This is a Question and Answer document for a construction supplies procurement by the U.S. Army Corps of Engineers, Rock Island District, for the Shady Creek Ranger Facility project. The solicitation involves four Contract Line Item Numbers (CLINs) that must all be quoted together on the SF 1449 form. Required submissions include the completed SF 1449, the revised Detailed Price Breakdown CLIN 0001 Excel spreadsheet, and manufacturer product data per Section 5.3 of the Purchase Description. Quotations must be emailed to bradley.j.grothus@usace.army.mil and matthew.l.kindig@usace.army.mil by the deadline listed on page 1 of the SF 1449. The project is a small-business set-aside, though the Nonmanufacturer Rule and subcontracting limitations do not apply to this acquisition.
The contract requires supply and installation of specific construction materials, with two line items requiring the contractor (KTR) to provide both materials and installation: mineral wool insulation and two overhead garage doors. All other construction will be completed using Government labor and funds. Deliveries must be split between two locations: sheetrock to the Mississippi River Project Office at 25549 182nd Street, Pleasant Valley, IA 52767, and all other materials to Shady Creek Recreation Area at 3550 Highway 22, Muscatine, IA 52761. The thermoplastic rubber wall base quantity is 75 units (each). Structural drawings with dimensions will be provided post-award. The dumpster for general construction debris only must remain on-site from two weeks post-award through April 30, 2027. The site is a public recreation area open year-round; visitor passes are not required, though contractors must comply with applicable security requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_W912EK27QA0040001.pdf | ||
| B08_J-0001_Detailed_Price_Breakdown_CLIN_0001_Rev_2026Nov24.xlsx | XLSX spreadsheet | |
| B08_J-0002_Image_One_Shady_Creek_Rec_Area_Locator_Map.pdf | ||
| B08_J-0001_Detailed_Price_Breakdown_CLIN_0001.xlsx | XLSX spreadsheet | |
| B08_W912EK27QA004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S Army Corps of Engineers Rock Island District
Shady Creek Ranger Facility – Construction Supplies Question & Answer
Q1: In Attachment J-0001, row 35, what is the required quantity for the thermoplastic rubber wall base?
A1: The required quantity is 75. Please see the revised Detailed Price Breakdown CLIN 0001 Excel spreadsheet.
Q2: Could you confirm the correct ZIP code for the sheetrock delivery address listed in rows 38–39?
A2: The correct address for sheet rock delivery is the Mississippi River Project Office located at 25549 182nd St. Pleasant Valley, IA. 52767
Q3: Are offerors required to quote all four CLINs, or are quotations for individual CLINs acceptable?
A3: Offers must quote all four CLINS within Section B - Supplies or Services & Prices or Cost of the SF1449.
Q4: Can the Government provide architectural or structural drawings, including insulation dimensions and garage-door openings, for accurate installation pricing?
A4: Yes, drawings will be provided post-award.
Q5: For the engineered trusses, can you clarify the required design-submittal and approval process, including whether the two-week delivery window starts only after drawing approval?
A5: The two-week delivery window will apply after designs are submitted and approved.
Truss designs should be provided promptly after award so approval process can begin as soon as possible.
Q6: May offerors arrange a pre-bid site visit, or will site measurements be coordinated after award?
A6: Structural drawings, including dimensions, will be provided post-award. The building site is located in a public use recreation area. It can be visited without Government provided site-visits if desired.
Q7: Please confirm the required email address or submission method for the completed quotation and whether any additional offer documents are required beyond the SF 1449, completed pricing attachment and garage-door product data.
A7: The required email addresses for submissions are bradley.j.grothus@usace.army.mil and matthew.l.kindig@usace.army.mil. Required submissions must include: completed SF1449, inclusive of all four CLINs within Section B - Supplies or Services & Prices or Costs, completed Detailed Price Breakdown - CLIN 0001 Excel spreadsheet, and manufacturer product data in accordance with Section 5.3 of the Purchase Description.
Q8: Given the combined supply and installation requirements and the small-business set-aside, please confirm any applicable nonmanufacturer or subcontracting limitations.
A8: The Nonmanufacturer Rule and limitations on subcontracting do not apply to this acquisition.
Q9: The CLIN 0001 workbook leaves the quantity blank for the 4 × 48 × 1/8-inch thermoplastic rubber wall base. What quantity and purchasing unit should quoters use?
A9: The quantity is 75 and purchasing units will be each. Please see the revised Detailed Price Breakdown - CLIN 0001 Excel spreadsheet.
Q10: The two sheetrock rows list 25549 182nd St., Pleasant Valley, IA, with ZIP 25549.
Could you confirm the full delivery address and ZIP and whether the other materials should still go to the Muscatine location?
A10: All sheetrock shall be delivered to The Mississippi River Project Office located at 25549 182nd St. Pleasant Valley, IA. 52767. All other materials shall be delivered to Shady Creek Recreation Area located at 3550 Highway 22 Muscatine, IA. 52761.
Q11: Please confirm the official method and recipient or portal for the final quote, and whether an offer must include all four CLINs.
A11: The official method for quote submission is email to bradley.j.grothus@usace.army.mil and matthew.l.kindig@usace.army.mil by the time and date listed on page 1 of the SF1449. Offers must quote all four CLINS within Section B - Supplies or Services & Prices or Cost of the SF1449.
Q12: Page 3 section 3. states "Design and construction of the new Ranger Facility will be completed with Government funds and labor. Construction supplies for the ranger Facility shall be procured through a supply contract" yet Page 4 section 5.2 requires installation and section 5.3 also requires installation. Please resolve this conflict.
A12: Please see the revised Purchase Description language.
Q13: Page 4 section 5.4 requests a 20 yard dumpster but the cost of this varies depending on the following
(a) Contents - dirt / concrete debris costs more and may only occupy a portion of a bin versus general construction debris
(b) Length of time the bin is to be onsite
A13: The dumpster is needed for general construction debris only. The bin shall be on site for the duration of the contract - no later than two-weeks post award through 30 April, 2027 or unless otherwise stated by The Government.
Q14: On the first page it shows in line 3. - will be completed with Gov. funds "and labor."
But on the second page, line - 5.2-0002 -- provide "and install" Mineral Wool insulation.
Do we quote with the installation or material only??
A14: Two line items on this contract require KTR provided installation - installation of the garage doors and installation of the insulation. All other aspects of the building will be constructed using Government labor. For the line item referenced, the KTR shall quote material AND installation.
Q15: Also on line 5.3-0003 --- Provide and install qty 2 each Overhead Garage Door -should I quote this with installation or the door package only????
A15: Two line items on this contract require KTR provided installation - installation of the garage doors and installation of the insulation. All other aspects of the building will be constructed using Government labor. For the line item referenced, the KTR shall quote the door packages AND installation of the doors.
Q16: I assume you would use metal roof an siding for the finished out door looks, gutters, trim ect. But I do not see any reference for that here. Just the Huber-Zip system for the exterior. Should there be???
A16: The exterior steel, gutters, etc. are all being sourced outside of this solicitation.
Q17: With our Arsenal security badges for myself along with our delivery drivers, should I assume that is acceptable to the Muscatine job-site ??
Should there be???
A17: The Shady Creek Recreation Area is open to the public year-round. Visitor passes are not required to access the job site. Contractors are still required to meet the requirements under the security clause in the Purchase Description.