AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
U.S. NAVY SUBMARINE BASE, KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47 FOOT PROJECT) & MARINE CORPS SUPPORT
BLOUNT ISLAND, DUVAL COUNTY, FLORIDA (38-FOOT PROJECT).
A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B. THE BID OPENING DATE REMAINS UNCHANGED @ January 19, 2017 @ 2:00 P.M. EST.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-17-B-0001
X 9B. DATED (SEE ITEM 11)
19-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2016
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
SF 30 CONTINUATION SHEET
Maintenance Dredging Projects U.S. Navy Submarine Base, Kings Bay, Camden County, Georgia (44, 45 and 47 Foot Project) & Marine Corps Support Facility, Blount Island, Duval County, Florida
(38-Foot Project)
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
1. Volume 1
Replace Standard Form 1442 with Revised Standard Form 1442
SECTION 00100 - INSTRUCTIONS TO OFFERORS
Add Clause 52.204-6
SECTION 00700 - CONTRACT CLAUSES
Add Clauses
52.217-7
52.236-5002
52.236-5008
Update Clause
52.236-4
52.211-5001
2. DRAWINGS:
DELETE Drawing No. AC-08 and REPLACE with the attached revised Drawing No. AC-08.
(End of Summary of Changes)
W912EP-17-B-0001 2 Amendment 0001
U.S. NAVY SUBMARINE BASE, KINGS BAY, CAMDEN COUNTY, GEORGIA (44, 45 AND 47 FOOT PROJECT) & MARINE CORPS SUPPORT
BLOUNT ISLAND, DUVAL COUNTY, FLORIDA (38-FOOT PROJECT).
DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION
DRAWINGS: SEE DFARS CLAUSE 252.236-7001, IN SECTION 00700.
MAGNITUDE OF CONSTRUCTION IS BETWEEN $5,000,000.00 AND $10,000,000.00. THIS IS A SMALL BUSINESS SET-ASIDE PROCUREMENT.
THE NAICS CODE IS 237990 AND THE SMALL BUSINESS SIZE STANDARD IS $27,000,000.00. TO BE CONSIDERED SMALL FOR PURPOSES
OF GOVERNMENT PROCUREMENT, A FIRM MUST PERFORM AT LEAST 40 PERCENT OF THE VOLUME DREDGED WITH ITS OWN
EQUIPMENT OR EQUIPMENT OWNED BY ANOTHER SMALL DREDGING CONCERN.
***BLOCK 11 - SEE SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE
A SITE VISIT WILL BE HELD ON 10 JANUARY 2017 AT 10:00AM. SEE FAR CLAUSE 52.236-27 IN SECTION 00100.
A PRE-PROPOSAL TELECONFERENCE HAS BEEN SCHEDULED FOR 11 JANUARY 2017 FROM 10:00AM - 11:00AM. PLEASE CALL:
877-402-9753, ACCESS CODE: 6546236 SECURITY CODE: 2873
YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM THIS SOLICITION. THE SAM WEBSITE IS LOCATED AT
WWW.SAM.GOV.
X
TIMOTHY G HUMPHREY 904-232-1072
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Dec-2016
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 45 calendar days and complete it within ________ 257 calendar days after receiving award, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________ *SECTION 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 19 Jan 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W912EP-17-B-0001 242
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701SAN MARCO BLVD
JACKSONVILLEFL32207-8175
X
Amendment 0001
See Item 14 document and return _______ copies to issuing office.)
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
OFFER (Must be fully completed by offeror)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
FACILITY CODE
(Insert any number equal to or greater than
AMENDMENT NO.
DATE
20B. SIGNATURE 20C. OFFER DATE
(To be completed by Government)
SEE SCHEDULE
41 U.S.C. 253(c)
CODE K3M0E00 27. PAYMENT WILL BE MADE BY CODE 964145
USACE FINANCE CENTER
5722 INTEGRITY DRIVE
ATTN: CEFC-AO-P
MILLINGTON, TN 38054-5005
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)
Contractor agrees
31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE 31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
(REV. 4-85) STANDARD FORM 1442 BACK
(Type or print)
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
(Include ZIP Code)
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD
23. ACCOUNTING AND APPROPRIATION DATA
AMOUNTS SEE SCHEDULE OF PRICES
(Type or print)
14. NAME AND ADDRESS OF OFFEROR
CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
18. The offeror agrees to furnish any required performance and payment bonds.
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER
21. ITEMS ACCEPTED:
22. AMOUNT
(4 copies unless otherwise specified)
26. ADMINISTERED BY
NORTH FLORIDA AREA OFFICE
SUITE 201
4070 BOULEVARD CENTER DRIVE,
JACKSONVILLE, FL 32206-3474
PH: (904) 232-3086
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN
30B. SIGNATURE
NSN 7540-01-155-3212 00010-2
to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
28. NEGOTIATED AGREEMENT (Contractor is required to sign this (Contractor is not required to sign this document.)29. AWARD
Amendment 0001
W912EP-17-B-0001 Amendment 0001
SECTION 00100 - INSTRUCTIONS TO OFFERORS
Added:
52.204-6 UNIQUE ENTITY IDENTIFIER (OCT 2016)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(End of provision) http://www.sam.gov/ http://www.sam.gov/
SECTION 00700 - CONTRACT CLAUSES
Added
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor Prior to Demobilization of Equipment. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.236-5002 - Government-Furnished Specifications, Drawings, Surveys, and Specifications in the Request for Proposal (JUL 2002)
This is to clarify DFARS 252.236-7001, Contract Drawings and Specifications, refers to any Government-furnished design or design criteria included in the Request for Proposal (RFP).
52.236-5008 - Value Engineering after Award (JUN 1999)
(a) In reference to FAR 52.248-3, Value Engineering-Construction, the Government may refuse to entertain a "Value Engineering Change Proposal" (VECP) for those "performance oriented" aspects of the Solicitation documents which were addressed in the Contractor's accepted contract proposal and which were evaluated in competition with other offerors for award of this contract.
(b) The Government may consider a VECP for those "prescriptive" aspects of the Solicitation documents, not addressed in the Contractor's accepted contract proposal or addressed but evaluated only for minimum conformance with the Solicitation requirements.
(c) For purposes of this clause, the term "performance oriented" refers to those aspects of the design criteria or other contract requirements which allow the offeror or Contractor certain latitude, choice of and flexibility to propose in its accepted contract offer a choice of design, technical approach, design solution, construction approach or other approach to fulfill the contract requirements. Such requirements generally tend to be expressed in terms of functions to be performed, performance required or essential physical characteristics, without dictating a specific process or specific design solution for achieving the desired result.
(d) In contrast, for purposes of this clause, the term "prescriptive" refers to those aspects of the design criteria or other
Solicitation requirements wherein the Government expressed the design solution or other requirements in terms of specific material, approaches, systems, and/or processes to be used. Prescriptive aspects typically allow the offerors little or no freedom in the choice of design approach, materials, fabrication techniques, methods of installation, or any other approach to fulfill the contract requirements.
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_232.htm#P784_58963 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_246.htm#P1618_232413
The following have been modified:
52.236-4 PHYSICAL DATA (APR 1984) (CESAJ ADAPTATION)
Data and information furnished or referred to below are for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by (See Section 00 31 32, 00 31 21 and 01 11 00 of this contract).
(b) Weather conditions (See Section 00 33 50 of this contract).
(c) Transportation facilities (See Section 01 11 00 of this contract).
52.211-5001 - VARIATIONS IN ESTIMATED QUANTITIES — SUBDIVIDED ITEMS (MAR 1995)
This variation in estimated quantities clause is applicable only to Items Nos. See Price Schedule.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for items Nos. See Price Schedule is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. See Price Schedule exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. See Price Schedule exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
.1
.9
.6
.7
.4
.2
.3
.2 .2
.0
.8
.5
.5
.7
.6
.5
.4
.3
.9
.9
.8
.4
.2
.0
.8
.7
.8
.4
.3
.0
.8
.6
.6
.5
.1
.6
.3
.2
.0
.0
.5
.2
.1
.9
.5
.5
.8
.8
.6
.5
.4
.4
.0
.6
.9
.8
.4
.2
.0
.6
.0
.6
.5
.4
.3
.4
.2
.4
.0
.2
.0
.7
.4
.3
.7
.6
.3
.7
.5
.7
.2
.4
.2
.5
.4
.3
.5
.2
.4
.2
.0
.0
.3
.2
.1
.2
.2
.8
.5
.1
.2
.9
.0
.5
.9
.3
.0
.1
.4
.8
.4
.1
.5
.1
.8
.3
.0
.9
.6
.6
.8
.6
.3
.8
.8
.5
.6
.5
.6
.7
.3
.1
.1
.0
.9
.8
.6
.5
.4
.0
.7
.5
.3
.1
.9
.7
.7
.5
.3
.3
.2
.0
.6
.4
.4
.4
.8
.7
.7
.7
.7
.5
.4
.3
.2
.1
.1
.1
.0
.9
.8
.7
.7
.6
.6
.4
.5
.5
.4
.5
.3
.3
.2
.2
.1
.0
.0
.1
.1
.1
.9
.8
.8
.8
.7
.7
.8
.5
.5
.3
.4
.3
.2
.2
.2
F
E
D
C
B
A
F
E
D
C
B
A
10 9 8 7 6 5 4 3 2
10 9 8 7 6 5 3 2 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E E
R S
DEPENDS ON YOU
SAFTEY ON THIS JOB
D E
P A
R T
M E
N T O
F T
H E A
R M
Y
M .R .2
V .M .B
J .E .B
J U
L Y
K
IN
G S B
A Y
P L
A N
S F
O R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G P
R O J
E C
T S
M A
R
IN
E C
O R
P S S
U P
P O
R T F
A C
IL
IT
Y U .S
N A
V Y S
U B
M A
R
IN
E B
A S
E
C
A M
D E
N C
O U
N T
Y
G E
O R
G
IA
A
N D
-F
O O
T P
R O J
E C
T
B L
O U
N T I S
L A
N D
D U
V A
L C
O U
N T
Y F
L O
R
ID
A
-F
O O
T P
R O J
E C
T
W E P -1
-B -0
AC01
AC02
AC03
AC04
(TYPICAL)
APPROXIMATE EDGE OF WATER
SIDE SLOPE DREDGING AREA
EXISTING BOTTOM
EXISTING BOTTOM
SIDE SLOPE DREDGING AREA
SEE NOTE 5
R A
N G
E -G
C H
A N
N E L C
E N T E R L
IN
E
GRAPHIC SCALE
N
F
IL
E N
A M
E H
E R
E
AC-08
C
IV
IL
D R
E D
G
IN
G P
L A
N C
R A
B I
S L
A N
D A
C C
E S
S C
H A
N N
E L
100'50'050'
2 FOOT ALLOWABLE OVERDEPTH
12 FOOT REQUIRED DEPTH (OPTION K) PLUS
MATERIAL TO BE PLACED IN D/A-1
Y
Y
Y
Y
X=865500
X=865000
POINT (Y) NORTHING(X) EASTING
AC04
AC03
AC02
AC01
865,404.63
865,348.11
865,285.58
865,334.74
289,285.64
289,316.26
289,653.84
289,662.95
CRAB ISLAND ACCESS CHANNEL
N
AC-08
O
AC-08
B-333 B-334
CRAB ISLAND
GEORGIA EAST ZONE PLANE COORDINATES NAD83(86)
NOTE:
S T
A .7
R
A N
G E -G
S T
A .7
R
A N
G E -G
5. THE SIDE SLOPE DREDGING IS UP TO EL. 0.00 FEET MLLW.
CHANNEL" FOR INSTRUCTIONS REGARDING DREDGING IN THIS AREA.
4. SEE SPECIFICATION DREDGING SECTION 35 20 23 PARAGRAPH TITLED "CRAB ISLAND ACCESS
ADJACENT TO STRUCTURES.
PROPERTY AND WATERFRONT STRUCTURES" FOR INSTRUCTIONS REGARDING DREDGING
3. SEE SPECIFICATION DREDGING SECTION 35 20 23 PARAGRAPH TITLED "KBIC ADJACENT
2. SEE DRAWING G-03 FOR PROJECT OVERVIEW COMBINED AND PROJECT GENERAL NOTES.
1. SEE DRAWING AG-01 FOR KBIC PROJECT OVERVIEW AND KBIC GENERAL NOTES.
A E E
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T R
E V
IS
IO
N N
O
AA
AREA TO BE DREDGED
PROJECT CHANNELCRAB ISLAND ACCESS CHANNEL
RANGE-G
12 - FOOT REQUIRED DEPTH
2 - FOOT ALLOWABLE OVERDEPTH
12 - FOOT REQUIRED DEPTH
2 - FOOT ALLOWABLE OVERDEPTH
AREA TO BE DREDGED
CRAB ISLAND ACCESS CHANNEL
N
AC-08
50 FT
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
E L E
V A
T
IO
N I
N F
E E
T M
L L
W
GRAPHIC SCALES
"A"
"B" 10'5'05'
100'50'050'
PROFILE - CRAB ISLAND ACCESS CHANNEL
CROSS SECTION - CRAB ISLAND ACCESS CHANNEL
O
AC-08
VERT = SCALE "B"
HORZ = SCALE "A"
VERT = SCALE "B"
HORZ = SCALE "A"
+2
+4
+6
+8
+2
+4
+6
+8
+10 +10
.0
.0
.0
.1
SURVEY NOTES:
SURVEYING, 30 NOV 2013.
REQUIREMENTS WERE FOLLOWED IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC
11. SURVEY ACCURACY PERFORMANCE STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE
THE SURVEY AND IS NOT TO BE USED FOR NAVIGATION.
AT THAT TIME. THIS CHART IS SOLELY FOR THE DISTRIBUTION OF AVAILABLE DEPTHS AT THE TIME OF
DATES INDICATED ABOVE AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS
10. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF SURVEYS MADE ON THE
9. AIDS TO NAVIGATION WERE LOCATED DURING THIS SURVEY.
CRAB ISLAND TOPOGRAPHIC SURVEY 9 DEC 2016
CRAB ISLAND HYDROGRAPHIC SURVEY 5 DEC 2016 SB-36
DATE OF SURVEY AREA SURVEYEDVESSEL
SINGLE-BEAM TRANSDUCER. SOUNDINGS SHOWN ARE IN HIGH FREQUENCY.
8. VERTICAL MEASUREMENTS WERE MADE USING A ROSS MODEL 835C SMART SOUNDER WITH A 28/200 KHZ
REFERENCE BASE LOCATED AT “USCG KINGS BAY ARP" FOR ENTIRE PROJECT.
REFERENCE BASE LOCATIONS:
7. THIS SURVEY WAS PERFORMED USING REAL-TIME KINEMATIC (RTK) GPS POSITIONING WITH THE FOLLOWING
6. ALL STATIONING REFERS TO THE CENTERLINE OF THE CHANNEL.
OF GEORGIA AND REFERENCED TO NORTH AMERICAN DATUM OF 1983 (NAD83).
5. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR THE EAST ZONE 1001
DATUM MODEL (KINGSBAY-2013 06 26.KTD).
4. TIDAL REDUCTIONS WERE OBTAINED UTILIZING REAL-TIME KINEMATIC GPS AND A HYPACK KINEMATIC TIDAL
3. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY A (+) SIGN.
NOAA TIDAL STATION 867-9511, KINGS BAY, GA
BENCH MARKS ASSOCIATED WITH THE TIDE GAGE SITE SPECIFIED BELOW:
(NOAA). NOAA’S VDATUM MODEL WAS USED AND CALIBRATED TO THE PUBLISHED MLLW HEIGHTS OF THE
TIDAL EPOCH 1983-2001, AS REPORTED BY THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
2. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO MEAN LOWER LOW WATER (MLLW) TIDAL DATUM,
1. REFER TO SURVEY NO. 17-047.
.1
.1
.3
.3
.3
.4
.4
.5
.6
.5
.7
.8
.0
.0
.1
.2
.4
.5
.5
.7
.7
.7
.8
.1
.3
.4
.5
.0
.0
.1
.2
.3
.4
.4
.8
.8
.4
.5
.6
.7
.9
.9
.0
.2
.2
.1
.3
.3
.3
.4
.4
.5
.5
.6
.6
.5
.5
.6
.7
.7
.7
.8
.8
.8
.8
.9
.0
.0
.0
.1
.1
.1
.3
.2
.2
.4
.4
.4
.4
.5
.5
.5
.7
.7
.7
.6
.9
.9
.1
.0
.1
.1
.1
.2
.2
.4
.5
.5
.6
.6
.7
.7
.7
.7
.8
.9
.0
.0
.0
.0
.0
.2
.1
.2
.3
.4
.6
.7
.5
.7
.7
.7
.8
.8
.8
.8
.9
.0
.0
.0
.1
.1
.1
.2
.2
.2
.3
.4
.5
.4 + .4
.5
.5
.5
.9
.9
.1
.2
.1
.3
.5
.5
.6
.9
.2
.3
.2
.4
.8
.9
.0
.9
.8
.1
.5
.4
.1
.2
.7
CRAB ISLAND ACCESS CHANNEL
| KBIC FY17 Amd0001 for CT ACTION.pdf |
| AC-08 |
| Pages from KBIC FY17 Amd0001 for CT ACTION.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| 1. Volume 1 |
| 2. DRAWINGS: |