This federal contract opportunity document solicits proposals for maintenance dredging of the 9-foot Anclote River Channel and Turning Basin located in Pinellas and Pasco Counties, Florida. Work includes dredging the channel and transporting dredged material to a temporary upland dredged material management area for dewatering. Incidental work involves endangered species monitoring, sea turtle trawl capture and relocation, bird monitoring, turbidity monitoring, and gopher tortoise capture and relocation. Proposals are due by 2:00pm Eastern Daylight Savings Time on April 5, 2021. Award will be made based on technical merit and past performance. This procurement is set aside for small businesses with a size standard of $30 million. The performance period is approximately 365 calendar days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Amendment 0003.pdf | ||
| B.07.01_Pre-Proposal Conference Slides_21R0007.pptx | PPTX presentation | |
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| B.08.01_GDR-DMMA Files Anclote River Updated Dec 2020.pdf | ||
| B.08.01_Plans Anclote.pdf | ||
| B.08.1_Anclote_FY21_RTA_SPECS Vol 1 and Vol 2 W912EP21R0007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Anclote River, Maintenance Dredging, 9 Foot Project Pinellas and Pasco County, Florida
This Amendment is being issued to:
DELETE Table of Contents and REPLACE w ith Table of Contents.
DELETE Submittal Register and REPLACE w ith Submittal Register.
DELETE SECTION 35 20 23 and REPLACE w ith SECTION 35 20 23.
DELETE SECTION 35 20 26.
DELETE SECTION 35 20 27.
Please see Summary of Changes for complete details.
Receipt of Proposal due date remains unchaged 05 April 2021 @ 2:00 PM Eastern Standard Time.
1. CONTRACT ID CODE PAGE OF PAGES
1 71
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP21R0007
X 9B. DATED (SEE ITEM 11)
19-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Mar-2021
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Anclote River, Maintenance Dredging, 9 Foot Project Pinellas and Pasco County, Florida
W912EP-21-R-0007 1 AMENDMENT 0004
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 – Contract Clauses:
N/A
Volume 2 of 2 – Technical Specifications:
DELETE Table of Contents and REPLACE with Table of Contents.
DELETE Submittal Register and REPLACE with Submittal Register.
DELETE SECTION 01 57 20 and REPLACE with SECTION 01 57 20.
ADD Appendix to SECTION 01 57 20.
DELETE SECTION 35 20 23 and REPLACE with SECTION 35 20 23.
DELETE SECTION 35 20 26.
DELETE SECTION 35 20 27.
2. DRAWINGS:
N/A
(End of Summary of Changes)
Anclote River, Maintenance Dredging, 9-Foot Project Pinellas and Pasco Counties, Florida
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32.10 GEOTECHNICAL DATA REPORT - DREDGE MATERIAL
00 31 32.20 GEOTECHNICAL DATA REPORT - DMMA
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE (Alternate)
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES
DI VI SI ON 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 05 23 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 13 33 PIER TIMBERWORK
DI VI SI ON 31 - EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
31 62 19 TIMBER PILES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
33 40 00.20 FLASHBOARD RISER SYSTEM
PROJECT TABLE OF CONTENTS Page 1 W912EP-21-R-0007 Amendment 0004
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
35 31 19 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR
STRUCTURES
35 41 00 LEVEE CONSTRUCTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14
PAGES
Amendment 0004
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
01 22 00 SD-01 Preconstruction Submittals
1.4 G AOSchedule of Values
3.1.1 G AORequest For Progress Payment
01 30 00 SD-01 Preconstruction Submittals
1.6.3Draft Joint Risk Register
1.6.4List of Subcontractors
Liability Insurance Policy
SD-07 Certificates
1.7.1.2 G ROPartnering Meeting(s) Written
Synopsis
3.3Signature Authority
3.4Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.2 G ROInitial Construction Schedule
1.2.1 G ROInitial Project Schedules
SD-07 Certificates
1.4 G ROConstruction Progress Schedule
1.3.1 G ROInitial Procurement Schedule
1.4.3Progress Photographs
01 33 00 SD-01 Preconstruction Submittals
1.9 G ROExport File
01 35 25 SD-01 Preconstruction Submittals
3.2 G RODive Operations Plan
SD-07 Certificates
1.6.2 G RODive Personnel Qualifications
3.2.1Daily Dive Logs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14
PAGES
Amendment 0004
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
1.16 G DOAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.4.1Monthly Qualification Summary
Report
1.12.1Mishap Notification
1.12.2 G DOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.2 G DOCompetent Person
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G DOCritical Lift Plan
1.7.2.4 G DONaval Architecture Analysis
1.8 G DOActivity Hazard Analysis (AHA)
1.9.1 G DOConfined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.12.5 G DOCrane Inspection Reports
01 45 05 SD-01 Preconstruction Submittals
3.2 G ROQuality Control Plan
SD-07 Certificates
3.2.2Letter of Authority
3.2.2 G ROPersonnel Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES
Amendment 0004
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
01 50 02 SD-01 Preconstruction Submittals
1.4.1 G ROMobilization/Demobilization Plan
1.4.2 G ROSecurity Plan
3.6 G ROSecurity Plan
1.4.3 G DOVegetation Protection and
Restoration Plan
1.4.4 G RODocumentation of Existing
Conditions and Post Construction
Restoration
SD-02 Shop Drawings
2.1Contractor's Temporary Facilities
3.5Contractor's Temporary Facilities
3.2.6Temporary Electric Drawings
1.4.5 G DOConstruction Drawings
01 55 26 SD-01 Preconstruction Submittals
1.3 G ROTraffic Control Plan
01 57 20 SD-01 Preconstruction Submittals
G DOEnvironmental Protection Plan
3.1.5.5 G DOPre-Construction Gopher Tortoise
Survey
3.1.5.6 G DOIndigo Snake
Protection/Education Plan
SD-06 Test Reports
3.1.5.2 G DOProtected Listed Species Sighting
Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
01 57 20 G DOBird Monitoring Qualifications
G DOManatee Observer Qualifications
G DOBenthic Resource Impact
Assessment Report
G DOGopher Tortoise Nesting Monitor
And Relocation Qualifications
G DOEastern Indigo Snake Observer
SD-11 Closeout Submittals
3.1.5.3 G DOProtected Species Summary
Report
Logs/Summary of Bird Nesting
Monitoring
G DOLogs/Summary Of Bird Nesting
Monitoring Report
G DOGopher Tortoises Comprehensive
Final Report
3.1.5.6 G DOEastern Indigo Snake Monitoring
Report
Invasive And Nuisance Species
Report
3.1.6 G DOEvaluation Of Physical Monitoring
Results Near Submerged Aquatic
Vegatation(SAV) Report
3.1.6 G DOWork Near SAV Report
01 57 25 SD-01 Preconstruction Submittals
1.3 G DOTurbidity Monitor Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
01 57 25 1.4 G DOTurbidity Monitoring Plan
SD-03 Product Data
3.2.1.1Calibration Standard
SD-06 Test Reports
3.3.2Turbidity Monitoring Reports
3.4.1Turbidity Exceedance Report
3.4.2Updated Turbidity Exceedance
Report
SD-07 Certificates
3.2.1.1Testing Equipment And
Procedure
02 22 13 SD-01 Preconstruction Submittals
1.2.1 G DOVibration Control Specialist
1.2.1 G DOVibration Control Specialist
Alternate
1.2.2 G DOVibration Monitoring
Technician(s)
1.2.3 G DOStructural Inspection/Evaluation
Engineer
3.2 G DOPre-Construction Structural
Survey
3.3 G DOVibration Control Plan
SD-06 Test Reports
3.5Vibration Monitoring Report
3.4Daily Instrument Logs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
02 22 13 3.6 G DOPost-Construction Structural
Survey
03 30 53 SD-03 Product Data
3.1.4.3Batching and Mixing Equipment
3.5Form work
2.3Ready-Mix Concrete
2.3 G DOMix Design Data
3.2Conveying And Placing Concrete
SD-06 Test Reports
2.1.3 G DOConcrete Mixture Proportions
SD-07 Certificates
2.2.1Cementitious Materials
2.3Delivery Tickets
05 05 23 SD-01 Preconstruction Submittals
3.2 G DOWelding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
2.2Welding Electrodes And Rods
1.3.2Welder, Welding Operator, And
Tacker Qualification
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.3Certified Welding Inspector
1.3.3Nondestructive Testing Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 G DOErection And Erection Bracing
Drawings
SD-02 Shop Drawings
1.3.2 G DOFabrication Drawings
SD-03 Product Data
2.2.1Recycled Content For Structural
Steel
2.3 G DOBolts, Nuts And Washers
2.4.1Welding Electrodes And Rods
2.4.2Non-Shrink Grout
SD-06 Test Reports
3.7Weld Inspection Log
SD-07 Certificates
2.2Steel
1.3.3.1 G DOWelding Procedures and
Qualifications
3.7Certified Welding Inspectors
2.5 G DOGalvanizing
3.4Welding Procedure Specifications
(Wps)
06 10 00 SD-02 Shop Drawings
1.8.1 G DOFabricated Structural Members
1.8.2 G DOModifications of Structural
Members
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
06 10 00 2.1.2Salvaged Lumber
2.1.3Recovered Lumber
1.4.3Structural-use and OSB Panels
2.3Oriented Strand Board
2.4.3Adhesives
SD-05 Design Data
1.8.2 G DOModifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
1.7Preservative Treatment
06 13 33 SD-03 Product Data
1.4.1 G ROMSDS And CIS
SD-06 Test Reports
1.4.2 G DODelivery Inspection List
31 05 22 SD-03 Product Data
2.2.1.5Thread
2.2.1.6 GInstallation Plan
SD-04 Samples
2.2.1 G DOGeotextiles
SD-06 Test Reports
2.2.1 G DOGeotextiles
2.2.2 G DOSite Verification
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
31 05 22 2.2.1 G DOGeotextiles
2.2.1.3 GNeedle Punched Geotextile
31 11 00 SD-03 Product Data
3.5.2 GNonsaleable Materials
31 62 19 SD-02 Shop Drawings
1.5 G DOInstallation Drawings
SD-03 Product Data
3.3.2 G DOCushion Block
3.3.2 G DODriving equipment
2.1.3 G DOPile Shoes
3.6 G DOPile driving records
SD-04 Samples
3.6 G DOTest Piles
SD-07 Certificates
2.1.1 G ROTimber Piles
SD-11 Closeout Submittals
3.6 G DOPile driving records
32 31 13 SD-02 Shop Drawings
1.3Fence Assembly
3.15.1Location of Gate, Corner, End, and Pull Posts
1.3Gate Assembly
2.15Gate Hardware and Accessories
1.3Erection/Installation Drawings
SD-03 Product Data
1.3Fence Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
32 31 13 1.3Gate Assembly
2.15Gate Hardware and Accessories
2.1Recycled Material Content
2.2Zinc Coating
1.5.1PVC Coating
Aluminum Alloy Coating
2.3Fabric
2.10Stretcher Bars
2.18Concrete
SD-04 Samples
2.3Fabric
2.5Posts
2.5Braces
2.6Line Posts
3.3Sleeves
2.9Tension Wire
2.10Stretcher Bars
2.13Gate Posts
2.15Gate Hardware and Accessories
2.17Wire Ties
SD-07 Certificates
1.5.2Certificates of Compliance
SD-08 Manufacturer’s Instructions
1.3Fence Assembly
1.3Gate Assembly
1.3Hardware Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
32 31 13 1.3Accessories
32 92 23 SD-03 Product Data
1.4.1.2Fertilizer
SD-06 Test Reports
Topsoil composition tests
SD-07 Certificates
2.1sods
33 40 00 SD-04 Samples
2.1 G ROPipe for Culverts and Storm
Drains
SD-07 Certificates
2.1.2 G DOResin Certification
3.5.4.2Determination of Density
3.5.5.1.2 G ROPost-Installation Inspection
Report
3.5.6.1 G ROPost-Installation Inspection
Report
3.3Placing Pipe
2.1.3.1Oil Resistant Gasket
33 40 00.20 SD-02 Shop Drawings
2.2.1 G DODetail Drawings
SD-03 Product Data
2.1.1 G DOComposite Weir Boards
2.3 G DOHDPE Weir Pipe
2.1.3 G ROMaterials List
2.5HDPE Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
33 40 00.20 SD-07 Certificates
G ROWelding (HDPE fusing)
G ROWelding Certificates
2.5 G ROFusing
SD-08 Manufacturer’s Instructions
3.3 GOutflow Pipe
35 20 23 SD-01 Preconstruction Submittals
Notice of Intent to Dredge
Relocation of Navigation Aids
G ROPre-Existing Conditions
SD-02 Shop Drawings
G RODrag Bar
3.4.6 G ROAcceptance Sections Plan
SD-07 Certificates
1.7Historical Period Shipwreck Sites
Surveys
Daily/Monthly Report of
Operations
3.3.7Misplaced Material
1.10Declaration of Inspection for
Refueling
SD-11 Closeout Submittals
G ROPost Construction Conditions
35 31 19 SD-02 Shop Drawings
1.5.1 GConstruction Method
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
35 31 19 2.2.2 G RORiprap
2.1 G ROBedding Material
1.2.3 GRubble (Ditch Lining)
2.2.2 GRubble (Ditch Lining)
1.6.1.2Sources
SD-04 Samples
2.2.1.2 GSample
SD-06 Test Reports
2.2.1.2Gradation Test
1.6.1.4Evaluation Testing of Stone
2.1Bedding Material
3.4.1.1Bulk Specific Gravity
SD-07 Certificates
1.5.2Weigh Scale Certification
1.5.3Certified Weight Scale Tickets
35 41 00 SD-01 Preconstruction Submittals
1.5.1 G ROPlan Of Operations
1.5.2 G ROEmbankment And Backfill
Materials
1.5.3 G ROExcavation Plan
1.5.4 G ROQuality Control Plan
3.6.1 GDewatering Plan
SD-03 Product Data
3.7.2 G ROBorrow Areas
3.17.3.2.4G RONuclear Density
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES
W912EP-21-R-0007
Anclote River, Maintenance Dredging, 9-Foot Project
35 41 00 1.10 G ROMeasurement Of Fill Material
1.9 G ROQuality Control Testing
SD-07 Certificates
3.17.3.2.4GQuality Control Laboratory And
Field Testing Equipment
Calibration
3.17.3.2.4GLaboratory Testing Personnel
Qualifications
3.17.3.2.4GNuclear Density
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 20
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 SCOPE
1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS
1.2.1 Miscellaneous Environmental Laws And Regulations
1.2.2 NEPA Reference
1.3 QUALITY CONTROL
1.4 PERMITS AND AUTHORIZATIONS
1.5 SUBMITTALS
1.6 SUBCONTRACTORS
1.7 NOTIFICATION
1.8 CONTRACTOR PERSONNEL QUALIFICATIONS IN POLLUTION CONTROL
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PROTECTION OF ENVIRONMENTAL RESOURCES
3.1.1 General Project Environmental Design and Installation Criteria
3.1.1.1 Sewage-Based Systems Environmental Design and Installation
Criteria
3.1.2 Protection of Land Resources
3.1.2.1 Work Area Limits
3.1.2.2 Unprotected Erodible Soils
3.1.2.3 Contractor Facilities and Other Work Areas
3.1.2.4 Solid Wastes
3.1.2.5 Fuel, Oil, and Lubricants
3.1.2.6 Hazardous Waste
3.1.2.7 Hazardous Materials
3.1.2.8 Disposal of Other Materials
3.1.3 Preservation and Recovery of Historic, Archeological, and
Cultural Resources
3.1.3.1 Applicable Law
3.1.3.2 Known Resources
3.1.3.3 Inadvertent Discoveries
3.1.3.4 Claims for Downtime due to Inadvertent Discoveries
3.1.4 Protection of Water Resources
3.1.4.1 Monitoring of Water Areas
3.1.4.2 Turbidity
3.1.4.3 Oil, Fuel, and Hazardous Substance Spill Prevention and
Mitigation
3.1.4.4 Wetlands Protection (Pipeline Corridors)
3.1.5 Protection of Fish and Wildlife Resources
3.1.5.1 Endangered Species Protection
3.1.5.2 Protected Listed Species Sighting Reports
3.1.5.3 Protected Species Summary Report
3.1.5.4 Protection of Migratory Bird Species
SECTION 01 57 20 Page 1
3.1.5.5 Protection of Gopher Tortoise (GT) Populations (Gopherus polyphemus)
3.1.5.6 Protection of Eastern Indigo Snake Populations
3.1.6 Submerged Aquatic Vegetation (SAV) Protection Measures and
Reporting
3.1.7 Protection of Air Resources
3.1.7.1 Particulates
3.1.7.2 Odors
3.1.8 Protection of Sound Intrusions
3.2 POSTCONSTRUCTION CLEANUP
3.3 PRESERVATION AND RESTORATION OF LANDSCAPE AND MARINE VEGETATION
DAMAGES
3.4 INVASIVE AND NUISANCE SPECIES
3.4.1 Prevention of Invasive and Nuisance Species Transfer
3.4.2 Invasive and Nuisance Species Reporting
3.5 MAINTENANCE OF POLLUTION CONTROL FACILITIES
3.6 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 01 57 20 Page 2
SECTION 01 57 20
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 SCOPE
This Section covers prevention of environmental damage as the result of construction operations under this contract and for those measures set forth in other Technical Requirements of these specifications. For the purpose of this specification, environmental damage is defined as the presence of hazardous, physical, chemical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; affect other species, biological communities, or ecosystems; or degrade the quality of the environment for aesthetic, cultural, and/or historical purposes. The control of environmental damage requires consideration of land, water, and air, and includes management of visual aesthetics, noise, solid waste, radiant energy and radioactive materials, as well as other pollutants.
1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS
1.2.1 Miscellaneous Environmental Laws And Regulations
There are numerous environmental laws and regulations. At the Federal level, the applicable laws and regulations include compliance with the Clean Water Act (CWA); Clean Air Act (CAA); Coastal Zone Management Act (CZMA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Endangered Species Act (ESA); Fish and Wildlife Coordination Act (FWCA); Marine Protection, Research, and Sanctuaries Act (MPRSA);
Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA);
National Environmental Policy Act (NEPA); National Historic Preservation Act (NHPA); National Pollution Discharge Elimination System (NPDES);
Research and Sanctuaries Act; Native American Graves Protection and Repatriation Act (NAGPRA); Resource Conservation and Recovery Act (RCRA);
Rivers and Harbors Act (R&H); Safe Drinking Water Act (SDWA); Toxic Substance Control Act (TSCA); Wild and Scenic Rivers Act (WSRA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Marine Mammal Protection Act (MMPA); Migratory Bird Treaty Act; Code of Federal Regulations (CFRs); Executive Orders; and, Environmental Protection Agency (EPA) requirements.
1.2.2 NEPA Reference
Commitments made in the NEPA document have been incorporated into these specifications. The NEPA document can be found at the following website:
http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Documents/ https://usace.contentdm.oclc.org/utils/getfile/collection/p16021coll7/id/17494
1.3 QUALITY CONTROL
The Contractor shall establish and maintain quality control for environmental protection of all items set forth herein. The Contractor
SECTION 01 57 20 Page 3 shall record on daily quality control reports or attachments thereto, any problems in complying with laws, regulations and ordinances, and corrective action taken.
1.4 PERMITS AND AUTHORIZATIONS
The Contractor shall comply with all requirements under the terms and conditions set out in the following permit(s) and authorization(s) obtained by the Corps of Engineers listed below.
a. Florida Department of Environmental Protection Environmental Resource Permit No. 52-0199763-002 issued August 13, 2020 and expires August 13, 2025.
b. Anclote River Channel Maintenance Dredging Environmental Assessment (EA), located at (https://usace.contentdm.oclc.org/utils/ getfile/collection/p16021coll7/id/11192)
The above permits indicate issuing agency approval of work required by this contract. Permits and environmental compliance documents, including Environmental Compliance Matrix (ECM) defining roles and responsibilities, are available at the following web address:
http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Compliance/
The Contractor shall obtain and comply with the requirements of all permits or licenses required for construction of this project in accordance with the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:
SD-01 Preconstruction Submittals
Environmental Protection Plan ; G, DO
No later than 10 calendar days after Notice to Proceed, the Contractor shall submit an Environmental Protection Plan for review and acceptance by the Contracting Officer. The Government will consider an interim plan for the first 30 days of operations. However, the Contractor shall furnish an acceptable final plan no later than 30 calendar days after receipt of Notice to Proceed. Acceptance of the Contractor's plan shall not relieve the Contractor of his responsibility for adequate and continuing control of pollutants and other environmental protection measures. Acceptance of the plan is conditional and predicated on satisfactory performance during construction. The Government reserves the right to require the Contractor to make changes to the Environmental Protection Plan or operations if the Contracting Officer determines that environmental protection requirements are
SECTION 01 57 20 Page 4 not being met. No physical work at the site shall begin prior to acceptance of the Contractor's plan or an interim plan covering the work to be performed. The Environmental Protection Plan shall include but not be limited to the following:
a. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.
b. Methods for protection of features to be preserved within authorized work areas. The Contractor shall prepare a listing of methods to protect resources needing protection, i.e., trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archeological, and cultural resources.
c. Procedures to be implemented to provide the required environmental protection and to comply with the applicable laws and regulations. The Contractor shall provide written assurance that immediate corrective action will be taken to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures set out in accordance with the environmental protection plan.
d. A permit or license for and the location of the solid waste disposal area.
e. Drawings showing locations of any proposed temporary excavations or embankments for haul roads, stream crossing, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials.
f. Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.
g. Traffic control plan.
h. Methods of protecting surface and ground water during construction activities.
i. Spill prevention. The Contractor shall specify all potentially hazardous substances to be used on the job site and intended actions to prevent accidental or intentional introduction of such materials into the air, ground, water, wetlands, or drainage areas. The plan shall specify the Contractor's provisions to be taken to meet Federal, State, and local laws and regulations regarding labeling, storage, removal, transport, and disposal of potentially hazardous substances.
j. Spill contingency plan for hazardous, toxic, or petroleum material.
k. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas.
SECTION 01 57 20 Page 5
l. A statement as to the person who shall be responsible for implementation of the Environmental Protection Plan. The Contractor personnel responsible shall report directly to the Contractor's top management and shall have the authority to act for the Contractor in all environmental protection matters.
m. Recycling and Waste Management Plan. Executive Order 12873 of 20 October 1993 requires a number of considerations in planning a project. Fallen trees should not be burned or buried.
Mulching, composting, and other uses for trees should be considered. Also, recovery of metals at the job site, including aluminum cans, should be considered with proceeds to be retained by the Contractor. Non-Federal recycling and waste minimization efforts shall also be incorporated into this plan.
n. Turbidity Monitoring Plan. A statement as to the person who shall be responsible for turbidity monitoring and reporting to be performed. Method of turbidity monitoring and reporting that will be performed.
o. Construction activities shall be conducted in a manner as not to impact migratory birds or induce their nesting.
p. Steps to be taken to construct the project in such a manner as not to impact gopher tortoises and Eastern indigo snakes.
q. Invasive & Nuisance Species Transfer Prevention Plan - The Invasive and Nuisance Species Transfer Prevention Plan shall identify specific transfer prevention procedures and if necessary, any cleaning sites/locations. Photos of equipment shall be submitted to verify that equipment has been cleaned prior to coming on site. This submittal will be reviewed by the Invasive Species Management Branch, Operations Division.
Pre-Construction Gopher Tortoise Survey ; G, DO
Indigo Snake Protection/Education Plan ; G, DO
SD-06 Test Reports
Protected Listed Species Sighting Reports ; G, DO
Provide a copy of the incidental take report in PDF format with photographs to the Contracting Officer within 24 hours of the incident.
SD-07 Certificates
Bird Monitoring Qualifications ; G, DO
No later than 10 calendar days after Notice to Proceed, the Contractor shall furnish to the Contracting Officer for approval, the qualifications of the bird monitor/observer. Appropriate qualifications for bird monitor/observer shall be a demonstrated ability to find and/or identify bird species, nesting behavior, eggs and nests, and habitat requirements. The Contractor shall consult with and coordinate all monitoring plans and activities with the Contracting Officer and the Project Biologist indicated in the ECM (See paragraph PERMITS AND AUTHORIZATIONS above).
SECTION 01 57 20 Page 6
Manatee Observer Qualifications (Clamshell Only); G, DO
No later than 10 calendar days after Notice to Proceed, the Contractor shall furnish to the Contracting Officer for approval, the qualifications of the manatee observer. Appropriate qualifications for manatee observer shall be demonstrated experience monitoring manatees and their behaviors in association with in-water construction projects.
Benthic Resource Impact Assessment Report ; G, DO
If requested, the Contractor shall submit as specified, Benthic Resource Impact Assessment within 10 calendar days after requested by the Contracting Officer.
Gopher Tortoise Nesting Monitor And Relocation Qualifications ; G, DO
Submit qualifications and permit no later than 10 calendar days after Notice to Proceed. A FF&WCC permitted Contractor is required to be approved by the Contracting Officer to accomplish the gopher tortoise monitoring and relocation (as necessary) of this section unless they demonstrate to the satisfaction of the Contracting Officer the capability to accomplish gopher tortoise monitoring and recovery by obtaining a permit from the FF&WCC to take turtles.
Eastern Indigo Snake Observer ; G, DO
Submit the qualifications of the eastern indigo snake observer no later than 10 calendar days after Notice to Proceed. Submit the name(s) and qualifications of the proposed observer for approval.
The information submitted should indicate what experience the individual has that would qualify the person to act as an indigo snake observer.
SD-11 Closeout Submittals
Protected Species Summary Report ; G, DO
Contractor shall submit within 30 calendar days following completion of the project, a written report of the absence or occurrence of environmental incidents. In addition, for construction activities whose anticipated duration is more than one calendar year, the Contractor shall complete a sheet each May 31st (plus/minus 14 days).
Logs/Summary of Bird Nesting Monitoring
Contractor shall submit as specified, logs and summary of monitoring detailing nesting and nesting success.
Logs/Summary Of Bird Nesting Monitoring Report ; G, DO
Gopher Tortoises Comprehensive Final Report ; G, DO
Eastern Indigo Snake Monitoring Report ; G, DO
SECTION 01 57 20 Page 7
Invasive And Nuisance Species Report
Evaluation Of Physical Monitoring Results Near Submerged Aquatic Vegatation(SAV) Report ; G, DO
Contractor shall submit as specified, Evaluation of Physical Monitoring Results Near SAV Report within 30 calendar days following the completion of the project.
Work Near SAV Report ; G, DO
Contractor shall submit as specified, Work Near SAV Report within 30 calendar days following the completion of the project.
1.6 SUBCONTRACTORS
Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.
1.7 NOTIFICATION
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with the aforementioned Federal, State, or local laws or regulations, permits and other elements of the Contractor's environmental protection plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken.
No time extensions shall be granted or costs or damages allowed to the Contractor for any such suspension.
Additionally, the Contractor shall notify the Contracting Officer, in writing, of the absence or occurrence of environmental incidents, as required on the Project Environmental Summary Sheet, copy on the first web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below. Refer to paragraph SUBMITTALS above.
1.8 CONTRACTOR PERSONNEL QUALIFICATIONS IN POLLUTION CONTROL
The Contractor's personnel shall be qualified to perform all phases of environmental protection, including methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, and careful installation and monitoring of the project to ensure adequate and continuous environmental pollution control. Quality Control and supervisory personnel shall be thoroughly knowledgeable of Federal, State, and local laws, regulations, and permits as listed in the Environmental Protection Plan submitted by the Contractor. Quality Control personnel will be identified in the Quality Control Plan submitted in accordance with Section 01 45 05 DREDGING/BEACH FILL PLACEMENT -
CONTRACTOR QUALITY CONTROL.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PROTECTION OF ENVIRONMENTAL RESOURCES
For contract work, the Contractor shall comply with all applicable
SECTION 01 57 20 Page 8
Federal, State, or local laws and regulations. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected at least during the entire period of this contract. The Contractor shall confine activities to areas defined by the drawings and specifications.
Environmental protection shall be as stated in the following subparagraphs.
3.1.1 General Project Environmental Design and Installation Criteria
Some project sites have features that shall not be impacted in any way, including cultural, historic, or archeological features. At all sites, the Contractor shall minimize disturbance to existing features at the site to the extent possible, including vegetative, topographic, and drainage pattern features. Wetland, seagrass or hardbottoms impacts (temporary access, detours, staging areas, and other work area impacts) to project sites should be avoided and may require separate permitting action. Any wetlands temporarily impacted shall have its soil restored upon project completion. Expansion of previously permitted project footprints may likewise require separate permitting action.
In all cases, the installation of temporary systems to aid construction shall provide for protection of the environment during handling, installing, storing, utilizing, transporting, servicing, testing, refilling, transferring, pumping, processing, removing waste products, repairing and maintaining systems and their components. Necessary protection shall also be considered that would prevent contamination of the environment from impacts to the systems caused by storm water runoff and flooding. Retrofit of temporary systems on project sites to modern environmental protection design standards shall also be considered.
In the event environmental protection measures fail, the Contractor shall implement procedures to control and correct environmental damage. The Contractor shall coordinate with the Contracting Officer if environmental protection measures fail.
3.1.1.1 Sewage-Based Systems Environmental Design and Installation Criteria
In general, there shall be no waste or debris discharges of any kind for a project unless authorized by the Contracting Officer. This shall include the Contractor's providing sufficient temporary sanitary equipment and facilities for the project. The design and/or installation of temporary or permanent sewage systems shall ensure that waters will be free of effects of sewage discharges. Applicable Federal, State, or local codes and requirements regarding sewage shall be strictly adhered to in the design, such as those of the EPA and, in the case of the State, Chapter 62-620 (Wastewater Facilities) of the FAC. Best Management Practices from the applicable agencies shall also be adhered to in the design.
3.1.2 Protection of Land Resources
Prior to the beginning of any construction, the Contractor shall identify all land resources to be preserved or avoided within the Contractor's work area. Materials displaced into uncleared areas shall be removed. The Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without special permission from the Contracting Officer. The Contractor shall engage a qualified tree surgeon to perform all tree surgery. The Contractor shall be responsible to repair injuries to bark, trunk, branches, and roots of protected trees by dressing, cutting, and painting
SECTION 01 57 20 Page 9 as specified for Class I Fine Pruning, of the National Arborist Association Pruning Standards for Shade Tree or as per State's Agricultural Extension Agency Guidelines, immediately as occurrences arise. No ropes, cables, or guys shall be fastened to or attached to any trees for anchorage unless specifically authorized. Where such special emergency use is permitted, the Contractor shall provide effective protection for land and vegetation resources at all times as defined in the following subparagraphs.
3.1.2.1 Work Area Limits
Prior to any construction, the Contractor shall mark the areas that are not required to accomplish all work to be performed under this contract.
Isolated areas within the general work area which are to be saved and protected shall also be marked or fenced. The Contractor shall protect from damage all existing trees designated to remain. Protection of tree roots shall be provided against noxious materials in solution caused by run-off or spillage. Fires shall be located outside the canopy of protected trees. No materials, trailers, or equipment shall be stored within the drip line of any protected tree. Monuments and markers shall be protected before construction operations commence. Where construction operations are to be conducted during darkness, the markers shall be visible. The Contractor shall convey to his personnel the purpose of marking and/or protection of all necessary objects.
3.1.2.2 Unprotected Erodible Soils
Earthwork brought to final grade shall be finished as indicated in the contract drawings. Side slopes and back slopes shall be protected as soon as practicable upon completion of rough grading. All earthwork shall be planned and conducted to minimize the duration of exposure of unprotected soils. Except in instances where the constructed feature obscures borrow areas, quarries, and waste material areas, these areas shall not initially be totally cleared. Clearing of such areas shall progress in reasonably sized increments as needed to use the areas developed as approved by the Contracting Officer.
3.1.2.3 Contractor Facilities and Other Work Areas
Locate facilities, staging and other work areas as indicated in Section 01 50 02 TEMPORARY CONSTRUCTION FACILITIES, and in compliance with permits listed in the paragraph PERMITS AND AUTHORIZATIONS above and obtained for performance of work. Borrow or dredge material management (DMMA) areas shall be managed to minimize erosion and to prevent sediment from entering nearby watercourses, wetlands, or lakes. Spoil areas shall be managed and controlled to limit spoil intrusion into areas designated on the drawings and to prevent erosion of soil or sediment from entering nearby watercourses, wetlands, or lakes. Spoil areas shall be developed in accordance with the grading plan indicated on the drawings. Temporary excavation and embankments for plant and/or work areas shall be controlled to protect adjacent areas from despoilment. If there is suspicion that sediment may be unsuitable for disposal at a specified location, the Contractor shall immediately take measures to contain the suspect sediment and notify the Contracting Officer.
3.1.2.4 Solid Wastes
Solid wastes (excluding clearing debris) shall be placed in containers which are emptied on a regular schedule. All handling and disposal shall
SECTION 01 57 20 Page 10 be conducted to prevent contamination. Solid waste materials shall be hauled to a solid waste disposal site approved by the Contracting Officer. The Contractor shall comply with Federal, State and local regulations pertaining to the use of the solid waste disposal site.
3.1.2.5 Fuel, Oil, and Lubricants
Fuel, oil, and lubricants shall be managed so as to prevent spills and evaporation. To prevent spills, fuel dispensers shall have a 4-foot square, 16-gauge metal pan with borders banded up and welded at corners right below the bibb. Edges of the pans shall be 8-inch minimum in depth to ascertain that no contamination of the ground takes place. Pans shall be cleaned by an approved method immediately after every dispensing of fuel and wastes disposed of offsite in an approved area. Should any spilling of fuel occur, the Contractor shall immediately recover the contaminated ground and dispose of it offsite in an approved area.
Petroleum waste generated shall be stored in marked corrosion-resistant containers and recycled or disposed of in accordance with 40 CFR 279, State, and local regulations.
3.1.2.6 Hazardous Waste
Hazardous wastes are defined in 40 CFR 261. The Contractor shall ensure that hazardous wastes are stored and disposed of in accordance with 40 CFR 261 and State and local regulations. The Contractor shall ensure that hazardous wastes are packed, labeled, and transported in accordance with 49 CFR 173 and State and local regulations.
3.1.2.7 Hazardous Materials
The Contractor shall ensure that hazardous materials are…