View the file

Other files

File Type Posted
Roster.pdf PDF
W912EP18R0017-0002s.pdf PDF
W912EP18R0017-0001.pdf PDF
2018Surveying_HUBZone.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indefinite Delivery Contract for Architect and Engineering (A-E) Services for Topographic and Hydrographic Surveying and Mapping Services within the Boundaries of Puerto Rico, the U.S. Virgin Islands, and other Caribbean Islands

Question and Answers:

Q.1 Is the prime required to have the PSM or can it be with the Subcontractor.

A.1 Per the solicitation Paragragh B(1) Professional Surveyor/Mapper within Prime Firm

At least one key personnel must have a professional license for Land Surveying in the Commonwealth of Puerto Rico. A bachelors or master’s degree in geomatics or related field will receive more weight for evaluation. Role in this contract: Professional Surveyor.

Q.2 In the solicitation under "SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE" (6) Subsurface Utility Engineering (SUE) Surveys.

There are four quality levels of SUE:

Quality Level D (Records Research / Data Collection) Quality Level C (Above Ground Survey) Quality Level B (Utility Designation) Quality Level A (Test Hole / Pot Holing) Please indicate which will be required under this solicitation.

A.2 The Quality Level required will be dependent on the specific technical requirements for a given Task Order. Over the life of the entire contract there could be a variety of Quality Levels specified.

File details come from the government source that posted it.