AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BEACH EROSION CONTROL AND HURRICANE PROTECTION PROJECT, DADE COUNTY, FLORIDA – SURFSIDE SEGMENT
A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B. THE BID OPENING DATE REMAINS UNCHANGED @ APRIIL 17, 2019 @ 2:00 P.M. LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP19B0008
X 9B. DATED (SEE ITEM 11)
26-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2019
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
W912EP19B0008 1 Amendment 0001
BEACH EROSION CONTROL AND HURRICANE PROTECTION PROJECT
SURFSIDE SEGMENT
MIAMI-DADE COUNTY, FLORIDA
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
Volume 1 of 2 DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
Volume 2 of 2 DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
DELETE Submittal Register and REPLACE with the attached revised Submittal Register.
DELETE Section 01 50 02 and REPLACE with the attached revised Section 01 50 02.
ADD Section 01 50 02, Attachments A and B.
2. DRAWINGS:
No changes.
3. Site Visit Roster Attached for distribution
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
BEACH EROSION AND HURRICANE PROTECTION PROJECT
MIAMI-DADE COUNTY, FLORIDA
SURFSIDE SEGMENT
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 BEACH FILL (ESTIMATED QUANTITY) 330,000 CUBIC YARD $______________ $______________
0002 BEACH TILLING (ESTIMATED QUANTITY) 7 16 ACRE $____________ $______________
CONSTRUCTION/VIBRATION CONTROL AND
MONITORING JOB $______________
0004 ENVIRONMENTAL SPECIES COORDINATION JOB $______________
0005 TURBIDITY MONITORING JOB $______________
0006 PARTNERING REGROUP 1 EACH $______________ $______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0006) $______________
NOTES:
(1) OFFER MUST PRICE ALL LINE ITEMS. SEE PROVISION AT 52.214-18 (SECTION 00100).
(2) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, AND
SECTION 00101) COULD RENDER YOUR BID NON-RESPONSIVE.
(3) ACTUAL QUANTITIES MAY VARY.
(4) FULL PAYMENT UNDER LINE ITEM "BEACH FILL" IS CONDITIONED ON REPAIRING ALL STAGING AND ACCESS AREAS
TO PRECONSTRUCTION CONDITION. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT.
(5) ANY VEGETATION IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED.
(6) BEACH FILL QUANTITIES SHOWN ARE THE ESTIMATED QUANTITY FOR THE FILL TEMPLATE AND DOES
NOT TAKE COMPACTION INTO CONSIDERATION.
(7) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.
W912EP19B0008 Page 1 Amendment 0001
Beach Er osi on Cont r ol and Hur r i cane Pr ot ect i on Pr oj ect ( Am 0001) Dade Count y, Fl or i da - Sur f s i de Segment
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
1. 2 DEFI NI TI ONS
1. 3 WORK COVERED BY CONTRACT DOCUMENTS
1. 3. 1 Pr oj ect Descr i pt i on
1. 3. 2 Locat i on
1. 3. 3 Saf et y Requi r ement s
1. 3. 4 Wor k Per f or med by Ot her s
1. 3. 5 Wor k Rest r i ct i ons
1. 3. 5. 1 Del i ver y of Mat er i al
1. 3. 5. 2 Wor k on t he Beach
1. 3. 5. 3 St agi ng Ar eas f or Const r uct i on Equi pment on t he Beach
1. 4 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
1. 5 LI QUI DATED DAMAGES - CONSTRUCTI ON
1. 6 PHYSI CAL DATA
1. 6. 1 Physi cal Condi t i ons
1. 6. 2 Weat her , Wat er St age and Ti de Dat a
1. 6. 3 Hydr ogr aphi c Sur veys
1. 6. 4 Cont r act or I nvest i gat i on
1. 7 LAYOUT OF WORK
1. 7. 1 Est abl i shed Pr oj ect Cont r ol
1. 7. 2 Layout
1. 7. 3 Sur vey
1. 8 DAMAGE TO WORK
1. 9 EXI STI NG WORK
1. 10 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( 31 OCT 1989)
1. 10. 1 Cont r act or Responsi bi l i t y
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1 W912EP19B0008 Amendment 0001
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
GDR Sect i on 00 31 32, Geot echni cal Dat a Repor t
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
1. 2 DEFINITIONS
a. " Adver se weat her " occur s when at mospher i c condi t i ons at a def i ni t e t i me and pl ace t hat ar e unf avor abl e t o const r uct i on act i v i t i es and i s based on c l i mat ol ogi cal and met eor ol ogi cal obser vat i ons and dat a sour ces pr ovi ded i n Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.
b. " Unusual l y sever e weat her " i s weat her t hat i s mor e sever e t han t he adver se weat her ant i c i pat ed by t he Cont r act or f or t he season or l ocat i on i nvol ved. Adver se weat her del ays ar e consi der ed unusual l y sever e weat her i f adver se weat her del ay days pr event wor k f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.
1. 3 WORK COVERED BY CONTRACT DOCUMENTS
1. 3. 1 Pr oj ect Descr i pt i on
Thi s pr oj ect wi l l nour i sh cr i t i cal l y er oded shor el i ne al ong t he t own of Sur f s i de. The pr oj ect beach has a maxi mum ber m el evat i on of +6. 6 f eet , NAVD88, and a mi ni mum ber m el evat i on no l ess t han +6. 1 f eet , NAVD88. The Const r uct i on Basel i ne ( CBL) and Er osi on Cont r ol Li ne ( ECL) ar e t he same and t he wi dt h of t he ber m cr est i s 240 f eet measur ed per pendi cul ar t o t he CBL/ ECL as shown on t he dr awi ngs. The ber m wi l l s l ope at 1V: 10H t o t i e i nt o exi st i ng gr ade. The sand sour ce f or t he pr oj ect wi l l be an upl and sour ce, and mat er i al wi l l be t r uck haul ed t o t he pr oj ect l ocat i on. The upl and sour ce wi l l be sel ect ed by t he Cont r act or meet i ng cr i t er i a r equi r ed i n Sect i on 35 30 00 BEACH FI LL. Ot her sour ces may be avai l abl e.
1. 3. 2 Location
Pr oj ect wor k i s l ocat ed 1 mi l e sout h of Baker s Haul over I nl et i n t he t own of Sur f s i de, Fl or i da bet ween DEP Monument s R- 31 t o R- 36. 5.
1. 3. 3 Saf et y Requi r ement s
See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and EM 385- 1- 1.
SECTI ON 01 11 00 Page 2
1. 3. 4 Wor k Per f or med by Ot her s
See par agr aph PROJECT COORDI NATI ON of Sect i on 01 30 00 ADMI NI STRATI VE
PROCEDURES.
1. 3. 5 Wor k Rest r i ct i ons
Wor k wi l l be per mi t t ed 6 days per week. Wor k i s per mi t t ed:
Monday t hr ough Thur sday - 7: 00 a. m. unt i l 7: 00 p. m Fr i day - 7: 00 a. m. unt i l 5: 00 p. m.
Sat ur day - 9: 00 a. m. unt i l 5: 00 p. m.
No const r uct i on on Sundays
No wor k i s per mi t t ed on t he f ol l owi ng days:
Sat Apr i l 20 - East er / Passover Fr i Apr i l 26 & Sat Apr i l 27 - Passover Sat May 25- Mon May 27 ( i ncl usi ve) - Memor i al Day weekend Mon June 10 - June Shavuot Thur s Jul y 4, 2019 - I ndependence Day Sat Aug 31 - Mon Sept . 2, 2019 ( i ncl usi ve) - Labor Day weekend Mon Sept 30 & Tues Oct 1 - Rosh Hashanah Wed Oct 9 Oct - Yom Ki ppur ( st op at 5pm on Tues Oct 8) Mon Oct 14 & Tues Oct 15 - Sukkot Mon Oct 21 - Semi ni ALzer et Mon Oct 22 - Scmchat Tor ah Thur s Nov 21- Sat Nov 23 - Thanksgi v i ng Wed Dec 25 - Chr i st mas ( st op at 5pm on Tues Dec 24)
Addi t i onal l y dur i ng Chanukah, Mon Dec 23 - Mon Dec 30, 2019, wor k i s onl y per mi t t ed bet ween 7: 00 a. m. unt i l 4: 30 p. m. Pl ease not e, sundown t i mes ar e not not ed i n Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA, but t he l i nks pr ovi ded wi l l assi st , or sundown shal l be at t he t i mes di r ect ed by t he Cont r act i ng Of f i cer .
The Cont r act or shal l onl y use t he access ar eas shown on t he dr awi ngs and descr i bed her ei n. Any addi t i onal access or st agi ng ar eas needed by t he Cont r act or wi l l need t o be appr oved by t he Cont r act i ng Of f i cer and coor di nat ed wi t h t he Town of Sur f s i de at t he Cont r act or ' s expense. The Cont r act or shal l not oper at e or st or e equi pment beyond t he l i mi t s of const r uct i on shown on t he dr awi ngs. Al l const r uct i on equi pment shal l y i el d t o emer gency vehi c l es i n t r ansi t as needed t hr oughout t he dur at i on of t he project.
1. 3. 5. 1 Del i ver y of Mat er i al
Del i ver y of t he mat er i al f r om t he Cont r act or ' s sel ect ed sour ce t o t he desi gnat ed st agi ng and access ar eas shown on t he dr awi ngs wi l l be per mi t t ed bet ween t he hour s.
1. 3. 5. 2 Wor k on t he Beach
No wor k shal l be per f or med seawar d of t he Er osi on Cont r ol Li ne ( ECL) pr i or t o sunr i se or af t er sunset . Sunr i se and sunset wi l l var y dependi ng on t he t i me of year ; however , no wor k wi l l be per mi t t ed pr i or t o 7: 00am or af t er 7: 00pm shoul d t he sun r i se bef or e 7: 00am and/ or t he sun set af t er 7: 00pm.
SECTI ON 01 11 00 Page 3
1. 3. 5. 3 St agi ng Ar eas f or Const r uct i on Equi pment on t he Beach
See Sect i on 01 57 20 f or per i ods when st agi ng ar eas f or const r uct i on equi pment on t he beach i s not per mi t t ed.
1. 4 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause COMMENCEMENT, PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5 LI QUI DATED DAMAGES - CONSTRUCTI ON
Ref er t o t he Cl ause LI QUI DATED DAMAGES - CONSTRUCTI ON ( FAR 52. 211- 12) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6 PHYSI CAL DATA
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause PHYSI CAL DATA ( FAR
52. 236- 4) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6. 1 Physi cal Condi t i ons
The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys and/ or by cor e bor i ngs. When t he i ndi cat ed physi cal condi t i ons ar e t he r esul t of s i t e i nvest i gat i ons by cor e bor i ngs, t he cor e bor i ng l ogs and l abor at or y dat a ar e i n Sect i on 00 31 32 GEOTECHNI CAL DATA REPORT ( GDR) and t he cor e bor i ng l ocat i ons ar e shown on t he dr awi ngs. Al so, see t he GDR f or i nst r uct i ons concer ni ng avai l abi l i t y of cor e bor i ngs f or i nspect i on.
1. 6. 2 Weat her , Wat er St age and Ti de Dat a
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.
1. 6. 3 Hydr ogr aphi c Sur veys
Hydr ogr aphi c sur veys ar e post ed as separ at e el ect r oni c f i l es. Sur vey number s ar e i ndi cat ed on t he dr awi ngs.
1. 6. 4 Cont r act or I nvest i gat i on
Ref er t o t he Cl ause SI TE I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK ( FAR 52. 236- 3) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 7 LAYOUT OF WORK
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause LAYOUT OF WORK ( FAR
52. 236- 17) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 7. 1 Est abl i shed Pr oj ect Cont r ol
The Gover nment has est abl i shed monument s al ong t he wor k s i t e( s) . Each monument i s r epr esent ed i n t he cont r act dr awi ngs by a Desi gnat i on and i n most cases, an al phanumer i c Per manent I dent i f i er ( PI D) . I nf or mat i on concer ni ng t he l ocat i on and el evat i ons can be f ound wi t hi n t he Sur vey Not es on t he pl an sheet s. The Sur vey Not es f or each i nc l uded f i el d sur vey wi l l c i t e a par t i cul ar sur vey number , and speci f y t he cont r ol used t o conduct t hat sur vey. Addi t i onal i nf or mat i on i s i ncl uded i n t he Sur vey Not es t hat
SECTI ON 01 11 00 Page 4 must be dupl i cat ed i f an at t empt t o r ecr eat e t he subj ect sur vey i s desi r ed.
For navi gat i on channel s, t he Gover nment has est abl i shed t i dal cal i br at i on s i t es f or pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um. Each t i dal cal i br at i on s i t e i s r epr esent ed i n t he pl an sheet dr awi ngs by St at i on I D, and i s c i t ed i n t he Sur vey Not es. Al l pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um shal l be cal i br at ed t o t he St at i on I D speci f i ed i n t he pl an sheet dr awi ngs. I nf or mat i on r egar di ng t he l ocat i on and associ at ed benchmar ks of t he r ef er enced St at i on I D i s i ncl uded i n t he Monument Descr i pt i on sect i on of t hese speci f i cat i ons.
See Sect i on 00 31 21 CONTROL MONUMENT DESCRI PTI ONS.
1. 7. 2 Layout
Fr om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment , t he Cont r act or shal l compl et e t he l ayout of t he wor k and shal l be r esponsi bl e f or al l measur ement s t hat may be r equi r ed f or t he execut i on of t he wor k t o t he l ocat i on and l i mi t mar ks pr escr i bed i n t he speci f i cat i ons or on t he cont r act dr awi ngs, subj ect t o such modi f i cat i ons as t he Cont r act i ng Of f i cer may r equi r e t o meet changed condi t i ons or as a r esul t of necessar y modi f i cat i ons t o t he cont r act wor k.
1. 7. 3 Survey
The Cont r act or shal l f ur ni sh, at hi s own expense, such st akes, t empl at es, pl at f or ms, equi pment , t ool s and mat er i al , and al l l abor as may be r equi r ed i n l ayi ng out any par t of t he wor k f r om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment . I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o mai nt ai n and pr eser ve al l monument s, st akes and ot her mar ks est abl i shed by t he Cont r act i ng Of f i cer unt i l aut hor i zed t o r emove t hem, and i f such mar ks or monument s ar e dest r oyed by t he Cont r act or or t hr ough hi s negl i gence, pr i or t o t hei r aut hor i zed r emoval , t hey may be r epl aced by t he Cont r act i ng Of f i cer , at hi s di scr et i on, and t he expense of r epl acement wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or . The Cont r act i ng Of f i cer may r equi r e t hat wor k be suspended at any t i me when l ocat i on and l i mi t mar ks est abl i shed by t he Cont r act or ar e not r easonabl y adequat e t o per mi t checki ng of t he wor k.
1. 8 DAMAGE TO WORK
The r esponsi bi l i t y f or damage t o any par t of t he per manent wor k shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. However , i f , i n t he j udgment of t he Cont r act i ng Of f i cer , any par t of t he per manent wor k per f or med by t he Cont r act or i s damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i ons or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s as or der ed by t he Cont r act i ng Of f i cer and f ul l compensat i on f or such r epai r s wi l l be made at t he appl i cabl e cont r act uni t or j ob pr i ces as f i xed and est abl i shed i n t he cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t her e ar e no cont r act uni t or j ob pr i ces appl i cabl e t o any par t of such wor k, an equi t abl e adj ust ment pur suant t o Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 wi l l be made as f ul l compensat i on f or t he r epai r s of t hat par t of t he per manent wor k f or whi ch t her e ar e no appl i cabl e cont r act uni t or j ob pr i ces. Except as her ei n pr ovi ded, damage t o al l wor k ( i ncl udi ng t empor ar y const r uct i on) , ut i l i t i es, mat er i al s, equi pment and pl ant shal l be r epai r ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer at
SECTI ON 01 11 00 Page 5 t he Cont r act or ' s expense, r egar dl ess of t he cause of such damage.
1. 9 EXI STI NG WORK
I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k shal l be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 10 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( 31 OCT 1989)
Thi s pr ovi s i on speci f i es t he pr ocedur e f or t he det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he Cl ause DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be sat i sf i ed:
a. The weat her exper i enced at t he pr oj ect s i t e dur i ng t he cont r act per i od must be f ound t o be unusual l y sever e; t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.
b. The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .
1. 10. 1 Schedul e of Mont hl y Ant i c i pat ed Adver se Weat her Del ays
The schedul e of mont hl y ant i c i pat ed adver se weat her del ays i s based upon Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent act i v i t i es.
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA t o obt ai n MONTHLY
ANTI CI PATED ADVERSE WEATHER DELAY WORK DAYS BASED ON 5- DAY WORK WEEK. A
r easonabl e number of ant i c i pat ed weat her del ay wor k days i s obt ai ned f r om t he aver age number of days per mont h ( r ounded t o t he near est whol e number ) wi t h pr eci pi t at i on gr eat er t han t hat i ndi cat ed i n Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.
1. 10. 1 Cont r act or Responsi bi l i t y
Upon acknowl edgment of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or wi l l r ecor d on t he dai l y CQC r epor t t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed i n
SECTI ON 01 11 00 Page 6
Section 00 33 50 WEATHER, WATER STAGE AND TI DE DATA ( r ounded t o t he near est whol e number ) , t he Cont r act i ng Of f i cer wi l l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he Cl ause DEFAULT ( FI XED PRI CE CONSTRUCTI ON) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
The pr oj ect ar ea may be af f ect ed by st or my, wi ndy and/ or r ai ny weat her , i ncl udi ng t hunder st or ms, dur i ng any t i me of t he year . The Cont r act or shal l be r esponsi bl e f or obt ai ni ng i nf or mat i on concer ni ng r ai n, wi nd and wave condi t i ons t hat coul d i nf l uence saf et y, haul i ng and pl acement oper at i ons pr i or t o submi t t i ng a pr oposal or bi d.
a. Cont r act or shal l r esear ch t he pr oj ect s i t e condi t i ons and i ncor por at e pot ent i al adver se weat her del ays i nt o t hei r schedul e pr i or t o submi t t i ng a pr oposal or bi d. The Cont r act or shal l devel op a schedul e of mont hl y ant i c i pat ed adver se weat her based on t he equi pment t o be used t o compl et e t he pr oj ect and det er mi ne t he condi t i ons t hat woul d cause t hem t o cease oper at i ons usi ng t he sour ces pr ovi ded i n Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent act i v i t i es.
b. Upon acknowl edgment of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or wi l l r ecor d on t he dai l y CQC r epor t t he occur r ence of adver se weat her and unusual l y sever e weat her wi t h t he pur pose t o not e i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul e t o be consi der ed " unusual l y sever e weat her " .
c. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days.
I f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed f or adver se weat her by t he Cont r act or , t he Cont r act i ng Of f i cer may conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days t hat shoul d have been ant i c i pat ed f or t he condi t i ons at t he pr oj ect l ocat i on.
1. 11 UNI TS OF MEASURE
The st andar d U. S. syst em or t he met r i c syst ems of measur e may be ut i l i zed by t he Cont r act or i n t he per f or mance of hi s wor k. Al l sur vey r ecor ds, of f i c i al document at i on, engi neer i ng dat a, and al l cor r espondence, i ncl udi ng any submi t t al s and shop dr awi ngs, shal l c l ear l y denot e whi ch syst em of measur e i s bei ng ut i l i zed, r ef er enced or di scussed. Any omi ssi on or i naccur at e use of a uni t of measur e on t he par t of t he Cont r act or shal l not r el i eve hi m of hi s r esponsi bi l i t i es under t he cont r act t er ms. The uni t of measur e used i n t hi s speci f i cat i on i s t he st andar d U. S. syst em. The cont r act dr awi ngs denot e bot h st andar d U. S. syst em and met r i c syst em wher e appr opr i at e. I f no uni t of measur e i s i ndi cat ed on t he dr awi ng such as on r anges, st at i ons, s l ope el evat i ons, and di st ance number s, t hen t hey ar e t o be consi der ed t he st andar d U. S. syst em.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
SECTI ON 01 11 00 Page 7
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 SUBMI TTALS
1. 4 JOB PAYMENT I TEMS
1. 4. 1 Const r uct i on/ Vi br at i on Cont r ol and Moni t or i ng ( Li ne I t em 0003)
1. 4. 2 Envi r onment al Speci es Coor di nat i on ( Li ne I t em 0004)
1. 4. 3 Tur bi di t y Moni t or i ng ( Li ne I t em 0005)
1. 5 UNI T PRI CE PAYMENT I TEMS
1. 5. 1 Beach Fi l l ( Li ne I t em 0001)
1. 5. 1. 1 Payment
1. 5. 1. 2 Measur ement
1. 5. 1. 3 Uni t of Measur e
1. 5. 2 Beach Ti l l i ng ( Li ne I t em 0002)
1. 5. 2. 1 Payment
1. 5. 2. 2 Measur ement
1. 5. 2. 3 Uni t of Measur e
1. 5. 3 Par t ner i ng Regr oup ( Li ne I t em 0006)
1. 5. 3. 1 Payment
1. 5. 3. 2 Measur ement s
1. 5. 3. 3 Uni t of Measur e
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 1
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i c t i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or mor e i nf or mat i on on CLI Ns, schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and payment pr ocedur es. The Cont r act or mode user manual wi t h i n- dept h i nst r uct i ons can be downl oaded f r om t he RMS web si t e i ndi cat ed i n Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE
( RMS CM) .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of j ob i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.
SECTI ON 01 22 00 Page 2
1. 4 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act l ump sum payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
Pr ogr ess payment s f or j ob CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each j ob CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE) . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedule.
1. 4. 1 Const r uct i on/ Vi br at i on Cont r ol and Moni t or i ng ( Li ne I t em 0003)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he pr ot ect i on of ex i st i ng st r uct ur es f r om const r uct i on act i v i t i es and moni t or i ng. See Sect i on 02 22 13 VI BRATI ON MONI TORI NG REQUI REMENTS FOR
EXI STI NG STRUCTURES.
1. 4. 2 Envi r onment al Speci es Coor di nat i on ( Li ne I t em 0004)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o dai l y coor di nat i on wi t h Mi ami - Dade Count y - Envi r onment al Resour ce Management ( DERM) on t hei r dai l y management of t he moni t or i ng of sea t ur t l es, mi gr at or y bi r ds, and ot her endanger ed speci es. Cont act s t o DERM wi l l be pr ovi ded at t he Pr e- const r uct i on conf er ence. See Sect i on 01 57 20
ENVI RONMENTAL PROTECTI ON.
1. 4. 3 Tur bi di t y Moni t or i ng ( Li ne I t em 0005)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.
1. 5 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s , and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
SECTI ON 01 22 00 Page 3
Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .
Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.
1. 5. 1 Beach Fi l l ( Li ne I t em 0001)
1. 5. 1. 1 Payment
a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o bar r i cades and s i gns, per manent t ur t l e awar eness s i gns, debr i s r emoval , excavat i on and t r anspor t at i on of beach f i l l , const r uct i ng t he beach pr of i l e and f i nal dr essi ng; noi se cont r ol ; condi t i on sur veys;
r est or at i on of al l access ar eas t o pr econst r uct i on condi t i on; and moni t or i ng and r epor t i ng t ur bi di t y. See Sect i ons 01 57 20
ENVI RONMENTAL PROTECTI ON, 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG,
and 35 30 00 BEACH FI LL ( TRUCK HAUL) .
b. I n addi t i on t o t he above, payment wi l l be made f or i n- pl ace beach f i l l t o t he t ol er ance l i ne i ndi cat ed on bot h ber m and s l ope. Payment quant i t i es wi l l be det er mi ned by t he Gover nment us i ng aver age end ar ea met hod of cal cul at i on, except i n l ocat i ons wher e a Const r uct i on Basel i ne ( CBL) Poi nt s of I nt er sect i on ( PI ) exi st i ng bet ween t wo st at i ons and at t he end t aper s/ t r ansi t i ons. At t hese t wo l ocat i ons, Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace met hod of cal cul at i on shal l be used. When beach f i l l i s pl aced above t he s l ough zone t o compensat e f or wave act i on, payment wi l l be based on a cut and f i l l cal cul at i on. No payment wi l l be made f or mat er i al pl aced i n excess of t he t ol er ance t empl at e A( T) i ndi cat ed on t he dr awi ngs.
1. 5. 1. 2 Measurement
a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y t he exi st i ng condi t i ons at t he t i me t he sur veys wer e per f or med, but t he dept hs and el evat i ons shown t her eon may be ver i f i ed and cor r ect ed by el evat i ons and soundi ngs t aken bef or e commenci ng t he wor k. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l us i on, f r aud, or obvi ous er r or .
b. Beach f i l l sat i sf act or i l y pl aced wi l l be measur ed f or payment by use of t he aver age end ar ea met hod and Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace di f f er ence met hod at t he r espect i ve l ocat i ons st at ed i n subpar agr aph " Payment " above. The quant i t i es wi l l be comput ed by t he Gover nment i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Measur ement of quant i t y pl aced f or pay pur poses wi l l be based on or i gi nal and f i nal sur f aces made on t he sect i on or r each i ndi cat ed on t he dr awi ngs. The Cont r act or shal l gi ve 3 cal endar days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need t o per f or m t he or i gi nal and f i nal sur veys. Qual i t y Cont r ol Sur veys shal l be t he r esponsi bi l i t y of t he Cont r act or . Mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by measur ement of t he i n- pl ace beach f i l l and i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
c. I n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT
SECTI ON 01 22 00 Page 4
CLAUSES i n Vol ume 1, t he Gover nment wi l l per f or m pr e- and post - const r uct i on t opogr aphi c sur vey at 100- f oot s t at i ons wi t h el evat i ons t aken at 10- f oot r ange i nt er val s f r om t he basel i ne t o t he t oe s l ope el evat i on. An addi t i onal cr oss sect i on shal l be col l ect ed at CBL PI ' s al ong a l i ne bi sect i ng t he angul ar di f f er ence of l i nes t angent t o t he i ncomi ng and out goi ng CBL and ever y 50 f eet wi t hi n t he end t aper s/ t r ansi t i ons. I n or der t o achi eve f i nal gr ade i n s l ough zone, Cont r act or shal l pl ace mat er i al t o f i nal gr ade wi t hi n t ol er ance f or ent i r e s l ope or may st ockpi l e beach f i l l up- sl ope of s l ough zone.
Af t er st ockpi l ed beach f i l l i s measur ed f or payment , t he Cont r act or shal l shape sl ope t o wi t hi n t he r equi r ed and t ol er ance gr ades f r om t op of s l ope t o wat er l i ne pr oduci ng a smoot h uni f or m s l ope. Once post - const r uct i on sur vey i s per f or med, no measur ement s wi l l be r evi sed except on suspi c i on of f r aud or obvi ous er r or .
1. 5. 1. 3 Uni t of Measur e
Cubi c yar d.
1. 5. 2 Beach Ti l l i ng ( Li ne I t em 0002)
1. 5. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o beach t i l l i ng. See Sect i ons 01 57 20 ENVI RONMENTAL PROTECTI ON and 35 30 00 BEACH
FILL.
1. 5. 2. 2 Measurement
Beach t i l l i ng wi l l be measur ed f or payment by t he act ual ar ea t i l l ed t o t he t ent h of an acr e.
1. 5. 2. 3 Uni t of Measur e
Acre.
1. 5. 3 Par t ner i ng Regr oup ( Li ne I t em 0006)
1. 5. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o conduct i ng a par t ner i ng r egr oup. Thi s l i ne i t em i s not subj ect t o t he VARI ATI ON I N ESTI MATED QUANTI TY cl ause, and t he Cont r act or wi l l onl y be pai d f or t he act ual number of par t ner i ng r egr oups conduct ed. See Sect i on 01 30 00 ADMI NI STRATI VE PROCEDURES. The i ni t i al par t ner i ng meet i ng wi l l not be pai d f or under t hi s l i ne i t em as i t i s a di st r i but ed cost mandat or y admi ni st r at i ve act i on.
1. 5. 3. 2 Measurements
The basi s f or payment wi l l be f or t he compl et i on of each par t ner i ng r egr oup meet i ng and Gover nment r ecei pt of al l compl et ed wor k pr oduct s.
1. 5. 3. 3 Uni t of Measur e
Each.
SECTI ON 01 22 00 Page 5
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.
3. 1. 1 Request i ng Pr ogr ess Payment
For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " Request Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs. Ensur e t hat sums of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment .
Submi t a r equest f or pr ogr ess payment mont hl y i n accor dance wi t h Cl ause
52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS of Sect i on 00700 CONTRACT CLAUSES. I n addi t i on t o t he i t ems l i s t ed i n Cl ause
52. 232- 5( b) ( 1) , submi t t he f ol l owi ng i n t he r equest f or pr ogr ess payment :
a. Appr oved const r uct i on schedul e.
b. Up- t o- dat e payr ol l r ecor ds.
c. Cur r ent submi t t al r egi st er .
d. Appr oved submi t t al s on i nst al l ed pr oper t y.
e. QA/ QC def i c i ency t r acki ng l i s t .
f . Cur r ent as- bui l t dr awi ngs.
Once t he compl et e pay appl i cat i on package i s r ecei ved t o i ncl ude t he Cont r act or ' s s i gned ENG 93, t he 14 cal endar days wi l l commence.
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
I f addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed. I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.
- - End of Sect i on - -
SECTI ON 01 22 00 Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
W912EP19B0008
Beach Erosion Control and Hurricane Protection Project (Am 0001)
01 22 00 SD-01 Preconstruction Submittals G ROSchedule of Values
01 30 00 SD-01 Preconstruction Submittals Draft Joint Risk Register List of Subcontractors
SD-07 Certificates G ROPartnering Meetings Written
Synopsis Signature Authority Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals G ROExport File
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G DOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
Beach Erosion Control and Hurricane Protection Project (Am 0001)
01 35 26 1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G DOCritical Lift Plan
1.7.2.4 G DONaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G DORadiography Operation Planning
Work Sheet
1.14.1 G DOPortable Gauge Operations
Planning Worksheet 01 45 05 SD-01 Preconstruction Submittals
G ROQuality Control Plan SD-07 Certificates Letter of Authority
G ROPersonnel Qualifications 01 50 02 SD-01 Preconstruction Submittals
Mobilization/Demobilization Plan 3.9Security Plan
G DOVegetation Protection and Restoration Plan
SD-02 Shop Drawings 3.8Contractor's Temporary Facilities
Temporary Electric Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
Beach Erosion Control and Hurricane Protection Project (Am 0001)
01 50 02 Permanent Turtle Awareness Signs
01 55 10 SD-01 Preconstruction Submittals G ROClearing Area Plan G RODisposal Plan
01 55 26 SD-01 Preconstruction Submittals G ROTraffic Control Plan
01 57 20 SD-01 Preconstruction Submittals G DOEnvironmental Protection Plan
SD-11 Closeout Submittals Logs/Final Summary Report Project Environmental Summary Sheet
Logs/Summary of Bird Nesting Monitoring
Logs/Summary of Marine Turtle Nesting and Relocation
01 57 25 SD-03 Product Data Calibration Standard
SD-06 Test Reports Turbidity Monitoring
SD-07 Certificates G DOCertification Of Accuracy Of
Testing Equipment And Procedure 02 22 13 SD-01 Preconstruction Submittals
G DOVibration Control Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
Beach Erosion Control and Hurricane Protection Project (Am 0001)
02 22 13 G DOVibration Control Specialist Alternate
G DOVibration Monitoring Technician(s)
G DOStructural Inspection/Evaluation Engineer
G DOPre-Construction Structural Survey
G DOVibration Control Plan SD-06 Test Reports Vibration Monitoring Report Daily Instrument Logs
G DOPost-Construction Structural Survey
32 93 00 SD-02 Shop Drawings Watering Plan
SD-03 Product Data Coastal Vegetation
SD-07 Certificates Certificates of Compliance
35 30 00 SD-01 Preconstruction Submittals G ROWork Plan G ROPedestrian Protection Plan G DOProgress Map G DOSource of Fill
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
Beach Erosion Control and Hurricane Protection Project (Am 0001)
35 30 00 3.7.5Noncompliant Material Contingency Plan
SD-04 Samples Sand Source Quality Control Samples
SD-06 Test Reports Sand Source Test Report
G DOEnvironmental and Hazardous Toxic and Radioactive Waste (HTRW) Evaluation Report for Sand Source
SD-07 Certificates Truck Information Equipment and Performance Data
G DOGrade Stake Recovery 1.5Notification of Discovery of
Historical Period Shipwreck Sites Daily/Monthly Report of Operations
Grade Stake Log Permits
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 50 02
TEMPORARY CONSTRUCTI ON FACI LI TI ES
PART 1 GENERAL
1. 1 SUMMARY
1. 2 REFERENCES
1. 3 SUBMI TTALS
1. 4 EXI STI NG UTI LI TI ES
1. 4. 1 Wat er
1. 4. 2 El ect r i c i t y
1. 5 WORK AND ACCESS AREA
1. 5. 1 St agi ng and Access Ar eas
1. 5. 1. 1 Exi st i ng Condi t i ons Document at i on and Post Const r uct i on
Restoration
1. 5. 2 Cont r act or Responsi bi l i t i es
1. 6 ADJACENT PROPERTY AND STRUCTURES
1. 7 PERMI TS AND RESPONSI BI LI TI ES
PART 2 PRODUCTS
2. 1 CONSTRUCTI ON PROJECT SI GNS
2. 1. 1 Haul Road Tr af f i c and Const r uct i on War ni ng Si gns
2. 2 STORAGE CONTAI NERS
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 1. 1 I dent i f i cat i on of Empl oyees
3. 1. 2 Empl oyee Par ki ng
3. 1. 3 Onsi t e I nf or mat i on
3. 1. 4 Jani t or i al Ser vi ces
3. 2 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
3. 2. 1 Li ght i ng
3. 2. 2 Heat i ng and Cool i ng
3. 2. 3 Wat er
3. 2. 4 Fi r e Ext i ngui sher
3. 2. 5 Ut i l i t y Li nes
3. 2. 6 El ect r i c Power
3. 3 BULLETI N BOARD, PROJECT SI GN, AND PROJECT SAFETY SI GN
3. 3. 1 Bul l et i n…