DATUM
Third NAD83(99)
CONVERGENCE ANGLE
(-) (+) Choose One
SCALE FACTOR COMBINED SCALE
FACTOR
AE FIRM
FSI
(X) (Y) (FT) (M) (X) (Y) (FT) (M) GRID AND ZONE DATE SET (yyyy-mm-dd)
0901 FL-EAST 2004-10-23
(MAG)
BACK AZ GEOD. DIST.
(FT) (M)
GRID. DIST.
(FT) (M)
Nail W/Disk In Edge Pvmt 098 20.700 Nail W/Disk In Guard Rail 139 20.920 South Gate Post 312 34.020
DESCRIPTION
To reach the mark, begin at the intersection of S.R. 70 and the Florida Turnpke in Ft. Pierce, FL. Go west on S.R. 70 for 6.8 miles to a North/South running canal and C.R. 609 (Header Canal Rd.), turn right and go North on C.R. 609 for 0.6 miles to a major high voltage transmission line, and the mark on the left.
The mark is a USACE Brass Disk, set approx. 0.3 feet below ground level in a 6 inch P.V.C. pipe filled with concrete. The mark is 39 feet North of the centerline of a canal crossing under C.R. 609, and 30 feet West of the C.R. 609 centerline.
DESCRIPTION RECORDED BY PROJECT DATE DESCRIBED (yyyy-mm-dd) FIELDBOOK
Denis Riordan - FSI IRLS 2004-10-23
SKETCH/PHOTOGRAPH (INSERT FROM FILE, SCANNER OR CAMERA)
STATE COUNTY TYPE OF MARK STATION STAMPING
Florida St. Lucie Disk In Concrete Monument IRLS-2 IRLS-2 2004 JAX DIST
SURVEY NUMBER (XX-XXX) AGENCY ELEVATION (FT) (M) VERTICAL DATUM
04-059 USACE NAVD88
LATITUDE (dd mm ss.sssss) LONGITUDE (ddd mm ss.sssss) HORIZONTAL ORDER HORIZONTAL DATUM
Third NAD83(99)
CONVERGENCE ANGLE
(-) (+) Choose One
SCALE FACTOR COMBINED SCALE
FACTOR
AE FIRM
FSI
(X) (Y) (FT) (M) (X) (Y) (FT) (M) GRID AND ZONE DATE SET (yyyy-mm-dd)
(MAG)
BACK AZ GEOD. DIST.
(FT) (M)
GRID. DIST.
(FT) (M)
Nail W/Disk West Edg Pvmt 094 10.530 Nail W/Disk In Wood Pole 120 59.820 Nail W/Disk In Wood Polet 211 29.200
DESCRIPTION
To reach the mark, begin at the intersection of S.R. 70 and C.R. 613 (Sneed Road). Go approimately 8.8 miles west on S.R. 70 from the Florida Turnpike in St. Lucie County, FL, go North on C.R. 613 for 1.0 mile to an electric pole brace wire that goes over C.R. 613 and the mark on the left (300 feet South of an East/West running high voltage transmission line).
The mark is a USACE Brass Disk, set approx. 0.3 feet below ground level in a 6 inch P.V.C. pipe filled with concrete. The mark is 20 feet West of the C.R. 613 centerline.
DESCRIPTION RECORDED BY PROJECT DATE DESCRIBED (yyyy-mm-dd) FIELDBOOK
Denis Riordan - FSI IRLS 2004-10-23
SKETCH/PHOTOGRAPH (INSERT FROM FILE, SCANNER OR CAMERA)
STATE COUNTY TYPE OF MARK STATION STAMPING
Florida St. Lucie Disk In Concrete Monument IRLS-3 IRLS-3 2004 JAX DIST
SURVEY NUMBER (XX-XXX) AGENCY ELEVATION (FT) (M) VERTICAL DATUM
04-059 USACE NAVD88
LATITUDE (dd mm ss.sssss) LONGITUDE (ddd mm ss.sssss) HORIZONTAL ORDER HORIZONTAL DATUM
Third NAD83(99)
CONVERGENCE ANGLE
(-) (+) Choose One
SCALE FACTOR COMBINED SCALE
FACTOR
AE FIRM
FSI
(X) (Y) (FT) (M) (X) (Y) (FT) (M) GRID AND ZONE DATE SET (yyyy-mm-dd)
(MAG)
BACK AZ GEOD. DIST.
(FT) (M)
GRID. DIST.
(FT) (M)
Iron Rod W/Cap(LB5776) 104 74.190 Iron Rod W/Cap(LB5776) 190 11.740 Iron Rod W/Cap(LB5776) 266 57.690
DESCRIPTION
To reach the mark, begin at the intersection of S.R. 70 and C.R. 613 (Sneed Road). Approimately 8.8 miles west of the Florida Turnpike in St. Lucie County, FL, go north on C.R. 613 for 1.8 miles to a fenced equipment shed and fuel tanks on the the right, turn right and go east through the citrus groves for 0.5 mile to a canal and a lone, 40 foot high cypress tree, turn left (on the west side of the canal) and go north for 0.25 mile to a canal cross-over and Flume Road (Flume Road is a 2-rut dirt road and is not open to the public), turn left and go west on Flume Road for 75 feet to the mark on the right.
The mark is a USACE Brass Disk, set approx. 0.3 feet above ground level in a 6 inch P.V.C. pipe filled with concrete. The mark is 12 feet North of the apparent centerline of Flume Road.
DESCRIPTION RECORDED BY PROJECT DATE DESCRIBED (yyyy-mm-dd) FIELDBOOK
Denis Riordan - FSI IRLS 2004-10-23
SKETCH/PHOTOGRAPH (INSERT FROM FILE, SCANNER OR CAMERA)
STATE COUNTY TYPE OF MARK STATION STAMPING
Florida St. Lucie Disk In Concrete Monument IRLS-4 IRLS-4 2004 JAX DIST
SURVEY NUMBER (XX-XXX) AGENCY ELEVATION (FT) (M) VERTICAL DATUM
04-059 USACE NAVD88
LATITUDE (dd mm ss.sssss) LONGITUDE (ddd mm ss.sssss) HORIZONTAL ORDER HORIZONTAL DATUM
Third NAD83(99)
CONVERGENCE ANGLE
(-) (+) Choose One
SCALE FACTOR COMBINED SCALE
FACTOR
AE FIRM
FSI
(X) (Y) (FT) (M) (X) (Y) (FT) (M) GRID AND ZONE DATE SET (yyyy-mm-dd)
SECTION 00 33 50
WEATHER, WATER STAGE AND TIDE DATA
COMPREHENSIVE EVERGLADES
RESTORATION PLAN,
INDIAN RIVER LAGOON - SOUTH,
C-23/C-24 STORMWATER
TREATMENT AREA,
St. Lucie County, Florida
COMPREHENSIVE EVERGLADES RESTORATION PLAN,
Indian River Lagoon – South
Section 00 33 50
1. The below-stated water fluctuations are for informational purposes only and are not to be utilized in conjunction with any contract-related hydrographic surveying purposes as noted on the control drawing(s) of the contract plans. All elevations in this section are in feet, National Geodetic Vertical Datum of 1929 (feet, NGVD).
2. The C-23/C-24 Stormwater Treatment Area (STA) Project is located in St.
Lucie County adjacent to and east of the C-24 canal within the northwestern portion of the C-24 drainage basin. The C-23/C-24 STA is approximately 1 mile north of Okeechobee Road (SR 70) bounded by C-24 on the west and County Road 609 to the east. A mix of wetlands, agricultural and livestock grazing lands that have sparsely distributed residents along the northern and southern boundaries.
3. Water levels in the project area are mainly affected by local runoff, rainfall, evaporation, groundwater levels, and C-24 and C-71 water levels.
Water levels in the C-24 are controlled by the spillway Structure 49 (S-49) (operated by SFWMD) which is approximately 17 miles southeast (downstream) from the location of the Project. The C-24 receives water from the C-23 and C-25 thru structures G-79 and G-81, respectively. Water levels in the C-71 are controlled by the Fittings Road Structure and the Gordy Road Structure, both operated by the North St. Lucie River Water Control District (NSLRWCD).
The Fittings Structure is located in the C-71 just west of Okeechobee Road (SR 70) and approximately 2 miles east of the location of the Project. The Gordy Road Structure is in Ten Mile Creek approximately 7 miles east of the location of the Project.
4. Structure 49 (S-49) is a reinforced concrete, gated spillway with release controlled by two stem operated vertical lift gates. S-49 is located in the C-24, 2400 feet west of the Sunshine Parkway. The purpose of this structure is to maintain desirable stages upstream in C-24. S-49 has two operating ranges in which to maintain the headwater (HW) elevation. The operating ranges vary seasonally. In the wet season (normally May 15 to October 15) the operating range is from 18.5 to 20.2 feet, NGVD. In the dry season (normally October 15 to May 15) the operating range is from 19.5 to
21.2 feet, NGVD. S-49 passes the design flood (100 percent of the Standard Project Flood) without exceeding upstream flood design stage and restricts downstream flood stages as well as discharge velocities to non-damaging levels.
5. The Gordy Road Control Structure, also known as S-71-1, is a 4-bay radial gate spillway operated by NSLRWCD. The structure is located in Tenmile Creek just west of the Florida Turnpike. The outside gates are two 18-foot wide radial gates, with a crest elevation of 9.3 feet, NGVD and inverts of the gates are at elevation 3.0 feet, NGVD. The inside gates are two 18-foot wide radial gates, with a crest elevation of 10.0 feet, NGVD and inverts of the gates are also at elevation 3.0 feet, NGVD. The Gordy Road Control Structure is the easternmost water control structure. This structure is generally operated to maintain an upstream pool elevation range from 9.5 feet, NGVD to 10.5 feet, NGVD. Additional operating details for this structure and other pertinent structures operated by NSLRWCD can be found by contacting the NSLRWCD office at (772)-461-5050.
6. The Fittings Structure is located in the C-71 Canal just west of
Okeechobee Road (SR 70) and approximately 2 miles east(downstream) of the location of the Project. This spillway that is the primary drainage structure for NSLRWCD located in the C-71. This structure is operated by NSLRWCD. *****NEED INFORMATION ON THIS structure and is operating ranges***** Additional operating details for this structure and other pertinent structures operated by NSLRWCD can be found by contacting the NSLRWCD office at (772)-461-5050.
7. Structure G-81 is located under Orange Avenue at the drainage divide between C-24 and C-25 approximately 4 miles north (upstream) of the location of the Project. The structure is a two concrete box culvert with gates controlled manually by SFWMD. The purpose of this structure is to provide flexibility in the operation of C-24 and C-25, by allowing water to be transferred from one basin to another as conditions warrant.
8. Structure G-79 is located at the junction of C-23 and C-24 approximately
3.5 miles south (upstream) of the location of the Project. This structure is used to transfer water from C-23 to C-24 when the western portion of the former basin is well in excess of optimum and the C-24 basin has capacity to spare. It is also used during dry periods when the C-23 basin has ample water and the C-24 and/or C-25 basins are deficient.
9. Historical S-49 HW elevations for the period of record from January 1, 2003 to May 5, 2020, are provided in Figure 1. A maximum elevation of 21.31 feet, NGVD was recorded on January 26, 2010.
10. Historical G-81 TW elevations for the period of record from January 1, 2003 to May 5, 2020, are provided in Figure 2. A maximum elevation of 21.81 feet, NGVD was recorded on August 20, 2008.
11. Historical G-79 TW elevations for the period of record from January 1, 2003 to May 5, 2020, are provided in Figure 3. A maximum elevation of 21.58 feet, NGVD was recorded on August 20, 2008.
12. It shall be the contractor's responsibility to obtain information concerning rain and wind. Reference is made to the National Oceanic and Atmospheric Administration (NOAA) publication entitled Local Climatological Data – Monthly Summary, which contains climatological and meteorological observations and data, including wind, rain, and temperature data for the project area. Subscription price and ordering information is available from the National Centers for Environmental Information, Federal Plaza, 151 Patton Avenue, Asheville, North Carolina 28801-5001. NOAA also has an internet information page at: http://www.ncdc.noaa.gov/.
13. The climate in the project area is subtropical and humid. The project area is subject to tropical storms and hurricanes from June through November and to windy and/or rainy weather during any time of the year. Temperatures below freezing are rare. May is generally a transitional month in which storms that typically occur in June through September may begin. The typical rainfall of October through May is associated with mid-latitude systems (fronts and low-pressure systems) and is distributed in a spatially uniform pattern. Typical June through September rainfall is closely associated with convective activity. These rainfall events are normally of short duration and amounts are quite variable spatially. Occasionally, daily rainfall during the typical rainfalls of October through May could be quite heavy as mid-latitude systems penetrate into Florida. Weather forecasts as well as actual rainfall information from the National Weather Service Miami-South http://www.ncdc.noaa.gov/
Florida Forecast Office can be accessed at: http://www.weather.gov/mfl/. The contractor may also obtain hydrometeorological data from the Jacksonville District, Water Management Section’s website, which can be found at:
https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ and the South Florida Water Management District’s (SFWMD) website which can be found at: https://www.sfwmd.gov
14. Temporary deviations from the water management operating criteria for S-49, G-79, G-81, Fittings Structure, and Gordy Road Structure can be conducted from time to time. It is possible that historic water levels, historic discharges, and design discharges will be exceeded from time to time. Historical hydrometeorological data is not necessarily indicative offuture conditions. The contractor should not expect that water levels and/or flows will be manipulated for the contractor. The contractor shall not attempt to operate any of the existing water management structures mentioned in this Section 00 33 50.
15. The following data are provided:
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS
BASED ON 5-DAY WORK WEEK
The average number of days in each calendar month with precipitation greater than, or equal to 0.50 inches is provided for the project area in the following table. This information is based on data obtained from station Ft Pierce Station, located at latitude 22.4417 and longitude -80.3508. The data were obtained from Climatography of the United States No. 20 Monthly Station Climate Summaries for Florida, published by the National Climatic Data Center, NOAA, for the period of record 1981-2010. The values in the table have been rounded to the nearest whole number.
Average Number of Days Per Month With
Precipitation >= 0.50 Inches
Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Ft Pierce Station
1 DRAFT
http://www.weather.gov/mfl/ https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ https://www.sfwmd.gov/
FIGURE 1: S-49 Headwater Elevation
C-23/C-24 Stormwater Treatment Area
Section 00 33 50
FIGURE 2: G-81 Tailwater Elevation
FIGURE 3: G-79 Tailwater Elevation
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.1.1 Base
1.2.1.1.1 Phase 1
1.2.1.1.2 Phase 2
1.2.1.1.3 Phase 3
1.2.1.1.4 Phase 4
1.2.1.2 Option A
1.2.1.3 Order of Work
1.2.2 Location
1.2.3 Permit Information
1.2.4 Safety Requirements
1.2.5 Work Performed by Others
1.2.5.1 Vehicle Access
1.2.5.2 Project Site Dewatering Design
1.2.5.3 Site Features
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED
1.9 LOCATION OF UNDERGROUND FACILITIES
1.9.1 Notification Prior to Excavation
1.10 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
1.10.1 Schedule of Monthly Anticipated Adverse Weather Delays
1.10.2 Contractor Responsibility
1.11 SOUTH FLORIDA WATER MANAGEMENT DISTRICT
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for Comprehensive Everglades Restoration Program, Indian River Lagoon - South, C-23/24 Stormwater Treatment Area, IRL-S, St. Lucie County, Florida
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.1.1 Base
The work includes construction of a stormwater treatment area consisting of two contiguous cells (about 410 acres) west of County Road (CR) 613, and three contiguous cells (about 1,560 acres) east of CR 613. Cells are parallel, flowing west to east, and consist of about 17,690 feet of perimeter levee and about 3,950 feet of cell division levee west of CR 613, and about 34,240 feet of perimeter levee and 2 cell division levees of about 12,190 and 9,410 feet east of CR 613. Collection and distribution channels run along the east and west ends of each cell.
Work includes construction of one 2-barrel ungated culvert structure (8 feet diameter culverts) under CR 613; one 3-barrel gated culvert structure (5 feet diameter culverts) under CR 609; five gated 8 feet x 6 feet box culverts for release into cells; two ungated 5 feet diameter culverts for boundary seepage return; four ungated 3 feet diameter culverts with weirs for runoff relief; two gated 8 feet x 6 feet box culverts for release from cells; six gated 5 feet diameter culverts with weirs for release from cells; and one gated 7 feet diameter sag culvert under the C-24 canal.
Work includes construction of site access from CR 613 and modification of CR 609 and CR 613 roadway drainage (swales and detention features).
There is South Florida Water Management District (SFWMD) owned property east of CR 613 and north of the contiguous cells that can be used for staging.
Work is divided into phases as follows:
SECTION 01 11 00 Page 2
1.2.1.1.1 Phase 1
The work includes construction of the S-425 Gated Sag Culvert and site access from CR 613.
1.2.1.1.2 Phase 2
The work includes construction of the Connection Canal connecting the North St. Lucie River Water Control District (NSLRWCD) C-70 canal to the NSLRWCD C-69 canal.
1.2.1.1.3 Phase 3
The work includes construction of the two contiguous cells (about 410 acres) west of CR 613 including associated structures: S-431A Ungated Culvert, S-431B Ungated Culvert, S-432A Gated Box Culvert, S-432B Gated Box Culvert, S-433A Gated Box Culvert, S-433B Gated Box Culvert, S-434A Ungated Culvert With Weir, S-434B Ungated Culvert With Weir, and S-451 Ungated Culverts. The work includes modification of CR 613 roadway drainage.
1.2.1.1.4 Phase 4
The work includes construction of the three contiguous cells (about 1,560 acres) east of CR 613 including associated structures: S-435A Ungated Culvert With Weir, S-435B Ungated Culvert With Weir, S-436A Gated Box Culvert, S-436B Gated Box Culvert, S-436C Gated Box Culvert, S-437A Gated Culvert With Weir, S-437B Gated Culvert With Weir, S-438A Gated Culvert With Weir, S-438B Gated Culvert With Weir, S-439A Gated Culvert With Weir, S-439B Gated Culvert With Weir, and S-441 Gated Culverts. The work includes modification of CR 609 roadway drainage.
1.2.1.2 Option A
The work includes installation of a temporary pump station. The temporary pump station centerline will be located east of the C-24 canal, approximately 150 feet north of the S-425 Gated Sag Culvert.
1.2.1.3 Order of Work
The Contractor will receive a separate Notice to Proceed (NTP) for each Base Phase and Option A. The first NTP will be to construct Base Phase
1. Subsequent NTPs may be issued prior to completion of Base Phase 1.
1.2.2 Location
Location is in St. Lucie County, Florida about 10.5 miles west-southwest of Fort Pierce. From the Interstate 95 interchange to State Road 70 (Exit 129), take State Road 70 west about 7 miles to CR 609 then north about 0.5 mile to the southeast corner of the project area, or take State Road 70 west about 9 miles to CR 613 then north about 1.5 miles to the project area on the east side of the road. From the Florida Turnpike interchange to State Road 70 (Exit 152), take State Road 70 west about 6.5 miles to CR 609 or 8.5 miles to CR 613, then continue as indicated above.
1.2.3 Permit Information
Comply with all requirements under the terms and conditions set out in the following permit(s) and authorization(s) obtained by the Corps of
SECTION 01 11 00 Page 3
Engineers listed below.
a. TBD - Any permit numbers
b. The Contractor is responsible for acquiring St. Lucie County permit(s) as required to work within the St. Lucie County ROW. The St. Lucie County permit is contingent upon approval of the Contractor's maintenance of traffic plan, see Section 01 55 26 TRAFFIC CONTROL.
1.2.4 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.5 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE
PROCEDURES.
Coordinate work with other Contractors performing work adjacent to the Project, adjacent landowners, and SFWMD staff activities, with specific attention to access and staging areas. Construction sequence must be determined by Contractor subject to the following needs for continuous access and operation by others.
1.2.5.1 Vehicle Access
Maintain vehicle traffic access at all times to Florida Power and Light (FPL) to access the Project site and their existing infrastructure within the Project site.
1.2.5.2 Project Site Dewatering Design
Coordinate the Project site dewatering design and operation with North St.
Lucie River Water Control District (NSLRWCD) and file and obtain permits as necessary. Do not impede irrigation waters to and drainage from NSLRWCD lands.
1.2.5.3 Site Features
Become familiar with all existing features on site including but not limited to all man-made features. Demolish and properly dispose of all man-made features on site that interfere with the construction of the Project and all features as specified in the Contract. This may include but is not limited to buildings, pumps, tanks, sheetpile walls, barns, trailers, towers, irrigation piping, risers and supports, culverts, wash stations, gates, fencing, pavement, and pads.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1. The time for completion does not include establishment of grass. Grass must be established no later than the time stated in the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1 plus the time stated for the establishment of grass as set forth in the paragraph SEED ESTABLISHMENT of Section 32 92 19 SEEDING.
SECTION 01 11 00 Page 4
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .