This federal contract opportunity solicits bids for maintenance and construction dredging services in Jacksonville Harbor and at the U.S. Naval Station Mayport in Florida. The solicitation number is W912EP20B0014 and bids are due by November 3, 2020. The work includes maintenance dredging of channels and basins at Mayport and in Jacksonville Harbor, as well as construction dredging to remove high spots in Jacksonville Harbor. Excavated materials will be transported to designated ocean dredged material disposal sites. The contract has a base element and two options, with a combined estimated value between $15-25 million. Offerors must register as interested vendors on beta.SAM.gov to receive any amendments, and must be registered in SAM to be eligible for award. The Department of the Army Corps of Engineers Engineering District Jacksonville is the issuing agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Maintenance Dredging, U.S. Naval Station Mayport, 50-Foot Project, Jacksonville Harbor, 47-Foot Project, and Construction Dredging, Jacksonville Harbor High Spot Removal Duval County, Florida

A. See Continuation Sheet for Amendment Details B. Bid Opening Date of 03 November 2020, remains unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 75

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP20B0014

X 9B. DATED (SEE ITEM 11)

02-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Oct-2020

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

Maintenance Dredging, U.S. Naval Station Mayport, 50-Foot Project, Jacksonville Harbor, 47-Foot Project, and Construction Dredging, Jacksonville Harbor High Spot Removal, Duval County, Florida

W912EP20B0014 2 Amendment 0002

SUMMARY OF CHANGES

1. SPECIFICATIONS:

Volume 1 text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. Volume 2 text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.

DELETE Section 00010A and REPLACE with the attached revised Section 00010A.

DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.

DELETE Section 01 57 20 and REPLACE with the attached revised Section 01 57 20.

DELETE Section 01 57 25 and REPLACE with the attached revised Section 01 57 25.

2. DRAWINGS:

DELETE Sheet ID G-04 and REPLACE with the attached revised Sheet ID G-04.

DELETE Sheet ID G-05 and REPLACE with the attached revised Sheet ID G-05.

DELETE Sheet ID AG-01 and REPLACE with the attached revised Sheet ID AG-01.

DELETE Sheet ID AG-02 and REPLACE with the attached revised Sheet ID AG-02.

DELETE Sheet ID AC-01 and REPLACE with the attached revised Sheet ID AC-01.

DELETE Sheet ID AC-02 and REPLACE with the attached revised Sheet ID AC-02.

DELETE Sheet ID AC-03 and REPLACE with the attached revised Sheet ID AC-03.

DELETE Sheet ID AC-04 and REPLACE with the attached revised Sheet ID AC-04.

DELETE Sheet ID AC-05 and REPLACE with the attached revised Sheet ID AC-05.

DELETE Sheet ID AC-06 and REPLACE with the attached revised Sheet ID AC-06.

DELETE Sheet ID AC-07 and REPLACE with the attached revised Sheet ID AC-07.

DELETE Sheet ID AC-08 and REPLACE with the attached revised Sheet ID AC-08.

DELETE Sheet ID AC-09 and REPLACE with the attached revised Sheet ID AC-09.

DELETE Sheet ID AC-10 and REPLACE with the attached revised Sheet ID AC-10.

DELETE Sheet ID AC-11 and REPLACE with the attached revised Sheet ID AC-11.

DELETE Sheet ID AC-12 and REPLACE with the attached revised Sheet ID AC-12.

DELETE Sheet ID AC-13 and REPLACE with the attached revised Sheet ID AC-13.

DELETE Sheet ID AC-14 and REPLACE with the attached revised Sheet ID AC-14.

DELETE Sheet ID BG-02 and REPLACE with the attached revised Sheet ID BG-02.

DELETE Sheet ID CG-01 and REPLACE with the attached revised Sheet ID CG-01.

DELETE Sheet ID CC-01 and REPLACE with the attached revised Sheet ID CC-01.

(End of Summary of Changes)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

MAINTENANCE DREDGING, U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT, JACKSONVILLE HARBOR, 47-FOOT PROJECT, AND CONSTRUCTION DREDGING, JACKSONVILLE HARBOR HIGH SPOT REMOVAL

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE, MAYPORT MAINTENANCE DREDGING

0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________

0002 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA 56+00 TO STA 148+00 AND

WIDENER (ESTIMATED QUANTITY, SEE NOTE 1) 601,500 CUBIC YARD $___________ $_______________

0003 EXCAVATION, UNCLASSIFIED

MAYPORT ENTRANCE CHANNEL (ESTIMATED

QUANTITY, SEE NOTE 1) 237,500 CUBIC YARD $___________ $_______________

0004 EXCAVATION, UNCLASSIFIED

TURNING BASIN (ESTIMATED QUANTITY,

SEE NOTE 1) 686,500 CUBIC YARD $___________ $_______________

0005 EXCAVATION, UNCLASSIFIED

DESTROYER SLIP (ESTIMATED QUANTITY,

SEE NOTE 1) 39,000 CUBIC YARD $___________ $_______________

0006 EXCAVATION, UNCLASSIFIED

SMALL BOAT BASIN (ESTIMATED QUANTITY,

SEE NOTE 1) 2,500 CUBIC YARD $___________ $_______________

0007 TURBIDITY MONITORING JOB $_______________

0008 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $_______________

0009 MARINE ANIMAL OBSERVER

(MECHANICAL DREDGING ONLY) JOB $_______________

0010 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) JOB $_______________

0011 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $___________ $_______________

0012 STANDBY TIME (SEE NOTE 4) 24 HOUR $___________ $_______________

0013 PARTNERING REGROUP 1 EACH $___________ $_______________

TOTAL BASE (LINE ITEMS 0001 THROUGH 0013) $_______________

OPTION A, JAX HARBOR MAINTENANCE DREDGING

0014 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA 187+00 TO END OF CUT-17

(SEE NOTE 1) 454,000 CUBIC YARD $___________ $_______________

0015 TURBIDITY MONITORING JOB $_______________

0016 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $_______________

0017 MARINE ANIMAL OBSERVER

(MECHANICAL DREDGING ONLY) JOB $_______________

0018 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $___________ $_______________

W912EP20B0014 00010A-1 Amendment 0002

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

MAINTENANCE DREDGING, U.S. NAVAL STATION MAYPORT, 50-FOOT PROJECT, JACKSONVILLE HARBOR, 47-FOOT PROJECT, AND CONSTRUCTION DREDGING, JACKSONVILLE HARBOR HIGH SPOT REMOVAL

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0019 BIRD MONITOR (BUCK ISLAND ONLY) JOB $_______________

0020 STANDBY TIME (SEE NOTE 4) 24 HOUR $___________ $_______________

TOTAL OPTION A (LINE ITEMS 0014 THROUGH 0020) $_______________

TOTAL BASE AND OPTION A (LINE ITEMS 0001 THROUGH 0020) $_______________

OPTION B, JAX HARBOR CONSTRUCTION DREDGING, HIGH SPOT REMOVAL

0021 EXCAVATION, UNCLASSIFIED

HIGH SPOTS (SEE NOTE 1) 69,000 CUBIC YARD $___________ $_______________

0022 TURBIDITY MONITORING JOB $_______________

0023 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $_______________

0024 MARINE ANIMAL OBSERVER

(MECHANICAL DREDGING ONLY) JOB $_______________

0025 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $___________ $_______________

0026 STANDBY TIME (SEE NOTE 4) 24 HOUR $___________ $_______________

TOTAL OPTION B (LINE ITEMS 0021 THROUGH 0026) $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0026) $_______________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS

SHOWN ON THE DRAWINGS AND ACTUAL DREDGING.

(2) OFFER MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS".

(3) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A MARINE ANIMAL

OBSERVER IS REQUIRED FOR MECHANICAL DREDGING ONLY, INCLUDING CLAMSHELL DREDGING.

(4) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED SPECIES CONCERNS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. REQUIREMENTS FOR WORK STOPPAGES, DELAYS OR OTHER IMPACTS ASSOCIATED WITH COMPLIANCE WITH SECTION 01 57 20 ENVIRONMENTAL PROTECTION ARE NOT PAID FOR UNDER THIS LINE ITEM. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING

OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT.

(5) SEA TURTLE TRAWL SWEEPING IS REQUIRED FOR HOPPER DREDGE ONLY WHEN DIRECTED BY THE

CONTRACTING OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION, SUBPARAGRAPH

"SUSPENSION OF DREDGING (HOPPER DREDGE ONLY)".

W912EP20B0014 00010A-2 Amendment 0002

M/D, USNS Mayport, 50-Ft Project, Jax Harbor, 47-Ft Project, and C/D, Jax Harbor High Spot Removal

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 DEFINITIONS

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

1.4.2 Location

1.4.3 Contractor Access and Use of Premises for Mayport Project

1.4.3.1 Subcontractors and Personnel Contacts

1.4.3.2 Installation Access

1.4.3.2.1 Registration for DBIDS

1.4.3.2.2 DBIDS Eligibility Requirements

1.4.3.2.3 DBIDS Notification Requirements

1.4.3.2.4 Pier Area Access Passes

1.4.3.2.5 Port Security Barrier (PSB) Access

1.4.3.3 No Smoking Policy

1.4.4 Safety Requirements

1.4.5 Work Performed by Others

1.5 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

1.6 LIQUIDATED DAMAGES - CONSTRUCTION

1.7 PHYSICAL DATA

1.7.1 Physical Conditions

1.7.2 Weather, Water Stage and Tide Data

1.7.3 Contractor Investigation

1.7.4 Maritime Traffic

1.7.5 Obstruction of Channel

1.7.6 Hydrographic Surveys

1.8 LAYOUT OF WORK

1.8.1 Established Project Control

1.8.2 Layout

1.8.3 Survey

1.9 DAMAGE TO WORK

1.10 EXISTING WORK

1.11 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)

1.11.1 Contractor Responsibility

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1 W912EP20B0014 Amendment 0002

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

GDR Mayport SECTION 00 31 32.10, Geotechnical Data Report for U.S. Naval Station Mayport, Maintenance Dredging, 50-Foot Project, Duval County, Florida

GDR Jacksonville Harbor SECTION 00 31 32.20, Geotechnical Data Report for Maintenance Dredging, Jacksonville Harbor, 47-Foot Project, and Construction Dredging, Jacksonville Harbor, High Spot Removal, Duval County, Florida

EM 385-1-1 Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List Of Contact Personnel ; G, RO

1.3 DEFINITIONS

a. "Adverse weather" occurs when atmospheric conditions at a definite time and place that are unfavorable to construction activities and is based on climatological and meteorological observations and data sources provided in Section 00 33 50 WEATHER, WATER STAGE AND TIDE

DATA.

b. "Unusually severe weather" is weather that is more severe than the adverse weather anticipated by the Contractor for the season or location involved. Adverse weather delays are considered unusually severe weather if adverse weather delay days prevent work for 50 percent or more of the Contractor's scheduled work day.

SECTION 01 11 00 Page 2

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

Project work consists of maintenance dredging in the Mayport approach channels and turning basin, and the Jacksonville Harbor federal channel.

Work also includes construction dredging in the Jacksonville Harbor designated high spots as shown on the drawings. The contract is split between a base and two options. The contract Base element consists of portions of Bar Cut-3, the Mayport Entrance Channel, Turning Basin, Destroyer Basin, and Small Boat Basin. Option A consists of portions of Jacksonville Harbor Bar Cut-3 to Cut-17. Option B consists of removing designated high spots in the Atlantic Ocean East-Southeast of Bar Cut-3.

For Option A, excavated material will be transported to and placed in Buck Island Cell A. For the Base and Option B, excavated material will be transported to and placed in the Jacksonville ODMDS Release Zone shown on the drawings. Work also includes turbidity monitoring, endangered species observers (hopper dredges only), sea turtle trawl-sweeping (hopper dredges only), and marine animal observer (clamshell dredges only).

1.4.2 Location

U. S. Naval Station Mayport is located at the mouth of the St. Johns River in Duval County, Florida where it enters the Atlantic Ocean and is accessible from both bodies of water. Land access is available from Florida SR A1A. The work is also located in Jacksonville Harbor project located in Duval County, Florida on the northeast coast of Florida in the St. Johns River.

1.4.3 Contractor Access and Use of Premises for Mayport Project

Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials to the Base shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer.

Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

A partial list of key NS Mayport regulations is provided:

Appendix A, SOPA(ADMIN)MYPTINST 3440.3B, Destructive Weather Annex.

1.4.3.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.3.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at

SECTION 01 11 00 Page 3 https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation. If the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections.

1.4.3.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the Base Visitor Control Center representative.

b. Present two forms of valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the Base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, Base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.4.3.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.4.3.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

1. An employee has departed the company without having properly

SECTION 01 11 00 Page 4 returned or surrendered their DBIDS credentials.

2. There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.3.2.4 Pier Area Access Passes

Access to the wharf will require all Contractor personnel to obtain pier area passes. Contractor must prepare personnel lists with supporting documentation and coordinate with the Contracting Officer for these passes. Typically passes will need to be renewed on approximately a weekly basis.

1.4.3.2.5 Port Security Barrier (PSB) Access

All maritime access to the turning basin and berthing areas will require access through the Port Security Barrier. Access through the PSB shall be directly coordinated with Naval Station Mayport Port Operations.

Contractor will provide Naval Station Mayport Port Operations a minimum of one hour notice in advance of a required PSB opening. Emergency/urgent situations necessitating an opening in less than one hour will be authorized on a case by case basis. Contractor shall schedule the work and conduct operations in a manner that minimize opens during hours of darkness, keeps opening time to a minimum, and only necessary to meet mission requirements.

1.4.3.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.4 Safety Requirements

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .

1.4.5 Work Performed by Others

See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE

PROCEDURES.

1.5 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6 LIQUIDATED DAMAGES - CONSTRUCTION

Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.7 PHYSICAL DATA

Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR

SECTION 01 11 00 Page 5

52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.7.1 Physical Conditions

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT for each area ( GDR Mayport and GDR Jacksonville Harbor ) and the core boring locations are shown on the drawings. Also, see GDR Mayport and GDR Jacksonville Harbor for instructions concerning availability of core borings for inspection.

1.7.2 Weather, Water Stage and Tide Data

See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA for applicable data links and information to where the Contractor can ascertain the weather conditions that could be encountered at the project location. The information provided does not preclude the Contractor from assessing and scheduling for adverse weather.

1.7.3 Contractor Investigation

Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.7.4 Maritime Traffic

Marine traffic in the project area consists of Naval, cruise ships, commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.

1.7.5 Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.

1.7.6 Hydrographic Surveys

Hydrographic surveys are provided on the ehydro web site:

https://www.arcgis.com/apps/opsdashboard/index.html#/4b8f2ba307684cf597617bf1b6d2f85d Survey numbers are indicated on the drawings.

1.8 LAYOUT OF WORK

Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.

SECTION 01 11 00 Page 6

1.8.1 Established Project Control

The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.

For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.

See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.

1.8.2 Layout

From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.

1.8.3 Survey

The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all monuments, stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks or monuments are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor. The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.

1.9 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered

SECTION 01 11 00 Page 7 by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.10 EXISTING WORK

In addition to FAR 52.236-9, "Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer.

At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.11 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

1.11.1 Contractor Responsibility

The project area may be affected by stormy, windy and/or rainy weather, including thunderstorms, during any time of the year. The Contractor shall be responsible for obtaining information concerning rain, wind and wave conditions that could influence safety, hauling and placement operations prior to submitting a proposal or bid.

a. Contractor shall research the project site conditions and incorporate potential adverse weather delays into their schedule prior to submitting a proposal or bid. The Contractor shall develop a schedule of monthly anticipated adverse weather based on the equipment to be used to complete the project and determine the conditions that would cause them to cease operations using the sources provided in

SECTION 01 11 00 Page 8

Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

b. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report the occurrence of adverse weather and unusually severe weather with the purpose to note impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's schedule to be considered "unusually severe weather".

c. The number of actual adverse weather delay days shall include days impacted by actual adverse weather, be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated for adverse weather by the Contractor, the Contracting Officer may convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days that should have been anticipated for the conditions at the project location.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

SECTION 01 11 00 Page 9

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 20

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 SCOPE

1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS

1.2.1 Miscellaneous Environmental Laws And Regulations

1.2.2 NEPA Reference

1.3 REFERENCES

1.4 QUALITY CONTROL

1.5 PERMITS AND AUTHORIZATIONS

1.6 SUBMITTALS

1.7 ENVIRONMENTAL PROTECTION PLAN

1.8 QUALIFICATIONS

1.8.1 Bird Monitoring Qualifications

1.8.2 Marine Animal Observer Qualifications (Clamshell/Mechanical

Only)

1.8.3 Endangered Species Observer and Trawl Supervisor

Qualifications (For Hopper Dredges Only)

1.8.4 Sturgeon Protected Species Observer (PSO)

1.9 SUBCONTRACTORS

1.10 NOTIFICATION

1.11 CONTRACTOR PERSONNEL QUALIFICATIONS IN POLLUTION CONTROL

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 PROTECTION OF ENVIRONMENTAL RESOURCES

3.1.1 General Project Environmental Design and Installation Criteria

3.1.1.1 Sewage-Based Systems Environmental Design and Installation

Criteria

3.1.2 Protection of Land Resources

3.1.2.1 Work Area Limits

3.1.2.2 Contractor Facilities and Other Work Areas

3.1.2.3 Solid Wastes

3.1.2.4 Fuel, Oil, and Lubricants

3.1.2.5 Hazardous Waste

3.1.2.6 Hazardous Materials

3.1.2.7 Disposal of Other Materials

3.1.3 Preservation and Recovery of Historic, Archeological, and

Cultural Resources

3.1.3.1 Applicable Law

3.1.3.2 Known Resources

3.1.3.3 Inadvertent Discoveries

3.1.3.4 Claims for Downtime due to Inadvertent Discoveries

3.1.4 Protection of Water Resources

3.1.4.1 Monitoring of Water Areas

3.1.4.2 Turbidity

SECTION 01 57 20 Page 1

3.1.4.3 Oil, Fuel, and Hazardous Substance Spill Prevention and Mitigation

3.1.5 Protection of Fish and Wildlife Resources

3.1.5.1 Listed Species Protection

3.1.5.2 Endangered Species Observers (Hopper Dredge Only)

3.1.5.3 Manatee, Sea Turtle, and Whale Sighting Reports

3.1.5.4 Disposition of Endangered or Threatened Species Carcasses

3.1.5.5 Protected Species Summary Report

3.1.5.6 Hopper Dredge Equipment

3.1.5.7 Sea Turtle Trawling and Relocation (For Hopper Dredges

Only)

3.1.5.8 Sturgeon Monitoring (Cutterhead Only)

3.1.5.9 Protection of Migratory Bird Species

3.1.5.10 Protection of Gopher Tortoise (GT) Populations (Gopherus polyphemus)

3.1.6 Protection of Air Resources

3.1.6.1 Particulates

3.1.6.2 Odors

3.1.7 Protection of Sound Intrusions

3.2 POSTCONSTRUCTION CLEANUP

3.3 PRESERVATION AND RESTORATION OF LANDSCAPE AND MARINE VEGETATION

DAMAGES

3.4 INVASIVE AND NUISANCE SPECIES

3.4.1 Prevention of Invasive and Nuisance Species Transfer

3.4.2 Invasive and Nuisance Species Reporting

3.4.2.1 Invasive And Nuisance Species Report

3.5 MAINTENANCE OF POLLUTION CONTROL FACILITIES

3.6 CONSTRUCTION FORMS AND DETAILS

-- End of Section Table of Contents --

SECTION 01 57 20 Page 2

SECTION 01 57 20

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 SCOPE

This Section covers prevention of environmental damage as the result of construction operations under this contract and for those measures set forth in other Technical Requirements of these specifications. For the purpose of this specification, environmental damage is defined as the presence of hazardous, physical, chemical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; affect other species, biological communities, or ecosystems; or degrade the quality of the environment for aesthetic, cultural, and/or historical purposes. The control of environmental damage requires consideration of land, water, and air, and includes management of visual aesthetics, noise, solid waste, radiant energy and radioactive materials, as well as other pollutants.

1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS

1.2.1 Miscellaneous Environmental Laws And Regulations

There are numerous environmental laws and regulations. At the Federal level, the applicable laws and regulations include compliance with the Clean Water Act (CWA); Clean Air Act (CAA); Coastal Zone Management Act (CZMA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Endangered Species Act (ESA); Fish and Wildlife Coordination Act (FWCA); Marine Protection, Research, and Sanctuaries Act (MPRSA);

Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA);

National Environmental Policy Act (NEPA); National Historic Preservation Act (NHPA); National Pollution Discharge Elimination System (NPDES);

Research and Sanctuaries Act; Native American Graves Protection and Repatriation Act (NAGPRA); Resource Conservation and Recovery Act (RCRA);

Rivers and Harbors Act (R&H); Safe Drinking Water Act (SDWA); Toxic Substance Control Act (TSCA); Wild and Scenic Rivers Act (WSRA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Marine Mammal Protection Act (MMPA); Migratory Bird Treaty Act; Code of Federal Regulations (CFRs); Executive Orders; and, Environmental Protection Agency (EPA) requirements.

1.2.2 NEPA Reference

Commitments for the Contractor made in the NEPA document have been incorporated into these specifications. For additional background information, the NEPA document can be found at the following website:

http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Documents/

1.3 REFERENCES

Any publication listed below forms a part of this specification to the extent referenced. Publications are referred to in the text by basic

SECTION 01 57 20 Page 3 designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-1-1003 (2011) NAVSTAR Global Positioning System Surveying

1.4 QUALITY CONTROL

Establish and maintain quality control for environmental protection of all items set forth herein. Record on daily quality control reports or attachments thereto, any problems in complying with laws, regulations and ordinances, and corrective action taken.

1.5 PERMITS AND AUTHORIZATIONS

Comply with all requirements under the terms and conditions set out in the following permit(s) and authorization(s) obtained by the Corps of Engineers listed below.

Jacksonville Harbor Construction Dredging, High Spot Removal (Option B):

a. Department of the Army Rivers and Harbors Act (RHA) Section 10 and Marine Protection, Research, and Sanctuaries Act (MPRSA) Section 103 Permit (PENDING).

b. Jacksonville Ocean Dredged Material Disposal Site, Site Management and Monitoring Plan (SMMP), issued 16 September 2015 and expires on 15 December 2025.

c. National Marine Fisheries Service NMFS South Atlantic Regional Biological Opinion (SARBO);

https://www.fisheries.noaa.gov/content/endangered-species-act-section-7-biological-opinions-southeast

Jacksonville Harbor Maintenance Dredging (Option A):

a. Florida Department of Environmental Protection JCP Permit No.

0303186-001-JC; issued Date: May 23, 2012; Expiration Date: May 23, 2022; Modification No. 0303186-005-JN September 16, 2020.

b. U.S. Environmental Protection Agency, Region 4, 103 concurrence for disposal of dredged material from Jacksonville Harbor Maintenance Dredging Project into the Jacksonville Ocean Dredged Material Disposal Site (ODMDS), issued 11 December 2018, and valid until 11 December 2021.

c. Jacksonville Ocean Dredged Material Disposal Site, Site Management and Monitoring Plan (SMMP), issued 16 September 2015 and expires on 15 December 2025.

d. Florida Department of Environmental Protection Operation Permit for Buck Island, No. 16-297486-002-ES, Effective date April 15, 2012.

Mayport Maintenance Dredging (Base):

a. Florida Department of Environmental Protection Permit No.

0298451-006BE Exemption; effective 12/27/2016.

SECTION 01 57 20 Page 4

b. DA RHA Section 10 Permit SAJ-2002-02052-(SP-BAL); effective 7/17/2014; expires 7/17/2024.

c. EPA MPRSA Section 103 Concurrence; effective 7/25/2019 and expires 7/25/2022.

d. Jacksonville Ocean Dredged Material Disposal Site, Site Management and Monitoring Plan (SMMP), issued 16 September 2015 and expires on 15 December 2025.

e. NMFS South Atlantic Regional Biological Opinion (SARBO).

The above permits indicate issuing agency approval of work required by this contract. Permits are available at the following web address:

https://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Compliance/

The South Atlantic Regional Biological Opinion (SARBO) for Dredging and Material Placement Activities in the Southeast United States (2020 SARBO) is located at (https://www.fisheries.noaa.gov/content/endangered-species-act-section- 7-biological-opinions-southeast)

Obtain and comply with the requirements of all other permits or licenses required for construction of this project in accordance with the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

Submit the following preconstruction submittal items no later than 5 calendar days after Notice to Proceed:

SD-01 Preconstruction Submittals

Environmental Protection Plan ; G, DO

SD-02 Shop Drawings

Turtle Deflector Device ; G, DO

Weekly Logs/Summary Of FWC Hopper Dredge Reports ; G, DO

SD-07 Certificates

Bird Monitoring Qualifications ; G, DO

Marine Animal Observer Qualifications (Clamshell/Mechanical Only);

G, DO

Endangered Species Observer and Trawl Supervisor Qualifications (For Hopper Dredges Only) ; G, DO

Sturgeon Protected Species Observer (PSO) ; G, DO

SECTION 01 57 20 Page 5

SD-11 Closeout Submittals

Protected Species Summary Report ; G, DO

Logs/Summary Of Bird Nesting Monitoring Report ; G, DO

Comprehensive Trawl Sweeping Daily Logs ; G, DO

Endangered Species Observer Program Final Report ; G, DO

Invasive And Nuisance Species Report

1.7 ENVIRONMENTAL PROTECTION PLAN

Submit a draft Environmental Protection Plan no later than 5 calendar days after Notice to Proceed for review and acceptance by the Contracting Officer. The Government will consider an interim plan for the first 30 days of operations. However, furnish an acceptable final plan no later than 30 calendar days after receipt of Notice to Proceed. Acceptance of the plan will not relieve the Contractor of their responsibility for adequate and continuing control of pollutants and other environmental protection measures. Acceptance of the plan is conditional and predicated on satisfactory performance during construction. The Government reserves the right to require the Contractor to make changes to the Environmental Protection Plan or operations if the Contracting Officer determines that environmental protection requirements are not being met. No physical work at the site shall begin prior to acceptance of the plan or an interim plan covering the work to be performed. The Environmental Protection Plan shall include but not be limited to the following:

a. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the proposed operations and the requirements imposed by those laws, regulations, and permits.

b. Methods for protection of features to be preserved within authorized work areas. Prepare a listing of methods to protect resources needing protection, i.e., trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archeological, and cultural resources.

c. Procedures to be implemented to provide the required environmental protection and to comply with the applicable laws and regulations.

Provide written assurance that immediate corrective action will be taken to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures set out in accordance with the environmental protection plan.

d. A permit or license for and the location of the solid waste disposal area.

e. Drawings showing locations of any proposed temporary excavations or embankments for haul roads, stream crossing, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials.

f. Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.

SECTION 01 57 20 Page 6

g. Traffic control plan.

h. Methods of protecting surface and ground water during construction activities.

i. Spill prevention. Specify all potentially hazardous substances to be used on the job site and intended actions to prevent accidental or intentional introduction of such materials into the air, ground, water, wetlands, or drainage areas. Specify the provisions to be taken to meet Federal, State, and local laws and regulations regarding labeling, storage, removal, transport, and disposal of potentially hazardous substances.

j. Spill contingency plan for hazardous, toxic, or petroleum material.

k. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Include measures for marking the limits of use areas.

l. Include a statement as to the person who will be responsible for implementation of the Environmental Protection Plan. The Contractor personnel responsible shall report directly to the Contractor's top management and shall have the authority to act for the Contractor in all environmental protection matters.

m. Recycling and Waste Management Plan. Executive Order 12873 of 20 October 1993 requires a number of considerations in planning a project. Fallen trees should not be burned or buried. Mulching, composting, and other uses for trees should be considered. Also, recovery of metals at the job site, including aluminum cans, should be considered with proceeds to be retained by the Contractor.

Non-Federal recycling and waste minimization efforts shall also be incorporated into this plan.

n. Turbidity Monitoring Plan. A statement as to the person who shall be responsible for turbidity monitoring and reporting to be performed.

Method of turbidity monitoring and reporting that will be performed.

The turbidity monitoring requirements of any special areas such as outstanding Florida waters.

o. Operational plan to achieve protection of sea turtles during hopper dredge(s) operation.

p. Construction activities shall be conducted in a manner as not to impact migratory birds or induce their nesting.

q. Steps to be taken to construct the project in such a manner as not to impact gopher tortoises.

r. Before the start of dredging, the Contractor shall provide one whale observer email address to receive aerial survey-related notification (status, fly/no-fly plans, etc.) that will be immediately sent to all active vessels working in water for the project. The email address will be provided to nmfs.ser.rw.subscribe@noaa.gov and Angie Dunn, Chief, Environmental Branch angela.e.dunn@usace.army.mil.

s. All captains of dredges, relocation trawlers, survey vessels, and support vessels over 33-ft in length will provide a text message address to receive real-time whale alerts throughout the calving

SECTION 01 57 20 Page 7 season to nmfs.ser.rw.subscribe@noaa.gov . The text message address will be provided at least 14 days prior to the start of dredging or annually on November 1 if the vessel is utilized year round.

t. Endangered Species Watch Plan detailing how the requirements to minimize the risk of a North Atlantic right whale/dredge vessel interaction will be accomplished.

u. Invasive and Nuisance Species Transfer Prevention Plan.

1.8 QUALIFICATIONS

The individual(s) shall have a combination of education and experience that demonstrates they have the knowledge and background to identify the species of concern and be able to fulfill the requirements of the environmental specification. Resume/qualification submittals must specifically address the knowledge/experience with the species of concern. Any specific requirements for an environmental observer/monitor called out in environmental coordination or authorization documents (such as agency coordination letters, biological opinions, or permits) regarding the project area must be also addressed in the submittals.

1.8.1 Bird Monitoring Qualifications

No later than 30 calendar days after Award, the Contractor shall furnish to the Contracting Officer for approval, the qualifications of the bird monitor(s). Appropriate qualifications for bird monitor(s) shall be a demonstrated ability to find and/or identify bird species, nesting behavior, eggs and nests, and habitat requirements. Bird monitor(s) shall be familiar with the general information, data collection protocol, and data entry procedures outlined on the FF&WCC Florida Shorebird Database website (https://publictemp.myfwc.com/crossdoi/shorebirds/index.aspx). The Contractor shall consult with and coordinate all monitoring plans and activities with the Contracting Officer and the Project Biologist indicated in the ECM (See paragraph PERMITS AND AUTHORIZATIONS above). The Bird Monitors shall meet the following minimum qualifications:

a. Has previously participated in beach-nesting bird surveys of Florida beach nesting birds and relevant work experience (provide references or resume). Experience with previous projects must document the ability to do the following:

(1) identify all species of beach-nesting birds by sight and sound,

(2) identify breeding/territorial behaviors, and find nests of shorebirds that occur in the project area,

(3) identify habitats preferred by shorebirds nesting in the project area.

b. Have a clear working knowledge of, and adhere to, the Breeding Bird Protocol for Florida’s Seabirds and Shorebirds:

(https://publictemp.myfwc.com/crossdoi/shorebirds/resources.aspx)

c. Have completed full-length webinars: Route Surveyor Training and Rooftop Monitoring Training, including annual refresher training.

Training resources can be found on the Florida Shorebird Database (FSD): https://publictemp.myfwc.com/crossdoi/shorebirds/index.aspx

SECTION 01 57 20 Page 8

d. Familiar with FF&WCC beach driving guidelines:

www.myfwc.com/conservation/you-conserve/wildlife/beach-driving.

e. Experience posting beach-nesting bird sites, consistent with…