AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
X 9B. DATED (SEE ITEM
11) 1 Feb 2019
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Feb 2019
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
MARINE CORPS SUPPORT FACILITY- BLOUNT ISLAND, MAINTENANCE DREDGING, 38-FOOT
PROJECT, DUVAL COUNTY, FLORIDA
A. See Continuation Sheet for Amendments details.
B. The Proposal Due Date Remain Unchanged C. All other Terms and Condiions remain uchanged.
W912EP19B0003
K3CTCWW9
Typewritten Text X
SF 30 CONTINUATION SHEET
Marine Corps Support Facility – Blount Island, Maintenance Dredging, 38-Foot Project, Duval County, Florida
W912EP19B0003 2 Amendment 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
DELETE Section 00 31 21 and REPLACE with the attached revised Section 00 31 21.
2. DRAWINGS:
DELETE Sheet ID G-02 and REPLACE with the attached revised Sheet ID G-02.
DELETE Sheet ID G-03 and REPLACE with the attached revised Sheet ID G-03.
DELETE Sheet ID C-01 and REPLACE with the attached revised Sheet ID C-01.
DELETE Sheet ID C-02 and REPLACE with the attached revised Sheet ID C-02.
DELETE Sheet ID C-03 and REPLACE with the attached revised Sheet ID C-03.
DELETE Sheet ID C-04 and REPLACE with the attached revised Sheet ID C-04.
DELETE Sheet ID C-05 and REPLACE with the attached revised Sheet ID C-05.
3. AVAILABLE INFORMATION:
Zipped survey XYZ file “19-073_XYZ.zip”.
(End of Summary of Changes)
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
CHANGES TO SPECIFICATIONS
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND
MAINTENANCE DREDGING, 38-FOOT PROJECT
DUVAL COUNTY, FLORIDA
W912EP19B0003 00010A-1 Amendment 0002
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
STATION 0+00 TO STATION 6+00 AND STATION
8+32.6 TO STATION 56+09.1 TO A DEPTH OF
38 FEET PLUS ALLOWABLE OVERDEPTH
(ESTIMATED QUANTITIES, SEE NOTE 1) 76,000 CUBIC YARD $___________ $_______________
0003 EXCAVATION, UNCLASSIFIED
STATION 6+00 TO STATION 8+32.6 TO A DEPTH
OF 50 FEET PLUS ALLOWABLE OVERDEPTH
(ESTIMATED QUANTITIES, SEE NOTE 1) 51,000 CUBIC YARD $___________ $_______________
0004 TURBIDITY AND DISPOSAL MONITORING JOB $_______________
0005 BIRD MONITORING JOB $_______________
0006 STANDBY TIME (SEE NOTE 3) 24 HOUR $___________ $_______________
0007 PARTNERING REGROUP (SEE NOTE 4) 1 EACH $___________ $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0007) $_______________
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY
BE EXCEEDED.
(2) ALL OFFERS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
(3) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERIING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER.
STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT
AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(4) THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY
BE MADE FOR ACTUAL NUMBER OF PARTNERING REGROUPS CONDUCTED.
SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS
SECTION 00 31 21 Page 1 Amendment 0002
DESIGNATION: ST JO 351 2009 JAX FL
PROCEED FROM INTERSECTION OF I295/S.R. 9A AND HECKSCHER DRIVE, 4.1 MI. SOUTH ON
HECKSCHER DRIVE TO A DIRT/GRAVEL ROAD DR. +/-280' SOUTH OF CLAPBOARD CREEK
BRIDGE, TURN EAST/LEFT ONTO GRAVEL ROAD +/- 160' TO A FENCE, CONTINUE THRU FENCE
345'+/- TO INTERSECTION OF A LEVEE ROAD, TURN LEFT/NORTH ALONG LEVEE ROAD +/-170'.
POINT IS +/- 260' NORTH OF CENTERLINE OF GRAVEL ROAD, +/-75' WEST OF WEST TOP OF
LEVEE.
SECTION 00 31 21 Page 2 Amendment 0002
DESIGNATION: ST JO 352 2009 JAX FL
PROCEED FROM INTERSECTION OF I295/S.R. 9A AND HECKSCHER DRIVE, 4.1 MI. SOUTH ON
HECKSCHER DRIVE TO A DIRT/GRAVEL ROAD DR. +/-280' SOUTH OF CLAPBOARD CREEK
BRIDGE, TURN EAST/LEFT ONTO GRAVEL ROAD +/- 160' TO A FENCE, CONTINUE THRU FENCE
345'+/- TO INTERSECTION OF A LEVEE ROAD, TURN LEFT/NORTH ALONG LEVEE ROAD 1 MILE'.
POINT IS +/- 65' NORTH OF NORTH TOP OF LEVEE.
SECTION 00 31 21 Page 3 Amendment 0002
Designation: BIMT-101
PID: BBBX61
Stamping: BIMT-101, 2010, JAX DIST Setting: Set in top of concrete monument
Description: To reach from the intersection of Heckscher Dr and the entrance to Blount Island Marine Terminal, proceed southerly for 0.4 miles to entrance road on left leading to the Marine Corps Support Facility. Turn left then right onto Channel View Blvd and proceed to Entry Control Gate. Once through gate proceed on Channel View Blvd 1.0 miles to Sonar Way. Turn right and proceed 0.4 miles to Pierhead Way. Turn left and proceed southerly 0.7 miles to an area known as Navy Point and station location.
Observed: 2010-05-26T14:41:00Z
SECTION 00 31 21 Page 4 Amendment 0002
DESIGNATION - 872 0221 M TIDAL
PID - DH8953
STATE/COUNTY - FL/DUVAL
MARKER: FLANGE-ENCASED ROD
SETTING: STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)
STAMPING: 0221 M 2004
MARK LOGO: NGS
PROJECTION: RECESSED 13 CENTIMETERS
MAGNETIC: MARKER EQUIPPED WITH BAR MAGNET
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE OBSERVATIONS - April 18, 2004 ROD/PIPE-DEPTH: 14.6 meters
HISTORY - Date Condition Report By
HISTORY - 20040418 MONUMENTED FLDEP
STATION DESCRIPTION :: TO REACH THE MARK FROM THE INTERSECTION OF MONUMENT
ROAD AND FORT CAROLINE ROAD IN THE COMMUNITY OF BEACON HILLS, GO WEST AND
SOUTHWEST ON FORT CAROLINE ROAD TO THE JUNCTION OF FULTON ROAD, TURN RIGHT ON
FULTON ROAD AND GO NORTH AND NORTHEASTERLY FOR 0.9 MI TO THE MARK ON THE
LEFT, ABOUT 250.0 FT SOUTH OF THE ST JOHNS RIVER, A STAINLESS STEEL ROD
DRIVEN TO REFUSAL AT A DEPTH OF 48.0 FT WITH AN NGS LOGO CAP RECESSED 0.5 FT
BELOW THE LEVEL OF THE GROUND AND BELOW THE LEVEL OF FULTON ROAD, THE DATUM
POINT IS RECESSED 0.3 FT BELOW THE LEVEL OF THE NGS LOGO CAP.
LOCATED 81.5 FT NORTHWEST OF WOODEN POWER POLE NUMBER 5049, 26.5 FT WEST OF
THE CENTERLINE OF FULTON ROAD, 9.8 FT SOUTH-SOUTHEAST OF THE SOUTH GATEPOST
FOR A 6.0 FT HIGH WOODEN FENCE GATE, 3.0 FT EAST OF A CHAIN LINK FENCE AND
1.8 FT EAST OF A CARSONITE WITNESS POST.
NOTE 1 : ACCESS TO THE DATUM POINT IS HAD THROUGH A 5-INCH NGS LOGO CAP.
NOTE 2 : A MAGNET WAS BURIED AT THE SOUTH SIDE OF THE MARK.
SECTION 00 31 21 Page 5 Amendment 0002
Designation: STJO-302
PID: BBCB02
Stamping: STJO 302 1991 JAX DIST Setting: Massive retaining walls
Description: To reach from the intersection of Heckscher Dr. and the entrance to Blount Island Marine Terminal, proceed southerly for 0.4 miles to entrance road on left leading to the Marine Corps Support Facility. Turn left then right onto Channel View Blvd and proceed to Entry Control Gate. Once through gate proceed on Channel View Blvd 1.0 miles to Sonar Way. Turn right and proceed 0.4 miles to Pierhead Way. Continue west to pier. Mark is located near SW corner of bulkhead near most southerly bollard.
Observed: 2008-11-25T15:11:00Z
G E
N E
R A
L
G-02
VI
CB-JH99-22 IDENTIFIER
P-JH99-22 IDENTIFIER
GS-JH99-22 IDENTIFIER
VB-JH99-22 IDENTIFIER
CORE BORING
PROBE
GRAB SAMPLE
VIBRACORE BORING
LIGHTED BEACON
GREEN DAYBEACON
RED DAYBEACON
CAN BUOY
NUN BUOY
PROJECT DEPTH
NO WAKE
SIGN
RED LIGHTED BUOY / GREEN LIGHTED BUOY
(EARTH, 45^)
EXISITNG SOIL
SEA GRASS LIMITS
PROJECT CHANNEL
ELEVATION AND LOCATION49.5
PIPELINE ROUTE
CONTROL MONUMENT
HORIZONTAL AND VERTICAL
UPLAND DISPOSAL AREA
IN THE DIRECTION OF ARROW
MONUMENT FALLS OFF THE PAGE
CONTROL POINT
VERTICAL / TIDAL CALIBRATION
GRASS OR MARSH AREA
PID AF31
CHANNEL PI POINTS
CHANNEL LIMITS
A B
B R
E V
IA
T
IO
N S A
N D S
Y M
B O
L S
VERTICAL
UNITED STATES MARINE CORPS
UNITED STATES COAST GUARD
UNITED STATES ARMY CORPS OF ENGINEERS
TYPICAL
TOE OF SLOPE
TOLERANCE
TOP OF BERM
TURNING BASIN
STATION
STREET
SQUARE FEET/FOOT
SHEET
RANGE
REQUEST FOR INFORMATION
ROAD
POINT OF INTERSECTION
NOT TO SCALE
NUMBER
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
NORTH AMERICAN DATUM OF 1983
NORTH AMERICAN VERTICAL DATUM OF 1998
MEAN LOW WATER
MEAN LOWER LOW WATER
MEAN HIGH WATER
MARINE CORPS SUPPORT FACILITY
LINEAR FOOT/FEET
INTRACOASTAL WATERWAY
HORIZONTAL
FOOT/FEET
FLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
EDGE OF BERM
ELEVATION
ELEVATION
EROSION CONTROL LINE
DRAWING
DREDGE MATERIAL PLACEMENT FACILITY
DISPOSAL AREA - DAYSON ISLAND
CUBIC YARD
CONTRACTING OFFICER'S REPRESENTATIVE
CONCRETE
CENTERLINE
CHANNEL
CONSTRUCTION BASELINE
BOULEVARD
APPROXIMATE
VERT
USMC
USCG
USACE
TYP
TOS
TOL
TOB
TB
STA
ST
SF
SH
RGE
RFI
RD
PI
N.T.S.
NO
NOAA
NAD83
NAVD88
MLW
MLLW
MHW
MCSF
LF
IWW
HORZ
FT
FDOT
FDEP
EOB
EL / ELEV
EL
ECL
DWG
DMPF
D/A-D
CY
COR
CONC
CL
CHN.
CBL
BLVD
APPROX
DREDGING AREA
FULL SECTION
PARTIAL SECTION
DETAIL INDICATOR
A7
DRAWING WHERE SHOWN
OUT IN DETAIL
LOCATION CALLED
SMALL CONDITIONS DETAIL INDICATOR
OBJECT REFERENCED
VIEWING PLANE
CUTTING PLANE LINE
(CONCST)
CONCRETE
CAST-IN-PLACE
(CONCLW)
PRECAST CONCRETE
(EARTH)
COMPACTED FILL
(GRVCRE)
/FDM
DRAINAGE BLANKET
(GRVSCL)
BEDDING MATERIAL
(RIPRAP)
RIPRAP
(EARTH, 45^)
EXISITNG SOIL
(TERRZO)
FILTER SAND
(GRAVEL)
GRAVEL
(POROUS)
COBBLES
EXTERIOR ELEVATION
E6
DRAWING WHERE SHOWN
G2
OBJECT REFERENCED
D5
VIEWING PLANE
CUTTING PLANE LINE
D5
F6 F3
MATERIAL SYMBOL KEY
REFERENCE SYMBOL KEY
TERMS AND ABBREVIATIONS
T - TELECOMMUNICATIONS
E - ELECTRICAL
M - MECHANICAL
F - FIRE PROTECTION
Q - EQUIPMENT
A - ARCHITECTURAL
S - STRUCTURAL
C - CIVIL
B - GEOTECHNICAL
V - SURVEY/MAPPING
G - GENERAL
IDENTIFICATION
IDENTIFICATION
IDENTIFICATION
IDENTIFICATION
S-56 S-56
S-76
A-32 M-51
A-21A-21
GENERAL NOTES
GENERAL SYMBOLOGY
LEGEND - NAVIGATION
LEGEND - GEOTECHNICAL BORINGS
LEGEND - AIDS TO NAVIGATION
SHOWN
DRAWING WHERE
SHOWN
DRAWING WHERE
DISCIPLINE DESIGNATOR
NAVD88
2.69'
NGVD29
1.3'
2.86'
TIDAL RELATIONSHIPS
(SEE NOTE 4.)
MLW (83-01)
MLLW (83-01)
1.9'
MLW (LEGACY)
SURVEY NOTES - CHANNELSURVEY NOTES - UPLAND DISPOSAL
400'0 200'20' 40'0
200'0 100'
N
NORTH INDICATOR
GRAPHIC SCALE
SECTION NAME
TITLE
DRAWING WHERE SHOWN
GRAPHIC SCALE
CROSS SECTIONC
C-16
HORIZONTALVERTICAL
DRAWING AREA CROSS SECTION PROFILE TITLE WITH ASYMMETRICAL SCALES
DRAWING AREA - PLAN
A
A F
E B
A
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT OF PROJECT.7.
SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
ADDITIONAL LEGENDS AND/OR ABBREVIATIONS MAY APPEAR IN THIS SET OF DRAWINGS TO INDICATE 6.
ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.
THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE CONDITIONS 5.
ARE NOT TO BE USED FOR MEASUREMENTS (DATED 2017).
THE AERIAL PHOTOGRAPHY SHOWN ON THESE DRAWINGS ARE FOR GENERAL INFORMATION ONLY AND 4.
OR AFFECT THE PERFORMANCE OF CONSTRUCTION OF THIS PROJECT.
VERIFYING THE LOCATION OF ALL SUCH FEATURES THAT HE/SHE DETERMINES ARE NECESSARY FOR
STRUCTURES ARE INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONCIBLE FOR
WERE NOT PHYSICALLY LOCATED BY SURVEY UNLESS OTHERWISE INDICATED. NOT ALL EXISTING
ALL PLANIMETRIC LAND FEATURES DEPICTED ON THESE PLANS ARE FOR INFORMATION ONLY AND 3.
OF 1983 (NAD83(90)). ALL UNITS ARE U.S. SURVEY FEET.
COORDINATE SYSTEM AND REFERENCED TO THE 1990 ADJUSTMENT TO THE NORTH AMERICAN DATUM
COORDINATES SHOWN ON THESE DRAWINGS ARE BASED ON THE FLORIDA STATE PLANE EAST ZONE 2.
REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS ARE WITHIN THE SCOPE OF THEIR EMPLOYMENT AS
ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS THAT
THIS PROJECT WAS DESIGNED BY THE JACKSONVILLE DISTRICT OF THE U.S. ARMY CORPS OF 1.
CF ACHAIN LINK FENCE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\01 General\G-02
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y Y
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
AMENDMENT 0002
USACE EM 1110-2-1003, HYDROGRAPHIC SURVEYING, 30 NOV 2013.
REQUIREMENTS WERE FOLLOWED DURING THIS SURVEY IN ACCORDANCE WITH
11. SURVEY ACCURACY STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE
IS NOT TO BE USED FOR NAVIGATION.
INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME.THIS CHART
SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED AS
10. THE INFORMATION DEPICTED ON THESE MAPS REPRESENTS THE RESULTS OF
DURING SURVEY 18-171.
9. NAVAIDS WERE NOT LOCATED FOR THIS SURVEY. NAVAIDS SHOWN COLLECTED
STA 12+00 TO STA 57+0012 JAN 2019 SB-46
STA 0+00 TO STA 12+0018 DEC 2018 SB-46
VESSEL DATE OF SURVEY AREA
GATE ARE SHOWN IN LOW FREQUENCY.
THE SECURITY GATE ARE SHOWN IN HIGH FREQUENCY. DEPTHS INSIDE SECURITY
A DUAL-FREQUENCY (28/200KHZ) SINGLE-BEAM TRANSDUCER. DEPTHS OUTSIDE
SYSTEM OPERATING AT 230 KHZ AND A ROSS MODEL 835C SMARTSOUNDER WITH
8. VERTICAL MEASUREMENTS WERE MADE USING A R2SONIC 2024 MULTI-BEAM
TIDE STAFF SET FROM "BIMT-101" (OPUS PID: BBBX61)
REFERENCE BASE LOCATED AT "BIMT-101" (OPUS PID: BBBX61)
WITH THE FOLLOWING REFERENCE BASE LOCATION:
7. THIS SURVEY WAS PERFORMED USING REAL-TIME KINEMATIC GPS POSITIONING
6. ALL STATIONING REFERS TO THE CENTERLINE OF THE CHANNEL.
1983.
THE EAST ZONE OF FLORIDA AND REFERENCED TO THE NORTH AMERICAN DATUM OF
5. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR
4. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY A (+) SIGN.
CAMDENGA-NASSAU-DUVAL-STJOHNS-FLAGLER_01FEB2011.KTD.
AND UTILIZING A HYPACK KINEMATIC TIDAL DATUM (KTD) MODEL, TITLED
3. TIDAL REDUCTIONS WERE OBTAINED USING REAL-TIME KINEMATIC (RTK) GPS
NOAA TIDAL STATION "872-0221", FULTON, ST. JOHNS RIVER FOR ALL CUTS
THE TIDE GAUGE SITE SPECIFIED BELOW:
TO THE PUBLISHED MLLW HEIGHTS OF THE BENCHMARK ASSOCIATED WITH
ADMINISTRATION (NOAA). NOAA'S VDATUM MODEL WAS USED AND CALIBRATED
1983-2001, AS REPORTED BY THE NATIONAL OCEANIC AND ATMOSPHERIC
2. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO MLLW, TIDAL EPOCH
1. REFER TO SURVEY NO. 19-073.
NOT VALID UNLESS SIGNED AND SEALED BY A FLORIDA LICENSED SURVEYOR.
DAVID J. O’BRIEN, JR. PROFESSIONAL SURVEYOR & MAPPER, NO. 5925.
MAP IS NOT VALID WITHOUT THIS REPORT AND VICE VERSA.
ASSOCIATED WITH THIS REPORT IS BY REFERENCE MADE A PART HEREOF AND THE
SURVEYORS AND MAPPERS PER FLORIDA ADMINISTRATIVE CODE 5J-17. THE MAP
PROFESSIONAL SURVEYORS AND MAPPERS AS SET FORTH BY THE FLORIDA BOARD OF
PERFORMED IN ACCORDANCE WITH THE STANDARDS OF PRACTICE FOR
12. CERTIFICATION - THIS IS TO CERTIFY THAT THIS REPORT AND SURVEY HAVE BEEN
SIGNING PARTY OR PARTIES.
SIGNING PARTY OR PARTIES IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF THE
11. ADDITIONS OR DELETIONS TO THE SURVEY MAPS OR REPORT BY OTHER THAN THE
LICENSED SURVEYOR AND MAPPER THIS SURVEY IS NOT VALID.
10. UNLESS IT BEARS THE SIGNATURE AND ORIGINAL RAISED SEAL OF A FLORIDA
AS INDICATING THE GENERAL CONDITIONS AT THAT TIME.
THE SURVEYS MADE ON THE DATES INDICATED ABOVE AND CAN ONLY BE CONSIDERED
9. THE INFORMATION DEPICTED ON THESE DRAWINGS REPRESENTS THE RESULT OF
THE BEGINNING, PERIODICALLY IN BETWEEN, AND AT THE END OF EACH RTK SESSION.
8. QUALITY CONTROL CHECKS WERE PERFORMED AT MONUMENT CONTROL POINTS AT
INTERVALS, SEPARATED BY A MINIMUM OF SIX (6) HOURS.
UTILIZING RTK (REAL TIME KINEMATIC) GPS, BY OBSERVING 180 EPOCHS AT TWO
INFORMATION. SURVTECH ESTABLISHED TEMPORARY CONTROL ON THE BERM
CANOPY, THE SOKKIA 330R TOTAL STATION WAS UTILIZED TO COLLECT TOPOGRAPHIC
CANOPY USING THE RTK (REAL TIME KINEMATIC) GPS. IN AREAS WHERE THERE WAS
3”INSTRUMENT. TOPOGRAPHIC INFORMATION WAS COLLECTED IN AREAS WITHOUT
GPS BOARDS), DUAL FREQUENCY SYSTEMS, AND AS NEEDED, A SOKKIA 330R
7. THE TOPOGRAPHIC DATA WAS COLLECTED UTILIZING A CHAMPION TKO (TRIMBLE R-8
A BOUNDARY SURVEY OF PARCEL B DAYSON SPOIL SITE.
LEVEE, TOPOGRAPHIC DATA ON A 100-FOOT GRID OVER THE IMPOUNDMENT AREA AND
6. THE WORK CONSISTED OF CROSS SECTIONS AT 100-FOOT INTERVAL OVER THE
FEET.
5. ALL POSITIONS AND ELEVATIONS ARE EXPRESSED IN THE UNITS OF U.S. SURVEY
(NAVD88).
4. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
EAST ZONE.
1983, REALIZATION OF 2011, NAD83(2011), STATE PLANE COORDINATE SYSTEM, FLORIDA
3. HORIZONTAL COORDINATES ARE REFERENCED TO THE NORTH AMERICAN DATUM OF
AND DECEMBER 20, 2018.
2. SURVEY WAS PERFORMED BY SURVTECH SOLUTIONS, INC., BETWEEN NOVEMBER 16
1. USACE DATABASE SURVEY NO. 18-272.
O V
E R
H E
A D E
L E
C T
R
IC
A L
E R
H E
A D E
L E
C T
R
IC
E R
H E
A D E
L E
C T
R
IC
GULF OF MEXICO
LAKE
OKEECHOBEE
ALABAMA
GEORGIA
TALLAHASSEE
PENSACOLA
JACKSONVILLE
ORLANDO
FT MYERS
MIAMI
TAMPA
KEY WESTN.T.S.
LOCATION MAP
OF WORK
LOCATION
CANAVERAL
ST LUCIE
ST AUGUSTINE
GAINESVILLE
FLORIDA
OCEAN
ATLANTIC
BEACH
WEST PALM
FT. LUDERDALE
N
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\01 General\G-03
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
AMENDMENT 0002
G-03600' 1200'0
G E
N E
R A
L
P R
O J E
C T O
V E
R V
IE
W -M
C T S
R -G
I0 .d g n
C L A P B
O A
R D C
R E E
K
DAMES P
OINT - F
ULTON C
UTOFF
HECKSCHER DR. (CR. 105)
HECKSCHER DR. (CR. 105
B R
O W
N 'S C
R E E
K
CEDAR POINT CREEK
S T. J O H N S R I V E R
O L D S T. J O H N S R I V E R
S T.
J O
H N S R
I V E R
B L O U N T I S L A N D
L I T T L E M A R S H I S L A N D
B L O
U N T
IS
L A
N D B
L V
D
B
LO
U N
T IS
LA
N
D R
O A D
ISLAND
BARTRAM
N
B
LO
U N
T ISLA
N
D
M A
R
IN
E C O
R
PS SU
PPO
R
T FA
C
ILITY
P R O J E C
T L I M I T S
J A X P O
R T C O
N T A I N
E R T E
R M I N A
L
DISCHARGE
PIPELINE
(S E
E S
H E
E T . C
-0
A P P
R O
X
IM
A T E D
R E
D G
E P
IP
E L
IN
E R
O U
T E
(S E
E S
H E
E T . C
-0
A P P
R O
X
IM
A T E D
R E
D G
E P
IP
E L
IN
E R
O U
T E
TOP OF EXISTING DIKE (TYP.)
INSTALLATION MANAGEMENT OFFICE (IMO)
(D/A-D)
DISPOSAL AREA
ISLAND
DAYSON
LOCATION OF WEIRS
TIMUCUAN ECOLOGICAL and HISTORIC PRESERVE MAP
LIMITS OF OUTSTANDING FLORIDA WATERS - OFW
DEPTH
REQUIRED
VOLUME TO
VOLUME
TOTAL
ESTIMATED DREDGING QUANTITIES IN CUBIC YARDS (CY)
STATIONING
DREDGE AREA
DEPTH
REQUIRED
6+00 TO 8+32.6
38'
50'
OVERDEPTH
ALLOWABLE
VOLUME IN 2'
51,00010,00041,000
8+32.6 TO 56+09.1
AND
0+00 TO 6+00
PRESERVE OUTSTANDING FLORIDA WATERS - OFW
LIMITS OF NASSAU RIVER ST JOHNS RIVER MARSHES AQUATIC
OUTSTANDING FLORIDA WATERS - OFW
LIMITS OF TIMUCUAN ECOLOGICAL AND HISTORIC PRESERVE
APPROXIMATE SHORELINE APPROXIMATE SHORELINE
APPROXIMATE S
HORELINE
APPRO
XIM
ATE SHO
RELINE
APPRO
XIM
ATE SHO
RELINE
A
A F
E B
4,000 72,000 76,000
TOTAL 127,000
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
100' 200'0
VERTICAL HORIZONTAL
A
C-01
PROJECT CHANNEL
AREA TO BE DREDGED
10' 20'0
A
C-01
A
C-01
50-FOOT REQUIRED DEPTH
EXISTING BOTTOM
EXISTING CONCRETE SILL
PROFILE OF CHANNEL CENTERLINE
AREA TO BE DREDGED
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
S T
A
2-FOOT ALLOWABLE OVERDEPTH
S T
A
C
C-03
C
C-03
5'
4'
EL. 46
WEST FACE OF SILL AT EL. 43 TO 46
#11 BARS ON 18" CTRS PROTRUDING FROM
FROM EAST FACE OF SILL AT EL. 38 AND 40
2 ROWS OF #8 BARS ON 12" CTRS PROTRUDING
50'50'
B
C-03
C
C-03
38' REQUIRED DEPTH 38' REQUIRED DEPTH
DEPTH
REQUIRED
DEPTH
REQUIRED
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\02 Civil\C-01
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
AMENDMENT 0002
.6
.4
.3
.2
.1
.0
.9
. 9
.8
.7
.5
. 4
. 2
. 1
42.9 4
42.8
42.7
42.6
.5 42.5
42.5
42.5
42.5
42.4
42.4
42.4
42.4
42.3
42.3
42.3
42.3
42.3
42.3
42.3
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.2
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.1
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0
42.0 42.0
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9
41.9 41.9
41.9
41.9
41.9
41.9
41.9
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8 41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.7
41.7
41.7
41.7
41.7
41.7
41.7 41.7
41.7
41.7
41.6
41.6
41.6
41.6 41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6 41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.6
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.5
41.4
41.4
41.4
41.4
41.4 41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.4
41.3
41.3 41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3
41.3 41.3
41.3
41.2 41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.2
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.0
41.0
41.0
41.0
41.0 41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
41.0
40.9
40.9
40.9 40.9
40.9
40.9
40.9
40.9 40.9
40.8
40.8
40.8
40.8
40.8
40.8
40.8 40.8
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.6
40.6
40.6
40.6
40.6
40.6 40.6
40.6
40.6
40.5
40.5
40.5
40.5
40.5
40.5
40.5
.5 40.5
40.5
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.4
40.3
40.3 40.3
40.3
40.3
40.3
40.3
40.3
40.3
40.3 4
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.2
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.0
40.0 40.0
40.0
40.0
40.0
40.0
40.0
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.7
39.7
39.7
39.7
39.6
39.6
39.6
39.6
39.6
39.5
39.5
39.4
39.4
39.4
39.4
39.4
39.4
39.4 39.4
39.4
39.3
39.3
39.3
39.3 39.3
39.3
39.3
39.3
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.2
39.1
39.1
39.1
39.1
39.1
39.1
39.1
39.1
.1
39.1 39.1
39.0
39.0
39.0
39.0
38.9
38.9
38.9
38.9
38.9 38.9
38.8
38.8
38.7
38.7
38.7
38.7
38.7
38.7
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.5
38.5
38.5
38.5
38.4 38.4
38.4
38.3
38.2
38.1
38.0
38.0
38.0
38.0
38.0
37.8
37.8
37.8
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.6
37.6
37.6
37.6
37.6
37.5
37.5
37.5
37.5
37.5
37.5
37.4
37.4
37.3 37.3
37.3
37.3
37.0 37.0
36.8
36.7
36.6
36.4 36.4
36.4
36.3 36.3
36.1
35.9
35.7 35.7
35.6
35.4
34.8 34.8
34.7
34.6
34.5
34.4
34.4
33.9
33.6
33.5
33.4
32.9
32.3
32.0
31.9
31.2
31.0
30.7 30.6
30.5
29.3
27.3
26.7
26.3
26.0
25.4 25.4
.3 24.5
23.5 23.4
22.2
21.9
21.4
21.1 20.7
20.1
20.0
19.4
19.2
18.8
17.9 17.7
17.5
.2
16.8 16.6
13.3 13.0
12.6
10.8
8.4
6.4 5.1
42.5
42.3
42.2
42.2
42.2 42.2 42.2
42.2
42.1
42.1
42.1 42.1
42.0 42.0
42.0
42.0
42.0
42.0
42.0 42.0
42.0
41.9
41.9
41.9
41.9
41.9
41.9
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.8
41.7
41.7
41.7
41.7
41.7
41.6
41.6
41.6
41.6
41.6 41.6
41.6
41.6
41.6
41.5 41.5
41.5
41.5
41.5 41.5
41.5
41.4
41.4
41.4
41.4
41.4
41.4
41.3
41.3
41.3 41.3
41.3 41.2 41.2
41.2
41.2
41.2 41.2
41.2
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1
41.1 41.1 41.0 41.0
41.0
40.9
40.9
40.9 40.9
40.8
40.8
40.8
40.8
40.7
40.7
40.7
40.6
40.6
40.6
40.6
40.6
40.5
40.5
40.4
40.3
40.2
40.2
40.2
40.2 40.1
40.1
40.1
40.0
40.0
40.0
40.0
40.0
39.9
39.9
39.9
39.8
39.8
39.8
39.8
39.7
39.6
39.5
39.5
39.5
39.5
39.5
39.4
39.4
39.4
39.4
39.4
39.4
39.3
39.3
39.3
39.3 39.3
39.2
39.2
39.2
39.2
39.2
39.2
39.1
39.1
39.1
39.1
39.1
39.1
39.1
39.0
39.0
39.0
39.0
39.0
38.9
38.9
38.9
38.9
38.9
38.9
38.8
38.8
38.8
38.8
38.8
38.8 38.8
38.8
38.8
38.7
38.7
38.7
38.7
38.7 38.7
38.7
38.7
38.7
38.7
38.6
38.6
38.6
38.6
38.6
38.6
38.5
38.5
38.5
38.5
38.5
38.5
38.5 38.5
38.5
38.5
38.5
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.4
38.3 38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.2
38.2
38.2
38.2
38.2 38.2
38.2
38.2
38.2
38.2
38.2
38.2
38.2
38.2
38.2 38.1
38.1
38.1 38.1
38.1 38.1 38.1
38.1
38.1
38.1
38.1
38.1
38.0
37.5
37.3 36.6 35.9
35.3
35.1 35.0
34.9
34.8 34.7
33.8
33.7 33.4
33.2
32.9
32.7
31.8
31.8
31.4 30.8 30.8
30.8
30.5
29.2 29.1 28.1
28.0 27.5
26.9
26.8
26.3
26.0
26.0 25.8
25.5
25.4
25.0
24.9
24.9 24.5
24.4
24.1 23.3
23.3 22.7
21.5 21.0 20.6 20.6
20.5 20.2
20.1 19.7 19.7 19.6 19.6
19.6
18.6 18.0
18.0
17.9 17.7
17.7
17.5
17.4
17.2
17.2
17.1
17.0
16.8
16.4 16.3 16.1 15.6
15.6
15.5
15.5
15.4 15.4 15.3
15.1
15.0
15.0
14.5
14.1
14.1 14.0
14.0
14.0 13.8
13.8
13.7
13.7
13.7
13.6 13.3 13.2
13.0 12.7
12.7
12.7
12.6
12.5
12.5
12.4
12.3
12.2
12.1 12.1 11.8
11.5
11.3
11.0 10.9
10.7 10.7 10.6
10.1
10.0
9.8
9.7 9.7 9.7
9.6
9.4
9.1 9.1
8.9
8.5 8.5 8.38.2 8.28.1
8.1 8.1
8.0
7.9
7.9
7.8
7.5 7.4
7.4
6.9
6.5
6.5 6.5 6.56.4
6.2
6.1
6.0 5.8
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -2
C B -B
IM
C -0
G S -B
IM
C -3
C B -B
IM
C -0
G S -B
IM
C -1
V B -B
IM
C -1
C B -B
IM
C -0
C B -B
IM
C -0
C B -B
IM
C -0
G S -B
IM
C -2
C B -B
IM
C -0
C B -B
IM
C -0
V B -B
IM
C -2
C B -B
IM
C -0
G S -B
IM
C -5
G S -B
IM
C -4
C B -B
IM
C -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
RGE. 707.5
RGE. 500
RGE. 292.5
RGE. 795.0
RGE 500
RGE. 222.5
R
IP
R
A P
STEEL SHEET PILE
PIERHEAD WAY
S L
IP
W A
Y D
R
IV
E
SHORELINE
APPROXIMATE
SHORELINE
APPROXIMATE
PILES
FENDER GUIDE
EXTENDED
DOLPHIN
MOORING DOLPHIN
MOORING
DOLPHIN
MOORING
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
S E
E N
O T
E
C-01
N
100' 200'0
-M
C T -C
N P
L N .d g n
C
IV
IL
Y= 2, 4, Y= 2, 3, Y= 2, 4, X ,0
X ,5
X ,0
X ,5
X ,0
Y= 2, 6, Y= 2, 6, Y= 2, 5, Y= 2, 7, Y= 2, 5, X ,5
X ,0
Y= 2, 5, X ,0
X ,5
X ,0
M A
T C
H L
IN
S H
E E
T C
-0
T
A
Y= 2, 5, X ,5
X ,0
X ,5
Y= 2, 3, X ,5 0Y=
2, 3, B A C K R I V E R
2 FOOT ALLOWABLE OVERDEPTH
38-FOOT REQUIRED DEPTH PLUS
D R
E D
G
IN
G P
L A
N
S T
A T
O S
T A
S T
A
S T
A
S T
A
L
IM
IT
S O
F P
R O J E
C T
M A R I N E C O R P S S U P P O R T F A C I L I T Y C H A N N E L
B L O U N T I S L A N D
S T
A
S T
A
2-FOOT ALLOWABLE OVERDEPTH
50-FOOT REQUIRED DEPTH PLUS 100'100'
S T
A
S T
A F
A C
E O
F S
IL
L
S T
A .6 F
A C
E O
F S
IL
L
S T
A .6
S T
A
S T
A
S T
A
S T
A
S T
A .3
2-FOOT ALLOWABLE OVERDEPTH
50-FOOT REQUIRED DEPTH PLUS
PIERHEAD WAY
AT ELEV. - 37.6' MLLW
SUBMERGED REINFORCED CONCRETE SILL
32.6'W x 426.5'L
PROFILE DETAIL BELOW
FACES OF SILL SEE
REBAR PROTRUDING FROM BOTH
FROM THE SILL IN THESE AREAS.
AND THE ADJACENT STRUCTURES. LARGE QUANTITIES OF REBAR PROTRUDE
3. DREDGING IS NOT REQUIRED BETWEEN THE ENDS OF THE CONCRETE SILL
OF PROJECT.
2. THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT
REGARDING DREDGING ADJACENT TO STRUCTURES.
"ADJACENT PROPERTY AND STRUCTURES" FOR INSTRUCTIONS
SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED
1. A 15' STRUCTURE DREDGING OFFSET IS REQUIRED FOR ALL STRUCTURES.
NOTES:
(RANGE 286.75 TO RANGE 713.25)(RANGE 286.75 TO RANGE 713.25)
SEE NOTE 3
NO-DREDGE AREA
SEE NOTE 3
NO-DREDGE AREA
RGE 713.25
RGE 286.75
A R
E V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
F E
B
.0
2.
0.
9.
.1
7.
.1
.1
.5
.8
6.
6.
5.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
9.
8.
8.
8.
8.
8.
8.
8.
8.
88.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
8.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
7.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
6.
5.
5.
5.
5.
4.
4.
4.
. 7
. 5
. 2
. 0
. 9
41.7
41.7
41.6
41.3
41.3
41.2
41.2
41.1
41.1
41.0
41.0
41.0
41.0
40.9
40.9
40.9
40.8
40.8 40.7
40.7
40.7
40.7
40.7
40.7
40.7
40.6
40.6
40.5
40.5
40.5
40.5
40.5
40.5 40.4
40.4
40.4
40.3
40.3
40.3
40.3
40.2
40.2
40.2
40.2 40.2
40.2
40.2
40.1
40.1
40.1
40.1
40.1
40.1
40.1
40.1 40.1
40.1
40.1 40.1
40.1
40.0
40.0
40.0
40.0 40.0
40.0
40.0
40.0
40.0
40.0
40.0
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.9
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8
39.8 39.8
39.8
39.8
39.8
39.7
39.7
39.7
39.7
39.7 39.7
39.7
39.7
39.7
39.7
39.7 39.7
39.7
39.7
39.7
39.7
39.6
39.6 39.6
39.6
39.6
39.6
39.6 39.6
39.6 39.6
39.6
39.6
39.6
39.6
39.6
39.6
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5 39.5
39.5
39.5
39.5
39.4
39.4
39.4
39.4
39.4
39.4
39.4
39.3
39.3
39.3
39.3
39.3 39.3
39.3
39.3
39.3
39.3
39.3
39.3
39.2
39.2
39.2
39.2
39.1 39.1
39.1
39.1
39.1
39.0
39.0
39.0
39.0
39.0
39.0
38.9
38.9
38.9
38.9
38.9
38.9 38.9 38.9
38.9
38.9
38.9
38.9
38.8
38.8 38.8
38.8 38.8
38.8
38.8
38.8
38.7
38.7
38.7
38.7 38.7
38.7
38.6
38.6
38.6
38.5
38.5 38.5
38.5
38.5
38.5
38.5
38.4
38.4
38.4 38.4
38.4
38.4
38.4
38.4
38.4 38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.2
38.2
38.2
38.1
38.1 38.1
38.0
37.8
37.6
37.4
37.3 37.1
37.1
37.0
36.7
36.6
35.6
35.6
34.9
34.7
34.5 33.9
33.8
33.7 33.4
33.1 32.7
32.6
32.5 32.2
32.2
32.0
31.7 31.2
31.1 31.0
30.2
29.7
28.3
28.0
27.8
27.8 27.7
27.5
27.5
27.3
27.0
26.8
26.6 26.3
26.0 25.5
25.3 24.4
24.4
24.2 24.1
23.5 23.4
23.3 23.0
22.8
22.7 22.6
22.3 22.2 21.5
21.4
21.3
21.1 20.9
20.6
20.2
19.5
19.3
19.3
19.1 18.3
18.2 18.2 18.0
17.9
17.6
17.6
17.4
17.4 17.3
17.2
16.7
16.5 16.4
16.2
16.2 16.2
16.1
16.1 15.6
15.4
15.4
15.2 15.2 15.2
14.9 14.8
14.7
14.7 14.7
14.7 14.7 14.6
14.5
14.5
14.5
14.1
14.0 14.0 13.8
13.8
13.8
13.7 13.6
13.6
13.5 13.4 13.4
13.1
13.1
12.9
12.9
12.9
12.9 12.8
12.7
12.5
12.4
12.2
12.2 12.2
12.0
11.9
11.9
11.8 11.8
11.8 11.6
11.5
11.5
11.5 11.5
11.4
11.0
10.8
10.8
10.8
10.7
10.6 10.5
10.5
10.4
10.4 10.4
10.3
10.2
10.1
10.0
10.0
9.9
9.9
9.6 9.5
9.5
9.4 9.4 9.4
8.7
8.6 8.4
8.3
7.9
7.9
7.9
7.9
7.0
7.0
6.5
6.4 5.8
5.1
S T
A
D
C-03
D
C-03
G S -B
IM
C -6
C B -B
IM
C -1
V B -B
IM
C -3
C B -B
IM
C -1
G S -B
IM
C -7
C B -B
IM
C -1
C B -B
IM
C -1
G S -B
IM
C -9
C B -B
IM
C -1
G S -B
IM
C -8
G S -B
IM
C -1
V B -B
IM
C -4
C B -B
IM
C -1
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -0
C B -B
IM
C T -1
C B -B
IM
C T -1
C B -B
IM
C T -0
C B -B
IM
C T -0
RGE. 707.5
RGE. 500
RGE. 292.5
RGE. 500
RGE. 292.5
B A C K R I V E R
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
SHO
RELI
NE
APP
RO
XI
M
ATE
SHO
RELI
NE
APP
RO
XI
M
ATE
Y= 2, 4, RGE. 707.5
Y= 2, 2, Y= 2, 3, Y= 2, 3, X ,5
L
IM
IT
S O
F P
R O J E
C T S
T A .1
C U T -4
D A
M E S P
O
IN
T F
U L T O
N C
U T O F F
S
J
H
R I V E R
L
IM
IT
S O
F P
R O J E
C T S
T A .8
B A C K R I V E R
X ,5
X ,0
X ,0
X ,0
NOTE:
EASTERN LIMIT OF PROJECT
Y= 2, 5, X ,5
Y= 2, 4, Y= 2, 5, Y= 2, 4, X ,5
Y= 2, 5, X ,0
CHANNEL LIMITS
JACKSONVILLE HARBOR
Y= 2, 2, Y= 2, 1, S E
E N
O T
E
SECURITY BARRIER
100' 200'0 C-02
C
IL
M A
T C
H L
IN
H
E E
T C
- 0
A
X ,0
X ,5
X ,5
X ,0
X ,5
X ,0
X ,5
X ,5
X ,5
X ,0
X ,5
X ,0
Y= 2, 2, Y= 2, 2, Y= 2, 3, Y= 2, 3, Y= 2, 5, Y= 2, 4, D R
E D
G
IN
G P
L A
N
S T
A T
O S
T A
.1
2 FOOT ALLOWABLE OVERDEPTH
38-FOOT REQUIRED DEPTH PLUS
APPROVED BY CONTRACTING OFFICER.
ROUTE. EXACT ROUTE TO BE FIELD LOCATED AND
APPROXIMATE LOCATION OF OVERLAND PIPELINE
A F
E B
A
-M
C T -C
N m o d .d g n
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
OF PROJECT.
2. THE JACKSONVILLE HARBOR CHANNEL LIMIT LINE IS THE EASTERN LIMIT
REGARDING DREDGING ADJACENT TO STRUCTURES.
" ADJACENT PROPERTY AND STRUCTURES" FOR INSTRUCTIONS
SEE SPECIFICATION SECTION 35 20 23 PARAGRAPH TITLED
1. A 15' STRUCTURE DREDGING OFFSET IS REQUIRED FOR ALL STRUCTURES.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\02 Civil\C-02
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
AMENDMENT 0002
R "3 6"
TIE-BACK BUOY (06/16) 493,257 2,204,649
SEC GATE BUOY (06/16) 493,525 2,203,783
SEC GATE BUOY (06/16) 493,650 2,204,305
SEC GATE BUOY (06/16) 493,518 2,203,731
PLANE COORDINATES
AIDS TO NAVIGATION
X Y
DBN-1 (06/18) 493,873 2,203,463
LT-36 (06/18) 495,633 2,203,276
SIGN / TIDE STAFF (06/18) 494,820 2,204,021
INFO SIGN (08/14) 493,490 2,203,765 "D
BN-
1"
"D
BN-
1""S
EC
G
ATE
B
UO
Y"
"IN
FO
_S
IG
N"
M O
O
RI
NG
B
UO
Y
SEC
G
ATE
"IN
FO
_S
IG
N" /T
ID
E
STAFF
"S
EC
G
ATE
B
UO
Y"
R G
E .5
R G
E .5
NOTE:
C H
A N
N E
L C
E N
T E
R L
IN
E
R G
E
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
NATURAL ANGLE OF REPOSE FOR THE ADJACENT MATERIAL.
PAYMENT PROPOSES ONLY. ACTUAL SIDE SLOPES VARY WITH THE
2. SIDE SLOPES SHOWN ON CROSS SECTIONS ARE FOR CONTRACTUAL
ADJACENT TO STRUCTURES.
STRUCTURES" FOR INSTRUCTIONS REGARDING DREDGING
35 20 23 PARAGRAPH TITLED "ADJACENT PROPERTY AND
ALL STRUCTURES. SEE SPECIFICATION SECTION
1. A 15' STRUCTURE DREDGING OFFSET IS REQUIRED FOR
100' 200'0
HORIZONTAL
100' 200'0
VERTICAL
R G
E .0
R G
E .0
PROJECT CHANNEL
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
R G
E
R G
E .5
C E
N T E
R L
IN
E C
H A
N N
E L
600 700 800 900 1000 1100400300200100-100
8+00
SCALE: HORIZONTAL 1" = 50' VERTICAL 1" = 10'
PROJECT CHANNEL
AREA TO BE DREDGED
(ASPHALT) PAVEMENT
BITUMINOUS CONCRETE
INBOARD CRANE RAIL
OUTBOARD CRANE RAIL
B E
R T
H
1 BERTH #2
FENDER PANEL
(TYP.)
24" SQUARE CONC. PILE
PILE TIP EL. NOT SHOWN
(TYP.)
18" SQUARE CONC. PILE
PILE TIP EL. NOT SHOWN
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
+10
+20
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
+10
+20
100' 200'0
HORIZONTAL
100' 200'0
VERTICAL
R G
E .0
R G
E .0
PROJECT CHANNEL
38-FOOT REQUIRED DEPTH
2-FOOT ALLOWABLE OVERDEPTH
R G
E
R G
E .5
AREA TO BE DREDGED
C E
N T E
R L
IN
E C
H A
N N
E L
600 700 800 900 1000 1100400300200100-100 5000
SCALE: HORIZONTAL 1" = 50' VERTICAL 1" = 10'
(ASPHALT) PAVEMENT
BITUMINOUS CONCRETE
INBOARD CRANE RAIL
OUTBOARD CRANE RAIL
B E
R T
H
1 BERTH #2
FENDER PANEL
(TYP.)
24" SQUARE CONC. PILE
PILE TIP EL. NOT SHOWN
(TYP.)
18" SQUARE CONC. PILE
PILE TIP EL. NOT SHOWN
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
+10
+20
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
+10
+20
100' 200'0
HORIZONTAL
100' 200'0
VERTICAL
600 700 800 900 1000 1100400300200100-100 5000
SCALE: HORIZONTAL 1" = 50' VERTICAL 1" = 10'
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
CROSS SECTION AT STA.42+00D
C-02
CROSS SECTION AT STA. 4+00B
C-01
C
C-01
CROSS SECTION AT STA. 8+00
64.25' 81.75'
EL. 37.6'
EL. 52.0'
R G
E .7
R G
E .2
DISTANCE IN FEET FROM CENTERLINE
4+00
DISTANCE IN FEET FROM CENTERLINE
DISTANCE IN FEET FROM CENTERLINE
42+00
EXISTING BOTTOM 19-073
EXISTING BOTTOM 19-073
EXISTING BOTTOM 19-073
2-FOOT ALLOWABLE OVERDEPTH
50-FOOT REQUIRED DEPTH
SUBMERGED CONCRETE SILL
(FACE OF SILL STA. 7+00 THRU 7+32.6)
AREA TO BE DREDGED
38' REQUIRED
DEPTH
38' REQUIRED
(SEE NOTE 2)
DEPTH
50' REQUIRED
(SEE NOTE 2)
DEPTH
38' REQUIRED
(SEE NOTE 1)
15' DREDGING OFFSET
(SEE NOTE 1)
15' DREDGING OFFSET
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\02 Civil\C-03
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
AMENDMENT 0002
IL
C-03
-M
C T -C
N s e c ti o n .d g n
T Y
P
IC
A L C
R O
S S S
E C
T
IO
N S
A
A F
E B
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
8 18
000 0 0
25 25
5 5
5 5
C-05
D1
D2
C-05
D2
C-05
D1
C-05
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\02 Civil\C-04
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
AMENDMENT 0002
C F
C F
C F
C F
C F
C F
C F
C F
C F
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
C F
C F
C F
CF
C F
DESIGNATION PID NORTHING EASTING NAVD88 MLLW
SURVEY CONTROL POINTS --- DAYSON ISLAND
HORIZONTAL AND VERTICAL CONTROL POINT
FLORIDA EAST ZONE (0901), NAD83(CORS96, U.S. SURVEY FEET
PLANECOORDINATES BASED ON THE STATE PLANE SYSTEM
NAVIGATION PROJECT.
DISPOSAL SITE. THEY ARE NOT INTENDED TO BE USED FOR SURVEYING IN THE
THE SURVEY CONTROL MARKS DEPICTED HEREON ARE TO BE USED ONLY AT THIS
ST JO 352
ST JO 351
AHB895
AHB896
2,205,859.38
2,207,653.37
500,575.11
496,641.59
12.31
20.59
X
X
ST JO 351
ST JO 352
+00
+0
10+
15+
+0
0 3
55+00
60+
+0
110+00
+00
0+
11+
12+
13+
14+
16+
+0
+0
+0
+0
+0
54+00
56+00
+0
61+00
62+00
63+0
+0
+0
+0
+0
0101+
2+
109+00
+00
+00
113+00
114+00
6+
7+
8+
9+
1+
' C
H A
IN
L
IN
K F
E N
C E
H E
C K S
C H
E R D
R . (C
R . 1
N
-M
C T -C
N P
L N .d g n
C-04
C
IV
IL
150' 300'0
NOTES:
2-4' BOX-RISER WEIRS
2-30" OUTFALLS
(SEE NOTE 2)
PIPELINE ROUTE
APPROXIMATE DREDGE
D I S P O S A L A R E A D A Y S O N ( D / A - D )
(EL. 30.5')
TOP OF DIKE
(EL. 30.5')
TOP OF DIKE
HECKSCHER DR. (CR. 105
Y=2,205,000
Y=2,206,000
Y=2,207,000
Y=2,208,000
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
Y= 2,204,000
D A
Y S
O N I S
L A
N D
D
IS
P O
S A
L A
R E
A P
L A
N
O L D S
T . J
O H N S R
I V E R
C L A P B O A
D
E E K
C E D A R
P O I N T
C R E E K
A F
E B
A
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
(SEE NOTE 5)
EXISTING DREDGE PIPE SEGMENT
APPROXIMATE LOCATION OF
(SEE NOTE 2)
PIPELINE DISCHARGE AREA
6. BACKGROUND IMAGE IS FROM THE 2017 DUVAL COUNTY AERIALS.
THE CONTRACTING OFFICER. SEE SPECIFICATION SECTION 35 20 23.
DREDGE PIPE SEGMENT. THE EXACT LOCATION TO BE SHOWN IN THE FIELD BY
5. CONTRACTOR MAY CONNECT TO THE END STRUCTURES OF THE EXISTING
IN THE DISPOSAL AREA SINCE THE SURVEY WAS PERFORMED.
4. ELEVATION AND VOLUME APPROXIMATE, AS MATERIAL HAS BEEN PLACED
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE.
MONITORING. IF WATER ELEVATIONS REACH 23 FEET (NAVD88), THE CONTRACTOR
TURBIDITY REQUIREMENTS SPECIFIED IN SECTION 01 57 25 TURBIDITY AND DISPOSAL
SHALL BE REQUIRED TO PRODUCE AN EFFLUENT QUALITY MEETING THE
DISCHARGING WATER THROUGH THE WEIR OUTFLOWS. BOTH OF THESE METHODS
USING WEIR OPERATIONS OR PUMPING METHODS THAT INCORPORATE
PROCEED TO REMOVE THE PONDED WATER FROM THE DISPOSAL AREA
3. UPON COMPLETION OF DISPOSAL OPERATIONS, THE CONTRACTOR SHALL
OFFICER'S REPRESENTATIVE.
BE SHOWN TO THE CONTRACTOR, IN THE FIELD, BY THE CONTRACTING
2. EXACT LIMITS OF THE PIPELINE DISCHARGE ROUTE AND AREA WILL
FIVE FEET BELOW DIKE CREST HEIGHT.
1. CAPACITY IS APPROXIMATELY 1.1 MILLION CUBIC YARDS ESTIMATED
NOTES:
THE DISPOSAL AREA SINCE THE SURVEY WAS PERFORMED.
2. SURFACES SHOWN ARE APPROXIMATE AS MATERIAL HAS BEEN PLACED IN
REFER TO SPECIFIC SURVEY NOTES FOR DATUM REFERENCES.
THIS VERTICAL DATUM IS DIFFERENT THAN THE CHANNEL HYDRO SURVEY.
AND ARE ABOVE REFERENCE DATUM UNLESS PRECEDED BY A (-) SIGN.
1. ELEVATIONS ARE IN FEET AND TENTHS AND REFER TO THE NAVD88 DATUM
C-05
IL
-M
C T -C
N s e c ti o n .d g n
T Y
P
IC
A L C
R O
S S S
E C
T
IO
N S
D A
Y S
O N I S
L A
N D
A R
E V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T
F E
B
A
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Navigation Projects\Marine Corps Terminal\USMC Terminal MD FY19\010 - Plans\180 - Amendments\Amendments 0002\02 Civil\C-05
/1
/2
D R
A W
IN
G D
A T
E
F
IL
E N
A M
E
A N
S I E
X X
X X
X X -X
X -X -X
X X
X
M M
M M
M M
M M
M Y
Y
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
J
B E
R G
E N
M
R
IC
E
M
C O
C H
R A
N E
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y B
L O
U N
T I S
L A
N D
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J E
C T
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
AMENDMENT 0002
(EL. 33.1')
TOP OF DIKE
(EL. 32.1')
TOP OF DIKE
(EL. 32.4')
TOP OF DIKE
0100200300 -100 -200 -300 -400 -500 -600 -700 -800 -900
E L E
V A
T
IO
N
F
E
V D
0 100 200 300-100-200-300-400-500-600-700-800
E L E
V A
T
IO
N
F
E
V D
0100200300 -100 -200 -300 -400 -500 -600 -700
E L E
V A
T
IO
N
F
E
V D
0 100 200 300-100-200-300-400-500-600
E L E
V A
T
IO
N
F
E
V D
100' 200'0
VERTICAL
TYPICAL DMPF SECTION THRU DIKED1
C-04
HORIZONTAL
SCALE HORIZONTAL 1" = 100' VERTICAL 1" = 100'
CENTERLINE OF DIKE AT STATION 87+00 DISTANCE IN FEET FROM CENTERLINE
EXISTING SURFACE
CENTERLINE OF DIKE AT STATION 71+00
LOOKING NORTHWESTLOOKING NORTHWEST
10' 20'0
(EL. 32.1')
TOP OF DIKE
EXISTING SURFACE
100' 200'0
VERTICAL
TYPICAL DMPF SECTION THRU DIKED2
C-04
HORIZONTAL
SCALE HORIZONTAL 1" = 100' VERTICAL 1" = 100'
CENTERLINE OF DIKE AT STATION 17+00 DISTANCE IN FEET FROM CENTERLINE CENTERLINE OF DIKE AT STATION 50+00
LOOKING SOUTHWESTLOOKING SOUTHWEST
10' 20'0
DISPOSAL AREA INTERIOR
DISPOSAL AREA INTERIOR
STATION 87+00 STATION 71+00
STATION 50+00STATION 17+00
| 19B0003Am0002SF30Cont |
| 00010A_MCSFBIMD |
| Bid Sheet |
| 00 31 21_ControlMD_Am0002 |
| MCSF O&M FY19_20190219 |
| G-02 |
| G-03 |
| C-01 |
| C-02 |
| C-03 |
| C-04 |
| C-05 |
File details come from the government source that posted it.