BIMT PH1 1436_Part10.pdf
PDF 15 MB Posted
- Solicitation number
- W912EP20R0004
About this file
This solicitation is for construction dredging services for the Jacksonville Harbor in Duval County, Florida. The U.S. Army Corps of Engineers seeks to deepen and widen the federal navigation channel from Bar Cut-3 to station 28+18.43 of Cut-45 to a project depth of 47 feet plus overdepths and advance maintenance dredging. Work includes dredging Cut-42 from station 33+80 to 136+00 to a depth of 48 feet plus one foot overdepth and placement of dredged materials in the approved ocean dredged material disposal site located approximately 16.7 nautical miles from the dredging location. Materials to be dredged include unconsolidated sediments and rock. The base work includes Cut 42 station 67+00 through 136+00, option A includes non-federal berths, and option B includes Cut 42 station 33+80 to 67+00. The request for proposal will be issued on or about July 13, 2020 with proposals due on or about August 12, 2020. The estimated performance period is 730 calendar days from notice to proceed.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-4-100
SWITCHGEAR BLDG
ELECTICAL SITE PLAN
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d w g
J a n p m
E-4-101
SWITCHGEAR BLDG LIGHTING PLAN
FIRST FLOOR
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-102
SWITCHGEAR BLDG LIGHTING
PLAN SECOND FLOOR
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-103
SWITCHGEAR BLDG POWER AND SYSTEMS
PLAN FIRST FLOOR
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-104
SWITCHGEAR BLDG POWER AND SYSTEMS
PLAN SECOND FLOOR
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-105
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
SWITCHGEAR BLDG LIGHTNING
PROTECTION PLAN
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-500
14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
SWITCHGEAR BLDG LIGHTNING
PROTECTION DETAILS
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-501
14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
SWITCHGEAR BLDG POWER ONE-LINE
DIAGRAM
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
E-4-502
SWITCHGEAR BLDG FIRE ALARM
ONE-LINE DIAGRAM
H A L L 14499 N. Dale Mabry Hwy.
Suite 179
Tampa, FL, USA 33618-2042
Tel: 813.374.2121
FL. C.O.A. #: 27620
H A L L
ENGINEERING GROUP
- HALL ENGINEERING GROUP, INC. RETAINS INTELLECTUAL AND PHYSICAL
RIGHTS TO THIS DOCUMENT AND ITS CONTENT AND PROHIBITS ITS
PUBLISHING, DISCLOSURE OR REPRODUCTION WITHOUT CONSENT.
- THIS DOCUMENT IS VALID FOR 12 MONTHS FROM DATE OF ENGINEER'S
SIGNATURE AND SEAL.
BLOUNT ISLAND MARINE TERMINAL
WHARF RECONSTRUCTION - PHASE 1
C-1436
HDR Engineering, Inc.
200 W Forsyth St
Suite 800
Jacksonville, Florida 32202
Certificate of Authorization No. 4213
KEITH W. HALL, P.E.; FL. REG. #: 55024
Z p r o j e c t s b j p a j a x p o r t b i m t p h a s e
D r a w i n g s e l e c t r i c a l p h a s e w h a r f r e c o n s t r u c t i o n s h e e t s e t E d n
| M-4-50X SERIES |
| M-4-60X SERIES |
| P-4-00X SERIES |
| P-1-10X SERIES |
| P-4-50X SERIES |
| P-4-60X SERIES |
| E-4-10X SERIES |
| E-4-50X SERIES |