FY09SurveyboatAMENDMENT0002.pdf
PDF 151 KB Posted
- Solicitation number
- W912EP-09-R-0029
About this file
Amendment 0002 for W912EP-09-R-0029 repairs to U.S. Surveyboat FLORIDA
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY09SurveyboatSB Florida Blackline Drawings.pdf | ||
| FY09SurveyboatAmendmentSOLICITATION.pdf | ||
| FY09SurveyboatSolicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W32CS591413243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
The purpose of this amendment is to revise the scope of w ork/specifications, revise the bidding schedule, add a 8 (eight) page draw ing attachment, and attach a 8 (eight) page question and answ er document. In addition, the due date has been extended to 1 July 2009 by 2:00 p.m. eastern time. No other changes are made.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-09-R-0029
X 9B. DATED (SEE ITEM 11)
12-Jun-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jun-2009
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
PRUDENTIAL OFFICE BLDG
701 SAN MARCO BLVD
JACKSONVILLE REGIONAL CONTRACTING CENTER
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP-09-R-0029
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Jun-2009 02:00 PM to 01-Jul-2009 02:00 PM.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-JUL-2009 TO
27-DEC-2009
N/A N/A
FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-JUL-2009 TO
27-DEC-2009
N/A N/A
FOB: Destination
The following have been modified:
BID SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Per the scope of work, line items 0011, 0016, and 0020 are to be completed by 24 July 2009. The remaining line items are to be completed between the period of performance of 22 September through 27 December 2009.
Contractor shall furnish all plant, labor, material, equipment, supplies, transportation, utilities (except any materials, equipment, utility or service, if any, specified herein to be furnished by the Government), and perform all work as specified herein.
ITEM DESCRIPTION QUANTITY U/M U/P AMOUNT
0001 Docking and Lay Days 1 Job $______ $______
0002 Aluminum Plate and Shapes 100 Lbs. $______ $______
0003 Welding Service 300 Hours $______ $______
0004 Painting 1 Job $______ $______
0005 Recondition Propellers 1 Job $______ $______
0006 Rub Rail
a. General 1 Job $______ $______
b. Renewal of Rub Rail 60 LF $______ $______
c. Retaining Bar 40 LF $______ $______
d. Mounting Channel 40 LF $______ $______
0007 Hydraulic Steering System 1 Job $______ $______
0008 Rudders 1 Job $______ $______
0009 Rudder Bearings 2 Each $______ $______
0010 Electrical 1 Job $______ $______
0011 Annual Inspection 1 Job $______ $______
0012 Anodes 1 Job $______ $______
0013 Windows 1 Job $______ $______
0014 Trim Tabs 1 Job $______ $______
0015 Doors 1 Job $______ $______
0016 Door and Hatch Seals 1 Job $______ $______
0017 Windlass 1 Job $______ $______
0018 Head System 1 Job $______ $______
0019 Graywater 1 Job $______ $______
0020 Fresh Water 1 Job $______ $______
TOTAL FOR BID ITEMS 0001 - 0020 $______
SCOPE OF WORK
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1.1. DESCRIPTION OF WORK.
1.1.1. The work consists of furnishing all plant, labor, materials, and equipment (except materials and equipment provided in the specifications to be furnished by the Government) and performing all work in strict accordance with the contract specifications and schedules forming parts thereof for repairing and modifying the U.S. Surveyboat FLORIDA, principal dimensions and physical data of which are as follows:
Length, overall 64 feet 11 inches Beam, molded 18 feet 2 inches Displacement Long Tons (2,240 lbs) 72 long tons Draft 5 feet 0 inches (Approx.)
Material of hull and house Aluminum (type 5086)
1.1.2. Offerors shall carefully examine the
specifications, go aboard the vessel, if necessary, and fully inform themselves as to all conditions and matters which can in any way affect the work or the cost thereof. Should an offeror find discrepancies in, or omissions from, the specifications or other documents, or be in doubt as to their meanings, the Contracting Officer should be notified at once, in order to obtain clarification prior to submitting any offer. Failure to do so will not relieve offerors from responsibility for properly estimating the difficulty or cost of successfully performing the work. Prospective offerors may contact the Corps of Engineers District Office, 701 San Marco Blvd., Jacksonville, FL 32207;
telephone (Area Code 904) 232-1196 (Mr. P. Bates) in order to make arrangements to inspect the vessel.
1.1.3. Work that is to be done on a unit price basis (see
Bid Schedule) will be pointed out and definitely assigned as to location and amount by the Contracting Officer.
1.1.4. DEFINITIONS -- SHIP REPAIR - For the purposes of this
solicitation and resulting contract, any reference to "job order" will be construed to mean "contract and/or task order" resulting from this solicitation. "Agreement" will be construed to mean "contract."
1.1.5. WORK COVERED BY THE CONTRACT PRICE -- SHIP REPAIR
(a) Lump Sum Jobs. A lump sum for doing any particular job shall cover the cost of all labor, material, and appliances (including hand and machine tools) necessary for fully completing the job unless the detailed description of the job specifies otherwise. When a job provides for the disassembly or replacement of parts of machinery or piping, it shall always be reassembled to proper working condition and all new gaskets, bolts, nuts, packing, or any part incidental thereto which may be necessary for re-assembly shall be furnished by the Contractor. All new work or areas disturbed by repair activities shall be thoroughly cleaned, given a prime coat of paint, and two final coats to restore the repaired work or area to the original surroundings, unless otherwise specified.
(b) Unit Price Jobs. On items in which it is not possible to determine in advance the exact quantities of work to be done, unit prices are required in the Price Schedule. The quantities stated under such items are the Government's best estimate. These quantities may be increased or decreased, to the extent necessary, by the Contracting Officer, for the satisfactory repair of the vessel. Payment for each estimated quantity item will be made at the unit price specified in the line items for the actual quantity ordered, completed and accepted under this contract; regardless of whether or to what extent the quantities are increased or decreased from the estimated amount. The unit price shall include all costs associated with accomplishing the work as specified in subparagraph (a) above.
1.1.6. ADVERSE WEATHER CONDITIONS -- SHIP REPAIR - No
outside work will be performed when (i) the temperature is below 32 degrees F.; (ii) wind, rain, snow, sleet, or ice renders efficient work impracticable; or (iii) ice conditions prevent operation of the Contractor's drydocks. No adjustment of contract price will be allowed for any additional costs incurred as a result of delays caused by conditions described in this paragraph.
1.1.7. Over and Above Work.
(a) "Definitions." - As used in this scope of work --
(1) "Over and above work" means work discovered during the course of performing overhaul, maintenance, and repair efforts that is --
(i) Within the general scope of the contract;
(ii) Not covered by the line item(s) for the basic work under the contract; and
(iii) Necessary in order to satisfactorily complete the contract.
(2) "Work request" means a document prepared by the Contractor which describes over and above work being proposed.
(b) The Contractor and Administrative Contracting Officer shall mutually agree to procedures for Government administration and Contractor performance of over and above work requests. If the parties cannot agree upon the procedures the Administrative Contracting Officer has the unilateral right to direct the over and above work procedures to be followed. These procedures shall, as a minimum, cover --
(1) The format, content, and submission of work requests by the Contractor. Work requests shall contain data on the type of discrepancy disclosed, the specific location of the discrepancy, and the estimated labor hours and material required to correct the discrepancy. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the Contracting Officer to perform the proposed work;
(2) Government review, verification, and authorization of the work; and
(3) Proposal pricing, submission, negotiation, and definitization.
(c) Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request in accordance with the agreed-to procedures.
(d) The Government shall --
(1) Promptly review the work request;
(2) Verify that the proposed work is required and not covered under the basic contract line item(s);
(3) Verify that the proposed corrective action is appropriate; and
(4) Authorize over and above work as necessary.
(e) The Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.
(f) Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.
1.1.8. ACCESS TO VESSEL –
(a) Upon the request of the Contracting Officer, the Contractor shall grant admission to the Contractor's facilities and access to vessel, on a non-interference basis, as necessary to perform their respective responsibilities, to a reasonable number of:
(1) Government and other Government contractor employees (in addition to those Government employees attached to the vessel);
and
(2) Representatives of offeror’s on other contemplated Government work.
(b) All personnel granted access shall comply with Contractor rules governing personnel at its shipyard.
1.1.9. VESSEL DELIVERY AND RETURN -- SHIP REPAIR
(a) Delivery of Vessel. It is anticipated that the vessel will be delivered to the Contractor’s yard on or about 6 July 2009; or earlier if negotiated. If tug or pilot service is required during said delivery for maneuvering the vessel between open water and the dry dock, slip, or berth at the Contractor's yard, such service shall be promptly furnished by the Contractor at his expense.
(b) Return of Vessel. The Government will accept return of the vessel at the Contractor's yard upon acceptance of the work.
Should tug or pilot service be necessary for unberthing the vessel or maneuvering into open water from slips or basins on which the Contractor's yard is located, the Contractor shall immediately furnish such service at his expense.
(c) Time of Completion. The date and hour of the completion of all the contract requirements and the vessel is returned to the Government shall be considered as the time of completion of the contract subject to the provisions of the Commencement, Prosecution, and Completion -- Ship Repair paragraph 1.1.13 of this scope of work.
1.1.10. In case of failure on the part of the Contractor to
complete the work within the specified availability period (see paragraph 1.1.13, below) or any extensions thereof, the Contractor shall pay the Government as liquidated damages as specified in Clause 52.211-11, for each calendar day of delay until the work is completed or accepted.
1.1.11. The Contractor shall submit a report to the
Contracting Officer pertaining to any major part or component found to be damaged or exceeding permissible tolerances upon disclosure of the defects.
1.1.12. Should the removal or shifting of any parts of the
vessel or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at his expense.
1.1.13. COMMENCEMENT, PROSECUTION, AND COMPLETION -- SHIP
REPAIR
(a) It is the intent of these specifications that the vessel be out of service for work under this contract for no longer than a total of 120 calendar days, as follows: Due to the work schedule, the vessel cannot be made available for one continuous period of time; but will have to be made available to the contractor for two separate periods of time, as specified hereafter. The vessel will be delivered to the contractor after award. The vessel must be released by the contractor in order to travel to, and arrive at Fernandina Harbor, FL, on 27 July 2009. Whatever items of repair work (see Part 2, DETAILS OF WORK TO BE PREFORMED, below) the contractor begins during this first period of availability must be completed not later than close of business on July 24, 2009, such that the vessel will be fully functional. The vessel will be returned to the contractor approximately 60 calendar days later, on or about 22 September 2009, for the second period of availability, during which all specified work will be completed, after which the vessel will depart for its next assignment at Miami Harbor, FL.
The Contractor will therefore be required to commence work under the contract immediately upon delivery of the vessel to prosecute the work with faithfulness and energy and to complete the work within the availability period specified above. This 120 calendar-day availability period shall include the travel time of the vessel from its last duty station to the Contractor's yard;
the time required to perform all work specified herein; the travel time to and from Fernandina Harbor, FL, during the break in the availability period and the travel time from the Contractor's yard to the vessel's next duty station. (See the Evaluation of Cost to Deliver Vessel -- Ship Repair paragraph in paragraph 1.1.13 below for location of duty stations.) For purposes of this paragraph, it shall be assumed that the vessel travels at a rate of 150 miles per day. The vessel is operated only between the hours of operation of 8:00 a.m. and 4:30 p.m., Monday through Friday, excluding Federal holidays. It shall be the contractor's responsibility to schedule work on the vessel in such a manner as to assure completion in a period, which, with allowance for travel time, does not extend past 120 calendar days.
(b) In computing the time for commencement and completion of the work under the contract, fractional days will be prorated to the nearest hour. The hour of commencement shall be reckoned as the time when the vessel leaves its duty station for the Contractor's yard. The hour of completion of the contract shall be reckoned as the time when the vessel arrives at its next duty station subsequent to leaving the Contractor's yard. The hour of delivery shall be reckoned as the time when the vessel enters the Contractor's yard. The hour of acceptance shall be reckoned as the time all work under the contract is accepted by the Contracting Officer. If all work is not satisfactorily completed when the vessel is returned to the Government, the Contractor shall complete the work remaining to be done. Any operating time lost by the vessel thereafter because of any activities of the Contractor in completing said work shall be included in the computation of time for completion of work under the contract.
(c) In Summary of the above mentioned period of performance, line items 0011, 0016, and 0020 are to be completed by 24 July 2009.
The remaining line items are to be completed between the periods of performance of 22 September 2009 through 27 December 2009.
1.1.14 EVALUATION OF COST TO DELIVER VESSEL -- SHIP REPAIR
(a) The Surveyboat FLORIDA will be located in Jacksonville, Florida at the time offers are received. For the purpose of determining the lowest priced offer, the cost of delivery and return of the vessel will be given due consideration at the rate of $20.00 for each nautical mile that the vessel is required to travel as herein described. Upon completion of the 2 (two) repair periods, the vessel will begin operations at Miami Harbor, Florida; therefore, the vessel will be delivered without cost to yards located between Jacksonville, FL and Miami, FL. Offers from yards located outside this area will be evaluated based on delivery and return of the vessel from and to Jacksonville or Miami Harbor, Florida as appropriate. All distances will be based on the usually traveled route affording safe navigation for the vessel as determined by the Contracting Officer.
(b) Offers must be based on the Contractor's acceptance of the vessel in accordance with the Vessel Delivery and Return -- Ship Repair paragraph of this contract and commencement of work in accordance with the Commencement, Prosecution, and Completion -- Ship Repair paragraph of this scope of work. Offers based on any other schedule will be rejected as non-responsive.
1.1.15. Should any portion of the vessel's structure, housing, fixtures, or equipment require alteration in order to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at his expense.
Moreover, should the contractor damage any portion of the vessel's structure, housing, fixtures, or equipment while carrying out this work on the vessel, the contractor shall make such alterations or repairs at his expense to restore the property to its previous condition.
1.1.16. Similarly, should any tank, compartment, void, bilge, or other area of the vessel, except those tanks specified hereafter, require cleaning and gas freeing in order to perform the work, it shall be done at no additional expense to the Government. This shall include furnishing a certificate to the Contracting Officer's representative stating that the area has been tested by a certified marine chemist and is safe for burning and welding.
1.1.17. Dimensions and quantities listed are approximations
only. Contractor shall be responsible for field verification of all dimensions and measurements and reporting any discrepancies to the Government before work is accomplished.
1.1.18 DELIVERABLES-PAYMENT TERMS AND CONDITIONS
PAYMENT SCHEDULE:
Payments under this contract will be made in partial payments which are based on, Section B of solicitation/contract bid schedule.
a. Partial payments will be invoiced monthly on work completed.
b. A minimum of 20% of award amount will be held until completion of contract.
The following are the points of contact (poc) for this scope:
Technical/Site Visit:
U.S. Army Corps of Engineers – Phil Bates, SAJ-OD-M, Jacksonville District, 904-232-1196, cell phone 904-382-6611, phillip.c.bates@usace.army.mil
Contracting:
U.S. Army Corps of Engineers-LaKia Johnson, SAJ-CT-S, Jacksonville District, 904-232-1068, LaKia.L.Johnson@usace.army.mil
PART 2 - DETAILS OF WORK TO BE PERFORMED
The work to be performed shall consist of the following items, which are numbered to correspond to the bid item to which they apply:
0001 - DOCKING AND LAY DAYS.
a. Haul out on suitable dock, lift, railway, etc., shift on blocks for pressure washing, cleaning and painting in way of same, and undock after all underwater repairs are completed. The contractor shall provide a safe and convenient means of boarding mailto:phillip.c.bates@usace.army.mil mailto:LaKia.L.Johnson@usace.army.mil the vessel at all times. The floor of the dock shall be kept clean at all times by the contractor.
b. This item shall include all lay days required to complete the underwater work specified herein, including up to 100% of the "indefinite" (Unit Price) items of this specification. Payment for this item will be one lump sum regardless of the time required for the work and whether or not the contractor may find it necessary or convenient to dry dock the vessel more the one time in order to complete the specified work.
0002 - ALUMINUM PLATE AND SHAPES.
a. Renew or install aluminum plate and shapes at any location throughout the vessel where directed by the Government.
Renewal shall duplicate original installation and construction and shall be fitted fair and flush with adjacent surfaces as necessary for a smooth transition and to restore original shape, contours, lines, etc.; and shall be tested tight as required.
Any appurtenances in way of renewals shall be renewed or reinstalled as required. New plate or shapes shall be welded in place as original and doublers shall be plug welded in an approved manner. All welders assigned to this work shall be experienced in and U. S. Coast Guard certified for aluminum welding. Quote price per pound, in place, to apply to either plate or shapes, and estimate on 100 pounds to be installed.
0003 - WELDING SERVICE.
a. Provide welding service, including welding material, to the Contracting Officer's Representative and/or Surveyboat Operator as directed throughout the vessel. The welder shall be experienced in and U. S. Coast Guard certified for welding aluminum. The work shall include, but not be limited to:
preparing the surfaces to be welded, making the weld, clean-up, grinding, touch-up paint in way of the work, etc. Quote price per hour, and estimate on 300 hours to be required.
0004 - PAINTING.
a. Underwater Hull Surfaces.
(1) General. Fully pressure wash entire underwater portion of hull and running gear. Care should be taken not to damage the shafts, propellers and rudders. All openings, anodes and fathometer transducers shall be adequately protected during surface preparation. Remove all barnacles and other marine growth. Scuff sand with 80 grit sandpaper then solvent clean with Seahawk S-80 Wax”N”Greaser to remove residue.
(2) Inspect all underwater hull surfaces. In areas where paint is failing, spot sand blast or mechanically remove paint to bare metal. Estimate 15% of total square footage to require sand blasting. Appling manufacturer’s approved primer to all bare metal surfaces followed by manufacturer’s approved epoxy barrier coat.
Apply primer and barrier paint per the manufacturer’s instructions.
(3) Hull Paint - Waterline to Keel. Apply two full color coats (first coat black and second coat blue) from waterline to keel of Bio-Cop TF anti-fouling paint or approved equal. The Antifouling coatings shall be applied to a wet film thickness of 5 mils per coat. Drying times between coat applications may vary.
Consult manufacturer’s recommendation for drying times.
(4) Materials for Hull Exterior - Waterline to Keel.
a) The contractor shall furnish all materials, and will require approximately the following Sea Hawk antifouling paints for use from waterline to keel:
4 gallons of 1205-1 Black Seahawk BIOCOP TF antifouling paint.
4 gallons of 1202-1 Light Blue Seahawk BIOCOP TF antifouling paint.
b) Sea Hawk paints and primers are manufactured by New Nautical Coatings, Incorporated, 4242 31st St. North, St.
Petersburg, FL 33714, telephone (800) 528-0997.
c) The Contractor shall follow specific instructions for application from manufacturer's representative, literature, etc. BIOCOP TF is a tin free paint.
b. Above water surfaces
(1) General - Any deteriorated surfaces, handrails, rubrail etc. will be repaired or replaced as necessary, and payment for such work will be made under Item 0003, WELDING SERVICE, or Item 0002, ALUMINUM PLATE AND SHAPES, as appropriate
(2) Deck - Sand blast entire main deck to bare metal and apply prime wash with Interlux Vinyl-Lux 353 Primewash; apply 2 coats of Interlux Pre-Kote 492876 primer. Apply 2 coats of Interlux Interdeck Gray model 4506705 # YJF684 with Intergrip Nonskid paint additive to deck surface. All bull nose edges and diamond plating will be top coated with matching Interlux Brightside Polyurethane Gray without the nonskid additive.
(3) Handrails, Vents, Boom, Deck Storage Boxes, Cabin Handrails – Inspect all surfaces. In areas where paint is failing spot sand blast or mechanically remove paint to bare metal as required; inspect surfaces for cracks and repair as required.
Prime wash all bare metal with Interlux Vinyl-Lux 353 Primewash.
Prime all bare surfaces with one coat of Interlux Pre-Kote one part primer model white 131120# Y4279/1. Prime entire surface with one coat of Interlux Pre-Kote one part primer model white 131120 # Y4279/1. Apply 2 coats of Interlux Brightside one part Polyurethane Grand Banks Beige model 406173 # Y4217.
(4) Cabin
(a) Exterior – Inspect all surfaces. In areas where paint is failing spot sand blast or mechanically remove paint to bare metal as required; inspect surfaces for cracks and repair as required. Estimate 15% of total square footage to require sand blasting. Prime wash all bare metal with Interlux Vinyl-Lux 353 Primewash. Prime all bare surfaces with one coat of Interlux Pre- Kote one part primer model white 131120# Y4279/1. Prime entire surface with one coat of Interlux Pre-Kote one part primer model white 131120 # Y4279/1. Apply 2 coats of Brightside One-Part Polyurethane with Teflon Hatteras Off White Y4208 or Grand Banks Beige.
(b) Interior - Sand as required; prime wash bare metal with Interlux Vinyl-Lux 353 Primewash; apply 2 coats of Pre-Kote 492876 primer; apply 2 coats of Brightside One-Part Polyurethane with Teflon Hatteras Off White Y4208 or Grand Bank Beige.
(5) Bilges - prep sand as required; prime wash bare metal with Interlux Vinyl-Lux 353 Primewash; apply 2 coats of Pre-kote 492876 primer; apply 2 coats of Brightside One-Part Polyurethane with Teflon Hatteras Dusk Gray Y4233.
(6) Legends – paint all legends with two coats of Brightside One-Part Polyurethane with Teflon Y4359 white.
0005 - RECONDITION PROPELLERS.
a. Recondition both existing port and starboard propellers to their original pitch and balance. The propellers are 34x32, 4-blade, one right hand and one left hand.
0006 - RUB RAIL.
a. General. Remove all Goodyear Rubber Company style M-4 upper and lower rub rail around the perimeter of the vessel.
Prior to reinstalling the rub rail, surface prep the mounting channels and paint, primer and two top coats. Subsequent to performing the work on the rub rails as specified restore all removals in good order, renewing all missing or defective type 316 stainless steel fasteners; and utilizing nylon washers. Existing nylon washers in good condition may be reused as approved by the Government representative. Coat all threaded surfaces and nylon washer before reconnection with Tef-Gel corrosion eliminator and anti-seize lubricant. Apply Tef-Gel liberally and as per manufacturer’s recommendations.
b. Renewal of Rub Rail. If directed, furnish and install new Goodyear Rubber Company style M-4 rub rail as required on either upper or lower rub rails. See Rub Rail Profile shown below. Quote price per foot and estimate on sixty (60) linear feet to be renewed.
c. Retaining Bar. If directed, replace deteriorated type 316 stainless steel flat bar inside the rub rail. Use the existing flat bar and rub rail as a pattern to locate drill points. See Rub Rail Profile shown below. Quote price per foot and estimate on forty (40) linear feet of flat bar to be renewed.
d. Mounting Channel. If directed, replace deteriorated 4 inch by 2.16# marine aluminum mounting channel for the rub rail.
Existing channel shall be cropped out neatly and adjacent/faying surfaces ground smooth. New channel shall be trimmed to match existing configuration, especially the notches for (wrench) access to bolts/nuts, and to fit fair and flush. See Rub Rail Profile shown below.
Continuously weld outside of each leg of channel to hull and to adjacent channel, duplicating original configuration. After welding is complete then surface prep and paint new channel and adjacent disturbed areas, primer and two top coats. Quote price per linear foot of channel in place, and estimate on forty (40) linear feet to be renewed.
0007 - HYDRAULIC STEERING SYSTEM
a. Refit existing hydraulic power steering system with a new electric pump system in aft rudder compartment with new electronic controls.
b. Remove both existing, 7 gmp, hydraulic power steering pumps (Parker model number SDV20P7P36C) and associated flex hoses from both main engines.
c. Install 2 new power steering pumps in aft rudder compartment (lazarette).
d. Replace hydraulic wheel at helm with an electronic steering wheel control.
e. Replace existing rudder indicator system with a new indicator that is compatible with the new power steering system.
f. Replace existing, 3.5 inch bore with a 12 inch stroke, hydraulic steering ram with a 3 inch bore and 12 inch stroke hydraulic cylinder (existing cylinder is over sized and needs to be down sized). Existing cylinder has a 1.25 inch OD rod with a fully extended length of 23 inches.
0008 - RUDDERS
a. Make all necessary removals and unship both rudders from ship to shop. Set rudder up between centers, and check straightness, truth, run-out, etc., of the blade and the rudder stock. Any repairs or straightening found to be required will be paid for separately. Reinstall the rudder in the vessel, renewing the 3/4 inch square packing in the stuffing box with an approved packing, and renewing any missing or defective fastenings.
0009 - RUDDER BEARINGS.
a. Inspect rudder bearings. If directed, remove and renew the existing rudder bearings. Furnish and install new rudder bearings at each rudder stock. Each bearing is cutless type, 2- 1/2 inches ID by approximately 3-1/8 inches OD by approximately 5 inches long. Coat all threaded surfaces before reconnection with Tef-Gel corrosion eliminator and anti-seize lubricant. Apply Tef- Gel liberally and as per manufacturer’s recommendations.
0010 - ELECTRICAL
a. Inspect and repair electrical system.
b. Remove 230 volt circuit (receptacle and wire) from bridge chart table. Remove wiring to the panel. Install blank cover plate where 230 volt receptacle was removed.
c. Power panels. Contractor shall clean all electrical power panels, test all wiring and connections, and repair as needed or directed by the COR.
d. Repair fire alarm/smoke detector system.
e. Install a new waterproof aft viewing camera on mast and connect to existing bridge monitor.
f. Furnish and install a new security system which notifies captain of vessels status (fire alarm, high bilge water alarm and intrusion alarm). Ship yard will discuss vessel’s needs with captain and present recommended system.
0011 - ANNUAL INSPECTION.
a. The Surveyboat will undergo a follow-up topside inspection for Certificate endorsement by the U.S. Coast Guard while under repair. The Surveyboat is classed as an S vessel under Rules and Regulations for Small Passenger Vessels, Subchapter T, 46 CFR 175-187. The Surveyboat, delivered in November 1973, is certificated for Oceans (100-mile) service. The contractor shall furnish all necessary labor, tools, material and equipment required by the U.S. Coast Guard representative for this inspection; and shall coordinate with the Government representative for scheduling and performance of the inspection(s).
0012 - ANODES.
a. Furnish and install two (2) new, 5 pound each, teardrop-shaped zinc anodes, one each port and starboard, on the forward portion of the hull. Existing stainless steel fasteners in good condition may be reused. The contractor shall replace deteriorated, missing, or damaged fasteners with new type 316 stainless steel items. Any deteriorated brackets will be repaired or replaced as necessary, and payment for such work will be made under Item 0003, WELDING SERVICE, or Item 0002, ALUMINUM PLATE AND SHAPES, as appropriate.
0013 - WINDOWS
a. Make all necessary removals and unship all the windows from the cabin and pilot house. The existing windows and gasket material will be disposed of as scrap. During the course of work on this item, all window openings shall be completely covered to prevent rain, dust, or other particulates and foreign matter from entering the vessel. Electronic equipment located near window openings shall be covered with sheet plastic and sealed with tape in an approved manner during the course of the work.
b. Install new government furnished American Marine Products, Inc, Pompano Beach, FL, Kevin O’Halloran, 954-782-1400 office, 401-862-9996 cell, Yachtsman Series (Clamp-Ring Mount) windows and window frames in accordance with the window manufacture’s requirements. Contractor shall coordinate with window manufacturer to assure proper fit of the new windows. After the existing windows and gaskets are removed, the gasket landing surfaces of the bulkheads shall be fitted to the new window frames, ground, sanded, and cleaned, removing all failing paint and oxidation buildup or other corrosion and foreign material.
Contractor shall coordinate with window manufacturer to assure proper fit of the new windows. The bulkheads shall then be faired (to include welding build up, if necessary) to a smooth, fair surface, lying in the same plane. Welding build up required will be paid for under Item 0003, WELDING SERVICE. After the bulkheads are faired, cleaned, and painted inside and out, reinstall the new window frames in each opening in accordance with the window manufacture’s recommendations to assure a water tight seal.
c. Subsequent to reinstallation of the windows the Contractor shall hose test each individual window at not less than 50 psig. No leaks or drips on the interior will be accepted.
A list of the windows, with approximate sizes, follows. All corners of window are rounded to a radius of approximately 3-1/2 inches. All corners of window opening may need to be refit to window manufacturer’s required radius.
Pilot House: 3 each windshields 31” x 36” 2 each doors (1P/1S) 12” x 28” 2 each side (1P/1S) 31” x 28” (non-rectangular) 2 each side (1P/1S) 36” x 28” (replace w/sliding windows) 2 each side (1P/1S) 26” x 15” (non-rectangular) 2 each aft bulkhead 36” x 18”
Cabin: 4 each side (2P/2S) 36” x 24” 2 each side (1P/1S) 36” x 24” (non-rectangular) 2 each side (1P/1S) 40” x 24” (non-rectangular) 1 each aft bulkhead (door) 24” x 36” 1 each aft bulkhead 20” x 36”
0014 - TRIM TABS
a. Remove and dispose of existing all four trim tab hydraulic rams and pump system. Procure and install four new commercial grade trim tab hydraulic rams and pump system.
Commercial grade rams shall be approved by the COR prior to installation. Connect new rams to the existing tabs which are approximately 12 inches by 6 feet each (planes are hinged to the lower stern of the vessel). Test for full range of motion and durability at plane speeds.
0015 - DOORS
a. Remove and dispose of the two (2) exterior doors in the pilot house. Provide and install two (2) new metal doors of the same size, thickness and material or as directed by the COR.
Install new door seals. Prove doors watertight.
b. Subsequent to installation of new doors and seals the Contractor shall hose test each individual door and hatche at not less than 50 psig. No leaks or drips on the interior will be accepted.
0016 – DOOR AND HATCH SEALS
a. Remove and dispose of hatch seals on two (2) exterior engine room hatches, storage boxes, and rear cabin door. Install new hatch seals of the same size and material or as directed by the COR. Make all hatches water tight.
b. Subsequent to installation of new seals the Contractor shall hose test each engine room hatch, engine room emergency hatch and rear cabin door at not less than 50 psig. No leaks or drips on the interior will be accepted.
0017 – WINDLASS
a. Anchor windlass winch is leaking oil.
b. Remove, disassemble and inspect the anchor windlass. All repair parts required to reseal and fix unit will be paid by modification to this contract.
c. Reinstall unit and test.
0018 – HEAD SYSTEM
a. Remove existing head system. Remove head system fixtures as necessary for demolition. Install new Vac-u-flush head system with overboard discharge and deck pump-out hook-up. New head system tank shall hold 50 gallons of waste. COR will assist in locating the waste tank’s position. Contractor shall provide all piping, fittings, connections, wiring and valves necessary for a complete, full functioning head system. Reinstall all removed fixtures and test for functionality. Provide Operation and Maintenance manuals for the new system.
0019 - GRAYWATER SYSTEM
a. Remove and dispose of existing graywater holding tank.
Install new plastic 50 gallon gray water holding tank with overboard discharge and deck pump-out hook-up. Contractor shall provide all piping, fittings, connections, wiring and valves necessary for a complete, fully functioning graywater system.
Provide Operation and Maintenance manuals for the new parts of the graywater system.
0020 - FRESH WATER SYSTEM
Empty the fresh water tank and system. Remove fresh water tank access hatch gaskets. Clean all interior surfaces of the fresh water tank. Replace the fresh water tank access hatch gasket with new. Flush and disinfect the fresh water system in its entirety.
Chlorinate tank after is repaired.
W912EP-09-R-0029 U.S. Surveyboat FLORIDA Description/Specifications/Work Statement
Questions and Answers
General Q&A’s
1. Stability test: Will a hydrostatic table of the vessel be available to create the procedure for stability test?
Answer: This item has been deleted. The USCG is no longer requiring a new Stability Letter.
2. What are the contract requirements?
Answer: The contract requirements are clearly stated in Bid Schedule, Section B; and Scope of Work, Section C, inclusive, of the Solicitation.
3. What will it take to satisfy each item of the contract?
Answer: See paragraph 1.1.5 of the amended specifications, WORK COVERED BY THE CONTRACT PRICE -- SHIP REPAIR. The Authorized Representative of the Contracting Officer, or other person, designated in writing, will make the determination as to when each job or item is fully completed.
4. No general arrangement drawings, tank drawings, capacity plans, docking plans or shell expansions drawings are provided. It is requested that USACE provide the drawings.
Answer: The vessel was built in 1973, and drawings were obtained with the vessel. Some, but not all, drawings were revised/updated in 2004 when the main engines were replaced.
No drawings have been revised since 2004. The 2004 drawings will be furnished to all prospective offerors, see attachment;
but may not include all of the items requested by this offeror. These drawings may or may not accurately describe the current configuration of the vessel, and the Government makes no warranty or representation as to their accuracy. A prudent offeror would have gone aboard the vessel, if necessary, in order to fully inform themselves as to all conditions and matters which could in any way affect the work or the cost thereof. Failure to do so does not relieve offerors from responsibility for properly estimating the difficulty or cost of successfully performing the work.
5. "as required" cannot be quantified, therefore cannot be priced. What work will USACE specifications require as a contract deliverable to satisfy each line item of the specifications were (sic) "as required" is noted.
Answer: The term "as required" in these sentences [the offeror does not specify in the question, but it is believed this question pertains to paragraphs b,(3) and b.(4)] is used as a modifier pertaining to surface preparation, and, as such is qualitative, NOT quantitative. The words "as required" as used in this sense pertain to how well the surfaces are prepared to accept new primer, paint, etc., for a finished paint system/job where the existing paint coating is failing.
The "as required" in these paragraphs also pertains to the offerors selection of sand blasting, mechanical removal, etc., to properly and adequately prepare the surface to accept the new primer and top coats. Again, a prudent offeror would have visited the vessel and inspected these above water surfaces.
6. The contract states that June 18, 2009 is the deadline for bids, but in your emails you say it is June 22, 2009. Which one is correct?
Answer: Both dates were amended. The most current due date is 1 July 2009 by 2:00 p.m. eastern time.
SECTION 0002 Q&A’s
7. Item 0002 states that the new plates and shapes are welded in place, but the requested quote is price per pound, which would be materials only. Please verify that this is either materials only or if the welding labor needs to be included in this quote. If the labor needs to be included in item 0002, why does item 0003 (page 12) request welding labor also? Also is the 100 pounds of plates and shapes a minimum?
Answer: With respect to the difference between the requirements under Bid Item 0002, Aluminum Plate and Shapes;
and Bid Item 0003, Welding Service: The welding labor specifications under Bid Item 0003 is for miscellaneous welding anywhere throughout the vessel, EXCEPT that associated with the renewal of plate and shapes (which would be included in Bid Item 0002). One example of such other welding would be to weld up cracks in shell plating, where the plate itself is not to be renewed. Such welding hours would include grinding out the crack on one or both sides of the plate, in order to properly prepare it for welding, drilling a hole at each end of the crack to stop propagation thereof; making the weld repair, and grinding the finished weld on one or both sides to blend with the adjacent plate surface(s), performing surface preparation, priming and painting, clean-up, etc., etc., all as specified in subparagraphs 1.1.5(a) and 1.1.5(b) of the solicitation. Costs for ALL labor, material, appliances, etc., Is specified for each item, whether Lump Sum or Unit Price;
and the Offerors shall estimate, prepare, and submit their prices accordingly.
8. For those items not quantified or specified will a Unit Price or a NSP (No Specifications Price) be acceptable.
Answer: Unit prices are only acceptable for the Unit Price items on the Bid Schedule for which the U/M (Unit of Measure) is Lbs., Hours, LF, or some other variable, but specifications, quantity. For all Lump Sum bid items (those for which the U/M is "Job"), the only acceptable response is a Lump Sum dollar amount. Any other responses or notations on the Bid Schedule will cause the entire bid to be rejected as non-responsive.
9. Per section 1.1.13, (a) the contract states that we will have 180 days to complete the job, but the dates show as to availability add up to only 60 days. The available dates are July 1 through July 24; then again on September 22 through October 29. This appears to be only 60 days for the work to be performed, is that the case?
Answer: The correct total performance period is 180 calendar days with 120 calendar days for that the vessel will be available for the contractor to perform the repairs minus days to mob and de-mob. The boat will be made available as soon as the contract is awarded and the first performance period work must be completed by July 24th, 2009. The boat will be made available again on or about September 22nd , 2009 for approximately 96 days making the end of the performance period on or about December 27th , 2009.
SECTION 0004 Q&A’s
10. Painting- Can you quantify “where paint is failing” into a specifications quantity or percentage of the square footage and or linear footage of “where paint is failing” in all subsections? A2; b3; 4a.
Answer: Estimate 15% of total square footage to require sand blasting. See amended specifications section 0004(a)(2).
11. Why is the COE using TBT paint when it has been banned in many areas, when there is very environmentally friendly paint available? Can the contractor use alt system?
Answer: See amended specifications item 0004(a)(3)(4).
12. Item 0004 - PAINTING: Paragraph a.(2). It is Industry standard to provide estimate for up to 10% of hull preservation system when spot is specified without quantification. Will USACE accept industry standard basis of estimate (BOE)?
Answer: See amended specifications 0004(a)(2).
13. Item 0004 - PAINTING; Paragraph b.(3). It is industry standard to provide estimate for up to 10% of hull preservation system repair when spot is specified without quantification. Will USACE accept industry standard basis of estimate (BOE)?
Answer: See amended specifications section 0004.
14. Item 0004, section B, Above water surfaces. #2. Deck.
Is the area to be painted the entire deck? How many square feet are involved? #3. Handrails, vents, booms, ect. How many square feet are involved? #4. Cabin. How many square feet involved on the (a) exterior and (b) interior?
Answer: Yes the entire main weather deck (see attached drawings for square feet of deck, handrails, vents, boom, cabin, etc.). The entire outside of the cabin shall be painted but only the exposed surfaces around the windows needs to be painted on the interior.
15. Bilges. Is this the entire bilge top to bottom? How many square feet are involved?
Answer: The bilge is the centerline to the chime per section 0004. See attached drawings to estimate square footage.
SECTION 0006 Q&A’s
16. How many LF of rub rail is “loose and removed”?
Answer: See amended specifications item 0006(a).
17. Item 0006 - RUB RAIL. What is the contract certain BOE for repair? How much of the rub rail is loose and how much of the rub rail is missing? How many defective 316 SS fasteners are there? How many missing nylon washers are there? What is the ID, OD and thickness of the nylon washers?
Answer: See amended specifications section 1.1.2 for inspection information and point of contact.
SECTION 0007 Q&A’s
18. Hydraulic power system: What is the horse power of each engine and Kw of the generator? So as to determine proper electric pump size and torque values on the system. Are you requiring to renew the steering cylinders or use existing?
Answer: The main engines are two 60 series Detroit Diesels, 740 BHP each, and the two getsets are 20KW each. See amended specifications for steering cylinder in section 0007(a-f).
19. Item 0007 - HYDRAULIC STEERING SYSTEM. Is the entire existing system to be removed, including reservoir, pumps, pump control system, hoses, piping, and wiring?
Answer: The specification state which existing components are to be removed or replaced; and what new components/systems are to be furnished and installed in new locations, or furnished and installed to replace which existing components/system.
The offeror's attention is also invited to paragraph 1.1.5.(a), Lump Sum Jobs.
20. Item 0007- Hydraulic steering system The contract does not state that the ram should be replaced.
We will need to know the bore, stroke, and displacement of the existing ram. Also, what size is the current hydraulic pump and how many gallons per minute is it rated for?
Answer: See amended specifications item 0007(a-f).
SECTION 0008 Q&A’s
21. Item 0008 - RUDDERS. What fasteners are missing and/or defective? What is the fastener composition, size and quantity?
Answer: See amended specifications 1.1.2 for inspection information and point of contact.
SECTION 0009 Q&A’s
22. Item 0009 - RUDDER BEARINGS. Are bidders to price in removal of existing and installation of new bearings, or does the limit of contractor liability end with open and inspection. Is the contractor correct to assume the remainder of the work will be the subject of a negotiated settlement?
Provide an installation drawing.
Answer: The words "If directed" indicate that the removal and renewal of the rudder bearings will be paid for by a modification to the contract. Reference the attached drawings.
SECTION 0010 Q&A’s
23. Electrical: Per section 0010 to what degree of “clean all electrical power panels, test wiring and connections” is…