W912EP18B0004_Amendment_0002.pdf
PDF 774 KB Posted
- Solicitation number
- W912EP18B0004
About this file
W912EP18B0004 Amendment 0002
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SHORE PROTECTION PROJECT DUVAL COUNTY, FLORIDA BEACH RENOURISHMENT 2018
A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B. THE BID OPENING DATE HAS BEEN CHANGED FROM JULY 24, 2018 @ 2:00 P.M. LOCAL TIME TO JULY 26, 2018 @ 2:00 P.M. LOCAL TIME.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
1. CONTRACT ID CODE PAGE OF PAGES
1 53
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18B0004
X 9B. DATED (SEE ITEM 11)
22-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jul-2018
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Shore Protection Project, Duval County, Florida Beach Renourishment 2018
W912EP-18-B-0004 2 Amendment 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. Deletions from Section 00010A are not indicated with cross-outs.
Changes to Specifications:
DELETE Volume 1 Cover Sheet and REPLACE with the attached revised Volume 1 Cover Sheet.
DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
DELETE Section 01 57 20 and REPLACE with the attached revised Section 01 57 20.
2. INFORMATION AVAILABLE TO OFFERORS:
The following reference files are included as separate documents.
18-073 Survey Report
R31-R39 Survey Report
17-148 Survey Report
(End of Summary of Changes)
W912EP18B0004
Jacksonville District
Shore Protection Project Duval County, Florida Beach Renourishment 2018
Construction Solicitation and Specifications Volume 1 of 2
22 JUNE 2018
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
SHORE PROTECTION PROJECT
DUVAL COUNTY, FLORIDA
BEACH RENOURISHMENT 2018
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE; CBL STATIONS 43+100 TO 54+200 AND 58+300 TO 80+000
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 BEACH FILL (ESTIMATED QUANTITY) 569,300 CUBIC YARD $___________ $_______________
0003 SCREENING (ESTIMATED QUANTITY) 569,300 CUBIC YARD $___________ $_______________
0004 BEACH TILLING (ESTIMATED QUANTITY) 90 ACRE $___________ $_______________
0005 TRANSPORTATION AND DISPOSAL OF MATERIAL
(SEE NOTE 3) 100 CUBIC YARD $___________ $_______________
0006 DUNE FILL (ESTIMATED QUANTITY) 57,700 CUBIC YARD $___________ $_______________
0007 DUNE FILL SCREENING
(ESTIMATED QUANTITY, SEE NOTE 7) 57,700 CUBIC YARD $___________ $_______________
0008 REMEDIATION OF NONCOMPLIANT MATERIAL
(SEE NOTE 3) 1 ACRE $___________ $_______________
0009 CONSTRUCTION/VIBRATION CONTROLS AND
MONITORING JOB $_______________
0010 ENVIRONMENTAL SPECIES MONITORING JOB $_______________
0011 TURBIDITY MONITORING JOB $_______________
0012 MOBILIZATION AND DEMOBILIZATION FOR NON-
CAPTURE SEA TURTLE TRAWL SWEEPING
(HOPPER DREDGE ONLY) JOB $_______________
0013 SEA TURTLE NON-CAPTURE TRAWL SWEEPING
(HOPPER DREDGE ONLY, SEE NOTES 3 AND 4) 10 DAY $___________ $_______________
0014 STANDBY TIME (SEE NOTE 6) 72 HOUR $___________ $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0014) $_______________
OPTION A; CBL STATIONS 54+200 TO 58+300
0015 BEACH FILL (ESTIMATED QUANTITY) 102,000 CUBIC YARD $___________ $_______________
0016 SCREENING (ESTIMATED QUANTITY) 102,000 CUBIC YARD $___________ $_______________
0017 BEACH TILLING (ESTIMATED QUANTITY) 30 ACRE $___________ $_______________
0018 TRANSPORTATION AND DISPOSAL OF MATERIAL
(SEE NOTE 3) 100 CUBIC YARD $___________ $_______________
W912EP18B0004 00010A-1 Amendment 0002
SHORE PROTECTION PROJECT
DUVAL COUNTY, FLORIDA
BEACH RENOURISHMENT 2018
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0019 DUNE FILL (ESTIMATED QUANTITY) 2,400 CUBIC YARD $___________ $_______________
0020 DUNE FILL SCREENING
(ESTIMATED QUANTITY, SEE NOTE 7) 2,400 CUBIC YARD $___________ $_______________
0021 REMEDIATION OF NONCOMPLIANT MATERIAL
(SEE NOTE 3) 1 ACRE $___________ $_______________
0022 CONSTRUCTION/VIBRATION CONTROLS AND
MONITORING JOB $_______________
0023 ENVIRONMENTAL SPECIES MONITORING JOB $_______________
0024 TURBIDITY MONITORING JOB $_______________
TOTAL OPTION A (LINE ITEMS 0015 THROUGH 0024) $_______________
TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0024) $_______________
OPTION B; CBL STATIONS 35+100 TO 43+100
0025 ADDITIONAL EQUIPMENT MOBILIZATION JOB $_______________
0026 BEACH FILL (ESTIMATED QUANTITY) 138,000 CUBIC YARD $___________ $_______________
0027 SCREENING (ESTIMATED QUANTITY) 138,000 CUBIC YARD $___________ $_______________
0028 BEACH TILLING (ESTIMATED QUANTITY) 15 ACRE $___________ $_______________
0029 TRANSPORTATION AND DISPOSAL OF MATERIAL
(SEE NOTE 3) 100 CUBIC YARD $___________ $_______________
0030 DUNE FILL (ESTIMATED QUANTITY) 9,100 CUBIC YARD $___________ $_______________
0031 DUNE FILL SCREENING
(ESTIMATED QUANTITY, SEE NOTE 7) 9,100 CUBIC YARD $___________ $_______________
0032 REMEDIATION OF NONCOMPLIANT MATERIAL
(SEE NOTE 3) 1 ACRE $___________ $_______________
0033 CONSTRUCTION/VIBRATION CONTROLS AND
MONITORING JOB $_______________
0034 ENVIRONMENTAL SPECIES MONITORING JOB $_______________
0035 TURBIDITY MONITORING JOB $_______________
TOTAL OPTION B (LINE ITEMS 0025 THROUGH 0035) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0035) $_______________
SEE NOTES ON NEXT PAGE.
W912EP18B0004 00010A-2 Amendment 0002
SHORE PROTECTION PROJECT
DUVAL COUNTY, FLORIDA
BEACH RENOURISHMENT 2018
NOTES: (1) OFFER MUST PRICE ALL LINE ITEMS.
(2) ACTUAL QUANTITIES MAY VARY.
(3) THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL EXECUTION OF THIS LINE ITEM AS APPROVED BY THE CONTRACTING OFFICER.
(4) SEA TURTLE NON-CAPTURE TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING
OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(5) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.
(6) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS.
THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANITITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00
MEASUREMENT AND PAYMENT AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(7) SEE PARAGRAPH "SCREENING" IN SECTION 01 22 00 FOR MEASUREMENT AND PAYMENT OF THIS LINE ITEM.
W912EP18B0004 00010A-3 Amendment 0002
Shor e Pr ot ect i on Pr oj ect , Duval Count y, Fl or i da Beach Renour i shment 2018
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 DEFI NI TI ONS
1. 3. 1 Compensat i ng Sl opes
1. 4 SUBMI TTALS
1. 5 JOB PAYMENT I TEMS
1. 5. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
1. 5. 2 Const r uct i on/ Vi br at i on Cont r ol and Moni t or i ng ( Li ne I t ems
0009, 0022 and 0033)
1. 5. 3 Envi r onment al Speci es Moni t or i ng ( Li ne I t ems 0010, 0023 and
0034)
1. 5. 4 Tur bi di t y Moni t or i ng ( Li ne I t ems 0011, 0024 and 0035)
1. 5. 5 Mobi l i zat i on and Demobi l i zat i on f or Non- Compt ur e Sea Tur t l e
Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t em 0012)
1. 5. 6 Addi t i onal Equi pment Mobi l i zat i on ( Li ne I t em 0025)
1. 6 UNI T PRI CE PAYMENT I TEMS
1. 6. 1 Beach Fi l l ( Li ne I t ems 0002, 0015 and 0026)
1. 6. 1. 1 Payment
1. 6. 1. 2 Measur ement
1. 6. 1. 3 Uni t of Measur e
1. 6. 2 Scr eeni ng ( Li ne I t ems 0003, 0016 and 0027)
1. 6. 2. 1 Payment
1. 6. 2. 2 Measur ement
1. 6. 2. 3 Uni t of Measur e
1. 6. 3 Beach Ti l l i ng ( Li ne I t ems 0004, 0017 and 0028)
1. 6. 3. 1 Payment
1. 6. 3. 2 Measur ement
1. 6. 3. 3 Uni t of Measur e
1. 6. 4 Tr anspor t at i on and Di sposal of Mat er i al ( Li ne I t ems 0005, 0018 and 0029)
1. 6. 4. 1 Payment
1. 6. 4. 2 Measur ement
1. 6. 4. 3 Uni t of Measur e
1. 6. 5 Dune Fi l l ( Li ne I t ems 0006, 0019 and 0030)
1. 6. 5. 1 Payment
1. 6. 5. 2 Measur ement
1. 6. 5. 3 Uni t of Measur e
1. 6. 6 Dune Fi l l Scr eeni ng ( Li ne I t ems 0007, 0020 and 0031)
1. 6. 6. 1 Payment
1. 6. 6. 2 Measur ement
1. 6. 6. 3 Uni t of Measur e
1. 6. 7 Remedi at i on of Noncompl i ant Mat er i al ( Li ne I t ems 0008, 0021
SECTI ON 01 22 00 Page 1 W912EP18B0004 Amendment 0002 and 0032)
1. 6. 7. 1 Payment
1. 6. 7. 2 Measur ement
1. 6. 7. 3 Uni t of Measur e
1. 6. 8 Sea Tur t l e Tr awl Non- Capt ur e Tr awl Sweepi ng ( Hopper Dr edge
Onl y, Li ne I t em 0013)
1. 6. 8. 1 Payment
1. 6. 8. 2 Measur ement
1. 6. 8. 3 Uni t of Measur e
1. 6. 9 St andby Ti me ( Li ne I t em 0014)
1. 6. 9. 1 Payment
1. 6. 9. 2 Measur ement
1. 6. 9. 3 Uni t of Measur e
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 2
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i ct i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or mor e i nf or mat i on on CLI Ns, schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and payment pr ocedur es. The Cont r act or mode user manual wi t h i n- dept h i nst r uct i ons can be downl oaded f r om t he RMS web si t e i ndi cat ed i n Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE
( RMS CM) .
1. 3 DEFINITIONS
1. 3. 1 Compensat i ng Sl opes
The al l owance f or mat er i al t o be pl aced above t he speci f i ed f i l l t ol er ance t o compensat e f or t he speci f i ed f or eshor e s l ope bei ng bel ow gr ade due t o sedi ment r el ocat ed by nat ur al f or ces bet ween t he t i me of pl acement and payment sur veys. Thi s i s per mi t t ed f or payment pur poses onl y.
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:
SECTI ON 01 22 00 Page 3
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of l ump sum i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.
SD- 07 Cer t i f i cat es
Request f or Pr ogr ess Payment ; G, RO
Submi t mont hl y i n accor dance wi t h subpar agr aph " Request i ng Pr ogr ess Payment " bel ow.
1. 5 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act l ump sum payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar l ump sum or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed l ump sum i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The l ump sum pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
Pr ogr ess payment s f or l ump sum CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each l ump sum CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE) . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedul e.
1. 5. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on and est abl i shment of i ni t i al pr oj ect management and coor di nat i on. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 2 Const r uct i on/ Vi br at i on Cont r ol and Moni t or i ng ( Li ne I t ems 0009, 0022 and 0032 0033 )
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he pr ot ect i on of exi st i ng st r uct ur es f r om const r uct i on act i v i t i es and moni t or i ng. See Sect i on 02 22 13 VI BRATI ON MONI TORI NG REQUI REMENTS FOR
EXI STI NG STRUCTURES.
SECTI ON 01 22 00 Page 4
1. 5. 3 Envi r onment al Speci es Moni t or i ng ( Li ne I t ems 0010, 0023 and 0033 0034 )
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he moni t or i ng of sea t ur t l es, mi gr at or y bi r ds, and endanger ed speci es. See Section 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 5. 4 Tur bi di t y Moni t or i ng ( Li ne I t ems 0011, 0024 and 0034 0035 )
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.
1. 5. 5 Mobi l i zat i on and Demobi l i zat i on f or Non- Compt ur e Sea Tur t l e Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t em 0012)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on f or sea t ur t l e t r awl i ng ( f or Hopper Dr edges Onl y) . See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 5. 6 Addi t i onal Equi pment Mobi l i zat i on ( Li ne I t em 0025)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o addi t i onal equi pment mobi l i zat i on needed f r om pl acement of mat er i al f or Opt i on B.
See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .
Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.
1. 6. 1 Beach Fi l l ( Li ne I t ems 0002, 0015 and 0025 0026 )
1. 6. 1. 1 Payment
a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o bar r i cades and si gns, debr i s r emoval , pi pel i ne cr ossi ng, excavat i on and t r anspor t at i on of beach f i l l , const r uct i ng t he beach pr of i l e and f i nal dr essi ng; escar pment s; noi se cont r ol ; di ve r epor t s;
i nst al l at i on, oper at i on, or mai nt enance of t he el ect r oni c posi t i onal moni t or i ng equi pment and condi t i on sur veys. See Sect i ons 01 57 20
ENVI RONMENTAL PROTECTI ON, 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG,
and 35 20 25 BEACH FI LL.
b. I n addi t i on t o t he above, payment wi l l be made f or i n- pl ace beach f i l l t o t he t ol er ance l i ne i ndi cat ed on bot h ber m and sl ope.
Payment quant i t i es wi l l be det er mi ned by t he Gover nment usi ng aver age end ar ea met hod of cal cul at i on, except i n l ocat i ons wher e a Const r uct i on Basel i ne ( CBL) Poi nt s of I nt er sect i on ( PI ) exi st i ng
SECTI ON 01 22 00 Page 5 bet ween t wo st at i ons and at t he end t aper s/ t r ansi t i ons. At t hese t wo l ocat i ons, Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace met hod of cal cul at i on shal l be used. When beach f i l l i s pl aced above t he sl ough zone t o compensat e f or wave act i on, payment wi l l be based on a cut and f i l l cal cul at i on. No payment wi l l be made f or mat er i al pl aced i n excess of t he t ol er ance t empl at e A( T) i ndi cat ed on t he dr awi ngs.
1. 6. 1. 2 Measurement
a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y t he exi st i ng condi t i ons at t he t i me t he sur veys wer e per f or med, but t he dept hs and el evat i ons shown t her eon may be ver i f i ed and cor r ect ed by el evat i ons and soundi ngs t aken bef or e commenci ng t he wor k. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .
b. Beach f i l l sat i sf act or i l y pl aced wi l l be measur ed f or payment by use of t he aver age end ar ea met hod and Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace di f f er ence met hod at t he r espect i ve l ocat i ons st at ed i n subpar agr aph " Payment " above. The quant i t i es wi l l be comput ed by t he Gover nment i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Measur ement of quant i t y pl aced f or pay pur poses wi l l be based on or i gi nal and f i nal sur f aces made on t he sect i on or r each i ndi cat ed on t he dr awi ngs. The Cont r act or shal l gi ve 3 cal endar days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need t o per f or m t he or i gi nal and f i nal sur veys. Qual i t y Cont r ol Sur veys shal l be t he r esponsi bi l i t y of t he Cont r act or . Mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by measur ement of t he i n- pl ace beach f i l l and i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
c. I n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1, t he Gover nment wi l l per f or m pr e- and post - const r uct i on t opogr aphi c sur vey at 100- f oot st at i ons wi t h el evat i ons t aken at 10- f oot r ange i nt er val s f r om t he basel i ne t o t he t oe sl ope el evat i on. An addi t i onal cr oss sect i on shal l be col l ect ed at CBL PI ' s al ong a l i ne bi sect i ng t he angul ar di f f er ence of l i nes t angent t o t he i ncomi ng and out goi ng CBL and ever y 50 f eet wi t hi n t he end t aper s/ t r ansi t i ons. I n or der t o achi eve f i nal gr ade i n s l ough zone, Cont r act or shal l pl ace mat er i al t o f i nal gr ade wi t hi n t ol er ance f or ent i r e s l ope or may st ockpi l e beach f i l l up- sl ope of s l ough zone.
Af t er st ockpi l ed beach f i l l i s measur ed f or payment , t he Cont r act or shal l shape sl ope t o wi t hi n t he r equi r ed and t ol er ance gr ades f r om t op of s l ope t o wat er l i ne pr oduci ng a smoot h uni f or m sl ope. Once post - const r uct i on sur vey i s per f or med, no measur ement s wi l l be r evi sed except on suspi c i on of f r aud or obvi ous er r or .
1. 6. 1. 3 Uni t of Measur e
Cubi c yar d.
SECTI ON 01 22 00 Page 6
1. 6. 2 Scr eeni ng ( Li ne I t ems 0003, 0016 and 0026 0027 )
1. 6. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o separ at i on of any mat er i al gr eat er t han 3/ 4 i nches i n di amet er by a met hod t o be det er mi ned by t he Cont r act or and appr oved by Cont r act i ng Of f i cer . See Section 35 20 25 BEACH FI LL.
1. 6. 2. 2 Measurement
Separ at i on of mat er i al gr eat er t han 3/ 4 i nches i n di amet er wi l l be measur ed f or payment by t he Beach f i l l quant i t y sat i sf act or i l y pl aced.
The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y and wi l l be det er mi ned on act ual quant i t y pl aced.
1. 6. 2. 3 Uni t of Measur e
Cubi c yar d.
1. 6. 3 Beach Ti l l i ng ( Li ne I t ems 0004, 0017 and 0027 0028 )
1. 6. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o beach t i l l i ng. See Sect i ons 01 57 20 ENVI RONMENTAL PROTECTI ON and 35 20 25
BEACH FI LL.
1. 6. 3. 2 Measurement
Beach t i l l i ng wi l l be measur ed f or payment by t he act ual ar ea t i l l ed t o t he t ent h of a acr e.
1. 6. 3. 3 Uni t of Measur e
Acre.
1. 6. 4 Tr anspor t at i on and Di sposal of Mat er i al ( Li ne I t ems 0005, 0018 and 0028 0029 )
1. 6. 4. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t r anspor t at i on and di sposal of mat er i al ( gr eat er t han 3/ 4 i nches i n di amet er t hat i s scr eened by met hod t o be det er mi ned by t he Cont r act or and appr oved by Cont r act i ng Of f i cer . See Sect i on 35 20 25 BEACH FI LL.
1. 6. 4. 2 Measurement
Tr anspor t at i on and di sposal of mat er i al ( gr eat er t han 3/ 4 i nches i n di amet er wi l l be measur ed f or payment by t he quant i t y di sposed. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y and wi l l be det er mi ned on act ual quant i t y di sposed.
1. 6. 4. 3 Uni t of Measur e
Cubi c yar d.
SECTI ON 01 22 00 Page 7
1. 6. 5 Dune Fi l l ( Li ne I t ems 0006, 0019 and 0029 0030 )
1. 6. 5. 1 Payment
a. Payment wi l l be made f or al l cost s associ at ed wi t h or i nci dent al t o, debr i s r emoval and di sposal , excavat i on, noi se cont r ol , t r anspor t at i on of dune f i l l , const r uct i ng t he dune pr of i l e, and f i nal dr essi ng. See Sect i on 35 20 25 BEACH FI LL.
b. I n addi t i on t o t he above, payment wi l l be made f or i n- pl ace dune f i l l above el evat i on +8. 2 f eet NAVD88 t o t he r equi r ed t ol er ance l i ne.
Payment quant i t i es wi l l be det er mi ned by t he Cont r act i ng Of f i cer ' s Repr esent at i ve usi ng Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace met hod of cal cul at i on.
1. 6. 5. 2 Measurement
a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y t he exi st i ng condi t i ons at t he t i me t he sur veys wer e per f or med, but t he dept hs and el evat i ons shown t her eon may be ver i f i ed and cor r ect ed by el evat i ons and soundi ngs t aken bef or e commenci ng t he wor k. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .
b. Dune f i l l sat i sf act or i l y pl aced wi l l be measur ed f or payment by use of t he Di gi t al Ter r ai n Model ( DTM) sur f ace- t o- sur f ace met hod. The quant i t i es wi l l be comput ed by t he Gover nment i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume
1. Measur ement of quant i t y pl aced f or pay pur poses wi l l be based on or i gi nal and f i nal sur f aces made on t he sect i on or r each i ndi cat ed on t he dr awi ngs. The Cont r act or shal l gi ve 3 cal endar days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need t o per f or m t he or i gi nal and f i nal sur veys. Qual i t y Cont r ol Sur veys shal l be t he r esponsi bi l i t y of t he Cont r act or . Mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by measur ement of t he i n- pl ace dune f i l l and i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
c. I n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1, Cont r act i ng Of f i cer wi l l per f or m pr e-and post - const r uct i on t opogr aphi c sur vey at 100- f oot st at i ons wi t h el evat i ons t aken at maxi mum 10- f oot r ange i nt er val s f r om t he basel i ne t o t he t oe sl ope el evat i on. An addi t i onal cr oss sect i on shal l be col l ect ed at Const r uct i on Basel i ne ( CBL) Poi nt s of I nt er sect i on ( PI ) al ong a l i ne bi sect i ng t he angul ar di f f er ence of l i nes t angent t o t he i ncomi ng and out goi ng CBL. Addi t i onal dat a shal l be col l ect ed at br eaks i n t he dune ( e. g. st or mwat er out f al l s, handi cap access poi nt s, access r oads, or ot her speci al pl acement l ocat i ons) t o gener at e adequat e sur f aces i n or der t o accur at el y capt ur e mat er i al pl aced i n t he s l opes at t hese br eaks. Once post - const r uct i on sur vey i s per f or med, no measur ement s wi l l be r evi sed except on suspi c i on of f r aud or obvi ous er r or . Payment wi l l be based on t he t ot al sand vol ume pl aced wi t hi n t he r equi r ed t empl at e and const r uct i on t ol er ance t empl at e. No payment shal l be made f or mat er i al pl aced above t ol er ance and deduct i ons wi l l be made f or mat er i al pl aced bel ow
SECTI ON 01 22 00 Page 8 tolerance.
1. 6. 5. 3 Uni t of Measur e
Cubi c Yar d.
1. 6. 6 Dune Fi l l Scr eeni ng ( Li ne I t ems 0007, 0020 and 0030 0031 )
1. 6. 6. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o separ at i on of any mat er i al gr eat er t han 3/ 4 i nches i n di amet er by a met hod t o be det er mi ned by t he Cont r act or and appr oved by Cont r act i ng Of f i cer . See Section 35 20 25 BEACH FI LL.
1. 6. 6. 2 Measurement
Separ at i on of mat er i al gr eat er t han 3/ 4 i nches i n di amet er wi l l be measur ed f or payment by t he Beach f i l l quant i t y sat i sf act or i l y pl aced.
The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y and wi l l be det er mi ned on act ual quant i t y pl aced.
1. 6. 6. 3 Uni t of Measur e
Cubi c yar d.
1. 6. 7 Remedi at i on of Noncompl i ant Mat er i al ( Li ne I t ems 0008, 0021 and 0031 0032 )
1. 6. 7. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o r emedi at i on of noncompl i ant mat er i al f ound on t he beach f i l l t empl at e and det er mi ned by t he Cont r act i ng Of f i cer t o have or i gi nat ed f r om wi t hi n t he bor r ow ar ea onl y. Remedi at i on pr ocedur es f or noncompl i ant mat er i al ar e i ndi cat ed i n par agr aph QUALI TY CONTROL FOR BEACH FI LL of Sect i on 35 20 25 BEACH FI LL. No payment wi l l be made f or r emedi at i on of noncompl i ant mat er i al r esul t i ng f r om over excavat i on or excavat i on out si de t he l i mi t s of t he bor r ow ar ea. Remedi at i on t o r emove mat er i al gr eat er t han 3/ 4 i nch shal l be at t he Cont r act or ' s expense and t hi s l i ne i t em not i mpl ement ed.
I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em.
1. 6. 7. 2 Measurement
Remedi at i on of noncompl i ant mat er i al wi l l be measur ed f or payment by t he act ual ar ea of noncompl i ant mat er i al bl ended wi t h adj acent mat er i al t o t he t ent h ( 0. 1) of an acr e. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y.
1. 6. 7. 3 Uni t of Measur e
Acre.
SECTI ON 01 22 00 Page 9
1. 6. 8 Sea Tur t l e Tr awl Non- Capt ur e Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t em 0013)
1. 6. 8. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he Sea Tur t l e Tr awl Sweepi ng. Thi s pr i ce shal l i ncl ude al l cost s f or f ur ni shi ng l abor , equi pment , f uel , oi l , mat er i al s, and suppl i es r equi r ed f or t r awl sweepi ng t o c l ear sea t ur t l es f r om i n t he v i c i ni t y of t he dr edge, and shal l i ncl ude t he cost of r epor t i ng as speci f i ed. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne item.
1. 6. 8. 2 Measurement
Sea Tur t l e Tr awl Sweepi ng wi l l be measur ed f or payment based upon t he dur at i on of per f or mance on a dai l y basi s. A day of t r awl sweepi ng i s def i ned as 24 hour s of cont i nuous t r awl i ng. The Cont r act or shal l conduct t r awl sweepi ng as descr i bed i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 6. 8. 3 Uni t of Measur e
Day.
1. 6. 9 St andby Ti me ( Li ne I t em 0014)
1. 6. 9. 1 Payment
St andby t i me i s def i ned as when t he dr edge pl ant i s not i n oper at i on at t he di r ect i on of t he Cont r act i ng Of f i cer or Admi ni st r at i ve Cont r act i ng Of f i cer . St andby t i me shal l be ut i l i zed onl y due t o t he pr esence of endanger ed speci es i n t he i mmedi at e ar ea of t he dr edgi ng oper at i ons, di f f er i ng s i t e condi t i ons, secur i t y oper at i ons or ot her condi t i ons as det er mi ned by t he Cont r act i ng Of f i cer . St andby t i me i s not af f or ded f or del ays caused by adver se weat her condi t i ons. Thi s l i ne i t em i s not subj ect t o t he var i at i on i n est i mat ed quant i t y c l ause and payment wi l l onl y be made f or act ual st andby t i me r equi r ed by t he Cont r act i ng Of f i cer .
I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em. See sect i on 01 57 20
ENVI RONMENTAL PROTECTI ON.
1. 6. 9. 2 Measurement
St andby Ti me, i f r equi r ed and i mpl ement ed as descr i bed i n Payment above, wi l l be measur ed and pai d f or each hour or par t t her eof i n 1/ 6 hour i ncr ement s, or 10 mi nut e i nt er val s, t hat t he pl ant i s not i n oper at i on by r equest of t he Cont r act i ng Of f i cer or t he Cont r act i ng Of f i cer ' s Representative.
1. 6. 9. 3 Uni t of Measur e
Hour.
SECTI ON 01 22 00 Page 10
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.
3. 1. 1 Request i ng Pr ogr ess Payment
For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs.
Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment . Submi t a r equest f or pr ogr ess payment mont hl y i n accor dance wi t h Cl ause 52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS of Sect i on 00700 CONTRACT CLAUSES. I n addi t i on t o t he i t ems l i s t ed i n Cl ause
52. 232- 5( b) ( 1) , submi t t he f ol l owi ng i n t he r equest f or pr ogr ess payment :
a. Appr oved const r uct i on schedul e.
b. Up- t o- dat e payr ol l r ecor ds.
c. Cur r ent submi t t al r egi st er .
d. Appr oved submi t t al s on i nst al l ed pr oper t y.
e. QA/ QC def i c i ency t r acki ng l i s t .
Once t he compl et e pay appl i cat i on package i s r ecei ved t o i ncl ude t he Cont r act or ' s s i gned ENG 93, t he 14 cal endar days wi l l commence.
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed.
I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.
- - End of Sect i on - -
SECTI ON 01 22 00 Page 11
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 57 20
ENVI RONMENTAL PROTECTI ON
PART 1 GENERAL
1. 1 SCOPE
1. 2 ENVI RONMENTAL LAWS, REGULATI ONS AND DOCUMENTS
1. 2. 1 Mi scel l aneous Envi r onment al Laws And Regul at i ons
1. 2. 2 NEPA Ref er ence
1. 3 REFERENCES
1. 4 QUALI TY CONTROL
1. 5 PERMI TS AND AUTHORI ZATI ONS
1. 6 SUBMI TTALS
1. 7 SUBCONTRACTORS
1. 8 NOTI FI CATI ON
1. 9 CONTRACTOR PERSONNEL QUALI FI CATI ONS I N POLLUTI ON CONTROL
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PROTECTI ON OF ENVI RONMENTAL RESOURCES
3. 1. 1 Gener al Pr oj ect Envi r onment al Desi gn and I nst al l at i on Cr i t er i a
3. 1. 1. 1 Sewage- Based Syst ems Envi r onment al Desi gn and I nst al l at i on
Criteria
3. 1. 2 Pr ot ect i on of Land Resour ces
3. 1. 2. 1 Wor k Ar ea Li mi t s
3. 1. 2. 2 Cont r act or Faci l i t i es and Ot her Wor k Ar eas
3. 1. 2. 3 Sol i d Wast es
3. 1. 2. 4 Fuel , Oi l , and Lubr i cant s
3. 1. 2. 5 Hazar dous Wast e
3. 1. 2. 6 Hazar dous Mat er i al s
3. 1. 2. 7 Di sposal of Ot her Mat er i al s
3. 1. 3 Pr eser vat i on and Recover y of Hi st or i c, Ar cheol ogi cal , and
Cul t ur al Resour ces
3. 1. 3. 1 Appl i cabl e Law
3. 1. 3. 2 Known Resour ces
3. 1. 3. 3 I nadver t ent Di scover i es
3. 1. 3. 4 Cl ai ms f or Downt i me due t o I nadver t ent Di scover i es
3. 1. 4 Pr ot ect i on of Wat er Resour ces
3. 1. 4. 1 Moni t or i ng of Wat er Ar eas
3. 1. 4. 2 Tur bi di t y
3. 1. 4. 3 Oi l , Fuel , and Hazar dous Subst ance Spi l l Pr event i on and
Mitigation
3. 1. 5 Pr ot ect i on of Fi sh and Wi l dl i f e Resour ces
3. 1. 5. 1 Li st ed Speci es Pr ot ect i on
3. 1. 5. 2 Endanger ed Speci es Obser ver s ( Hopper Dr edge Onl y)
3. 1. 5. 3 Manat ee, Sea Tur t l e, and Whal e Si ght i ng Repor t s
SECTI ON 01 57 20 Page 1
3. 1. 5. 4 Di sposi t i on of Endanger ed or Thr eat ened Speci es Car casses
3. 1. 5. 5 Repor t Submi ssi on
3. 1. 5. 6 Hopper Dr edge Equi pment
3. 1. 5. 7 Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng ( For Hopper Dr edges
Only)
3. 1. 5. 8 Suspensi on of Dr edgi ng ( Hopper Dr edge Onl y)
3. 1. 5. 8. 1 Excessi ve Tur t l e Take
3. 1. 5. 8. 2 Gener al Gui del i nes f or Cor ps Di scr et i onar y Aut hor i t y t o I ni t i at e Tur t l e Tr awl i ng
3. 1. 5. 9 Pi pel i ne Cor r i dor Sur veys
3. 1. 5. 10 Sea Tur t l e Beach Nest Moni t or i ng
3. 1. 5. 11 Beach Pl acement Rest r i ct i ons
3. 1. 5. 12 Escar pment s
3. 1. 5. 13 Pr ot ect i on of Shor ebi r d Speci es
3. 1. 5. 14 Shor ebi r d Buf f er Zones and Tr avel Cor r i dor s
3. 1. 6 Pr ot ect i on of Ai r Resour ces
3. 1. 6. 1 Par t i cul at es
3. 1. 6. 2 Bur ni ng
3. 1. 6. 3 Odor s
3. 1. 7 Pr ot ect i on of Sound I nt r usi ons
3. 2 POSTCONSTRUCTI ON CLEANUP
3. 3 PRESERVATI ON AND RESTORATI ON OF LANDSCAPE AND MARI NE VEGETATI ON
DAMAGES
3. 4 I NVASI VE AND NUI SANCE SPECI ES
3. 4. 1 Pr event i on of I nvasi ve and Nui sance Speci es Tr ansf er
3. 4. 2 I nvasi ve and Nui sance Speci es Repor t i ng
3. 5 MAI NTENANCE OF POLLUTI ON CONTROL FACI LI TI ES
3. 6 CONSTRUCTI ON FORMS AND DETAI LS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 57 20 Page 2
SECTI ON 01 57 20
ENVI RONMENTAL PROTECTI ON
PART 1 GENERAL
1. 1 SCOPE
Thi s Sect i on cover s pr event i on of envi r onment al damage as t he r esul t of const r uct i on oper at i ons under t hi s cont r act and f or t hose measur es set f or t h i n ot her Techni cal Requi r ement s of t hese speci f i cat i ons. For t he pur pose of t hi s speci f i cat i on, envi r onment al damage i s def i ned as t he pr esence of hazar dous, physi cal , chemi cal , or bi ol ogi cal el ement s or agent s whi ch adver sel y af f ect human heal t h or wel f ar e; unf avor abl y al t er ecol ogi cal bal ances; af f ect ot her speci es, bi ol ogi cal communi t i es, or ecosyst ems; or degr ade t he qual i t y of t he envi r onment f or aest het i c, cul t ur al , and/ or hi st or i cal pur poses. The cont r ol of envi r onment al damage r equi r es consi der at i on of l and, wat er , and ai r , and i ncl udes management of v i sual aest het i cs, noi se, sol i d wast e, r adi ant ener gy and r adi oact i ve mat er i al s, as wel l as ot her pol l ut ant s.
1. 2 ENVI RONMENTAL LAWS, REGULATI ONS AND DOCUMENTS
1. 2. 1 Mi scel l aneous Envi r onment al Laws And Regul at i ons
Ther e ar e numer ous envi r onment al l aws and r egul at i ons. At t he Feder al l evel , t he appl i cabl e l aws and r egul at i ons i ncl ude compl i ance wi t h t he Cl ean Wat er Act ( CWA) ; Cl ean Ai r Act ( CAA) ; Coast al Zone Management Act ( CZMA) ; Compr ehensi ve Envi r onment al Response, Compensat i on, and Li abi l i t y Act ( CERCLA) ; Endanger ed Speci es Act ( ESA) ; Fi sh and Wi l dl i f e Coor di nat i on Act ( FWCA) ; Mar i ne Pr ot ect i on, Resear ch, and Sanct uar i es Act ( MPRSA) ;
Magnuson- St evens Fi sher y Conser vat i on and Management Act ( MSFCMA) ;
Nat i onal Envi r onment al Pol i cy Act ( NEPA) ; Nat i onal Hi st or i c Pr eser vat i on Act ( NHPA) ; Nat i onal Pol l ut i on Di schar ge El i mi nat i on Syst em ( NPDES) ;
Resear ch and Sanct uar i es Act ; Nat i ve Amer i can Gr aves Pr ot ect i on and Repat r i at i on Act ( NAGPRA) ; Resour ce Conser vat i on and Recover y Act ( RCRA) ;
Ri ver s and Har bor s Act ( R&H) ; Saf e Dr i nki ng Wat er Act ( SDWA) ; Toxi c Subst ance Cont r ol Act ( TSCA) ; Wi l d and Sceni c Ri ver s Act ( WSRA) ; Feder al I nsect i c i de, Fungi c i de, and Rodent i c i de Act ( FI FRA) ; Mar i ne Mammal Pr ot ect i on Act ( MMPA) ; Mi gr at or y Bi r d Tr eat y Act ; Code of Feder al Regul at i ons ( CFRs) ; Execut i ve Or der s; and, Envi r onment al Pr ot ect i on Agency ( EPA) r equi r ement s.
1. 2. 2 NEPA Ref er ence
Commi t ment s made i n t he NEPA document have been i ncor por at ed i nt o t hese speci f i cat i ons. The NEPA document can be f ound at t he f ol l owi ng websi t e:
http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Documents/
1. 3 REFERENCES
Any publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.
SECTI ON 01 57 20 Page 3
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
EM 1110- 1- 1003 ( 1996) NAVSTAR Gl obal Posi t i oni ng Syst em Surveying
1. 4 QUALI TY CONTROL
The Cont r act or shal l est abl i sh and mai nt ai n qual i t y cont r ol f or envi r onment al pr ot ect i on of al l i t ems set f or t h her ei n. The Cont r act or shal l r ecor d on dai l y qual i t y cont r ol r epor t s or at t achment s t her et o, any pr obl ems i n compl yi ng wi t h l aws, r egul at i ons and or di nances, and cor r ect i ve act i on t aken.
1. 5 PERMI TS AND AUTHORI ZATI ONS
The Cont r act or shal l compl y wi t h al l r equi r ement s under t he t er ms and condi t i ons set out i n t he f ol l owi ng per mi t ( s) and aut hor i zat i on( s) obt ai ned by t he Cor ps of Engi neer s l i s t ed bel ow.
a. Fl or i da Depar t ment of Envi r onment al Pr ot ect i on Per mi t No.
0228528- 005- JC; Ef f ect i ve Dat e: 9/ 18/ 15; Expi r at i on Dat e: 9/ 18/ 30.
b. Bur eau of Ocean Ener gy Management Regul at i on and Enf or cement MOA.
The above per mi t s i ndi cat e i ssui ng agency appr oval of wor k r equi r ed by t hi s cont r act . Per mi t s and envi r onment al compl i ance document s, i ncl udi ng Envi r onment al Compl i ance Mat r i x ( ECM) def i ni ng r ol es and r esponsi bi l i t i es, ar e avai l abl e at t he f ol l owi ng web addr ess:
http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Compliance/
The Cont r act or shal l obt ai n and compl y wi t h t he r equi r ement s of al l ot her per mi t s or l i censes r equi r ed f or const r uct i on of t hi s pr oj ect i n accor dance wi t h t he Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES.
Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Awar d:
SD- 01 Pr econst r uct i on Submi t t al s
Envi r onment al Pr ot ect i on Pl an; G, DO
No l at er t han 14 cal endar days pr i or t o t he pr e- const r uct i on conf er ence, t he Cont r act or shal l submi t a dr af t Envi r onment al Pr ot ect i on Pl an f or r evi ew and accept ance by t he Cont r act i ng Of f i cer . The Gover nment wi l l consi der an i nt er i m pl an f or t he f i r st 30 days of oper at i ons. However , t he Cont r act or shal l f ur ni sh an accept abl e f i nal pl an no l at er t han 30 cal endar days
SECTI ON 01 57 20 Page 4 af t er r ecei pt of Not i ce t o Pr oceed. Accept ance of t he Cont r act or ' s pl an shal l not r el i eve t he Cont r act or of hi s r esponsi bi l i t y f or adequat e and cont i nui ng cont r ol of pol l ut ant s and ot her envi r onment al pr ot ect i on measur es. Accept ance of t he pl an i s condi t i onal and pr edi cat ed on sat i sf act or y per f or mance dur i ng const r uct i on. The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o make changes t o t he Envi r onment al Pr ot ect i on Pl an or oper at i ons i f t he Cont r act i ng Of f i cer det er mi nes t hat envi r onment al pr ot ect i on r equi r ement s ar e not bei ng met . No physi cal wor k at t he s i t e shal l begi n pr i or t o accept ance of t he Cont r act or ' s pl an or an i nt er i m pl an cover i ng t he wor k t o be per f or med. The Envi r onment al Pr ot ect i on Pl an shal l i ncl ude but not be l i mi t ed t o t he f ol l owi ng:
a. A l i s t of Feder al , St at e, and l ocal l aws, r egul at i ons, and per mi t s concer ni ng envi r onment al pr ot ect i on, pol l ut i on cont r ol , and abat ement t hat ar e appl i cabl e t o t he Cont r act or ' s pr oposed oper at i ons and t he r equi r ement s i mposed by t hose l aws, r egul at i ons, and per mi t s.
b. Met hods f or pr ot ect i on of f eat ur es t o be pr eser ved wi t hi n aut hor i zed wor k ar eas. The Cont r act or shal l pr epar e a l i s t i ng of met hods t o pr ot ect r esour ces needi ng pr ot ect i on, i . e. , t r ees, shr ubs, v i nes, gr asses and gr ound cover , l andscape f eat ur es, ai r and wat er qual i t y, f i sh and wi l dl i f e, soi l , hi st or i cal , ar cheol ogi cal , and cul t ur al r esour ces.
c. Pr ocedur es t o be i mpl ement ed t o pr ovi de t he r equi r ed envi r onment al pr ot ect i on and t o compl y wi t h t he appl i cabl e l aws and r egul at i ons. The Cont r act or shal l pr ovi de wr i t t en assur ance t hat i mmedi at e cor r ect i ve act i on wi l l be t aken t o cor r ect pol l ut i on of t he envi r onment due t o acci dent , nat ur al causes, or f ai l ur e t o f ol l ow t he pr ocedur es set out i n accor dance wi t h t he envi r onment al pr ot ect i on pl an.
d. A per mi t or l i cense f or and t he l ocat i on of t he sol i d wast e di sposal ar ea.
e. Dr awi ngs showi ng l ocat i ons of any pr oposed t empor ar y excavat i ons or embankment s f or haul r oads, st r eam cr ossi ng, mat er i al st or age ar eas, st r uct ur es, sani t ar y f aci l i t i es, and st ockpi l es of excess or spoi l mat er i al s.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.