AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
U.S. NAVY SUBMARINE BASE, KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47 FOOT PROJECT) & MARINE CORPS SUPPORT
BLOUNT ISLAND, DUVAL COUNTY, FLORIDA (38-FOOT PROJECT).
A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B. THE BID OPENING DATE REMAINS UNCHANGED @ JANUARY 26, 2017 @ 2:00 P.M. EST.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
1. CONTRACT ID CODE PAGE OF PAGES
1 65
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-17-B-0001
X 9B. DATED (SEE ITEM 11)
19-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jan-2017
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
SF 30 CONTINUATION SHEET
Maintenance Dredging Projects U.S. Navy Submarine Base, Kings Bay, Camden County, Georgia (44, 45 and 47 Foot Project) & Marine Corps Support Facility, Blount Island, Duval County, Florida
(38-Foot Project)
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
DELETE SECTION 00010A LINE ITEMS AND PRICING SCHEDULE and REPLACE with the attached revised SECTION 00010A LINE ITEMS AND PRICING SCHEDULE.
REVISE CLAUSE 52.211.10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
REVISE Local Clause 999.211-1 SECTION 00800
DELETE SECTION 00800A WAGE DETERMINATIONS & OTHER ATTACHMENTS and REPLACE with the attached revised SECTION 00800A WAGE DETERMINATIONS & OTHER ATTACHMENTS
DELETE Specifications Section 01 22 00 and REPLACE with the attached revised Specifications Section 01 22 00.
DELETE Specifications Section 35 20 23 and REPLACE with the attached revised Specifications Section 35 20 23.
2. DRAWINGS:
DELETE Drawing No. BC-04 and REPLACE with the attached revised Drawing No. BC-04.
(End of Summary of Changes)
W912EP-17-B-0001 2 Amendment 0004
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
W912EP-17-B-0001 00010A-1 AMD 0004
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE:
0001 KBIC MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $_______________
0002 and KBIC EXCAVATION, UNCLASSIFIED;
0003 below KBIC STATION 43+300 TO STATION 48+175
(ESTIMATED QUANTITIES - SEE NOTE 2)
0002 UP TO 150,000 CUBIC YARDS (CY) 150,000 CUBIC YARD $___________ $_______________
0003 FROM 150,001 CY TO 300,000 CY 150,000 CUBIC YARD $___________ $_______________
0004 and KBIC EXCAVATION, UNCLASSIFIED;
0005 below KBIC STATION 39+141 TO STATION 43+300
AND EXPLOSIVE HANDLING BASIN
(ESTIMATED QUANTITIES - SEE NOTE 2)
0004 UP TO 200,000 CUBIC YARDS (CY) 200,000 CUBIC YARD $___________ $_______________
0005 FROM 200,001 CY TO 315,000 CY 115,000 CUBIC YARD $___________ $_______________
0006 and KBIC EXCAVATION, UNCLASSIFIED;
0007 below KBIC STATION 31+800 TO STATION 39+141 AND
MAGNETIC SILENCING FACILITY (MSF) NORTH
(ESTIMATED QUANTITIES - SEE NOTE 2)
0006 UP TO 100,000 CUBIC YARDS (CY) 100,000 CUBIC YARD $___________ $_______________
0007 FROM 100,001 CY TO 255,000 CY 155,000 CUBIC YARD $___________ $_______________
0008 and KBIC EXCAVATION, UNCLASSIFIED; SITE SIX NORTH 0009 below KBIC STATION 36+850 TO STATION 38+800
(ESTIMATED QUANTITIES - SEE NOTE 2)
0008 UP TO 40,000 CUBIC YARDS (CY) 40,000 CUBIC YARD $___________ $_______________
0009 FROM 40,001 CY TO 70,000 CY 30,000 CUBIC YARD $___________ $_______________
00010 and KBIC STANDBY TIME (SEE NOTE 5) 0011 below (ESTIMATED QUANTITIES)
0010 UP TO 24 HOURS 24 HOUR $___________ $_______________
0011 FROM 24 HOURS TO 120 HOURS 96 HOUR $___________ $_______________
0012 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL BASE (LINE ITEMS 0001 THRU 0012): $_______________
OPTION A:
0013 and KBIC EXCAVATION, UNCLASSIFIED;
0014 below KBIC SITE SIX OPERATING AREA - SOUTH
AND ARDM YOKE
STATION 34+233.1 TO STATION 36+548
(ESTIMATED QUANTITIES - SEE NOTE 2)
0013 UP TO 40,000 CUBIC YARDS (CY) 40,000 CUBIC YARD $___________ $_______________
0014 FROM 40,001 CY TO 75,000 CY 35,000 CUBIC YARD $___________ $_______________
0015 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
OPTION A CONTINUES ON NEXT PAGE.
MAINTENANCE DREDGING PROJECTS AT: U.S. NAVY SUBMARINE BASE,
KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47-FOOT PROJECT)
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND,
DUVAL COUNTY, FLORIDA (38-FOOT PROJECT)
W912EP-17-B-0001 00010A-2 AMD 0004
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
MAINTENANCE DREDGING PROJECTS AT: U.S. NAVY SUBMARINE BASE,
KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47-FOOT PROJECT)
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND,
DUVAL COUNTY, FLORIDA (38-FOOT PROJECT)
TOTAL OPTION A (LINE ITEMS 0013 THROUGH 0015) $_______________
TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0015) $_______________
OPTION B:
0016 and KBIC EXCAVATION, UNCLASSIFIED;
0017 below EXPLOSIVE HANDLING WHARVES (EHW)
STATION 41+420 TO STATION 43+320
(ESTIMATED QUANTITIES - SEE NOTE 2)
0016 UP TO 15,000 CUBIC YARDS (CY) 15,000 CUBIC YARD $___________ $_______________
0017 FROM 15,001 CY TO 30,000 CY 15,000 CUBIC YARD $___________ $_______________
0018 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION B (LINE ITEMS 0016 THROUGH 0018) $_______________
TOTAL BASE PLUS OPTIONS A & B (LINE ITEMS 0001 THROUGH 0018) $_______________
OPTION C:
0019 and KBIC EXCAVATION, UNCLASSIFIED;
0020 below KBIC REFIT WHARVES
STATION 45+850.4 TO STATION 48+175
(ESTIMATED QUANTITIES - SEE NOTE 2)
0019 UP TO 10,000 CUBIC YARDS (CY) 10,000 CUBIC YARD $___________ $_______________
0020 FROM 10,001 CY TO 15,000 CY 5,000 CUBIC YARD $___________ $_______________
0021 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION C (LINE ITEMS 0019 THROUGH 0021) $_______________
TOTAL BASE PLUS OPTIONS A, B & C (LINE ITEMS 0001 THROUGH 0021) $_______________
OPTION D:
022 and KBIC EXCAVATION, UNCLASSIFIED;
0023 below PORT OPERATIONS SMALL BOAT BASIN
STATION 43+497.45 TO STATION 45+207.13
(ESTIMATED QUANTITIES - SEE NOTE 2)
0022 UP TO 15,000 CUBIC YARDS (CY) 15,000 CUBIC YARD $___________ $_______________
0023 FROM 15,001 CY TO 20,000 CY 5,000 CUBIC YARD $___________ $_______________
0024 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION D (LINE ITEMS 0022 THROUGH 0024) $_______________
TOTAL BASE PLUS OPTIONS A, B, C & D (LINE ITEMS 0001 THROUGH 0024) $_______________
W912EP-17-B-0001 00010A-3 AMD 0004
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
MAINTENANCE DREDGING PROJECTS AT: U.S. NAVY SUBMARINE BASE,
KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47-FOOT PROJECT)
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND,
DUVAL COUNTY, FLORIDA (38-FOOT PROJECT)
OPTION E:
0025 KBIC EXCAVATION, UNCLASSIFIED; 38,000 CUBIC YARD $___________ $_______________
PORT SECURITY BARRIER MOORING AREA
STATION 46+100 TO STATION 47+393.59
(ESTIMATED QUANTITIES - SEE NOTE 2)
0026 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION E (LINE ITEMS 0025 AND 0026) $_______________
TOTAL BASE PLUS OPTIONS A, B, C, D & E (LINE ITEMS 0001 THROUGH 0026) $_______________
OPTION F:
0027 KBIC EXCAVATION, UNCLASSIFIED; DRY DOCK 1 LUMP SUM $___________ $_______________
CAISSON GATE SILL AND MOORING FACILITY
(ESTIMATED QUANTITIES - SEE NOTE 2)
0028 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION F (LINE ITEMS 0027 AND 0028) $_______________
TOTAL BASE PLUS OPTIONS A, B, C, D, E & F (LINE ITEMS 0001 THROUGH 0028) $_______________
OPTION G:
KBIC SECONDARY MAINTENANCE DREDGING
0029 KBIC INTERIM MOBILIZATION 1 LUMP SUM $_______________
0030 KBIC EXCAVATION, UNCLASSIFIED; 40,000 CUBIC YARD $___________ $_______________
KBIC SITE SIX OPERATING AREA - SOUTH
AND ARDM YOKE
(ESTIMATED QUANTITIES - SEE NOTE 2)
0031 KBIC EXCAVATION, UNCLASSIFIED; 15,000 CUBIC YARD $___________ $_______________
EXPLOSIVE HANDLING WHARVES (EHW)
(ESTIMATED QUANTITIES - SEE NOTE 2)
0032 KBIC EXCAVATION, UNCLASSIFIED; 10,000 CUBIC YARD $___________ $_______________
KBIC REFIT WHARVES
(ESTIMATED QUANTITIES - SEE NOTE 2)
0033 KBIC EXCAVATION, UNCLASSIFIED; DRY DOCK 1 LUMP SUM $___________ $_______________
CAISSON GATE SILL AND MOORING FACILITY
(ESTIMATED QUANTITIES - SEE NOTE 2)
0034 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
0035 KBIC STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________
(ESTIMATED QUANTITIES)
TOTAL OPTION G (LINE ITEMS 0029 THROUGH 0035) $_______________
TOTAL BASE PLUS OPTIONS A, B, C, D, E, F & G (LINE ITEMS 0001 THROUGH 0035) $_______________
OPTION H:
0036 KBIC FIELD-CUT WEIR RISER BOARDS * 200 20 EACH $___________ $_______________
(ESTIMATED QUANTITY)
TOTAL OPTION H (LINE ITEM 0036) $_______________
TOTAL BASE PLUS OPTIONS A, B, C, D, E, F, G & H (LINE ITEMS 0001 THROUGH 0036) $_______________
W912EP-17-B-0001 00010A-4 AMD 0004
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
MAINTENANCE DREDGING PROJECTS AT: U.S. NAVY SUBMARINE BASE,
KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47-FOOT PROJECT)
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND,
DUVAL COUNTY, FLORIDA (38-FOOT PROJECT)
OPTION J:
MCT MAINTENANCE DREDGING
0037 MCT INTERIM MOBILIZATION 1 LUMP SUM $_______________
0038 and MCT EXCAVATION, UNCLASSIFIED;
0039 below MCT STATION 0+00 TO STATION 12+00
(ESTIMATED QUANTITIES - SEE NOTE 2)
0038 UP TO 30,000 CUBIC YARDS (CY) 30,000 CUBIC YARD $___________ $_______________
0039 FROM 30,001 CY TO 55,000 CY 25,000 CUBIC YARD $___________ $_______________
0040 and MCT EXCAVATION, UNCLASSIFIED;
0041 below MCT STATION 12+00 TO STATION 56+09.1
(ESTIMATED QUANTITIES - SEE NOTE 2)
0040 UP TO 40,000 CUBIC YARDS (CY) 40,000 CUBIC YARD $___________ $_______________
0041 FROM 40,001 CY TO 65,000 CY 25,000 CUBIC YARD $___________ $_______________
0042 MCT STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________
(ESTIMATED QUANTITY)
0043 MCT BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
0044 MCT TURBIDITY AND DISPOSAL MONITORING 1 LUMP SUM $_______________
TOTAL OPTION J (LINE ITEMS 0037 THROUGH 0044) $_______________
TOTAL BASE PLUS OPTIONS A, B, C, D, E, F, G H & J (LINE ITEMS 0001 THROUGH 0044)
OPTION K:
0045 KBIC EXCAVATION, UNCLASSIFIED; 9,500 CUBIC YARD $___________ $_______________
CRAB ISLAND ACCESS CHANNEL
STATION 38+198.70 TO STATION 38+478.75
(ESTIMATED QUANTITIES - SEE NOTE 2)
0046 KBIC BIRD MONITORING (SEE NOTE 7) 1 LUMP SUM $_______________
TOTAL OPTION K (LINE ITEMS 0045 AND 0046) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0046) $_______________
W912EP-17-B-0001 00010A-5 AMD 0004
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
MAINTENANCE DREDGING PROJECTS AT: U.S. NAVY SUBMARINE BASE,
KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47-FOOT PROJECT)
MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND,
DUVAL COUNTY, FLORIDA (38-FOOT PROJECT)
NOTES:
(1) OFFEROR MUST PRICE ALL LINE ITEMS.
(2) QUANTITY INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH AND SHOALING ESTIMATED TO OCCUR BETWEEN DATES OF SURVEYS SHOWN ON DRAWINGS AND ACTUAL DREDGING. (SEE CLAUSE 999.211-1)
(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101, AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 (SECTION 00100)
(4) THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL ITEMS ANYTIME PRIOR TO DEMOBILIZATION OF EQUIPMENT. SEE CLAUSE 52.217-7 (SECTION 00700). THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, IN WRITING, A MINIMUM OF 7 DAYS PRIOR TO THE ANTICIPATED DATE OF THE DEMOBILIZATION OF A DREDGE PLANT. SEE CLAUSE 52.211-10 (SECTION 00700) FOR MORE INFORMATION ABOUT ORDER OF WORK FOR OPTIONS.
(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERIING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN
ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME
REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND
SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(6) KINGS BAY INNER CHANNEL (KBIC) AND MARINE CORPS TERMINAL (MCT) HAVE SEPARATE SECURITY REQUIREMENTS.
SEE PARAGRAPHS "KINGS BAY INNER CHANNEL U.S. NAVY SUBMARINE BASE STATION ACCESS/REGULATIONS" AND THE "MARINE CORPS SUPPORT FACILITY - BLOUNT ISLAND (MCSF-BI) ENTRY CONTROL REGULATIONS" LOCATED IN THE SECTION 01 11 00 IN ADDITION TO THE SECTION 01 11 00 APPENDICES A, 2A, 3A and B.
(7) PAYMENT WILL BE MADE FOR BIRD MONITORING IN ACCORDANCE WITH SECTION 01 57 20.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 257 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
The total completion time of 257 calendar days includes the following:
Base Bid 181 calendar days (includes mob/demob) Option A 11 calendar days Option B 4 calendar days Option C 3 calendar days Option D 3 calendar days Option E 4 calendar days Option F 2 calendar days Option G 22 calendar days** (Inclusive of interim mobilization) (MCT to
KBIC)
Option H 2 calendar days*** Option J 25 calendar days* (Inclusive of interim mobilization) MCT Option K 2 calendar days TOTAL 257 calendar days
*Option J will be the last order of work after the Base and Option A through Option F, and Option K are completed and accepted. Exhibit “I” was not used in accordance with DFARS Procurement, Guidance and Information 204.7105(b) (1).
**Option G will be the last order of work after the completion and acceptance of Option J.
***NOTE: Option H timeframe is excluded from the total duration as this element of work shall be performed concurrently with construction (base or options)
(End of clause)
W912EP-17-B-0001 Amendment 0004
SECTION 00800 - SPECIAL REQUIREMENTS
The following have been modified:
PREPRICING VARIATION IN ESTIMATED QUANTITY
a. This paragraph applies to contract line item number (CLIN) 0002,0003,0004,0005,0006,0007,0008,0009,0013,0014, 0016,0017,0019,0020, 0022, 0023, 0038, 0039, 0040, and 0041. The purpose of this paragraph is to establish a method for pre-pricing, during the offer preparation stage, a potential variation in estimated quantity and reduce the likelihood that the contract parties will have to enter into equitable adjustment negotiations at a later date.
b. The Government’s experience with this project reveals that it is extremely difficult to develop an estimate that will fall between 85 percent and 115 percent of the actual quantity. Therefore, we have adopted the process described in this paragraph.
c. The total estimated quantity for CLINs 0002 and 0003 is 300,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0002 and 0003. CLIN 0002 represents the quantity we believe we can safely assume. CLIN 0003 represent(s) the quantity we believe is possible, depending on conditions.
d. For CLINs 0002 and 0003, the contract prices for CLINs 0002 and 0003 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0002 and no more than 115 percent of the total estimated quantity for CLINs 0002 and 0003 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
e. The total estimated quantity for CLINs 0004 and 0005 is 315,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0004 and 0005. CLIN 0004 represents the quantity we believe we can safely assume. CLIN 0005 represent(s) the quantity we believe is possible, depending on conditions.
f. For CLINs 0004 and 0005, the contract prices for CLINs 0004 and 0005 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0004 and no more than 115 percent of the total estimated quantity for CLINs 0004 and 0005 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
g. The total estimated quantity for CLINs 0006 and 0007 is 255,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0006 and 0007. CLIN 0006 represents the quantity we believe we can safely assume. CLIN 0007 represent(s) the quantity we believe is possible, depending on conditions.
h. For CLINs 0006 and 0007, the contract prices for CLINs 0006 and 0007 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0006 and no more than 115 percent of the total estimated quantity for CLINs 0006 and 0007 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
i. The total estimated quantity for CLINs 0008 and 0009 is 70,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0008 and 0009. CLIN 0008 represents the quantity we believe we can safely assume. CLIN 0009 represent(s) the quantity we believe is possible, depending on conditions.
j. For CLINs 0008 and 0009, the contract prices for CLINs 0008 and 0009 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0008 and no more than 115 percent of the total estimated quantity for CLINs 0008 and 0009 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
k. The total estimated quantity for CLINs 0013 and 0014 is 70,000 75,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0013 and 0014. CLIN 0013 represents the quantity we believe we can safely assume. CLIN 0014 represent(s) the quantity we believe is possible, depending on conditions.
l. For CLINs 0013 and 0014, the contract prices for CLINs 0013 and 0014 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0013 and no more than 115 percent of the total estimated quantity for CLINs 0013 and 0014 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
m. The total estimated quantity for CLINs 0016 and 0017 is 30,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0016 and 0017. CLIN 0016 represents the quantity we believe we can safely assume. CLIN 0017 represent(s) the quantity we believe is possible, depending on conditions.
n. For CLINs 0016 and 0017, the contract prices for CLINs 0016 and 0017 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0016 and no more than 115 percent of the total estimated quantity for CLINs 0016 and 0017 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
o. The total estimated quantity for CLINs 0019 and 0020 is 15,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0019 and 0020. CLIN 0019 represents the quantity we believe we can safely assume. CLIN 0020 represent(s) the quantity we believe is possible, depending on conditions.
p. For CLINs 0019 and 0020, the contract prices for CLINs 0019 and 0020 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0019 and no more than 115 percent of the total estimated quantity for CLINs 0019 and 0020 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
q. The total estimated quantity for CLINs 0022 and 0023 is 20,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0022 and 0023. CLIN 0022 represents the quantity we believe we can safely assume. CLIN 0023 represent(s) the quantity we believe is possible, depending on conditions.
r. For CLINs 0022 and 0023, the contract prices for CLINs 0022 and 0023 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0022 and no more than 115 percent of the total estimated quantity for CLINs 0022 and 0023 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
s. The total estimated quantity for CLINs 0038 and 0039 is 50,000 55,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0038 and 0039. CLIN 0038 represents the quantity we believe we can safely assume. CLIN 0039 represent(s) the quantity we believe is possible, depending on conditions.
t. For CLINs 0038 and 0039, the contract prices for CLINs 0038 and 0039 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0038 and no more than 115 percent of the total estimated quantity for CLINs 0038 and 0039 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
u. The total estimated quantity for CLINs 0040 and 0041 is 65,000 Cubic Yards. For pricing and payment purposes, the total has been divided into CLINs 0040 and 0041. CLIN 0040 represents the quantity we believe we can safely assume. CLIN 0041 represent(s) the quantity we believe is possible, depending on conditions.
v. For CLINs 0040 and 0041, the contract prices for CLINs 0040 and 0041 shall apply providing the actual quantity is at least 85 percent of the estimated quantity in CLIN 0040 and no more than 115 percent of the total estimated quantity for CLINs 0040 and 0041 combined. If the actual quantity falls outside these parameters, either party to the contract may request an equitable adjustment in accordance with the Variation In Estimated Quantity clause of the contract.
(End of paragraph 999.211-1)
U.S. Naval Submarine Base, Kings Bay, Camden County, Georgia (44, 45, 47 Foot Project), & Marine Corps Support Facility-Blount Island, Duval County, Florida (38- Foot Project)
SECTION 00800A
WAGE DETERMINATIONS & OTHER ATTACHMENTS LIST OF CONSTRUCTION CONTRACT
ATTACHMENTS
NO. TITLE DATE NO. OF PAGES
1 NOTE 1
2 General Decision Number GA20160016 01/06/2017 5 3 General Decision Number GA20160072 01/06/2017 5 4 General Decision Number FL20160002 01/06/2017 5 5 General Decision Number FL20160154 01/06/2017 5
W912EP-17-B-0001 00800A-1 Amendment 0004
NOTE NOTE NOTE
THIS PROJECT INCORPORATES HEAVY CONSTRUCTION, HEAVY DREDGING
AND HOPPER DREDGING WAGE DETERMINATIONS FOR CAMDEN COUNTY, GA
AND NASSAU COUNTY, FL
THE HEAVY CONSTRUCTION WAGE DECISION MAY ONLY BE APPLIED TO
OPERATIONS OCCURRING ON LAND.
EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF
$10.15 FOR 2016 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-
BACON ACT FOR WHICH THE SOLICITATION IS ISSUED ON OR AFTER
JANUARY 1, 2016.
IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE
DECISIONS FURNISHED FOR THIS PROJECT, PLEASE CONTACT:
FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT, U.S. ARMY
CORPS OF ENGINEERS AT 904-232-3761, FAX 904-232-1954.
W912EP-17-B-0001 00800A-2 Amendment 0004
General Decision Number: GA170016 01/06/2017 GA16
Superseded General Decision Number: GA20160016
State: Georgia
Construction Type: Heavy Dredging
DREDGING
Counties: Georgia Statewide.
STATEWIDE
DREDGING CONSTRUCTION PROJECTS GEORGIA (East of the Aucilla and Ocmulgee Rivers within the Jacksonville & Savannah Districts of the Corps of Engineers).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
* ENGI0025-002 10/01/2014
Rates Fringes
Dredging: (Hydraulic Dredges Over 20") CLASS A.....................$ 35.63 12.39+a CLASS B1....................$ 30.81 12.00+a CLASS B2....................$ 29.01 11.86+a CLASS C1....................$ 28.22 11.55+a CLASS C2....................$ 27.30 11.47+a CLASS D.....................$ 22.68 10.85+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b Welder......................$ 9.79 1.73+b
W912EP-17-B-0001 00800A-3 Amendment 0004
CLASSIFICATIONS:
CLASS A: Leverman, Operator.
CLASS B1: Licensed Tug Operator over 1000 HP, Derrick Operator, Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.
CLASS B2: Licensed Boat Operator, Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO
W912EP-17-B-0001 00800A-4 Amendment 0004 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
W912EP-17-B-0001 00800A-5 Amendment 0004 http://www.dol.gov/whd/govcontracts
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage
W912EP-17-B-0001 00800A-6 Amendment 0004 payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
W912EP-17-B-0001 00800A-7 Amendment 0004
General Decision Number: GA170072 01/06/2017 GA72
Superseded General Decision Number: GA20160072
State: Georgia
Construction Type: Heavy Heavy Construction, Includes Water and Sewer Lines, and Heavy Construction on Treatment Plant Sites and Industrial Sites (Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)
Counties: Appling, Atkinson, Bacon, Ben Hill, Berrien, Calhoun, Camden, Charlton, Clay, Clinch, Coffee, Colquitt, Cook, Decatur, Grady, Irwin, Jeff Davis, Miller, Mitchell, Pierce, Quitman, Randolph, Seminole, Telfair, Thomas, Tift, Turner, Ware and Wayne Counties in Georgia.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
ELEC0177-003 11/30/2015
CHARLTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 26.49 11.23
ELEC0508-010 09/01/2015
APPLING, ATKINSON, BACON, CAMDEN, CLINCH, COFFEE, PIERCE, WARE,
& WAYNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 24.30 1.50%+8.50
ELEC0613-019 03/01/2016
CLAY & QUITMAN COUNTIES
W912EP-17-B-0001 00800A-8 Amendment 0004
ELECTRICIAN......................$ 30.20 28.5%
ELEC1205-008 06/05/2016
BERRIEN, COOK, DECATUR, GRADY, SEMINOLE, & THOMAS COUNTIES
Rates Fringes
ELECTRICIAN......................$ 24.18 14%+6.43
ELEC1316-015 09/01/2015
JEFF DAVIS & TELFAIR COUNTIES
Rates Fringes
ELECTRICIAN......................$ 24.63 11.57
* ELEC1531-008 12/01/2016
BEN HILL, CALHOUN, COLQUITT, IRWIN, MILLER, MITCHELL, RANDOLPH,
TIFT, & TURNER COUNTIES
ELECTRICIAN......................$ 22.45 4%+11.60
SUGA2012-090 08/11/2012
Rates Fringes
CARPENTER (Form Work Only).......$ 15.21 0.00
CEMENT MASON/CONCRETE FINISHER...$ 14.11 1.78
LABORER: Common or General......$ 11.00 0.00
LABORER: Pipelayer..............$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.23 0.00
OPERATOR: Grader/Blade..........$ 18.88 1.32
OPERATOR: Loader................$ 15.92 0.00
TRUCK DRIVER: Dump Truck........$ 12.00 2.14
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any
W912EP-17-B-0001 00800A-9 Amendment 0004 solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and
W912EP-17-B-0001 00800A-10 Amendment 0004 non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
W912EP-17-B-0001 00800A-11 Amendment 0004
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
W912EP-17-B-0001 00800A-12 Amendment 0004
General Decision Number: FL170002 01/06/2017 FL2
Superseded General Decision Number: FL20160002
State: Florida
Construction Type: Heavy Dredging
Counties: Florida Statewide.
Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
* ENGI0025-002 10/01/2014
Rates Fringes
Dredging : (Hydraulic Dredges Over 20") CLASS A.....................$ 35.63 12.39+a CLASS B1....................$ 30.81 12.00+a CLASS B2....................$ 29.01 11.86+a CLASS C1....................$ 28.22 11.55+a CLASS C2....................$ 27.30 11.47+a CLASS D.....................$ 22.68 10.85+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b Welder......................$ 9.79 1.73+b
CLASSIFICATIONS:
CLASS A: Leverman, Operator.
W912EP-17-B-0001 00800A-13 Amendment 0004
CLASS B1: Licensed Tug Operator over 1000 HP, Derrick Operator, Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.
CLASS B2: Licensed Boat Operator, Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .