About this file

W912EP19B0011 - Bid Abstract

View the file

Other files

File Type Posted
W912EP19B0011_0003.pdf PDF
Jax_O&M_GDR_2019_10April2019_Updated.pdf PDF
W9012EP19B00110002.pdf PDF
AM0002_REV_Drawings_JAX_Harbor_MDFY19.pdf PDF
Jax_O&M_GDR_2019_5April2019updated.pdf PDF
W912EP19B00110001.pdf PDF
A.07.14__Site_Visit_Roster.pdf PDF
19-001_JAX_HBR_ANNUAL_XYZ_Data_2.zip ZIP file
19-001_JAX_HBR_ANNUAL_XYZ_Data_1.zip ZIP file
19B0011Volume2Specs.pdf PDF
19B0011Volume1Specs.pdf PDF
19-001_JAX_HBR_ANNUAL_XYZ_Data_4.zip ZIP file
19B0011Plans.pdf PDF
Jax_O&M_GDR_2019_final_21Feb2019.pdf PDF
19-001_JAX_HBR_ANNUAL_XYZ_Data_3.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OF-1419 Page 1 of 1

1. SOLICITATION NUMBER

ABSTRACT OF OFFERS - CONSTRUCTION

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Jacksonville District Office U.S. Army Corps of Engineers P.O. Box 4970 SIGNATURE DATE SIGNED

Jacksonville, FL 32232-0019 4/23/2019

5. PROJECT TITLE 9. OFFERS

8. ORIGINAL GOVERNMENT NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6

ESTIMATE A. OFFEROR: Ph: A. OFFEROR Ph: A. OFFEROR Ph: A. OFFEROR Ph: A. OFFEROR Ph: A. OFFEROR Ph:

(Check A, B, or C, and complete D, E, a

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

6. NUMBER OF ADENDA ISSUED: 3 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

ITEM

NO. 7B. DESCRIPTION OF OFFERED ITEM:

7C. EST.

QUANTITY D. UNIT E. UNIT PRICE F. AMOUNT E. UNIT PRICE F. AMOUNT E. UNIT PRICE F. AMOUNT E. QTY/UNIT PRICE F. AMOUNT E. QTY/UNIT PRICE F. AMOUNT E. QTY/UNIT PRICE F.. AMOUNT E. QTY/UNIT PRICE F. EST. AMOUNT

BASE

0001 Mobilization and Demobilization 1 Job $2,450,000.00 $2,450,000.00 $2,700,000.00 $2,700,000.00 $5,250,000.00 $5,250,000.00 $3,050,000.00 $3,050,000.00 $3,780,000.00 $3,780,000.00 $1,250,000.00 $1,250,000.00 $2,002,000.00 $2,002,000.00 0002 Excavation, Unclassified, Cut-55 STA 34+00

Through LCT STA 8+00 and LCT STA 20+00 Through LCT STA 65+00 (Estimated Quantity, See Note 1) 276,000 CY $12.85 $3,546,600.00 $13.50 $3,726,000.00 $15.50 $4,278,000.00 $4.82 $1,330,320.00 $14.69 $4,054,440.00 $10.50 $2,898,000.00 $10.00 $2,760,000.00

0003 Turbidity Monitoring 1 Job $33,600.00 $33,600.00 $20,000.00 $20,000.00 $30,000.00 $30,000.00 $16,500.00 $16,500.00 $17,500.00 $17,500.00 $10,000.00 $10,000.00 $36,000.00 $36,000.00 0004 Endangered Species Observers (Hopper Dredges

Only) 1 Job $50,000.00 $50,000.00 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $7,400.00 $7,400.00 $0.00 $0.00 $0.00 $0.00 $9,300.00 $9,300.00 0005 Mobilization and Demobilization for Sea Turtle

Trawl Sweeping (Hopper Dredges Only, See Note

4) 1 Job $11,700.00 $11,700.00 $8,500.00 $8,500.00 $10,000.00 $10,000.00 $7,900.00 $7,900.00 $0.00 $0.00 $0.00 $0.00 $12,000.00 $12,000.00

0006 Sea Turtle Trawl Sweeping (Hopper Dredges Only, See Note 4) 1 Day $7,600.00 $7,600.00 $3,850.00 $3,850.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $0.00 $0.00 $0.00 $0.00 $4,600.00 $4,600.00

0007 Dedicated Manatee and Sea Turtle Observer (Mechanical Dredging Only, See Note 5) 1 Job $50,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,000.00 $50,000.00 $0.00 $0.00

0008 Bird Monitoring (See Note 6) 1 Job $21,500.00 $21,500.00 $30,000.00 $30,000.00 $10,000.00 $10,000.00 $9,000.00 $9,000.00 $12,500.00 $12,500.00 $30,000.00 $30,000.00 $9,300.00 $9,300.00 0009 Standby Time ( See Note 2) 24 Hour $5,000.00 $120,000.00 $1,800.00 $43,200.00 $5,000.00 $120,000.00 $5,400.00 $129,600.00 $3,000.00 $72,000.00 $3,000.00 $72,000.00 $24,000.00 0010 Disposal Area Pumpout (See Note 7) 100 Day $3,700.00 $370,000.00 $400.00 $40,000.00 $5,000.00 $500,000.00 $2,000.00 $200,000.00 $2,000.00 $200,000.00 $500.00 $50,000.00 $700.00 $70,000.00 0011 Partnering Regroup (See Note 8) 1 Ea $9,000.00 $9,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $1,200.00 $1,200.00 $4,000.00 $4,000.00 $2,500.00 $2,500.00 $2,200.00 $2,200.00

TOTAL BASE (LINE ITEMS 0001 THROUGH

0011) $6,670,000.00 $6,616,550.00 $10,223,000.00 $4,755,920.00 $8,140,440.00 $4,362,500.00 $4,929,400.00

OPTION A

Excavation, Unclassified, Cut-45 STA 1+00 Through Cut-45 STA 31+00 and Cut-46 STA10+00 Through Cut-48 STA 13+00 (Estimated Quantity, See Note 1) 122,000 CY $12.40 $1,512,800.00 $9.25 $1,128,500.00 $7.50 $915,000.00 $8.72 $1,063,840.00 $21.65 $2,641,300.00 $12.00 $1,464,000.00 $7.00 $854,000.00

0013 Turbidity Monitoring 1 Job $15,500.00 $15,500.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $9,000.00 $9,000.00 $11,700.00 $11,700.00 $5,000.00 $5,000.00 $14,400.00 $14,400.00

Endangered Species Observers (Hopper Dredges Only)

1 Job $21,000.00 $21,000.00 $17,500.00 $17,500.00 $5,000.00 $5,000.00 $4,300.00 $4,300.00 $0.00 $0.00 $0.00 $0.00 $3,720.00 $3,720.00

Sea Turtle Trawl Sweeping (Hopper Dredges Only, See Note 4) 1 Day $7,600.00 $7,600.00 $3,850.00 $3,850.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $0.00 $0.00 $0.00 $0.00 $4,600.00 $4,600.00

Dedicated Manatee and Sea Turtle Observer (Mechanical Dredging Only, See Note 5) 1 Job $21,000.00 $21,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,000.00 $40,000.00 $0.00 $0.00

0017 Bird Monitoring (See Note 6) 1 Job $9,100.00 $9,100.00 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $10,800.00 $10,800.00 $20,000.00 $20,000.00 $3,720.00 $3,720.00 0018 Standby Time (See Note 2) 24 Hour $5,000.00 $120,000.00 $1,800.00 $43,200.00 $5,000.00 $120,000.00 $5,400.00 $129,600.00 $3,000.00 $72,000.00 $3,000.00 $72,000.00 $1,000.00 $24,000.00

TOTAL OPTION A (LINE ITEMS 0012

THROUGH 0018) $1,707,000.00 $1,218,050.00 $1,055,000.00 $1,214,740.00 $2,735,800.00 $1,601,000.00 $904,440.00

TOTAL BASE + OPTION A (LINE ITEMS 0001

THROUGH 0018) $8,377,000.00 $7,834,600.00 $11,278,000.00 $5,970,660.00 $10,876,240.00 $5,963,500.00 $5,833,840.00

OPTION B

Excavation, Unclassified, Cut-42 STA. 60+00 through Cut-42 STA. 140+00 and Cut-42 STA 157+00 Through Cut-43 STA 6+00 (Estimated Quantity, See Note 1) 38,000 CY $19.25 $731,500.00 $12.65 $480,700.00 $15.00 $570,000.00 $17.98 $683,240.00 $28.00 $1,064,000.00 $22.50 $855,000.00 $7.00 $266,000.00

0020 Turbidity Monitoring 1 Job $9,000.00 $9,000.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $3,800.00 $3,800.00 $7,800.00 $7,800.00 $5,000.00 $5,000.00 $5,400.00 $5,400.00

Endangered Species Observers (Hopper Dredges Only) 1 Job $10,500.00 $10,500.00 $3,500.00 $3,500.00 $2,500.00 $2,500.00 $1,900.00 $1,900.00 $0.00 $0.00 $0.00 $0.00 $1,395.00 $1,395.00

Sea Turtle Trawl Sweeping (Hopper Dredges Only, See Note 4) 1 Day $7,600.00 $7,600.00 $3,850.00 $3,850.00 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $0.00 $0.00 $0.00 $0.00 $4,600.00 $4,600.00

Dedicated Manatee and Sea Turtle Observer (Mechanical Dredging Only, See Note 5) 1 Job $10,900.00 $10,900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25,000.00 $25,000.00 $0.00 $0.00

0024 Bird Monitoring (See Note 6) 1 Job $5,500.00 $5,500.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $7,200.00 $7,200.00 $10,000.00 $10,000.00 $1,395.00 $1,395.00 0025 Standby Time (See Note 2) 24 Hour $5,000.00 $120,000.00 $1,800.00 $43,200.00 $5,000.00 $120,000.00 $5,400.00 $129,600.00 $3,000.00 $72,000.00 $3,000.00 $72,000.00 $1,000.00 $24,000.00

TOTAL OPTION B (LINE ITEMS 0019

THROUGH 0025) $895,000.00 $536,250.00 $700,000.00 $824,540.00 $1,151,000.00 $967,000.00 $302,790.00

TOTAL BASE + OPTION A + OPTION B (LINE

ITEMS 0001 THROUGH 0025) $9,272,000.00 $8,370,850.00 $11,978,000.00 $6,795,200.00 $12,027,240.00 $6,930,500.00 $6,136,630.00

Brian J. Kilpatrick, Contract Specialist CONTINUATION SHEET CONTINUATION SHEET

1. SOLICITATION NUMBER:

INSTRUCTIONS - Attach this for to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

ABSTRACT OF OFFERS -

CONSTRUCTION

2. DATE ISSUED 3. DATE CLOSED:

March 20, 2019 April 23, 2019 ABSTRACT OF OFFERS -

ABSTRACT OF OFFERS -

CONSTRUCTION

CONTINUATION SHEET

4. OFFERS (Continued)

CONTINUATION SHEET

ABSTRACT OF OFFERS -

CONSTRUCTION CONSTRUCTION

4. OFFERS (Continued)

Y

3 3 3 3 C. REASONABLE CONTRACT

(Including Profit)

B. REASONABLE CONTRACT

(Without Profit)

Jacksonville Harbor, Maintenance Dredging, 38- and 40- Foot Projects, Cut-42 through Cut-48, Cut-55, and The Lower Terminal Channel, Duval County, Florida

Y

Weeks Marine Marinex

A. HIRED LABOR

/s/ Brian Kilpatrick

2. DATE ISSUED

Manson Dutra

3. DATE CLOSED:

March 20, 2019 April 23, 2019

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

W912EP19B0011

Great Lakes Dredge & Dock

Cashman

Y Y

W912EP19B0011 Bid Abstract

File details come from the government source that posted it.