This solicitation is for design-build services for a new annex building for the Food and Drug Administration facility in San Juan, Puerto Rico. The single-award firm fixed-price contract valued between $5-10 million will be competitively awarded to a responsible 8(a) offeror. The 864-day period of performance requires the contractor be responsible for full design and construction of the new building, commissioning, site work, landscaping, and demolition/remodeling of rooms in an existing building. The contractor must sign and seal all design and construction aspects. The Department of the Army Corps of Engineers Engineering District Jacksonville is the issuing agency. Utilities connections and relocations are included in the design and coordination with the FDA. The NAICS code is 236220 with a size standard of $39.5 million. The solicitation number is W912EP20R0006 and responses are due by the date specified.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building No.1

Toro Building Legend Phase 1 Temporary Construction Fence Main Access Gate (M.A.G.)

Construction Access Gate (C.A.G.)

New Building Construction Area New Parking Area Existing Building Footprint

IMAGERY:

Main Frame- San Juan and Rio Puerto Nuevo 2013

Location Map- ESRI OpenStreetMap Document Path:D:\3_GIS_Temp_Local_Save\FDA_SanJuan_Reconstruction_PR_Valdez_20190808\mxd\FDA_SanJuan_PR_11by17_Phase1.mxd

Location Map

Data Notes:

Features Provided by Juan Valdez P.E. (EN-DC)

Mapper: D.Santiago

Map Date: 10/24/2019 Reviewer: B.Price

Document Name: FDA_SanJuan_PR_11by17_Phase1

Department of the Army South Atlantic Division Jacksonville District, Corps of Engineers

1:650

CONSTRUCTION PHASE 1

FDA- Reconstruction of San Juan Campus

Puerto Rico

0 10 20 30 Feet

Fernandez Juncos Avenue

M.A.G.

C.A.G.

Notes:

1. Construction of the new parking (Phase 1) is required to be done at the beginning of the construction. C.A.G.

will be used by the FDA employees to enter to the existing building Andres Toro parking area.

2. Temporary fences are to be in place prior to begin the construction works. Contractor is required to submit a staging layout plan to be approved by the COR prior to begin the construction activities.

3. Construction contractor, personnel, suppliers, equipment, haul trucks are appoint to use the contractor's access gate C.A.G. At no time the contractor be allowed to use the M.A.G. for construction activities. Contractor shall control and maintain the same level of security at the C.A.G. as at the M.A.G. during construction activities. C.A.G gate shall be locked after hours, but contain a "double lock" mechanism to allow FDA access after hours.

4. Construction of the new building (Phase II) shall not begin until the construction of the new parking is complete and turn over to the user.

5. Safety measures shall be provided by the Contractor for the FDA personnel working in the existing building during the construction. Gate at west end is only to be used after proper coordination with FDA or in case of emergencies. Double locks shall be placed to allow FDA access to site.

Building No.1

Toro Building Legend

Phase 2 Temporary Construction Fence Main Access Gate (M.A.G.)

Construction Access Gate (C.A.G.)

New Building Construction Area New Parking Area Pedestrial Walkway Pavement Mark Existing Building Footprint

IMAGERY:

Main Frame- San Juan and Rio Puerto Nuevo 2013

Location Map- ESRI OpenStreetMap Document Path:D:\3_GIS_Temp_Local_Save\FDA_SanJuan_Reconstruction_PR_Valdez_20190808\mxd\FDA_SanJuan_PR_11by17_20190808.mxd

Location Map

Data Notes:

Features Provided by Juan Valdez P.E. (EN-DC)

Mapper: D.Santiago

Map Date: 10/24/2019 Reviewer: B.Price

Document Name: FDA_SanJuan_PR_11by17_20190808

Department of the Army South Atlantic Division Jacksonville District, Corps of Engineers

1:650

CONSTRUCTION PHASE 2

FDA- Reconstruction of San Juan Campus

Puerto Rico

0 10 20 30 Feet

Fernandez Juncos Avenue

M.A.G.

C.A.G.

Notes:

1. Construction of the new parking (Phase 1) is required to be done at the beginning of the construction. C.A.G.

will be used by the FDA employees to enter to the existing building Andres Toro parking area.

2. Temporary fences are to be in place prior to begin the construction works. Contractor is required to submit a staging layout plan to be approved by the COR prior to begin the construction activities.

3. Construction contractor, personnel, suppliers, equipment, haul trucks are appoint to use the contractor's access gate C.A.G. At no time the contractor be allowed to use the M.A.G. for construction activities. Contractor shall control and maintain the same level of security at the C.A.G. as at the M.A.G. during construction activities. C.A.G gate shall be locked after hours, but contain a "double lock" mechanism to allow FDA access after hours.

4. Construction of the new building (Phase II) shall not begin until the construction of the new parking is complete and turn over to the user.

5. Safety measures shall be provided by the Contractor for the FDA personnel working in the existing building during the construction. Gate at west end is only to be used after proper coordination with FDA or in case of emergencies. Double locks shall be placed to allow FDA access to site.

FDA_SanJuan_PR_11by17_20191024_Phase1
FDA_SanJuan_PR_11by17_20191024_Phase2

File details come from the government source that posted it. Updated .