W912EP-16-B-0007-U0002.pdf
PDF 1008 KB Posted
- Solicitation number
- W912EP-16-B-0007
About this file
W912EP-16-B-0007-U0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_Tampa_final.pdf | ||
| Amendment_0001-Tampa_Harbor_FY-16.pdf | ||
| Plans-Tampa_Harbor_MD_FY16_6-27-16.pdf | ||
| VOL_2_Tampa.pdf | ||
| VOL_1_TampaFinal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TAMPA HARBOR, MAINTENANCE DREDGING, 43-FOOT, 41-FOOT, AND 34-FOOT PROJECTS, HILLSBOROUGH BAY HB), CUT-A (HB), CUT C
(HB) AND CUT-D (HB), HILLSBOROUGH COUNTY, FLORIDA
The Purpose of this Amendment is to:
ADD an additional page to end of Section 00 31 32 - GEOTECHNICAL DATA REPORT. All other terms and conditions remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-16-B-0007
X 9B. DATED (SEE ITEM 11)
01-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Aug-2016
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
TAMPA HARBOR, MAINTENANCE DREDGING,
43-FOOT, 41-FOOT, AND 34-FOOT
PROJECTS, HILLSBOROUGH BAY (HB), CUT-A
(HB), CUT C (HB) AND CUT-D (HB)
THE PURPOSE OF THIS REVISION IS TO PROVIDE:
1) Add an additional page to the end of section 00 31 32.
TECHNICAL SPECIFICATIONS:
SECTION: 00 31 32 – GEOTECHNICAL DATA REPORT
Add an additional page to the end of section 00 31 32
DRAWINGS:
No Changes
#230 0.06 8.18
#200 0.08 7.75
#170 0.09 6.20
#120 0.13 3.00
#80 0.18 1.07
#60 0.25 0.52
#45 0.36 0.38
#35 0.50 0.29
#25 0.71 0.17
#18 1.00 0.14
#14 1.40 0.12
#10 2.00 0.00
513,829 1,293,061
Northing (ft):Easting (ft):
-43.9 MLLW
Sieve Number C. % Weight Retained
Shells (%):
Granularmetric Report
Fines (%):
10Y 3/1
Project Name: Tampa Harbor FL
Sample Name: VB-HBC14-1 @ 0 ft
Moment
Statistics
Elevation (ft):
USCS:
Coordinate System:
Phi 75 Phi 95
State Plane, FLW (U.S. Ft.)
Analysis Date: 6/2/2014
Munsell:
Sieve Size (Phi)
% Weight Retained
Carbonates (%):
Sieve Size (Millimeters)
Organics (%):
#200 - 92.25 #230 - 91.82
US Army Corps of Engineers Jacksonville District
KurtosisSkewnessSortingMean Phi
Phi 50 Phi 84
Median Phi
Phi 5 Phi 16 Phi 25
Mean mm Median mm
CLAY, inorganic-H, few fine-grained sand-sized quartz
G R
A N
U
LA
R M
E T
R
IC
R E
P O
R T
_T A
M P
A _H
B R
_A
LL
_B O
R
IN
G S
.G P
J C
E S
A J3
.G D
T
/2
/1
Tampa Harbor, Maintenance Dredging, 43-Ft, 41-Ft, & 34-Ft Projects Hillsborough Bay (HB), Cut-A (HB), Cut-C (HB), & Cut D (HB)
00 31 32-39 AMENDMENT 0002
File details come from the government source that posted it. Updated .