This solicitation seeks bids for maintenance and construction dredging services. The U.S. Army Corps of Engineers Engineering District Jacksonville is soliciting bids under solicitation number W912EP20B0014 for maintenance dredging of the Mayport approach channels and turning basin, and the Jacksonville Harbor federal channel. Additional work includes construction dredging of designated high spots in Jacksonville Harbor and transport of excavated materials to the Jacksonville ODMDS Release Zone or Buck Island Cell A. Bids are due by November 3, 2020. Work will be split between a base and two options, covering various areas around Naval Station Mayport and Jacksonville Harbor. Services also include turbidity monitoring, species observers, sea turtle trawling, and marine animal observation. The total magnitude of construction is estimated between $15-25 million. This is an unrestricted acquisition encouraging all responsible offerors to participate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 OFFERS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6

OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: Large C. BUSINESS SIZE: Large C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 4 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN

NO. DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE (ENTRANCE CHANNEL)

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB 3112000 $3,112,000.00 1950000 $1,950,000.00 4750000 $4,750,000.00 $0.00 $0.00 $0.00 $0.00 0002 EXCAVATION, UNCLASSIFIED BAR CUT-3 STA 57+00 TO STA 148+00 AND WIDENER (ESTIMATED QUANTITY, SEE NOTE 1) 751,000 CUBIC YARD 5.40 $4,055,400.00 3.2 $2,403,200.00 4 $3,004,000.00 $0.00 $0.00 $0.00 $0.00 0003 EXCAVATION, UNCLASSIFIED MAYPORT ENTRANCE CHANNEL (ESTIMATED QUANTITY, SEE NOTE 1) 243,000 CUBIC YARD 6.50 $1,579,500.00 10.75 $2,612,250.00 7.5 $1,822,500.00 $0.00 $0.00 $0.00 $0.00 0004 EXCAVATION, UNCLASSIFIED TURNING BASIN (ESTIMATED QUANTITY, SEE NOTE 1) 815,000 CUBIC YARD 7.75 $6,316,250.00 7 $5,705,000.00 10 $8,150,000.00 $0.00 $0.00 $0.00 $0.00 0005 EXCAVATION, UNCLASSIFIED DESTROYER SLIP (ESTIMATED QUANTITY, SEE NOTE 1) 32,000 CUBIC YARD 14.90 $476,800.00 10.15 $324,800.00 12 $384,000.00 $0.00 $0.00 $0.00 $0.00 0006 EXCAVATION, UNCLASSSIFIED SMALL BOAT BASIN (ESIMATED QUANTITY, SEE NOTE 1) 2,100 CUBIC YARD 31.85 $66,885.00 56.5 $118,650.00 30 $63,000.00 $0.00 $0.00 $0.00 $0.00 0007 TURBIDITY MONITORING 1 JOB 230000.00 $230,000.00 54000 $54,000.00 150000 $150,000.00 $0.00 $0.00 $0.00 $0.00 0008 ENDANGERED SPECIES OBSERVER (HOPPER DREDGE ONLY) 1 JOB 64265.00 $64,265.00 9000 $9,000.00 25000 $25,000.00 $0.00 $0.00 $0.00 $0.00 0009 MARINE ANIMAL OBSERVER (MECHANICAL DREDGING ONLY) 1 JOB 88100.00 $88,100.00 125000 $125,000.00 225000 $225,000.00 $0.00 $0.00 $0.00 $0.00 0010 MOBILIZATION AND DEMOBILIZATION FOR SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY, SEE NOTE 5) 1 JOB 8500.00 $8,500.00 9500 $9,500.00 10000 $10,000.00 $0.00 $0.00 $0.00 $0.00 0011 SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY 10600.00 $10,600.00 5500 $5,500.00 5000 $5,000.00 $0.00 $0.00 $0.00 $0.00 0012 STANDBY TIME (SEE NOTE 4) 24 HOUR 7550.00 $181,200.00 3650 $87,600.00 7500 $180,000.00 $0.00 $0.00 $0.00 $0.00 0013 PARTNERING REGROUP 1 EACH 7500.00 $7,500.00 1500 $1,500.00 5000 $5,000.00 $0.00 $0.00 $0.00 $0.00

TOTAL BASE (LINE ITEMS 0001 THROUGH 0013) $16,197,000.00 $13,406,000.00 $18,773,500.00 $0.00 $0.00 $0.00 $0.00

OPTION A, JAX HARBOR MAINTENANCE DREDGING)

0014 EXCAVATION, UNCLASSIFIED BAR CUT-3 STA 187+00 TO END OF CUT-17 (SEE NOTE 1) 454,000 CUBIC YARD 10.55 $4,789,700.00 16.65 $7,559,100.00 10 $4,540,000.00 $0.00 $0.00 $0.00 $0.00 0015 TURBIDITY MONITORING 1 JOB 66000.00 $66,000.00 28000 $28,000.00 25000 $25,000.00 $0.00 $0.00 $0.00 $0.00 0016 ENDANGERED SPECIES OBSERVER (HOPPER DREDGE ONLY) 1 JOB 49100.00 $49,100.00 17000 $17,000.00 25000 $25,000.00 $0.00 $0.00 $0.00 $0.00 0017 MARINE ANIMAL OBSERVER (MECHANICAL DREDGING ONLY) 1 JOB 0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 0018 SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY 11000.00 $11,000.00 5500 $5,500.00 5000 $5,000.00 $0.00 $0.00 $0.00 $0.00 0019 BIRD MONITOR (BUCKS ISLAND ONLY) 1 JOB 23200.00 $23,200.00 67000 $67,000.00 20000 $20,000.00 $0.00 $0.00 $0.00 $0.00 0020 STANDBY TIME (SEE NOTE 4) 24 HOUR 4500.00 $108,000.00 5200 $124,800.00 7500 $180,000.00 $0.00 $0.00 $0.00 $0.00

TOTAL OPTION A (LINE ITEMS 0014 THROUGH 0020) $5,047,000.00 $7,801,400.00 $4,795,000.00 $0.00 $0.00 $0.00 $0.00 TOTAL BASE AND OPTION A (LINE ITEMS 0001 THROUGH 0020) $21,244,000.00 $21,207,400.00 $23,568,500.00 $0.00 $0.00 $0.00 $0.00

0021 EXCAVATION, UNCLASSIFIED HIGH SPOTS (SEE NOTE 1) 69,000 CUBIC YARD 9.80 $676,200.00 15.8 $1,090,200.00 20 $1,380,000.00 $0.00 $0.00 $0.00 $0.00 0022 TURBIDITY MONITORING 1 JOB 11600.00 $11,600.00 3000 $3,000.00 10000 $10,000.00 $0.00 $0.00 $0.00 $0.00 0023 ENDANGERED SPECIES OBSERVER (HOPPER DREDGE ONLY) 1 JOB 8200.00 $8,200.00 4000 $4,000.00 10000 $10,000.00 $0.00 $0.00 $0.00 $0.00 0024 MARINE ANIMAL OBSERVER (MECHANICAL DREDGING ONLY) 1 JOB 0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 0025 SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY 11000.00 $11,000.00 5500 $5,500.00 5000 $5,000.00 $0.00 $0.00 $0.00 $0.00 0026 STANDBY TIME (SEE NOTE 4) 24 HOUR 4500.00 $108,000.00 3650 $87,600.00 7500 $180,000.00 $0.00 $0.00 $0.00 $0.00

TOTAL OPTION B (LINE ITEMS 0021 THROUGH 0026 $815,000.00 $1,190,300.00 $1,585,000.00 $0.00 $0.00 $0.00 $0.00 TOTAL BID (LINE ITEMS 0001 THROUGH 0026) $22,059,000.00 $22,397,700.00 $25,153,500.00 $0.00 $0.00 $0.00 $0.00

Yes 4 Yes 4

IGE OFFERS (Continued)

PROJECT TITLE

MAINTENANCE DREDGING, U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT, JACKSONVILLE, 47-FOOT

PROJECT, AND CONSTRUCTION DREDGING, JACKSONVILLE HARBOR HIGH SPOT REMOVAL

Original Government Estimate

Great Lakes Dredge & Dock Weeks Marine

20% 20%

ABSTRACT OF OFFERS - CONSTRUCTION SOLICITATION NUMBER: W912EP20B0014

DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

NAME AND TITLE OF CERTIFYING OFFICIAL:

ISSUING OFFICE

October 2, 2020 November 6, 2020 Frederick L. Cooper, Contracts Specialist

Signature Date Signed: 06 November 2020